BRAZORIA SH 6 (0192-02-059)

Items: 72

County: BRAZORIA
Length: N/A
Highway: SH 6
District: HOUSTON
Control Number: 0192-02-059
DBE Goal: N/A
Project: F 2021(729)
Guaranty: N/A
Time: 118 WORKING DAYS
Engineer's Estimate: $6,009,004.27
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$6,009,004.27
$5,272,928.80
Over/Under Est: -12.25% -$736,075.47
Over/Under Est: -10.28% -$617,431.57
Amt Left: 2.25% $118,643.90
Over/Under Est: -6.88% -$413,527.85
Amt Left: 6.12% $322,547.62
Delta: -3.78% -$203,903.72
Subcontractor Percentage Amount
BATTERSON, LLP 1.80% $166,588.82
R & A TRANSPORT, INC. 1.52% $140,675.00
HOLES INCORPORATED 0.50% $46,274.67
RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC 0.46% $42,572.70
TRAFFIC SIGNS & LINES, LLC 0.46% $42,572.70
DUSTROL, INC. 0.14% $12,956.91
Total: 4.88% $451,640.80

Bid Items & Bid Tabulations

72 Total 0 of 72
BRAZORIA  |  SH 6  |  HOUSTON  |  0192-02-059  |  07/01/2021  |  $6,009,004.27  |  F 2021(729)  |  RESURF ROADWAY  |  118 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
REMOVING CONCRETE(MOW STRIP)
LF 450.000 $8.000 $29.000 $10.000 $12.000
BACKFILL (TY A OR B)
STA 104.120 $152.780 $233.000 $600.000 $275.000
ASPH (AC-20-5TR)
GAL 72,914.000 $3.090 $3.250 $3.300 $3.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,758.000 $114.000 $138.000 $142.000 $120.000
D-GR HMA(SQ) TY-F PG64-22
TON 21.000 $300.000 $600.000 $500.000 $1,000.000
TACK COAT
GAL 99.000 $6.290 $2.000 $2.600 $4.000
TOM (ASPHALT) PG 76-22
TON 1,799.000 $145.000 $121.500 $128.000 $131.000
TOM-C (AGGREGATE) SAC-A
TON 12,138.000 $110.000 $121.500 $128.000 $131.000
TOM - F (AGGREGATE) SAC - A
TON 12,158.000 $129.500 $121.500 $128.000 $131.000
TACK COAT
GAL 13,766.000 $3.500 $2.000 $2.600 $4.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 4,134.000 $5.000 $8.750 $15.000 $18.000
FULL - DEPTH REPAIR CRCP (8")
SY 1,400.000 $275.000 $271.000 $270.000 $275.000
RIPRAP (MOW STRIP)(4 IN)
CY 51.240 $450.000 $517.000 $550.000 $850.000
MOBILIZATION
LS 1.000 $291,000.000 $185,000.000 $125,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $13,400.000 $925.000 $4,500.000
CONC DIRECTIONAL ISLAND
LF 558.000 $50.000 $42.000 $43.000 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $21.000 $24.300 $25.400 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,800.000 $1,960.000 $2,035.000 $2,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 6.000 $850.000 $547.000 $745.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $2.750 $3.000 $2.150 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,600.000 $2,675.000 $2,915.000 $2,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $350.000 $345.000 $160.000 $350.000
CONDT (PVC) (SCH 80) (2")
LF 145.000 $9.530 $15.000 $9.600 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 285.000 $21.480 $15.500 $19.250 $18.000
CONDT (RM) (2")
LF 30.000 $44.560 $32.000 $37.500 $40.000
ELEC CONDR (NO.6) BARE
LF 395.000 $1.330 $1.500 $1.800 $2.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $1,257.730 $950.000 $910.000 $900.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $18.000 $19.000 $22.500 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $32.000 $27.000 $29.000 $40.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 61,830.000 $0.290 $0.240 $0.250 $0.170
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 62,472.000 $0.250 $0.240 $0.250 $0.170
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,543.000 $0.580 $0.420 $0.450 $0.420
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,850.000 $1.920 $0.920 $1.000 $0.920
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,460.000 $3.010 $1.840 $2.000 $1.840
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 39.000 $58.120 $62.000 $66.000 $62.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 33.000 $115.420 $75.000 $80.000 $75.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 36.000 $65.020 $62.000 $66.000 $62.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 29,880.000 $0.260 $0.240 $0.250 $0.170
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 123,600.000 $0.250 $0.240 $0.250 $0.170
WK ZN PAV MRK REMOV (W)(SYMBOL)
EA 6.000 $65.020 $55.000 $60.000 $55.000
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 375.000 $3.380 $1.500 $1.600 $1.500
WK ZN PAV MRK REMOV (W) (BIKE DOT)
EA 240.000 $5.000 $3.000 $3.200 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,181.000 $1.080 $0.820 $0.900 $0.820
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 950.000 $3.300 $3.000 $3.200 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 820.000 $6.600 $6.000 $6.400 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 13.000 $157.610 $125.000 $135.000 $125.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 11.000 $186.240 $135.000 $145.000 $135.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $156.720 $125.000 $135.000 $125.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 2.000 $206.970 $91.000 $100.000 $91.000
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
EA 80.000 $2.590 $3.250 $3.500 $3.250
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 125.000 $3.620 $3.000 $3.200 $3.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 20,610.000 $0.710 $0.450 $0.500 $0.450
REFL PAV MRK TY II (Y) 24" (SLD)
LF 558.000 $2.910 $2.000 $2.150 $2.000
REFL PAV MRK TY II (Y) (MED NOSE)
EA 1.000 $282.500 $100.000 $110.000 $100.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 20,610.000 $0.620 $0.400 $0.450 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 20,824.000 $1.290 $0.400 $0.450 $0.400
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 9,960.000 $5.000 $0.400 $0.450 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 41,200.000 $1.070 $0.400 $0.450 $0.400
REFL PAV MRKR TY I-C
EA 1,150.000 $4.450 $3.000 $3.200 $3.000
REFL PAV MRKR TY II-A-A
EA 2,070.000 $4.320 $3.000 $3.200 $3.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 35.000 $250.000 $100.000 $105.000 $140.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 10.000 $250.000 $150.000 $160.000 $150.000
INSTALL OF LUMINAIRE MAST ARMS
EA 2.000 $1,833.330 $480.000 $515.000 $1,700.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 240.000 $500.000 $244.240 $240.000 $250.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 25,000.000 $6.000 $2.440 $2.400 $2.500
FIBER REINF POLYMER PATCHNG MATLS (SPL)
LB 175,000.000 $5.000 $2.440 $2.400 $2.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 250.000 $89.710 $30.000 $53.500 $100.000
TMA (STATIONARY)
DAY 81.000 $209.830 $237.500 $160.000 $200.000
TMA (MOBILE OPERATION)
DAY 27.000 $529.210 $588.000 $260.000 $200.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 16.000 $544.290 $770.000 $825.000 $900.000
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 16.000 $493.690 $770.000 $825.000 $600.000
VIVDS CAM ASSY (REMOVE)
EA 7.000 $282.990 $200.000 $215.000 $200.000
Totals: $6,009,004.274 $5,272,928.800 $5,391,572.700 $5,595,476.420