|
|
PREPARING ROW
|
STA
|
431.759
|
$5,500.000
|
$26,284.490
|
$25,000.000
|
$13,000.000
|
$23,426.820
|
|
|
REMOVING CONC (PAV)
|
SY
|
81,593.000
|
$6.000
|
$3.500
|
$13.790
|
$1.750
|
$2.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
47.000
|
$12.000
|
$14.000
|
$8.190
|
$25.380
|
$100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
19,615.000
|
$16.000
|
$8.000
|
$8.700
|
$10.270
|
$8.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
936.000
|
$10.000
|
$2.000
|
$4.090
|
$1.510
|
$8.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
81,593.000
|
$4.750
|
$3.500
|
$2.260
|
$1.680
|
$3.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
122,553.000
|
$10.000
|
$7.500
|
$10.700
|
$5.790
|
$9.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
33,169.000
|
$5.000
|
$5.500
|
$6.030
|
$7.390
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
293,946.000
|
$10.000
|
$4.900
|
$6.000
|
$6.190
|
$6.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
395,558.000
|
$10.750
|
$10.200
|
$4.000
|
$16.690
|
$11.750
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
4,593.000
|
$40.000
|
$65.500
|
$50.000
|
$63.690
|
$57.170
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
1,090.000
|
$45.000
|
$65.000
|
$45.000
|
$85.710
|
$56.740
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
685,675.000
|
$1.100
|
$1.040
|
$1.040
|
$1.040
|
$1.450
|
|
|
BLOCK SODDING
|
SY
|
419,177.000
|
$5.000
|
$2.680
|
$2.680
|
$2.680
|
$2.680
|
|
|
STRAW OR HAY MULCH
|
SY
|
915,862.000
|
$0.200
|
$0.170
|
$0.170
|
$0.170
|
$0.170
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
577,416.000
|
$0.100
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
338,446.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
31,318.169
|
$10.000
|
$30.000
|
$10.000
|
$23.240
|
$18.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
1,434.000
|
$40.000
|
$100.000
|
$25.000
|
$114.280
|
$85.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
402,217.000
|
$3.500
|
$2.500
|
$2.750
|
$2.770
|
$4.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
5,429.930
|
$220.000
|
$318.500
|
$265.000
|
$295.510
|
$267.000
|
|
|
CEMENT
|
TON
|
243.000
|
$180.000
|
$213.000
|
$200.000
|
$209.220
|
$250.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
8,604.000
|
$3.000
|
$25.000
|
$4.000
|
$2.010
|
$10.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
393,286.000
|
$6.500
|
$5.000
|
$12.000
|
$15.270
|
$13.400
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
19,793.675
|
$90.000
|
$112.380
|
$116.050
|
$114.700
|
$117.700
|
|
|
ASPH (AC-15P)
|
GAL
|
2,764.000
|
$4.000
|
$6.500
|
$6.860
|
$5.420
|
$6.960
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
81.000
|
$110.000
|
$113.880
|
$300.000
|
$531.010
|
$347.750
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
357,741.000
|
$82.000
|
$61.000
|
$65.000
|
$73.860
|
$75.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(10")
|
SY
|
3,239.000
|
$170.000
|
$73.000
|
$100.000
|
$143.350
|
$145.000
|
|
|
STRUCT EXCAV
|
CY
|
3,232.500
|
$6.000
|
$15.000
|
$4.000
|
$19.220
|
$25.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
13,292.395
|
$1.700
|
$4.000
|
$1.000
|
$11.380
|
$25.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
4,275.724
|
$3.600
|
$4.000
|
$1.000
|
$11.380
|
$25.000
|
|
|
CEM STABIL BKFL
|
CY
|
41,070.200
|
$52.000
|
$50.000
|
$50.000
|
$53.840
|
$60.000
|
|
|
CUT & RESTORING PAV
|
SY
|
2,198.000
|
$230.000
|
$35.000
|
$100.000
|
$107.700
|
$97.330
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
2,328.000
|
$45.000
|
$50.000
|
$60.000
|
$53.840
|
$60.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
2,045.000
|
$45.000
|
$25.000
|
$65.000
|
$100.400
|
$37.550
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
55,501.900
|
$3.500
|
$3.400
|
$1.690
|
$1.100
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,789.000
|
$5.000
|
$33.000
|
$36.610
|
$10.580
|
$55.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,836.000
|
$207.860
|
$185.000
|
$230.000
|
$122.930
|
$168.430
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,080.000
|
$185.000
|
$235.000
|
$250.000
|
$206.570
|
$227.080
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
4,818.000
|
$225.000
|
$300.000
|
$250.000
|
$255.760
|
$266.370
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,134.000
|
$315.000
|
$400.000
|
$300.000
|
$312.610
|
$372.170
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
25.000
|
$435.000
|
$650.000
|
$632.680
|
$640.380
|
$441.060
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
112.000
|
$215.000
|
$149.780
|
$149.780
|
$158.530
|
$111.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
$250.000
|
$186.690
|
$186.690
|
$195.790
|
$195.790
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
175.000
|
$335.000
|
$235.420
|
$235.420
|
$245.570
|
$245.570
|
|
|
CL A CONC (MISC)
|
CY
|
3.200
|
$690.000
|
$1,000.000
|
$725.000
|
$4,825.960
|
$3,500.000
|
|
|
CL A CONC (PLUG)
|
EA
|
10.000
|
$690.000
|
$5,000.000
|
$950.000
|
$1,698.940
|
$1,200.000
|
|
|
CL C CONC (ABUT)
|
CY
|
433.000
|
$800.000
|
$1,300.000
|
$1,000.000
|
$925.410
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
149.200
|
$1,000.000
|
$1,350.000
|
$1,250.000
|
$1,461.780
|
$1,600.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
100.000
|
$800.000
|
$1,000.000
|
$800.000
|
$950.630
|
$1,100.000
|
|
|
CL C CONC (HEADWALL)
|
CY
|
125.500
|
$800.000
|
$1,200.000
|
$1,250.000
|
$1,133.430
|
$2,000.000
|
|
|
CL F CONC (CAP)
|
CY
|
236.000
|
$750.000
|
$1,350.000
|
$1,000.000
|
$792.140
|
$1,700.000
|
|
|
REINF CONC SLAB
|
SF
|
48,778.000
|
$15.000
|
$30.000
|
$18.000
|
$22.440
|
$24.000
|
|
|
BRIDGE MEDIAN
|
SF
|
1,456.000
|
$9.000
|
$15.000
|
$15.000
|
$21.060
|
$8.000
|
|
|
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
|
SF
|
36,322.000
|
$50.000
|
$65.000
|
$50.000
|
$38.790
|
$70.000
|
|
|
PRESTR CONC U - BEAM (U54)
|
LF
|
2,112.540
|
$225.000
|
$370.000
|
$270.000
|
$365.160
|
$247.040
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,862.500
|
$150.000
|
$170.000
|
$260.000
|
$168.260
|
$230.770
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,338.000
|
$150.000
|
$200.000
|
$275.000
|
$180.330
|
$223.880
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
143.200
|
$440.000
|
$409.710
|
$599.630
|
$487.810
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,548.300
|
$520.000
|
$385.900
|
$450.000
|
$357.050
|
$475.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$400.000
|
$586.610
|
$350.000
|
$1,667.730
|
$1,700.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
530.600
|
$440.000
|
$370.870
|
$400.000
|
$469.000
|
$750.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
82.400
|
$375.000
|
$504.920
|
$375.000
|
$689.580
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
245.700
|
$145.000
|
$184.350
|
$250.000
|
$162.370
|
$172.080
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
17.300
|
$175.000
|
$192.020
|
$250.000
|
$238.050
|
$181.490
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
397.900
|
$130.000
|
$185.190
|
$185.000
|
$169.340
|
$163.090
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
814.900
|
$135.000
|
$195.450
|
$260.000
|
$164.010
|
$167.740
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
382.100
|
$450.000
|
$489.890
|
$500.000
|
$572.950
|
$650.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,481.900
|
$44.000
|
$36.000
|
$44.000
|
$52.320
|
$51.130
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
1,498.000
|
$100.000
|
$140.000
|
$200.000
|
$141.500
|
$125.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,280.000
|
$45.000
|
$50.000
|
$44.040
|
$54.910
|
$51.260
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
708.000
|
$115.000
|
$250.000
|
$250.000
|
$181.000
|
$213.650
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
2,660.000
|
$200.000
|
$280.000
|
$360.000
|
$264.410
|
$262.080
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
1,402.000
|
$210.000
|
$290.000
|
$400.000
|
$294.300
|
$278.350
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
2,560.000
|
$235.000
|
$295.000
|
$390.000
|
$284.740
|
$262.440
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
1,744.000
|
$260.000
|
$330.000
|
$455.000
|
$338.260
|
$305.330
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,770.000
|
$285.000
|
$390.000
|
$496.570
|
$384.620
|
$383.640
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,142.000
|
$325.000
|
$400.000
|
$522.050
|
$402.440
|
$374.410
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
110.000
|
$375.000
|
$450.000
|
$588.670
|
$430.040
|
$410.070
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,081.000
|
$380.000
|
$530.000
|
$643.890
|
$485.190
|
$493.370
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
530.500
|
$430.000
|
$550.000
|
$708.090
|
$526.780
|
$538.150
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
942.000
|
$535.000
|
$600.000
|
$787.780
|
$583.070
|
$609.630
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
82.000
|
$560.000
|
$680.000
|
$862.700
|
$650.900
|
$653.790
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
265.400
|
$600.000
|
$800.000
|
$1,049.570
|
$742.070
|
$847.460
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
150.000
|
$800.000
|
$900.000
|
$1,258.160
|
$899.060
|
$1,053.310
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
525.000
|
$56.000
|
$92.000
|
$80.390
|
$105.260
|
$73.520
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
18,862.000
|
$86.000
|
$88.000
|
$91.500
|
$92.380
|
$81.800
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4,452.000
|
$90.000
|
$126.000
|
$123.260
|
$116.570
|
$96.570
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,690.000
|
$85.000
|
$152.000
|
$172.360
|
$146.390
|
$146.680
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
314.000
|
$175.000
|
$195.000
|
$238.470
|
$192.490
|
$180.930
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
246.000
|
$200.000
|
$230.000
|
$285.430
|
$233.810
|
$229.540
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
194.000
|
$100.000
|
$170.000
|
$106.720
|
$177.210
|
$109.010
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
8.000
|
$5,100.000
|
$5,750.000
|
$9,000.000
|
$4,624.340
|
$6,393.340
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
10.000
|
$5,500.000
|
$7,200.000
|
$9,000.000
|
$6,079.310
|
$7,953.180
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
10.000
|
$11,800.000
|
$11,000.000
|
$10,000.000
|
$10,067.190
|
$12,159.790
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
12.000
|
$14,000.000
|
$15,000.000
|
$20,000.000
|
$13,646.190
|
$16,007.090
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$7,400.000
|
$10,000.000
|
$7,596.420
|
$9,466.440
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
21.000
|
$7,600.000
|
$7,800.000
|
$9,000.000
|
$8,313.260
|
$10,520.040
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
19.000
|
$4,300.000
|
$6,300.000
|
$9,000.000
|
$6,746.780
|
$8,524.830
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
16.000
|
$10,350.000
|
$9,900.000
|
$9,000.000
|
$12,054.180
|
$15,360.030
|
|
|
MANH (COMPL)(TY A)
|
EA
|
13.000
|
$3,500.000
|
$7,300.000
|
$13,000.000
|
$11,190.130
|
$9,167.950
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
124.000
|
$3,300.000
|
$6,100.000
|
$9,000.000
|
$5,074.100
|
$6,833.470
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
5.000
|
$15,000.000
|
$8,400.000
|
$10,000.000
|
$8,461.950
|
$10,391.850
|
|
|
INLET (COMPL)(TY C)(1 GRATE)
|
EA
|
10.000
|
$5,800.000
|
$10,000.000
|
$6,000.000
|
$4,107.670
|
$5,846.530
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
120.000
|
$1,000.000
|
$1,520.000
|
$2,000.000
|
$1,342.280
|
$1,697.100
|
|
|
INLET (COMPL) (TY C) (2 GRATE)
|
EA
|
39.000
|
$9,000.000
|
$11,100.000
|
$3,500.000
|
$5,514.840
|
$7,315.440
|
|
|
MANH (COMPL)(RISER ONLY)
|
EA
|
2.000
|
$12,000.000
|
$3,500.000
|
$3,000.000
|
$4,495.090
|
$4,864.460
|
|
|
INLET (COMP)(TY G)(1 GRATE)
|
EA
|
1.000
|
$7,000.000
|
$3,400.000
|
$5,000.000
|
$3,374.900
|
$5,059.690
|
|
|
INLET (COMP)(TY G)(2 GRATE)
|
EA
|
21.000
|
$12,000.000
|
$4,900.000
|
$6,500.000
|
$4,962.590
|
$6,717.070
|
|
|
INLET (COMP)(EXT TY C1)
|
EA
|
7.000
|
$6,000.000
|
$1,600.000
|
$3,000.000
|
$1,342.280
|
$1,697.100
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$8,700.000
|
$14,000.000
|
$10,000.000
|
$10,088.830
|
$8,673.730
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$10,600.000
|
$15,900.000
|
$9,000.000
|
$11,422.100
|
$8,183.740
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
3.000
|
$8,000.000
|
$20,100.000
|
$15,000.000
|
$10,856.740
|
$14,188.310
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$15,000.000
|
$19,000.000
|
$15,000.000
|
$11,224.360
|
$22,060.010
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$10,500.000
|
$19,200.000
|
$17,500.000
|
$12,676.760
|
$55,539.980
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$17,000.000
|
$23,000.000
|
$25,000.000
|
$18,929.360
|
$26,885.090
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(3:1)(C)
|
EA
|
2.000
|
$5,700.000
|
$5,900.000
|
$4,000.000
|
$7,737.940
|
$7,873.410
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
|
EA
|
33.000
|
$5,800.000
|
$6,900.000
|
$5,000.000
|
$8,805.260
|
$9,143.490
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
1.000
|
$5,900.000
|
$6,600.000
|
$5,000.000
|
$8,507.910
|
$8,717.510
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
4.000
|
$6,500.000
|
$7,800.000
|
$6,000.000
|
$9,830.110
|
$9,927.820
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
9.000
|
$5,800.000
|
$6,200.000
|
$6,000.000
|
$7,992.820
|
$8,009.920
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (P)
|
EA
|
1.000
|
$5,800.000
|
$8,000.000
|
$6,000.000
|
$9,952.260
|
$10,055.310
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
42.000
|
$5,900.000
|
$8,800.000
|
$6,000.000
|
$10,621.320
|
$11,037.740
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$6,000.000
|
$12,000.000
|
$8,000.000
|
$13,366.640
|
$13,986.210
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
35.000
|
$5,900.000
|
$9,000.000
|
$6,000.000
|
$10,977.090
|
$11,419.070
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
6.000
|
$6,400.000
|
$12,900.000
|
$9,000.000
|
$14,619.820
|
$15,344.660
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$6,500.000
|
$16,500.000
|
$10,500.000
|
$18,862.590
|
$19,898.180
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$6,900.000
|
$14,100.000
|
$10,750.000
|
$15,426.960
|
$16,197.120
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (P)
|
EA
|
2.000
|
$6,800.000
|
$11,000.000
|
$9,000.000
|
$12,777.220
|
$13,216.620
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$7,000.000
|
$18,000.000
|
$11,000.000
|
$20,598.990
|
$21,721.390
|
|
|
SET (TY I)(S= 7 FT)(HW= 3 FT)(3:1) (P)
|
EA
|
1.000
|
$9,400.000
|
$11,200.000
|
$11,250.000
|
$13,260.450
|
$13,725.290
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$10,000.000
|
$17,000.000
|
$12,000.000
|
$19,090.920
|
$20,155.650
|
|
|
SET (TY I)(S= 9 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$20,000.000
|
$36,000.000
|
$17,000.000
|
$24,538.550
|
$15,488.160
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$750.000
|
$1,300.000
|
$1,500.000
|
$1,301.670
|
$1,330.320
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
17.000
|
$1,050.000
|
$1,250.000
|
$1,519.430
|
$1,264.390
|
$1,291.520
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
15.000
|
$1,300.000
|
$1,950.000
|
$1,519.490
|
$1,976.000
|
$2,034.290
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
3.000
|
$1,150.000
|
$2,100.000
|
$1,727.840
|
$2,124.690
|
$2,189.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
142.000
|
$1,350.000
|
$1,610.000
|
$2,044.940
|
$1,646.780
|
$1,690.620
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,550.000
|
$1,600.000
|
$1,996.220
|
$1,962.140
|
$3,212.190
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
3.000
|
$2,000.000
|
$1,620.000
|
$1,995.140
|
$1,962.120
|
$2,377.960
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
54.000
|
$2,500.000
|
$1,650.000
|
$3,437.810
|
$2,663.050
|
$2,602.360
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,250.000
|
$3,550.000
|
$4,147.780
|
$4,214.630
|
$4,518.960
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$4,200.000
|
$4,500.000
|
$5,943.260
|
$5,277.570
|
$5,172.700
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$7,500.000
|
$12,000.000
|
$7,175.860
|
$12,281.890
|
$12,548.930
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$9,000.000
|
$12,600.000
|
$11,638.130
|
$12,307.220
|
$13,291.210
|
|
|
REMOV STR (INLET)
|
EA
|
15.000
|
$550.000
|
$590.000
|
$465.690
|
$641.630
|
$1,358.620
|
|
|
REMOV STR (SET)
|
EA
|
220.000
|
$400.000
|
$620.000
|
$366.640
|
$275.230
|
$490.160
|
|
|
REMOV STR (HEADWALL)
|
EA
|
17.000
|
$1,250.000
|
$1,650.000
|
$2,301.470
|
$2,475.370
|
$709.480
|
|
|
REMOV STR (PIPE)
|
LF
|
11,496.000
|
$20.000
|
$24.000
|
$23.330
|
$30.040
|
$14.670
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
593.000
|
$50.000
|
$52.000
|
$86.810
|
$68.390
|
$41.400
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,000.000
|
$1.000
|
$63,546.860
|
$36,393.390
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$8,523,400.000
|
$11,348,567.150
|
$11,574,440.230
|
$11,700,000.000
|
$10,975,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
43.000
|
$5,000.000
|
$4,654.750
|
$20,000.000
|
$18,094.860
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,190.000
|
$29.000
|
$38.860
|
$30.000
|
$40.200
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,389.000
|
$50.000
|
$103.950
|
$32.000
|
$136.420
|
$32.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,579.000
|
$8.000
|
$8.970
|
$10.000
|
$19.620
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,680.000
|
$25.000
|
$47.080
|
$30.000
|
$36.830
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
222.000
|
$17.400
|
$27.140
|
$30.000
|
$133.280
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,902.000
|
$7.000
|
$13.120
|
$10.000
|
$11.500
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
39,340.000
|
$2.500
|
$3.620
|
$3.000
|
$4.250
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
39,340.000
|
$0.600
|
$0.590
|
$1.000
|
$0.960
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
4,322.000
|
$3.700
|
$4.040
|
$4.000
|
$4.570
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,322.000
|
$1.000
|
$1.010
|
$1.000
|
$0.960
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
35,857.000
|
$76.000
|
$130.000
|
$50.000
|
$85.260
|
$81.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,070.000
|
$35.000
|
$75.000
|
$60.000
|
$30.340
|
$32.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
9,740.000
|
$37.000
|
$70.000
|
$60.000
|
$38.350
|
$34.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,880.000
|
$48.000
|
$85.000
|
$60.000
|
$33.040
|
$39.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
2,610.000
|
$4.400
|
$16.000
|
$6.000
|
$12.900
|
$26.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
6,900.000
|
$10.700
|
$14.000
|
$6.000
|
$10.710
|
$21.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
660.000
|
$23.200
|
$12.000
|
$10.000
|
$10.710
|
$27.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,190.000
|
$3.500
|
$5.000
|
$7.000
|
$3.670
|
$8.480
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,740.000
|
$5.000
|
$4.500
|
$8.000
|
$4.690
|
$7.490
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
13,960.000
|
$5.000
|
$4.800
|
$8.000
|
$2.990
|
$4.360
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
2,380.000
|
$5.000
|
$4.800
|
$8.000
|
$3.480
|
$11.470
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
2,610.000
|
$4.900
|
$5.000
|
$10.000
|
$10.590
|
$21.280
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
6,900.000
|
$6.700
|
$5.500
|
$10.000
|
$9.910
|
$12.310
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
660.000
|
$7.800
|
$5.600
|
$10.000
|
$9.910
|
$16.340
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,070.000
|
$8.000
|
$6.000
|
$18.220
|
$4.350
|
$7.510
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
9,740.000
|
$9.000
|
$6.000
|
$11.760
|
$6.490
|
$4.360
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
1,880.000
|
$9.000
|
$6.000
|
$11.760
|
$6.650
|
$8.610
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
28,278.000
|
$4.000
|
$4.360
|
$5.340
|
$3.310
|
$4.150
|
|
|
CONC CURB (TY C1)
|
LF
|
326.000
|
$110.000
|
$79.460
|
$62.930
|
$91.440
|
$69.760
|
|
|
DRIVEWAYS (CONC)
|
SY
|
21,341.000
|
$80.000
|
$71.560
|
$66.570
|
$73.420
|
$75.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
10,451.000
|
$55.000
|
$42.960
|
$49.980
|
$46.730
|
$58.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,850.000
|
$1,875.880
|
$1,400.000
|
$1,961.930
|
$1,912.150
|
|
|
CURB RAMPS (TY 2)
|
EA
|
9.000
|
$2,000.000
|
$2,076.340
|
$1,400.000
|
$1,910.950
|
$3,989.090
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$1,900.000
|
$1,875.880
|
$1,000.000
|
$1,961.930
|
$1,978.190
|
|
|
CURB RAMPS (TY 10)
|
EA
|
23.000
|
$1,500.000
|
$1,875.880
|
$1,000.000
|
$1,910.950
|
$2,317.740
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$2,700.000
|
$3,629.890
|
$1,500.000
|
$3,992.030
|
$5,724.330
|
|
|
CONC MEDIAN
|
SY
|
1,766.000
|
$65.000
|
$90.580
|
$60.000
|
$101.780
|
$49.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,301.000
|
$21.000
|
$21.700
|
$20.000
|
$24.660
|
$24.660
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
283.000
|
$40.000
|
$76.380
|
$80.000
|
$84.600
|
$84.600
|
|
|
SHORT RADIUS
|
LF
|
237.500
|
$35.000
|
$38.270
|
$50.000
|
$60.000
|
$60.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$1,100.000
|
$767.000
|
$1,118.520
|
$1,100.000
|
$1,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
26.000
|
$1,200.000
|
$1,349.000
|
$1,342.220
|
$1,320.000
|
$1,320.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
300.000
|
$44.000
|
$34.230
|
$30.510
|
$30.000
|
$30.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
11.000
|
$1,000.000
|
$947.000
|
$823.640
|
$810.000
|
$810.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
907.000
|
$2.500
|
$1.940
|
$0.510
|
$0.500
|
$0.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$2,500.000
|
$3,115.000
|
$3,192.860
|
$3,140.000
|
$3,140.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$8,000.000
|
$2,242.670
|
$1,016.840
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
29.000
|
$2,260.000
|
$1,191.790
|
$991.410
|
$975.000
|
$975.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
37.000
|
$860.000
|
$869.100
|
$610.100
|
$600.000
|
$600.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
38.000
|
$8,000.000
|
$10,000.000
|
$9,558.250
|
$9,400.000
|
$9,400.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
2.000
|
$4,337.000
|
$4,058.500
|
$4,058.500
|
$4,121.500
|
$4,121.500
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
548.000
|
$10.000
|
$10.140
|
$10.140
|
$10.560
|
$10.560
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
26,370.000
|
$11.000
|
$13.330
|
$13.330
|
$13.610
|
$13.610
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
43,480.000
|
$8.500
|
$13.360
|
$13.360
|
$13.640
|
$13.640
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,320.000
|
$9.500
|
$10.160
|
$10.160
|
$10.580
|
$10.580
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
320.000
|
$14.500
|
$13.220
|
$13.220
|
$13.900
|
$13.900
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
515.000
|
$12.500
|
$17.700
|
$17.700
|
$18.260
|
$18.260
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
18,324.000
|
$21.000
|
$15.440
|
$15.440
|
$15.930
|
$15.930
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
40.000
|
$16.000
|
$29.450
|
$29.450
|
$30.200
|
$30.200
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
75.000
|
$20.000
|
$33.250
|
$33.250
|
$34.370
|
$34.370
|
|
|
CONDT (RM) (2")
|
LF
|
135.000
|
$30.000
|
$23.330
|
$23.330
|
$24.170
|
$24.170
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
42,530.000
|
$0.750
|
$1.120
|
$1.120
|
$1.180
|
$1.180
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,058.000
|
$1.250
|
$1.780
|
$1.780
|
$1.850
|
$1.850
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,901.000
|
$1.500
|
$1.910
|
$1.910
|
$1.980
|
$1.980
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
115.000
|
$1.750
|
$3.030
|
$3.030
|
$3.140
|
$3.140
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
215.000
|
$2.000
|
$3.340
|
$3.340
|
$3.450
|
$3.450
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
2,930.000
|
$2.000
|
$2.580
|
$2.580
|
$2.670
|
$2.670
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
21.000
|
$800.000
|
$938.000
|
$938.000
|
$966.000
|
$966.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
9.000
|
$900.000
|
$775.000
|
$775.000
|
$804.750
|
$804.750
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
12.000
|
$1,028.000
|
$1,048.000
|
$1,048.000
|
$1,077.750
|
$1,077.750
|
|
|
ELC SRV TY D 120/240 060(SS)SS(E)SP(O)
|
EA
|
3.000
|
$6,500.000
|
$6,005.000
|
$6,005.000
|
$6,197.500
|
$6,197.500
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
15.000
|
$3,125.000
|
$5,535.000
|
$5,535.000
|
$5,727.500
|
$5,727.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
38.000
|
$22.000
|
$24.860
|
$24.860
|
$24.750
|
$24.750
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
586.000
|
$23.500
|
$22.560
|
$22.560
|
$27.650
|
$27.650
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
10.000
|
$20.000
|
$36.850
|
$18.430
|
$23.300
|
$23.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
163.000
|
$533.000
|
$559.000
|
$441.650
|
$485.000
|
$485.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
102.000
|
$674.000
|
$570.000
|
$474.740
|
$500.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
53.000
|
$682.000
|
$641.000
|
$570.960
|
$561.000
|
$561.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$1,056.000
|
$709.000
|
$622.910
|
$720.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,640.000
|
$1,244.000
|
$1,715.990
|
$2,300.000
|
$2,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
6.000
|
$848.000
|
$965.000
|
$605.000
|
$900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$700.000
|
$953.000
|
$870.680
|
$900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$880.000
|
$991.000
|
$608.430
|
$875.000
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
8.000
|
$715.000
|
$1,030.000
|
$794.570
|
$1,060.000
|
$1,060.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$900.000
|
$1,001.000
|
$722.560
|
$1,010.000
|
$1,010.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$920.000
|
$1,061.000
|
$635.000
|
$1,100.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$2,600.000
|
$1,931.000
|
$2,350.000
|
$2,500.000
|
$2,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
4.000
|
$2,250.000
|
$2,220.000
|
$1,626.390
|
$1,850.000
|
$1,850.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$1,800.000
|
$4,356.000
|
$2,294.290
|
$3,400.000
|
$3,400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
113.000
|
$85.000
|
$45.000
|
$88.490
|
$50.000
|
$50.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,393.000
|
$4.500
|
$6.560
|
$3.950
|
$4.490
|
$4.490
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$29,233.000
|
$43,314.000
|
$43,314.000
|
$43,891.500
|
$43,891.500
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$28,700.000
|
$44,470.000
|
$44,470.000
|
$45,021.250
|
$45,021.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
111.000
|
$31.000
|
$27.000
|
$22.450
|
$30.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
43.000
|
$31.000
|
$27.000
|
$22.490
|
$30.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
60.000
|
$65.000
|
$72.000
|
$76.480
|
$60.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
21.000
|
$21.400
|
$24.000
|
$16.630
|
$35.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
13.000
|
$12.900
|
$24.000
|
$26.340
|
$35.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
8.000
|
$75.000
|
$150.000
|
$66.760
|
$450.000
|
$450.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
17.000
|
$75.000
|
$150.000
|
$85.160
|
$450.000
|
$450.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,660.000
|
$0.250
|
$0.350
|
$0.350
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
65,711.000
|
$0.200
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,218.000
|
$0.400
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
145.000
|
$1.000
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
92.000
|
$2.500
|
$1.500
|
$0.150
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
38.000
|
$55.000
|
$35.000
|
$35.000
|
$35.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
6.000
|
$51.000
|
$50.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
5,760.000
|
$0.250
|
$0.350
|
$0.350
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
66,008.000
|
$0.250
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
516.000
|
$2.500
|
$1.500
|
$1.500
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
140.000
|
$0.850
|
$1.250
|
$1.250
|
$1.250
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
90,971.000
|
$0.650
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,908.000
|
$1.250
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
268.000
|
$4.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,434.000
|
$4.500
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
36.000
|
$180.000
|
$185.000
|
$185.000
|
$185.000
|
$185.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
5,760.000
|
$0.650
|
$1.250
|
$1.250
|
$1.250
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
97,435.000
|
$0.650
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
27.000
|
$6.500
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
915.000
|
$1.000
|
$1.250
|
$1.250
|
$1.250
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
814.000
|
$5.500
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$130.000
|
$35.000
|
$35.000
|
$35.000
|
$35.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$140.000
|
$45.000
|
$45.000
|
$45.000
|
$45.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
233.000
|
$0.700
|
$0.850
|
$0.850
|
$0.850
|
$0.850
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,366.000
|
$0.480
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
465.000
|
$0.820
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
563.000
|
$0.500
|
$0.550
|
$0.550
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
10,681.000
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
9,959.000
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
22.000
|
$30.000
|
$35.000
|
$35.000
|
$35.000
|
$35.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
140.000
|
$35.000
|
$45.000
|
$45.000
|
$45.000
|
$45.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,239.000
|
$4.000
|
$5.500
|
$5.500
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$4.000
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,494.000
|
$4.000
|
$5.500
|
$5.500
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
586.000
|
$4.000
|
$5.500
|
$5.500
|
$5.500
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
70,711.000
|
$0.300
|
$0.180
|
$0.180
|
$0.180
|
$0.180
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,382.000
|
$0.600
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
450.000
|
$0.900
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
383.000
|
$1.800
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
218,737.000
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
15,196.000
|
$0.200
|
$0.030
|
$0.030
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,509.000
|
$0.300
|
$0.060
|
$0.060
|
$0.060
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,070.000
|
$0.600
|
$0.120
|
$0.120
|
$0.120
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
107.000
|
$18.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$20.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
55.000
|
$20.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
22.000
|
$4.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$27,000.000
|
$25,106.340
|
$25,106.340
|
$25,701.340
|
$25,701.340
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
2.000
|
$26,325.000
|
$25,106.340
|
$25,106.340
|
$25,701.340
|
$25,701.340
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$3,025.000
|
$3,500.000
|
$3,500.000
|
$3,745.000
|
$3,745.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$30,482.000
|
$31,615.980
|
$31,615.980
|
$32,665.980
|
$32,665.980
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
20.000
|
$175.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
10.000
|
$174.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
28.000
|
$176.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$175.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
28.000
|
$175.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
12.000
|
$172.000
|
$230.000
|
$230.000
|
$237.350
|
$237.350
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
20.000
|
$600.000
|
$603.000
|
$603.000
|
$625.750
|
$625.750
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
22.000
|
$100.000
|
$108.000
|
$108.000
|
$110.450
|
$110.450
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
8.000
|
$120.000
|
$128.000
|
$128.000
|
$131.150
|
$131.150
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
2.000
|
$200.000
|
$148.000
|
$148.000
|
$151.850
|
$151.850
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
3,925.000
|
$1.240
|
$1.640
|
$1.640
|
$1.710
|
$1.710
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
4,030.000
|
$1.560
|
$2.510
|
$2.510
|
$2.600
|
$2.600
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
5,765.000
|
$2.090
|
$3.210
|
$3.210
|
$3.310
|
$3.310
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$4,500.000
|
$7,710.000
|
$7,710.000
|
$7,979.850
|
$7,979.850
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$9,700.000
|
$3,005.000
|
$3,005.000
|
$3,162.500
|
$3,162.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
2.000
|
$8,500.000
|
$10,822.000
|
$10,822.000
|
$10,962.000
|
$10,962.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
6.000
|
$13,000.000
|
$12,747.000
|
$12,747.000
|
$12,904.500
|
$12,904.500
|
|
|
INS TRF PL AM(1) ARM (44')(LUM)(HNGD)
|
EA
|
4.000
|
$9,500.000
|
$17,020.000
|
$17,020.000
|
$17,198.500
|
$17,198.500
|
|
|
PED POLE ASSEMBLY
|
EA
|
14.000
|
$1,700.000
|
$1,570.000
|
$1,570.000
|
$1,615.850
|
$1,615.850
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$700.000
|
$683.000
|
$683.000
|
$693.850
|
$693.850
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,400.000
|
$1,255.000
|
$1,255.000
|
$1,290.000
|
$1,290.000
|
|
|
INSTALL OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$10,000.000
|
$925.000
|
$925.000
|
$972.250
|
$972.250
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
520.000
|
$520.000
|
$450.000
|
$478.780
|
$601.490
|
$528.220
|
|
|
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
|
TON
|
892.430
|
$195.000
|
$152.750
|
$158.260
|
$196.470
|
$160.500
|
|
|
D-GR HMA TY-C PG70-22 (EXEMPT)
|
TON
|
904.310
|
$145.000
|
$147.750
|
$152.980
|
$196.470
|
$155.150
|
|
|
SOUND WALL (8 FT)
|
LF
|
730.000
|
$704.000
|
$425.000
|
$506.430
|
$423.010
|
$826.540
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
173,752.000
|
$2.000
|
$2.140
|
$2.140
|
$2.260
|
$2.260
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
41,119.000
|
$2.800
|
$4.310
|
$4.310
|
$4.500
|
$4.500
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
36.000
|
$1,100.000
|
$1,670.000
|
$1,670.000
|
$1,759.250
|
$1,759.250
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
3.000
|
$5,400.000
|
$3,245.000
|
$3,245.000
|
$3,439.250
|
$3,439.250
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 1)
|
EA
|
2.000
|
$11,200.000
|
$12,250.000
|
$12,250.000
|
$12,617.500
|
$12,617.500
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
13.000
|
$5,900.000
|
$6,960.000
|
$6,960.000
|
$7,117.500
|
$7,117.500
|
|
|
CCTV MOUNT (POLE)
|
EA
|
9.000
|
$600.000
|
$190.000
|
$190.000
|
$191.750
|
$191.750
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
69,810.000
|
$20.000
|
$19.090
|
$19.090
|
$19.410
|
$19.410
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
9,474.000
|
$33.000
|
$49.990
|
$49.990
|
$55.690
|
$55.690
|
|
|
ITS MULTI-DUCT CND (PVC-80)(CONC ENCSE)
|
LF
|
6,040.000
|
$80.000
|
$19.240
|
$19.240
|
$19.750
|
$19.750
|
|
|
COMMUNICATION HUB BUILDING
|
EA
|
1.000
|
$21,000.000
|
$16,850.000
|
$16,850.000
|
$16,850.000
|
$16,850.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
83,010.000
|
$0.650
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
20,384.000
|
$0.650
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
14,776.000
|
$1.000
|
$1.500
|
$1.500
|
$1.500
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,068.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
1,301.000
|
$6.300
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
88,193.000
|
$0.650
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
6,236.000
|
$0.650
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
1,442.000
|
$3.250
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
11,141.000
|
$0.750
|
$0.850
|
$0.850
|
$0.850
|
$0.850
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
101.000
|
$145.000
|
$125.000
|
$125.000
|
$125.000
|
$125.000
|
|
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
|
EA
|
6.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
51.000
|
$250.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$6,940.000
|
$6,750.000
|
$6,750.000
|
$6,890.000
|
$6,890.000
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
2.000
|
$4,820.000
|
$2,925.000
|
$2,925.000
|
$2,960.000
|
$2,960.000
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
3.000
|
$11,000.000
|
$20,650.000
|
$20,650.000
|
$20,929.650
|
$20,929.650
|
|
|
ITS POLE (55 FT)(130 MPH)
|
EA
|
9.000
|
$12,100.000
|
$20,892.000
|
$20,892.000
|
$21,171.650
|
$21,171.650
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
13.000
|
$5,189.500
|
$4,975.000
|
$4,975.000
|
$5,097.500
|
$5,097.500
|
|
|
VIDEO IMAGING AND RAD VEH DETECTION SYS
|
EA
|
2.000
|
$8,850.000
|
$500.000
|
$500.000
|
$535.000
|
$535.000
|
|
|
VID IMAGE AND RADAR DET PROCESSOR SYS
|
EA
|
4.000
|
$8,850.000
|
$750.000
|
$750.000
|
$802.500
|
$802.500
|
|
|
DMS CABINET FOUNDATION
|
EA
|
1.000
|
$2,100.000
|
$1,175.000
|
$1,175.000
|
$1,232.750
|
$1,232.750
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
1.000
|
$260.000
|
$225.000
|
$225.000
|
$240.750
|
$240.750
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
7.000
|
$1,000.000
|
$225.000
|
$225.000
|
$240.750
|
$240.750
|
|
|
GIGABIT ETHERNET/FIBER MEDIA CONV (SM)
|
EA
|
1.000
|
$500.000
|
$725.000
|
$725.000
|
$740.750
|
$740.750
|
|
|
FIBER OPTIC XCVR (SM)
|
EA
|
9.000
|
$500.000
|
$475.000
|
$475.000
|
$490.750
|
$490.750
|
|
|
TMA (STATIONARY)
|
DAY
|
757.000
|
$254.000
|
$146.140
|
$250.000
|
$616.620
|
$155.600
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
126.000
|
$183.000
|
$73.490
|
$50.000
|
$95.280
|
$600.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
160.000
|
$2,500.000
|
$3,375.000
|
$3,375.000
|
$3,443.250
|
$3,443.250
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
14.000
|
$350.000
|
$875.000
|
$875.000
|
$936.250
|
$936.250
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
10.000
|
$375.000
|
$1,037.500
|
$1,037.500
|
$1,110.130
|
$1,110.130
|
|
|
VIVDS TEMPORARY
|
EA
|
3.000
|
$13,882.000
|
$7,183.330
|
$7,183.330
|
$7,557.830
|
$7,557.830
|
|
|
VIVDS CABLING
|
LF
|
1,500.000
|
$2.500
|
$3.380
|
$3.380
|
$3.520
|
$3.520
|
|
|
VIVDS TEMPORARY (REMOVE)
|
EA
|
2.000
|
$300.000
|
$750.000
|
$750.000
|
$802.500
|
$802.500
|
|
|
VIVDS CABLING (REMOVE)
|
LF
|
1,500.000
|
$1.900
|
$0.500
|
$0.500
|
$0.540
|
$0.540
|
|
|
SANITARY SEWER (4 IN) (PVC) (SDR 26)
|
LF
|
26.000
|
$45.000
|
$175.000
|
$72.620
|
$62.000
|
$65.000
|
|
|
SANITARY SEWER (6 IN) (PVC) (SDR 26)
|
LF
|
29.000
|
$45.000
|
$168.000
|
$100.560
|
$77.300
|
$90.000
|
|
|
SANITARY SEWER (8 IN) (PVC) (SDR 26)
|
LF
|
3,823.000
|
$110.000
|
$106.000
|
$134.080
|
$85.250
|
$120.000
|
|
|
SANITARY SEWER (10 IN) (PVC) (SDR 26)
|
LF
|
8,367.000
|
$130.000
|
$105.000
|
$147.480
|
$124.530
|
$132.000
|
|
|
SANITARY SEWER (12 IN) (PVC) (SDR 26)
|
LF
|
3,026.000
|
$150.000
|
$126.000
|
$192.180
|
$141.670
|
$172.000
|
|
|
MANHOLE (SAN SEWER) ( 4' DIA)
|
EA
|
53.000
|
$7,100.000
|
$9,792.000
|
$5,474.770
|
$6,360.480
|
$4,900.000
|
|
|
MANHOLES (SANITARY SEWER) DROP (4' DIA)
|
EA
|
2.000
|
$11,000.000
|
$1,828.000
|
$6,927.260
|
$6,900.410
|
$6,200.000
|
|
|
ABANDON SANITARY SEWER (8IN)
|
EA
|
7,508.000
|
$30.000
|
$24.000
|
$18.990
|
$16.630
|
$17.000
|
|
|
ABANDON SANITARY SEWER (10IN)
|
EA
|
5,655.000
|
$35.000
|
$25.000
|
$23.460
|
$12.120
|
$21.000
|
|
|
ABANDON SANITARY SEWER (LIFT STATION)
|
EA
|
1.000
|
$10,000.000
|
$30,000.000
|
$13,407.590
|
$250,000.000
|
$12,000.000
|
|
|
FM CONNECTION (FORCE MAIN)
|
EA
|
2.000
|
$14,000.000
|
$5,846.000
|
$4,469.200
|
$3,000.000
|
$4,000.000
|
|
|
REMOVE EXISTING MANHOLE(SANITARY SEWER)
|
EA
|
23.000
|
$2,000.000
|
$776.000
|
$837.970
|
$1,575.500
|
$750.000
|
|
|
CASING (STEEL)(SANITARY SEWER)(24IN)
|
LF
|
264.000
|
$42.000
|
$311.000
|
$815.630
|
$680.810
|
$730.000
|
|
|
BYPASS PUMPING
|
LS
|
42.000
|
$27,000.000
|
$4,000.000
|
$3,953.080
|
$13,584.100
|
$1,800.000
|
|
|
WATER MAIN PIPE (PVC) (2IN)
|
LF
|
1,247.000
|
$15.500
|
$32.000
|
$39.110
|
$28.420
|
$35.000
|
|
|
WATER MAIN PIPE (PVC) (6IN) (C-900)
|
LF
|
1,537.000
|
$85.000
|
$85.000
|
$75.980
|
$85.260
|
$68.000
|
|
|
WATER MAIN PIPE (PVC) (8IN) (C-900)
|
LF
|
17,822.000
|
$95.000
|
$65.000
|
$78.210
|
$80.130
|
$70.000
|
|
|
CASING STEEL (12IN)
|
LF
|
131.000
|
$110.000
|
$81.000
|
$525.130
|
$263.170
|
$470.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
38.000
|
$5,000.000
|
$6,500.000
|
$9,608.780
|
$6,366.190
|
$8,600.000
|
|
|
WATER METER AND VAULT
|
EA
|
28.000
|
$750.000
|
$2,254.000
|
$1,955.270
|
$1,823.910
|
$1,750.000
|
|
|
REMOVING FIRE HYDRANT
|
EA
|
9.000
|
$300.000
|
$614.000
|
$1,005.570
|
$200.270
|
$900.000
|
|
|
REMOVE WATER METER AND VAULT
|
EA
|
28.000
|
$500.000
|
$799.000
|
$558.650
|
$300.270
|
$500.000
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
7.000
|
$750.000
|
$1,114.000
|
$1,452.490
|
$1,491.780
|
$1,300.000
|
|
|
CUT AND PLUG WATER MAIN (12IN)
|
EA
|
3.000
|
$1,320.000
|
$1,705.000
|
$2,234.600
|
$1,656.930
|
$2,000.000
|
|
|
WET CONNECTION (2IN)
|
EA
|
1.000
|
$557.000
|
$4,111.000
|
$558.650
|
$4,453.100
|
$500.000
|
|
|
WET CONNECTION (6IN)
|
EA
|
2.000
|
$780.000
|
$5,646.000
|
$1,452.490
|
$4,953.100
|
$1,300.000
|
|
|
WET CONNECTION (8IN)
|
EA
|
7.000
|
$2,000.000
|
$5,780.000
|
$1,675.950
|
$6,953.100
|
$1,500.000
|
|
|
CASING STEEL (16 IN)
|
LF
|
951.000
|
$120.000
|
$165.000
|
$614.510
|
$313.020
|
$550.000
|
|
|
REMOVE WATER LINE (ASBESTOS-CEMENT)
|
LF
|
18,504.000
|
$70.000
|
$23.000
|
$52.690
|
$8.000
|
$55.390
|
|
|
CONCRETE ENCASEMENT
|
LF
|
580.000
|
$100.000
|
$131.000
|
$55.870
|
$70.000
|
$50.000
|
|
|
NEW SAN SWR LIFT STATION (COMPLETE)
|
EA
|
1.000
|
$1,654,200.000
|
$563,000.000
|
$699,400.000
|
$300,000.000
|
$349,000.000
|
|
Totals: |
$108,271,346.058
|
$113,599,268.733
|
$115,744,402.328
|
$117,260,282.953
|
$122,703,610.055
|