Show Job Controls
Bid Cobra

BRAZORIA SH 36 (0188-06-046)

Items: 139

County: BRAZORIA
Length: N/A
Highway: SH 36
District: HOUSTON
Control Number: 0188-06-046
DBE Goal: N/A
Project: C 188-6-46
Guaranty: N/A
Time: 719 WORKING DAYS
Engineer's Estimate: $42,018,665.84
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
MARIA APONTE
RAJENDRA HADA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$42,018,665.84
$32,995,991.98
Over/Under Est: -21.47% -$9,022,673.86
$36,318,822.72
Over/Under Est: -13.57% -$5,699,843.12
Amt Left: 10.07% $3,322,830.74
Over/Under Est: -8.41% -$3,534,889.73
Amt Left: 16.63% $5,487,784.13
Delta: -5.96% -$2,164,953.39
Over/Under Est: 13.16% $5,527,701.13
Amt Left: 44.1% $14,550,374.99
Delta: -23.55% -$9,062,590.86
Subcontractor Percentage Amount
GMJ PAVING COMPANY LLC 7.65% $2,862,808.25
QUALITY TURF FARMS, L.C. 1.46% $546,366.02
WHO-B TRUCKING, INC. 1.25% $467,779.13
ALLSTATE SIGNAL & CONSTRUCTION, LLC 1.12% $419,130.10
A BROTHERS MILLING, LLC 0.81% $303,120.87
PROFESSIONAL TRAFFIC CONTROL LLC 0.66% $246,987.38
HERMANOS STEEL, LLC 0.53% $198,338.35
C.G. ANTHONY DELIVERIES, LLC 0.48% $179,627.18
WILLOW CITY SIGN & RAIL, INC. 0.31% $116,009.22
ROADWAY CONSTRUCTION, INC. 0.25% $93,555.83
CPAVE, INC. 0.25% $93,555.83
MILSTEAD HIGHWAY SERVICES, LLC 0.21% $78,586.89
PROTECTIVE RESOLUTION, LLC 0.19% $71,102.43
PENHALL COMPANY 0.18% $67,360.19
ANTIGO CONSTRUCTION, INC. 0.18% $67,360.19
Total: 15.53% $5,811,687.86

Bid Items & Bid Tabulations

139 Total 0 of 139
BRAZORIA  |  SH 36  |  HOUSTON  |  0188-06-046  |  08/04/2022  |  $42,018,665.84  |  C 188-6-46  |  WIDEN ROAD - ADD LANES  |  719 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
SER CONSTRUCTION PARTNERS, LLC
PULICE CONSTRUCTION, INC.
PREPARING ROW
STA 156.000 $12,000.000 $18,750.000 $23,258.010 $14,000.000 $30,478.440
REMOVING CONC (PAV)
SY 49,722.000 $13.000 $1.760 $10.000 $0.300 $15.000
REMOVING CONC (RIPRAP)
SY 781.000 $11.000 $15.970 $26.000 $5.900 $4.000
REMOVING CONC (DRIVEWAYS)
SY 3,922.000 $4.000 $3.240 $17.000 $3.700 $4.000
REMOVING CONC (CTB)
LF 5,160.000 $8.000 $13.880 $23.000 $16.000 $12.100
REMOVING STAB BASE AND ASPH PAV (6")
SY 34,093.000 $10.000 $2.270 $3.000 $2.600 $3.100
REMOVING STAB BASE & ASPH PAV(14")
SY 31,366.000 $10.000 $5.130 $6.000 $2.900 $4.980
REMOVING STAB BASE & ASPH PAV (12")
SY 10,588.000 $37.000 $4.360 $5.000 $5.900 $5.390
REMOVING STAB BASE AND ASPH PAV (10")
SY 26,024.000 $16.000 $5.000 $4.900 $3.100 $4.930
EXCAVATION (ROADWAY)
CY 66,500.000 $18.000 $3.000 $5.000 $5.900 $9.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 145,164.000 $14.000 $12.000 $14.000 $10.800 $9.000
BLOCK SODDING
SY 142,183.000 $3.000 $2.680 $4.160 $4.600 $3.360
STRAW OR HAY MULCH
SY 27,179.000 $0.200 $0.180 $0.420 $0.200 $0.230
DRILL SEED (TEMP)(WARM OR COOL)
SY 27,179.000 $0.100 $0.200 $0.100 $0.300 $0.250
FERTILIZER
AC 35.000 $600.000 $500.000 $841.750 $735.000 $626.360
VEGETATIVE WATERING
MG 4,199.000 $20.000 $19.360 $42.770 $17.300 $27.560
LIME TRT (EXST MATL) (6")
SY 153,088.000 $3.000 $2.310 $1.950 $3.000 $2.900
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,066.700 $200.000 $195.450 $288.750 $289.300 $265.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 153,088.000 $25.000 $7.180 $4.800 $13.900 $13.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 13,843.000 $120.000 $75.220 $90.000 $111.100 $155.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 8,416.000 $135.000 $83.150 $111.730 $118.000 $165.000
SALV, HAUL & STKPL RCL APH PV (3")
SY 12,644.000 $2.000 $1.280 $2.000 $4.900 $4.480
SALV,HAUL & STKPL RCL APH PV (2")
SY 33,471.000 $3.000 $1.000 $1.800 $1.000 $1.260
SALV, HAUL & STKPL RCL ASH PV (12")
SY 17,777.000 $5.000 $4.730 $5.000 $1.000 $7.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 150.000 $91.000 $29.500 $41.270 $66.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 100.000 $35.000 $44.260 $73.470 $53.400 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 100.000 $35.000 $44.260 $60.950 $59.900 $100.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 136,859.000 $95.000 $88.000 $70.500 $96.500 $106.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 9,230.000 $130.000 $140.000 $87.000 $138.500 $180.000
FULL - DEPTH REPAIR CRCP (10")
SY 150.000 $400.000 $163.410 $250.000 $145.000 $160.000
CEM STABIL BKFL
CY 2,661.000 $70.000 $36.990 $75.000 $58.800 $75.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 170.000 $258.150 $250.000 $185.400 $194.700 $232.250
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 44.000 $500.000 $240.770 $300.000 $577.500 $200.000
RIPRAP (CONC) (CL B) (4")
CY 5.950 $430.270 $534.900 $420.000 $617.000 $400.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 144.000 $500.000 $417.890 $850.000 $561.800 $500.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 600.000 $1,200.000 $555.830 $950.000 $673.700 $800.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 168.000 $900.000 $736.390 $1,800.000 $787.200 $1,200.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 912.000 $1,000.000 $648.170 $2,000.000 $834.100 $1,000.000
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 256.000 $1,400.000 $1,116.830 $2,800.000 $1,256.900 $1,500.000
RC PIPE (CL III)(18 IN)
LF 140.000 $76.000 $69.220 $170.000 $73.300 $100.000
RC PIPE (CL III)(24 IN)
LF 288.000 $72.000 $55.210 $200.000 $83.700 $120.000
SET (TY I)(S=10 FT)(HW=8FT)(4:1)(C)
EA 8.000 $9,000.000 $25,681.680 $29,000.000 $37,882.300 $26,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 3.000 $9,000.000 $7,028.990 $11,000.000 $7,379.500 $12,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $9,000.000 $7,747.750 $17,000.000 $8,929.200 $19,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 6.000 $1,000.000 $8,017.920 $19,000.000 $7,964.900 $30,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 18.000 $10,000.000 $9,223.000 $18,500.000 $10,482.200 $10,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $12,000.000 $9,841.600 $20,000.000 $11,594.500 $12,000.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (C)
EA 6.000 $12,000.000 $12,828.310 $20,500.000 $18,050.000 $50,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 12.000 $12,000.000 $8,111.160 $25,400.000 $12,436.600 $55,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (C)
EA 12.000 $13,000.000 $13,822.760 $29,000.000 $18,658.800 $70,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $1,350.000 $1,691.070 $1,000.000 $861.500 $3,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 56.000 $1,600.000 $1,881.580 $1,600.000 $1,316.200 $3,000.000
CLEAN EXIST CULVERTS
EA 37.000 $2,000.000 $2,573.760 $3,500.000 $3,500.000 $3,000.000
REMOV STR (INLET)
EA 1.000 $600.000 $1,461.570 $450.000 $1,622.300 $2,500.000
REMOV STR (SET)
EA 8.000 $400.000 $499.110 $480.000 $165.400 $1,500.000
REMOV STR (WINGWALL)
EA 14.000 $2,000.000 $3,186.110 $10,000.000 $10,000.000 $3,000.000
REMOV STR (PIPE)
LF 1,211.000 $20.000 $12.090 $20.000 $19.400 $25.000
MOBILIZATION
LS 1.000 $3,766,606.000 $3,000,000.000 $3,628,250.480 $3,700,000.000 $4,754,636.700
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 48.000 $7,900.000 $5,367.770 $1,786.130 $6,000.000 $9,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 200.000 $60.000 $32.000 $161.230 $36.800 $40.090
ROCK FILTER DAMS (REMOVE)
LF 200.000 $10.000 $10.000 $18.990 $15.800 $12.530
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 622.000 $30.000 $30.000 $47.640 $21.900 $37.580
CONSTRUCTION EXITS (REMOVE)
SY 622.000 $9.000 $10.000 $9.320 $5.900 $12.530
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,840.000 $3.000 $3.000 $7.680 $2.600 $3.760
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,840.000 $1.000 $1.000 $1.020 $1.400 $1.250
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 17,850.000 $12.000 $9.380 $17.000 $17.100 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 37,470.000 $9.000 $1.510 $4.000 $5.900 $6.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 17,850.000 $10.000 $9.380 $5.000 $13.100 $12.000
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 5,040.000 $100.000 $67.380 $10.000 $107.600 $115.000
INTERSECTIONS (CONC)
SY 2,087.000 $80.000 $65.240 $119.000 $124.700 $175.000
DRIVEWAYS (CONC)
SY 2,834.000 $77.000 $62.620 $74.450 $84.800 $95.000
CONC MEDIAN
SY 2,420.000 $80.000 $34.840 $88.620 $74.800 $90.000
CONC DIRECTIONAL ISLAND
LF 222.000 $45.000 $31.720 $86.130 $31.900 $80.000
CONCRETE MEDIAN (NOSE)
SY 22.000 $55.000 $238.950 $86.860 $87.200 $90.000
REMOVE METAL BEAM GUARD FENCE
LF 2,250.000 $2.500 $0.500 $0.500 $7.900 $2.620
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $140.000 $140.000 $341.300 $235.750
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $250.000 $140.000 $140.000 $341.300 $235.750
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $220.000 $160.000 $160.000 $341.300 $275.030
GUARDRAIL END TREATMENT (REMOVE)
EA 23.000 $250.000 $220.000 $220.000 $393.800 $425.650
CRASH CUSH ATTEN (MOVE & RESET)
EA 33.000 $2,200.000 $1,600.000 $1,600.000 $2,362.500 $3,339.720
CRASH CUSH ATTEN (REMOVE)
EA 15.000 $900.000 $750.000 $750.000 $2,100.000 $1,407.920
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 16.000 $24,000.000 $26,750.000 $26,750.000 $25,830.000 $25,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 7.000 $230.000 $184.380 $250.000 $231.000 $203.000
REMOVE RD IL ASM (CTB MOUNT)
EA 14.000 $252.920 $500.000 $250.000 $262.500 $313.180
REMOVE RD IL ASM (TRANS-BASE)
EA 13.000 $928.780 $500.000 $250.000 $262.500 $313.180
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 16.000 $4,646.980 $7,925.000 $5,142.500 $5,399.600 $6,442.080
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 17.000 $3,960.510 $5,700.000 $4,297.500 $4,512.400 $5,383.540
CONDT (PVC) (SCH 80) (2")
LF 5,433.000 $10.710 $12.850 $10.150 $10.700 $12.720
CONDT (PVC) (SCH 80) (2") (BORE)
LF 458.000 $23.760 $16.000 $13.670 $14.400 $17.120
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
LF 3,600.000 $10.580 $21.000 $17.340 $18.200 $21.720
CONDT (RM) (2")
LF 470.000 $31.140 $38.000 $26.980 $28.300 $33.800
ELEC CONDR (NO.8) BARE
LF 10,172.000 $1.300 $1.850 $1.590 $1.700 $1.990
ELEC CONDR (NO.8) INSULATED
LF 21,404.000 $1.520 $1.900 $1.660 $1.700 $2.080
GROUND BOX TY D (162922)W/APRON
EA 13.000 $1,088.000 $1,300.000 $1,033.000 $1,084.700 $1,294.050
REMOVE ELECTRICAL SERVICES
EA 3.000 $571.530 $650.000 $100.000 $105.000 $125.270
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 3.000 $6,744.160 $6,500.000 $7,505.000 $7,880.300 $9,401.620
ALUMINUM SIGNS (TY A)
SF 544.000 $30.000 $18.000 $18.000 $21.700 $30.690
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 43.000 $550.000 $515.000 $515.000 $448.900 $720.310
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $750.000 $660.000 $660.000 $598.200 $1,096.130
REMOVE SM RD SN SUP&AM
EA 58.000 $88.000 $46.000 $46.000 $62.200 $106.480
REMOVE LRSA
EA 1.000 $1,672.000 $800.000 $800.000 $1,512.000 $739.100
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 101.000 $40.000 $20.000 $20.000 $20.400 $27.370
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 101.000 $25.000 $20.000 $20.000 $15.100 $27.370
INSTL OM ASSM (OM-2Y)(WC)GND
EA 16.000 $65.000 $55.000 $55.000 $54.800 $72.660
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 70,700.000 $2.000 $1.000 $1.000 $1.100 $1.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 600.000 $2.000 $1.500 $1.500 $1.600 $1.880
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 72,400.000 $2.000 $1.000 $1.000 $1.100 $1.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 28.000 $200.000 $185.000 $185.000 $194.300 $231.750
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $250.000 $225.000 $225.000 $236.300 $281.860
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 2.000 $300.000 $2,000.000 $2,000.000 $2,100.000 $2,505.430
REFL PAV MRKR TY I-C
EA 407.000 $4.000 $5.500 $5.500 $5.800 $6.890
REFL PAV MRKR TY II-A-A
EA 1,009.000 $4.000 $5.500 $5.500 $5.800 $6.890
ELIM EXT PAV MRK & MRKS (6")
LF 51,300.000 $0.200 $0.350 $0.350 $0.400 $0.440
ELIM EXT PAV MRK & MRKS (12")
LF 100.000 $1.400 $1.000 $1.000 $1.100 $1.250
PAV SURF PREP FOR MRK (6")
LF 81,675.000 $0.100 $0.030 $0.030 $0.030 $0.040
PAV SURF PREP FOR MRK (8")
LF 300.000 $0.150 $0.040 $0.040 $0.040 $0.050
PAV SURF PREP FOR MRK (24")
LF 192.000 $0.600 $0.120 $0.120 $0.100 $0.150
PAV SURF PREP FOR MRK (ARROW)
EA 28.000 $16.500 $5.000 $5.000 $5.300 $6.260
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $20.000 $8.000 $8.000 $8.400 $10.020
FULL - WIDTH MOWING
CYC 12.000 $3,000.000 $2,655.040 $3,789.130 $567.000 $6,263.570
LITTER REMOVAL
CYC 12.000 $2,000.000 $1,106.270 $1,800.000 $954.500 $2,254.890
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 16.000 $800.000 $737.510 $2,000.000 $954.500 $1,503.260
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 48.000 $1,500.000 $811.260 $2,500.000 $535.500 $2,505.430
TACK COAT
GAL 1,553.000 $5.000 $2.460 $5.130 $21.000 $7.380
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 2,799.000 $180.000 $140.430 $125.000 $118.700 $206.770
REPLACE 19-PILE DOLPHIN (50 FT)
EA 4.000 $100,000.000 $200,000.000 $190,500.000 $330,000.000 $183,000.000
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 228.000 $4.000 $34.290 $120.000 $64.300 $80.000
THERMO PIPE(24")(PP)(TY S)(TY II)
LF 1,650.000 $80.000 $46.720 $90.000 $82.800 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 112.000 $70.000 $19.840 $59.540 $110.300 $388.400
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 32,000.000 $0.440 $0.700 $0.700 $0.700 $0.880
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 7,800.000 $0.600 $0.750 $0.750 $0.800 $0.940
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 300.000 $1.000 $1.500 $1.500 $1.600 $1.880
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 192.000 $5.700 $6.000 $6.000 $6.300 $7.520
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 35,000.000 $0.400 $0.700 $0.700 $0.700 $0.880
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 6,075.000 $0.600 $0.750 $0.750 $0.800 $0.940
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 7,800.000 $0.600 $0.850 $0.850 $0.900 $1.060
SOLAR-PWR MARINE NAV LIGHT SYSTEM
LS 1.000 $100,000.000 $19,200.000 $25,500.000 $29,975.400 $35,807.590
TMA (STATIONARY)
DAY 400.000 $165.000 $114.760 $144.330 $137.800 $215.550
TMA (MOBILE OPERATION)
HR 320.000 $180.000 $47.460 $73.490 $37.800 $151.480
Totals: $42,018,665.836 $32,995,991.990 $36,318,822.725 $38,483,776.110 $47,546,366.970