BRAZORIA SH 36 (0188-05-027)

Items: 318

County: BRAZORIA
Length: N/A
Highway: SH 36
District: HOUSTON
Control Number: 0188-05-027
DBE Goal: N/A
Project: NH 2021(728)
Guaranty: N/A
Time: 824 WORKING DAYS
Engineer's Estimate: $91,239,424.71
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: RECONSTRUCT & WIDEN ROAD FROM 2 TO 4 LANE DIVIDED
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$91,239,424.71
$96,532,489.41
Over/Under Est: 5.8% $5,293,064.70
$96,611,622.36
Over/Under Est: 5.89% $5,372,197.65
Amt Left: 0.08% $79,132.95
Subcontractor Percentage Amount
JOSLIN CONSTRUCTION TEXAS, LLC 8.58% $9,491,010.14
THIRD COAST SERVICES LLC 4.80% $5,309,656.02
ANDERSON DUMP TRUCKING, INC. 3.54% $3,915,871.32
GMJ PAVING COMPANY LLC 3.14% $3,473,399.98
C.G. ANTHONY DELIVERIES, LLC 3.09% $3,418,091.06
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.55% $2,820,754.76
ROADWAY CONSTRUCTION, INC. 2.19% $2,422,530.56
HB FARMER FOUNDATION, LLC 1.43% $1,581,835.02
WHO-B TRUCKING, INC. 1.20% $1,327,414.01
WILLOW CITY SIGN & RAIL, INC. 1.12% $1,238,919.74
DUSTROL, INC. 0.57% $630,521.65
HERMANOS STEEL, LLC 0.52% $575,212.74
PROFESSIONAL TRAFFIC CONTROL LLC 0.40% $442,471.34
JB PINNACLE GROUP, LLC 0.24% $265,482.80
PRIMATE CONSTRUCTION, LP 0.24% $265,482.80
TRAFFIC LAW ENFORCEMENT LLC 0.10% $110,617.83
PROTECTIVE RESOLUTION, LLC 0.10% $110,617.83
G-IRON LOGISTICS LLC 0.09% $99,556.05
ANTIGO CONSTRUCTION, INC. 0.09% $99,556.05
JH CONTRACT FIELD SERVICES, LLC 0.08% $88,494.27
SCOTT DERR PAINTING CO, LLC 0.04% $44,247.13
STAR CONCRETE PUMPING 0.03% $33,185.35
AIMS COMPANIES 0.03% $33,185.35
CURB PLANET INC. 0.01% $11,061.78
TEX-LINE, INC. 0.00% $0.00
Total: 34.18% $37,809,175.58

Bid Items & Bid Tabulations

318 Total 0 of 318
BRAZORIA  |  SH 36  |  HOUSTON  |  0188-05-027  |  08/04/2021  |  $91,239,424.71  |  NH 2021(728)  |  RECON & WIDEN ROAD FROM 2 TO 4 LANE...  |  824 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
PREPARING ROW
STA 509.000 $12,000.000 $15,333.940 $13,530.000
REMOVING CONC (PAV)
SY 102,949.000 $4.750 $2.010 $5.000
REMOVING CONC (DRIVEWAYS)
SY 5,920.000 $5.000 $4.390 $7.000
REMOVE STAB BASE & ASPH PAV (24")
SY 7,489.000 $7.000 $3.120 $11.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 102,949.000 $4.000 $1.000 $5.200
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 58,481.000 $4.000 $1.000 $7.600
REMOV STAB BASE AND ASPH PAV (22")
SY 20,930.000 $4.000 $1.000 $13.250
RMV TRT & UNTRT BASE & ASPH PV(10"-15")
SY 91,326.000 $5.000 $2.000 $5.450
EXCAVATION (ROADWAY)
CY 192,493.000 $5.000 $2.500 $16.370
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 646,521.000 $8.000 $5.300 $4.300
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 19,176.000 $15.000 $36.840 $45.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 23,029.000 $15.000 $36.840 $45.000
COMPOST MANUF TOPSOIL (4")
SY 241,823.000 $0.800 $2.660 $0.560
BLOCK SODDING
SY 468,272.000 $2.000 $2.560 $2.560
STRAW OR HAY MULCH
SY 743,351.000 $0.190 $0.190 $0.190
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 241,823.000 $0.160 $0.080 $0.080
DRILL SEED (TEMP)(WARM OR COOL)
SY 743,351.000 $0.120 $0.060 $0.060
FERTILIZER
AC 301.000 $450.000 $572.840 $572.840
VEGETATIVE WATERING
MG 36,036.000 $14.000 $15.000 $10.000
LIME TRT (EXST MATL) (6")
SY 532,164.000 $2.000 $2.490 $2.500
LIME (HYD, COM, OR QK(SLURRY))
TON 8,013.000 $175.000 $175.150 $174.080
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 532,164.000 $7.000 $10.220 $6.790
ASPHALT STAB BASE (GR 4)(PG 64)
TON 36,149.000 $74.000 $82.920 $79.500
D-GR HMA(SQ) TY-C SAC-B PG70-22
TON 1,183.000 $74.000 $110.560 $106.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 268.000 $160.000 $110.560 $106.000
TACK COAT
GAL 674.000 $2.500 $3.870 $3.710
CONC PVMT (CONT REINF - CRCP) (10")
SY 486,770.000 $53.000 $54.000 $54.340
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 7,984.000 $87.000 $125.000 $88.300
STRUCT EXCAV
CY 23,029.000 $2.000 $1.970 $6.500
CEM STABIL BKFL
CY 20,564.000 $80.000 $35.300 $40.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,418.000 $80.000 $35.300 $40.000
TRENCH EXCAVATION PROTECTION
LF 16,112.000 $1.650 $2.330 $1.000
TEMPORARY SPL SHORING
SF 78,271.000 $20.000 $5.000 $1.000
DRILL SHAFT (18 IN)
LF 180.000 $95.000 $106.730 $73.160
DRILL SHAFT (30 IN)
LF 2,192.000 $130.000 $113.260 $124.550
DRILL SHAFT (36 IN)
LF 2,850.000 $170.000 $170.570 $192.140
DRILL SHAFT (42 IN)
LF 2,238.000 $166.000 $215.770 $239.090
DRILL SHAFT (54 IN)
LF 140.000 $368.000 $415.250 $692.010
DRILL SHAFT (84 IN)
LF 738.000 $550.000 $821.790 $1,033.670
DRILL SHAFT (SIGN MTS) (12 IN)
LF 14.000 $117.000 $85.000 $149.380
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 108.000 $228.000 $209.120 $264.010
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 22.000 $300.000 $251.780 $278.140
CL C CONC (ABUT)
CY 275.300 $900.000 $847.150 $950.000
CL C CONC (CAP)
CY 466.100 $900.000 $1,319.150 $950.000
CL C CONC (COLUMN)
CY 211.800 $900.000 $1,272.020 $950.000
CL C CONC (MISC)
CY 11.000 $1,027.000 $326.450 $1,000.000
REINF CONC SLAB
SF 58,780.000 $12.000 $16.660 $12.000
REINF CONC SLAB (BOX BEAM)
SF 14,121.000 $12.000 $11.730 $12.000
SHEAR KEY
CY 77.100 $210.000 $214.090 $237.010
RETAINING WALL (MSE) (WAVE SCHEME)
SF 87,403.000 $40.000 $52.100 $50.400
PRESTR CONC BOX BEAM (4B20)
LF 642.000 $200.000 $155.850 $168.000
PRESTR CONC BOX BEAM (5B20)
LF 2,247.000 $200.000 $157.270 $168.000
PRESTR CONC GIRDER (TX28)
LF 3,190.020 $80.000 $168.190 $168.000
PRESTR CONC GIRDER (TX54)
LF 4,094.410 $95.000 $155.330 $168.000
RIPRAP (CONC)(4 IN)
CY 2,561.000 $400.000 $372.660 $375.870
RIPRAP (CONC)(CL B)
CY 24.750 $395.000 $384.330 $390.870
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 260.000 $420.000 $408.200 $400.870
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 71.000 $135.000 $108.930 $209.080
RIPRAP (MOW STRIP)(4 IN)
CY 238.350 $470.000 $458.990 $465.870
RAIL (TY T223)
LF 356.000 $100.000 $111.660 $181.300
RAIL (TY SSTR)
LF 8,356.000 $30.000 $36.000 $46.300
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 623.000 $110.000 $139.100 $163.130
CONC BOX CULV (3 FT X 2 FT)
LF 95.000 $155.000 $169.110 $222.640
CONC BOX CULV (3 FT X 3 FT)
LF 158.000 $200.000 $183.750 $198.130
CONC BOX CULV (4 FT X 2 FT)
LF 1,132.000 $166.000 $180.860 $190.670
CONC BOX CULV (4 FT X 3 FT)
LF 336.000 $225.000 $209.230 $200.270
CONC BOX CULV (4 FT X 4 FT)
LF 363.000 $255.000 $232.190 $215.500
CONC BOX CULV (5 FT X 2 FT)
LF 1,117.000 $200.000 $248.060 $222.380
CONC BOX CULV (5 FT X 3 FT)
LF 780.000 $285.000 $256.770 $239.320
CONC BOX CULV (5 FT X 4 FT)
LF 363.000 $324.000 $286.210 $257.960
CONC BOX CULV (6 FT X 3 FT)
LF 1,677.000 $347.000 $334.670 $291.550
CONC BOX CULV (6 FT X 4 FT)
LF 4,403.000 $330.000 $362.150 $311.000
CONC BOX CULV (7 FT X 4 FT)
LF 4,525.000 $400.000 $445.330 $375.250
RC PIPE (CL III)(18 IN)
LF 5,168.000 $65.000 $57.690 $66.750
RC PIPE (CL III)(24 IN)
LF 5,771.000 $70.000 $64.960 $65.440
RC PIPE (CL III)(30 IN)
LF 689.000 $85.000 $73.730 $89.230
RC PIPE (CL III)(36 IN)
LF 740.000 $100.000 $100.400 $118.390
RC PIPE (CL III)(42 IN)
LF 492.000 $115.000 $141.680 $132.560
RC PIPE (CL III)(48 IN)
LF 817.000 $150.000 $147.700 $129.820
RC PIPE (CL III)(54 IN)
LF 404.000 $187.000 $212.600 $198.470
RC PIPE (ARCH)(CL III)(DES 1)
LF 153.000 $155.000 $111.020 $138.010
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $4,300.000 $4,954.340 $7,608.580
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $5,900.000 $5,926.760 $8,553.580
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $8,600.000 $8,995.310 $9,268.330
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 4.000 $10,000.000 $16,429.790 $15,890.240
INLET (COMPL)(TY A)
EA 72.000 $3,700.000 $4,357.350 $3,270.230
INLET (COMPL)(TY AZ)
EA 9.000 $4,000.000 $5,521.160 $4,085.230
INLET (COMPL)(TY AZR)
EA 8.000 $6,900.000 $6,496.160 $5,060.090
MANH (COMPL)(TY A)
EA 2.000 $6,300.000 $5,555.380 $5,604.210
INLET (COMPL)(CURB)(TY C1)
EA 73.000 $6,000.000 $5,701.350 $4,702.190
HEADWALL (CH - FW - 30) (DIA= 48 IN)
EA 4.000 $8,000.000 $5,385.130 $10,801.350
HEADWALL (CH - FW - 30) (DIA= 54 IN)
EA 2.000 $9,000.000 $9,744.230 $10,786.670
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $5,910.000 $13,727.400 $18,484.960
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $12,200.000 $7,726.610 $13,418.520
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $18,000.000 $6,190.680 $27,651.640
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $6,500.000 $18,340.250 $14,411.350
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $5,000.000 $3,312.380 $6,983.630
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $3,500.000 $4,296.020 $7,508.630
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $7,600.000 $3,924.360 $7,808.630
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 14.000 $7,200.000 $3,788.700 $7,378.820
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $7,000.000 $4,732.350 $9,208.860
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $6,900.000 $3,632.350 $7,553.630
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 4.000 $4,300.000 $5,934.530 $9,918.980
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $3,100.000 $4,320.260 $8,943.980
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 3.000 $7,000.000 $8,011.930 $11,513.860
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $4,000.000 $4,939.910 $9,948.860
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $15,600.000 $6,430.420 $10,468.630
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (P)
EA 1.000 $14,725.000 $11,509.430 $14,914.340
SET (TY I)(S= 7 FT)(HW= 5 FT)(6:1) (P)
EA 1.000 $10,100.000 $14,390.160 $16,029.340
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 10.000 $890.000 $1,372.930 $717.100
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 65.000 $1,000.000 $1,414.850 $782.100
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 85.000 $1,000.000 $1,592.000 $827.100
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 3.000 $1,300.000 $7,654.400 $775.480
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 38.000 $1,300.000 $1,671.020 $935.470
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 189.000 $1,400.000 $1,875.220 $1,020.470
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 30.000 $2,300.000 $3,509.650 $3,847.740
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,700.000 $2,874.800 $2,187.060
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 8.000 $2,700.000 $3,253.260 $1,645.690
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 9.000 $3,000.000 $4,676.610 $5,387.740
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 4.000 $4,000.000 $4,281.480 $6,467.520
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 5.000 $7,465.000 $7,221.550 $9,107.530
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 4.000 $4,000.000 $4,959.390 $6,497.520
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 1.000 $6,076.000 $8,740.200 $10,028.220
SET (TY II) (54 IN) (RCP) (4: 1) (C)
EA 2.000 $8,000.000 $6,232.260 $9,152.540
SET (TY II) (DES 1) (RCP) (3: 1) (C)
EA 3.000 $3,000.000 $2,457.980 $775.480
SET (TY II) (DES 1) (RCP) (4: 1) (C)
EA 1.000 $2,500.000 $2,581.750 $935.470
REMOV STR (INLET)
EA 5.000 $370.000 $1,662.290 $1,000.000
REMOV STR (MANHOLE)
EA 1.000 $375.000 $1,692.290 $1,000.000
REMOV STR (SET)
EA 288.000 $420.000 $409.010 $300.000
REMOV STR (WINGWALL)
EA 16.000 $1,500.000 $409.010 $1,000.000
REMOV STR (PIPE)
LF 8,655.000 $16.000 $11.150 $20.000
REMOV STR (BOX CULVERT)
LF 1,282.000 $40.000 $34.280 $30.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $50,000.000 $77,242.940 $50,000.000
MOBILIZATION
LS 1.000 $6,984,000.000 $8,075,000.000 $9,750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 39.000 $6,000.000 $5,048.450 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 864.000 $30.000 $23.780 $23.780
ROCK FILTER DAMS (REMOVE)
LF 864.000 $9.000 $7.010 $7.010
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,333.000 $26.000 $26.730 $26.730
CONSTRUCTION EXITS (REMOVE)
SY 2,333.000 $7.500 $6.130 $6.130
TEMP SEDMT CONT FENCE (INSTALL)
LF 61,472.000 $2.320 $1.840 $1.840
TEMP SEDMT CONT FENCE (REMOVE)
LF 61,472.000 $0.650 $0.370 $0.370
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,080.000 $3.200 $3.060 $3.060
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 36,040.000 $4.160 $3.720 $3.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 37,120.000 $0.800 $0.370 $0.370
CONSTRUCTING DETOURS
SY 9,812.000 $70.000 $63.850 $69.880
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 10,055.000 $25.000 $35.870 $20.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,480.000 $41.000 $38.450 $20.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 360.000 $43.000 $38.110 $20.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 10,700.000 $6.000 $1.270 $1.870
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 6,520.000 $3.600 $2.560 $3.360
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 380.000 $4.500 $7.140 $2.870
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 10,055.000 $9.000 $5.520 $8.680
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 4,480.000 $6.000 $6.370 $8.390
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 360.000 $7.000 $9.110 $10.330
CONC CURB (MONO) (TY II)
LF 20,739.000 $5.000 $1.930 $5.000
CONC CURB (U-TURN)
LF 891.000 $34.000 $3.210 $51.000
DRIVEWAYS (ACP)
SY 656.000 $40.000 $19.900 $23.620
DRIVEWAYS (CONC) (HES)
SY 15,063.000 $70.000 $70.300 $66.540
CURB RAMPS (TY 7)
EA 4.000 $1,800.000 $1,958.700 $2,313.520
CONC MEDIAN
SY 497.000 $67.000 $69.050 $62.540
MTL W-BEAM GD FEN (TIM POST)
LF 1,773.000 $20.000 $23.500 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,700.000 $1,925.000 $1,615.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,225.000 $1,255.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 876.000 $3.000 $5.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $2,500.000 $2,750.000 $2,710.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $300.000 $200.000 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 56.000 $1,875.000 $3,500.000 $975.000
CRASH CUSH ATTEN (STKPL)
EA 24.000 $705.000 $1,000.000 $525.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 26.000 $18,000.000 $24,650.000 $25,500.000
WIRE FENCE (TY A)
LF 464.000 $14.000 $15.000 $21.650
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 6.000 $290.000 $445.000 $645.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 54.000 $190.000 $220.000 $210.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 13.000 $210.000 $280.000 $335.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $950.000 $1,014.000 $857.520
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 14.000 $3,000.000 $3,259.000 $4,041.940
CONDT (PVC) (SCH 40) (3") (BORE)
LF 26,410.000 $25.000 $23.710 $8.230
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 75,610.000 $12.000 $8.660 $8.410
CONDT (PVC) (SCH 80) (2")
LF 10,965.000 $8.500 $7.420 $5.860
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,130.000 $14.500 $12.520 $9.670
CONDT (PVC) (SCH 80) (4")
LF 380.000 $16.500 $19.480 $14.160
CONDT (PVC) (SCH 80) (4") (BORE)
LF 940.000 $20.000 $20.250 $12.550
CONDT (RM) (2")
LF 650.000 $29.000 $23.240 $17.320
CONDT (RM) (3")
LF 990.000 $45.000 $47.290 $31.330
ELEC CONDR (NO.14) INSULATED
LF 51,980.000 $0.620 $1.040 $0.500
ELEC CONDR (NO.12) BARE
LF 960.000 $0.940 $1.050 $0.800
ELEC CONDR (NO.12) INSULATED
LF 2,050.000 $0.910 $1.060 $0.610
ELEC CONDR (NO.8) BARE
LF 7,710.000 $1.100 $1.220 $0.940
ELEC CONDR (NO.8) INSULATED
LF 16,870.000 $1.200 $1.440 $1.210
ELEC CONDR (NO.6) BARE
LF 1,870.000 $1.150 $1.400 $1.140
ELEC CONDR (NO.4) BARE
LF 1,005.000 $1.600 $2.450 $2.190
ELEC CONDR (NO.4) INSULATED
LF 2,050.000 $1.810 $2.750 $1.350
ELEC CONDR (NO.2) BARE
LF 3,530.000 $2.000 $2.900 $2.700
ELEC CONDR (NO.2) INSULATED
LF 6,130.000 $2.180 $3.150 $3.120
TRAY CABLE (4 CONDR) (12 AWG)
LF 3,640.000 $1.770 $1.840 $1.660
GROUND BOX TY A (122311)
EA 2.000 $585.000 $545.000 $636.350
GROUND BOX TY A (122311)W/APRON
EA 33.000 $670.000 $775.000 $861.090
GROUND BOX TY D (162922)
EA 11.000 $575.000 $627.000 $775.690
GROUND BOX TY D (162922)W/APRON
EA 32.000 $800.000 $877.000 $944.390
REMOVE GROUND BOX
EA 14.000 $180.000 $50.000 $161.320
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 1.000 $6,700.000 $6,675.000 $5,331.370
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 2.000 $3,900.000 $5,800.000 $4,897.020
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 6.000 $3,800.000 $4,823.000 $4,319.870
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
EA 2.000 $3,800.000 $4,823.000 $4,337.720
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 3.000 $3,200.000 $4,823.000 $4,397.220
ELC SRV TY D 120/240 125(NS)SS(N)GC(O)
EA 1.000 $8,800.000 $5,888.000 $5,777.620
ELC SRV TY D 120/240 150(NS)GS(N)GC(O)
EA 1.000 $4,000.000 $5,888.000 $5,402.770
ALUMINUM SIGNS (TY A)
SF 120.000 $18.000 $25.000 $22.850
ALUMINUM SIGNS (TY G)
SF 60.000 $25.000 $25.000 $30.940
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 320.000 $440.000 $435.000 $435.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 47.000 $570.000 $610.000 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 23.000 $480.000 $585.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 2.000 $575.000 $835.000 $540.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $740.000 $845.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $800.000 $1,030.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 19.000 $900.000 $1,045.000 $900.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 4.000 $730.000 $2,130.000 $1,700.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $325.000 $590.000 $800.000
REMOVE SM RD SN SUP&AM
EA 453.000 $90.000 $50.000 $55.000
INSTALL LRSS (STRUCT STEEL)
LB 394.000 $5.000 $4.350 $4.550
INS OH SN SUP(30 FT BAL TEE)
EA 3.000 $28,000.000 $37,993.000 $51,204.810
SIGN WALKWAY (36 IN) WITH HNDRL
LF 91.500 $270.000 $283.000 $191.470
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 26.000 $100.000 $55.000 $65.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 364.000 $70.000 $55.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 27.000 $33.000 $32.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 6.000 $33.000 $32.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 32.000 $34.000 $55.000 $52.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 21.000 $30.000 $55.000 $52.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 142,838.000 $0.220 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 140,679.000 $0.250 $0.250 $0.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 14,448.000 $0.650 $0.890 $0.890
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 373.000 $5.120 $6.000 $6.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 15,606.000 $0.690 $0.890 $0.890
PREFAB PAV MRK TY B (W)(ARROW)
EA 74.000 $400.000 $375.000 $375.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 24.000 $800.000 $635.000 $635.000
PREFAB PAV MRK TY B (W)(WORD)
EA 79.000 $400.000 $600.000 $600.000
REFL PAV MRKR TY I-C
EA 268.000 $4.100 $4.500 $4.500
REFL PAV MRKR TY II-A-A
EA 1,426.000 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 2,308.000 $4.410 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 274,835.000 $0.290 $0.180 $0.180
PAV SURF PREP FOR MRK (4")
LF 8,618.000 $0.050 $0.010 $0.010
PAV SURF PREP FOR MRK (6")
LF 273,559.000 $0.050 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 25,792.000 $0.110 $0.040 $0.040
PAV SURF PREP FOR MRK (12")
LF 475.000 $0.170 $0.060 $0.060
PAV SURF PREP FOR MRK (24")
LF 6,153.000 $0.350 $0.120 $0.120
PAV SURF PREP FOR MRK (ARROW)
EA 74.000 $10.000 $3.000 $3.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 21.000 $12.000 $6.000 $6.000
PAV SURF PREP FOR MRK (WORD)
EA 79.000 $10.000 $7.000 $7.000
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $29,000.000 $25,779.750 $33,265.020
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,500.000 $2,500.000 $3,612.840
TEMP TRAF SIGNALS
EA 2.000 $30,000.000 $28,969.250 $28,687.930
VEH SIG SEC (12")LED(GRN)
EA 20.000 $173.000 $214.000 $190.340
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $173.000 $214.000 $190.340
VEH SIG SEC (12")LED(YEL)
EA 36.000 $173.000 $214.000 $190.340
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $173.000 $214.000 $190.340
VEH SIG SEC (12")LED(RED)
EA 20.000 $173.000 $214.000 $190.340
VEH SIG SEC (12")LED(RED ARW)
EA 10.000 $173.000 $214.000 $190.340
BACK PLATE (12")(1 SEC)
EA 16.000 $70.000 $69.000 $51.150
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 22.000 $95.000 $99.000 $123.740
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $114.000 $119.000 $151.110
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 6,270.000 $2.100 $2.360 $2.010
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 8.000 $4,900.000 $6,150.000 $4,034.570
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 2.000 $8,200.000 $9,870.000 $10,173.550
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 4.000 $8,400.000 $11,491.000 $11,631.300
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $8,300.000 $12,259.000 $12,498.810
INS TRF SIG PL AM(S)2 ARM(40-36')LUM
EA 1.000 $12,000.000 $13,416.000 $17,326.400
STRIP MOWING
CYC 12.000 $2,000.000 $3,500.000 $3,000.000
LITTER REMOVAL
CYC 12.000 $2,000.000 $2,000.000 $3,000.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 12.000 $1,450.000 $550.000 $1,500.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 12.000 $1,500.000 $1,100.000 $1,500.000
LANDSCAPE AMENITY (TY 1)
EA 1.000 $4,000.000 $4,000.000 $5,000.000
LANDSCAPE AMENITY (TY 2)
EA 1.000 $650.000 $650.000 $5,000.000
LANDSCAPE AMENITY (TY 3)
EA 1.000 $10,600.000 $10,000.000 $5,000.000
WIDE FLANGE PAVEMENT TERMINALS
LF 488.000 $255.000 $441.540 $515.150
TIP TESTING(DRILL SHAFT)
EA 8.000 $4,800.000 $4,945.630 $7,087.500
HISTORICAL MARKER RELOCATION
EA 1.000 $400.000 $5,000.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,460.000 $75.000 $25.000 $72.530
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 31,715.000 $1.400 $1.290 $1.720
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 55,610.000 $2.230 $3.470 $3.290
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 32.000 $1,136.000 $1,205.000 $575.490
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 10.000 $4,850.000 $1,760.000 $2,460.920
FO SPLICE ENCLOSURE (TYPE 1)
EA 7.000 $1,350.000 $1,825.000 $2,222.920
FIBER OPTIC FUSION SPLICE
EA 948.000 $30.000 $67.600 $16.590
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 5.000 $10,000.000 $12,300.000 $9,381.960
CCTV FIELD EQUIPMENT (ANALOG)
EA 12.000 $6,100.000 $5,925.000 $6,466.460
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 26,410.000 $20.000 $30.720 $23.270
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 75,610.000 $15.000 $15.810 $15.960
ITS MULTI-DUCT CND (RMC)
LF 990.000 $64.000 $116.120 $112.230
INSTALL DMS (FOUNDATION MTD CABINET)
EA 3.000 $7,400.000 $11,021.000 $8,524.140
FIBER OPTIC VIDEO DATA TRANSMITTER
EA 12.000 $1,146.000 $1,225.000 $1,116.160
FIBER OPTIC VIDEO DATA RECEIVER
EA 12.000 $1,143.000 $1,225.000 $1,116.160
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 102,452.000 $0.640 $0.480 $0.480
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 25,185.000 $0.770 $0.500 $0.500
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 387.000 $1.810 $1.000 $1.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 25,792.000 $1.310 $0.950 $0.950
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 475.000 $3.460 $2.500 $2.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 1,816.000 $7.550 $5.000 $5.000
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 8,618.000 $2.100 $0.450 $0.450
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 116,295.000 $0.650 $0.480 $0.480
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 4,055.000 $0.640 $0.500 $0.500
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 25,185.000 $0.850 $0.550 $0.550
PREFB PAV MK TY B (W)18"(YLD TR)
EA 46.000 $30.000 $45.000 $45.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $6,000.000 $6,650.000 $6,311.290
ITS POLE (55 FT)(130 MPH)
EA 12.000 $12,041.000 $18,259.000 $19,414.130
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 12.000 $5,700.000 $5,240.000 $5,169.360
ETHERNET SWITCH (INSTALL ONLY)
EA 20.000 $160.000 $250.000 $90.320
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
EA 12.000 $180.000 $250.000 $90.320
TERMINAL SERVER (INSTALL ONLY)
EA 9.000 $130.000 $300.000 $90.320
INSTALLATION OF BLUETOOTH READER
EA 7.000 $330.000 $500.000 $3,486.110
TMA (STATIONARY)
DAY 150.000 $170.000 $450.000 $287.290
TMA (MOBILE OPERATION)
HR 210.000 $50.000 $150.000 $68.870
ITS GND BOX(PCAST) TY 1 (243636)
EA 3.000 $3,000.000 $2,845.000 $3,016.060
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 139.000 $2,500.000 $3,205.000 $3,121.590
ITS GND BOX(PCAST) TY 2 (366036)
EA 3.000 $6,000.000 $5,395.000 $3,323.380
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 4.000 $6,500.000 $5,870.000 $3,557.060
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 11.000 $400.000 $1,409.100 $839.420
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 6.000 $430.000 $1,500.000 $839.420
ITS RVSD (DATA COLLECT ONLY) SYS
EA 9.000 $8,800.000 $5,950.000 $6,793.710
VIVDS TEMPORARY
EA 2.000 $12,200.000 $13,172.000 $15,165.830
Totals: $91,239,424.710 $96,532,489.458 $96,611,622.373