Show Job Controls
Bid Cobra

BRAZORIA SH 36 (0111-08-100)

Items: 160

County: BRAZORIA
Length: N/A
Highway: SH 36
District: HOUSTON
Control Number: 0111-08-100
DBE Goal: N/A
Project: C 111-8-100
Guaranty: N/A
Time: 522 WORKING DAYS
Engineer's Estimate: $7,638,229.00
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN TO 4-LANE DIVIDED RURAL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$7,638,229.00
1
Awarded
$8,923,164.87
Over/Under Est: 16.82% $1,284,935.87
Over/Under Est: 25.21% $1,925,330.60
Amt Left: 7.18% $640,394.73
$9,839,746.00
Over/Under Est: 28.82% $2,201,517.00
Amt Left: 10.27% $916,581.13
Delta: -2.89% -$276,186.40
$11,348,999.99
Over/Under Est: 48.58% $3,710,770.99
Amt Left: 27.19% $2,425,835.12
Delta: -15.34% -$1,509,253.99
Subcontractor Percentage Amount
SMYRNA READY MIX CONCRETE, LLC 10.64% $1,322,726.74
GMJ PAVING COMPANY LLC 4.17% $518,399.48
THIRD COAST SERVICES LLC 2.35% $292,143.59
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 2.34% $290,900.43
QUALITY TURF FARMS, L.C. 1.49% $185,231.47
VORTEX LINING SYSTEMS, LLC 1.38% $171,556.66
HERMANOS STEEL, LLC 1.06% $131,775.41
PROFESSIONAL TRAFFIC CONTROL LLC 0.82% $101,939.47
PENHALL COMPANY 0.56% $69,617.20
CPAVE, INC. 0.37% $45,997.08
TEXOP CONSTRUCTION 0.21% $26,106.45
ANTIGO CONSTRUCTION, INC. 0.19% $23,620.12
CRANE MASTERS, INC. 0.12% $14,917.97
SORRELL CONSTRUCTION, EQUIPMENT & MATERIALS, LLC 0.00% $0.00
Total: 25.70% $3,194,932.07

Bid Items & Bid Tabulations

160 Total 0 of 160
BRAZORIA  |  SH 36  |  HOUSTON  |  0111-08-100  |  08/04/2021  |  $7,638,229.00  |  C 111-8-100  |  WIDEN TO 4-LANE DIVIDED RURAL  |  522 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPASA INC
ZACHRY CONSTRUCTION CORPORATION
ISI CONTRACTING, INC.
TRIPLE B SERVICES LLP
PREPARING ROW
AC 7.590 $8,800.000 $28,000.000 $105,698.420 $5,360.000 $9,500.000
REMOVING CONC (PAV)
SY 21,871.000 $4.500 $5.230 $6.040 $8.750 $12.500
REMOVING CONC (MEDIANS)
SY 125.000 $15.710 $9.510 $13.070 $26.000 $10.500
REMOVE CONC (RAIL)
LF 1,290.000 $13.800 $7.310 $8.040 $7.500 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 160.000 $6.550 $5.110 $10.720 $13.000 $20.000
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 34,675.000 $10.000 $3.320 $3.830 $11.250 $3.000
EXCAVATION (ROADWAY)
CY 12,047.000 $21.000 $12.000 $3.000 $18.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 14,879.000 $21.000 $18.000 $25.000 $30.000 $33.000
COMPOST MANUF TOPSOIL (4")
SY 43,674.000 $1.060 $0.800 $1.080 $1.000 $1.150
BLOCK SODDING
SY 2,934.000 $3.000 $2.950 $2.950 $3.750 $4.500
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 40,740.000 $0.210 $0.150 $0.150 $0.190 $0.200
STRAW OR HAY MULCHING
SY 81,480.000 $0.200 $0.100 $0.100 $0.190 $0.200
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 40,740.000 $0.090 $0.120 $0.120 $0.180 $0.200
FERTILIZER
AC 17.440 $650.000 $550.000 $550.000 $1,220.000 $1,400.000
VEGETATIVE WATERING
MG 2,094.000 $11.210 $20.000 $20.000 $17.000 $8.000
LIME TRT (EXST MATL) (6")
SY 61,069.000 $1.650 $2.980 $2.380 $4.000 $4.250
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 824.450 $177.000 $170.000 $172.550 $181.000 $230.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 61,069.000 $6.250 $14.860 $14.140 $16.500 $22.500
ASPHALT STAB BASE (GR 2)(PG 64)
TON 798.000 $74.000 $81.500 $97.000 $112.000 $105.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 3,362.000 $68.000 $84.000 $94.000 $96.000 $102.000
SALV, HAUL & STKPL RCL APH PV (3")
SY 21,871.000 $0.600 $2.000 $1.770 $2.450 $3.500
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 116.000 $97.000 $119.000 $159.000 $221.000 $143.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 118.000 $148.370 $124.750 $146.000 $77.000 $143.000
TACK COAT
GAL 789.000 $5.000 $2.500 $8.000 $6.500 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,000.000 $72.000 $95.000 $107.360 $99.000 $80.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 58,142.000 $50.000 $64.070 $60.150 $59.000 $86.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 1,905.000 $86.700 $98.320 $135.000 $88.000 $120.000
CEM STABIL BKFL
CY 450.000 $50.000 $45.000 $41.720 $58.000 $60.000
CUT & RESTORING PAV
SY 137.000 $130.000 $233.340 $120.980 $142.000 $155.000
TRENCH EXCAVATION PROTECTION
LF 58.000 $2.000 $1.830 $27.340 $28.000 $3.500
TEMPORARY SPL SHORING
SF 1,776.000 $12.960 $25.000 $67.500 $16.000 $15.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 36.000 $150.000 $141.650 $120.000 $157.000 $200.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 50.000 $230.140 $235.220 $160.000 $242.000 $210.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 42.000 $265.000 $270.520 $250.000 $278.000 $325.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $385.000 $346.820 $350.000 $357.000 $455.000
CONC STR REPAIR (STANDARD)
SF 4.000 $135.000 $491.760 $90.390 $615.000 $200.000
RIPRAP (CONC)(6 IN)
CY 62.000 $497.000 $181.730 $510.810 $615.000 $385.000
RIPRAP (CONC) (CL B) (4")
CY 1.750 $365.000 $358.420 $524.340 $1,980.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $420.230 $478.210 $524.330 $715.000 $500.000
CONC BOX CULV (8 FT X 4 FT)
LF 216.000 $640.000 $584.650 $544.700 $770.000 $735.000
WINGWALL (FW - 0) (HW=6 FT)
EA 2.000 $11,872.870 $14,038.000 $16,418.670 $18,500.000 $31,700.000
REMOV STR (PIPE)
LF 500.000 $17.000 $19.880 $14.260 $31.000 $38.000
REMOV STR (DRILL SHAFT)
EA 5.000 $4,500.000 $3,000.000 $743.070 $800.000 $4,500.000
MOBILIZATION
LS 1.000 $700,000.000 $830,000.000 $730,000.000 $970,000.000 $173,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $8,000.000 $1,000.000 $15,000.000 $6,200.000 $3,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 200.000 $70.000 $61.610 $25.000 $98.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $10.310 $10.120 $1.000 $19.500 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 784.000 $24.000 $26.460 $17.000 $28.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 784.000 $8.000 $9.370 $1.000 $8.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,450.000 $2.660 $2.170 $1.750 $2.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,450.000 $0.800 $0.540 $0.250 $0.450 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,260.000 $31.300 $36.000 $85.000 $65.000 $80.470
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 4,860.000 $5.500 $4.410 $6.000 $15.000 $25.380
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,880.000 $4.000 $3.500 $2.000 $3.300 $15.340
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 6,120.000 $5.000 $4.860 $6.000 $13.000 $32.880
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,260.000 $55.000 $70.000 $1.000 $64.000 $96.370
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 30.000 $167.000 $250.000 $267.480 $122.000 $344.170
CONC MEDIAN
SY 8.400 $85.000 $66.920 $225.660 $152.000 $112.740
MTL W-BEAM GD FEN (TIM POST)
LF 122.500 $21.190 $27.000 $20.000 $15.250 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,191.190 $1,090.000 $1,150.000 $1,060.000 $1,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 40.000 $59.700 $77.500 $75.000 $94.000 $100.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $2.970 $1.000 $3.000 $1.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $203.340 $175.000 $250.000 $117.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,608.250 $3,020.000 $2,700.000 $2,285.000 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $355.000 $225.000 $350.000 $213.000 $442.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,200.580 $1,450.000 $2,000.000 $1,530.000 $1,900.000
CRASH CUSH ATTEN (STKPL)
EA 8.000 $700.000 $600.000 $750.000 $1,175.000 $775.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $750.000 $600.000 $850.000 $1,175.000 $775.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 9.000 $22,000.000 $22,900.000 $24,500.000 $21,000.000 $29,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $1,485.000 $383.520 $500.000 $403.000 $850.000
REPLACE LUMINAIRE W/LED (400W EQ)
EA 9.000 $575.000 $491.760 $365.000 $515.000 $450.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 5.000 $4,200.000 $4,517.040 $4,500.000 $4,745.000 $5,500.000
CONDT (PVC) (SCH 80) (2")
LF 1,785.000 $8.580 $9.600 $10.000 $10.000 $12.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 90.000 $19.590 $12.000 $11.000 $12.500 $13.500
CONDT (PVC) (SCH 80) (3")
LF 25.000 $13.430 $18.590 $13.000 $19.500 $16.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 185.000 $25.000 $21.000 $15.000 $22.000 $18.500
CONDT (PVC) (SCH 80) (4")
LF 25.000 $18.060 $22.790 $17.000 $23.750 $23.000
ELEC CONDR (NO.8) BARE
LF 1,600.000 $1.190 $1.560 $1.850 $1.600 $2.250
ELEC CONDR (NO.8) INSULATED
LF 3,200.000 $1.580 $1.860 $2.000 $1.950 $2.500
ELEC CONDR (NO.6) BARE
LF 455.000 $1.250 $1.800 $2.100 $1.850 $2.600
ELEC CONDR (NO.4) BARE
LF 105.000 $1.750 $2.760 $3.100 $2.900 $3.800
ELEC CONDR (NO.4) INSULATED
LF 210.000 $2.130 $3.060 $3.600 $3.200 $4.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,285.000 $2.000 $2.460 $2.600 $2.500 $3.200
GROUND BOX TY D (162922)W/APRON
EA 11.000 $1,100.000 $884.830 $650.000 $930.000 $800.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $545.000 $287.640 $350.000 $302.000 $430.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 3.000 $7,000.000 $5,314.700 $5,100.000 $5,585.000 $6,260.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $4,686.110 $4,771.810 $4,600.000 $5,015.000 $5,631.500
ALUMINUM SIGNS (TY A)
SF 16.000 $21.000 $26.400 $16.000 $27.500 $25.000
ALUMINUM SIGNS (TY G)
SF 256.500 $25.000 $38.380 $24.560 $40.000 $37.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000 $486.770 $486.670 $450.000 $461.000 $620.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $575.780 $571.850 $500.000 $567.000 $820.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $700.000 $818.530 $700.000 $618.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $850.000 $849.620 $800.000 $618.000 $1,225.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $868.790 $1,095.990 $900.000 $924.000 $1,230.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,100.000 $1,694.960 $750.000 $882.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 28.000 $85.000 $75.000 $100.000 $81.000 $75.000
INSTALL LRSS (STRUCT STEEL)
LB 1,547.400 $5.000 $5.040 $4.300 $5.300 $5.700
REMOVE LRSA
EA 2.000 $1,300.000 $191.760 $700.000 $201.000 $920.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $27.960 $26.300 $30.000 $15.300 $30.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 15.000 $34.010 $5.000 $35.000 $15.300 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 160.000 $0.760 $0.250 $0.250 $0.770 $0.900
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 48.000 $2.500 $5.000 $5.000 $4.600 $5.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 160.000 $0.840 $0.350 $0.350 $0.770 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 31,044.000 $0.640 $0.790 $0.790 $0.740 $0.900
WK ZN PAV MRK REMOV (W)(RR XING)
EA 4.000 $385.000 $400.000 $400.000 $463.000 $560.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 31,044.000 $0.700 $0.790 $0.790 $0.740 $0.900
REFL PAV MRK TY II (Y) 12" (SLD)
LF 30.000 $2.500 $2.000 $2.000 $1.540 $2.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 16.000 $240.690 $185.000 $185.000 $235.000 $280.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $250.000 $225.000 $225.000 $270.000 $320.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $580.000 $450.000 $450.000 $489.000 $580.000
REFL PAV MRKR TY I-C
EA 183.000 $4.000 $4.500 $4.500 $4.350 $5.300
REFL PAV MRKR TY II-A-A
EA 446.000 $3.170 $4.500 $4.500 $4.350 $5.300
REFL PAV MRKR TY II-C-R
EA 72.000 $4.040 $4.500 $4.500 $4.350 $5.300
ELIM EXT PAV MRK & MRKS (6")
LF 45,519.000 $0.670 $0.250 $0.250 $0.460 $0.550
ELIM EXT PAV MRK & MRKS (24")
LF 1,411.000 $4.500 $1.500 $1.500 $2.150 $2.600
ELIM EXT PAV MRK & MRKS (RR XING)
EA 4.000 $194.690 $150.000 $150.000 $123.000 $200.000
PAV SURF PREP FOR MRK (6")
LF 41,135.000 $0.100 $0.020 $0.020 $0.030 $0.100
PAV SURF PREP FOR MRK (8")
LF 1,075.000 $0.140 $0.040 $0.040 $0.040 $0.200
PAV SURF PREP FOR MRK (12")
LF 545.000 $0.210 $0.060 $0.060 $0.060 $0.300
PAV SURF PREP FOR MRK (24")
LF 615.000 $0.760 $0.120 $0.120 $0.120 $0.750
PAV SURF PREP FOR MRK (ARROW)
EA 16.000 $12.740 $3.000 $3.000 $25.750 $30.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $14.950 $5.000 $5.000 $25.750 $30.000
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $101.670 $15.000 $15.000 $25.750 $30.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $27,403.850 $27,408.180 $29,000.000 $28,800.000 $35,500.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,232.920 $1,917.600 $3,000.000 $2,016.000 $4,000.000
TEMP TRAF SIGNALS
EA 1.000 $41,725.580 $24,588.000 $7,000.000 $25,845.000 $8,600.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $200.000 $185.940 $175.000 $195.000 $215.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $200.000 $185.940 $175.000 $195.000 $215.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $210.000 $185.940 $175.000 $195.000 $215.000
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $205.000 $185.940 $175.000 $195.000 $215.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $200.000 $185.940 $175.000 $195.000 $215.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $210.000 $185.940 $175.000 $195.000 $215.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $87.000 $125.980 $85.000 $132.000 $105.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 1.000 $110.000 $153.580 $90.000 $161.000 $140.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,340.000 $2.050 $2.760 $3.000 $2.900 $3.700
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $663.940 $287.640 $350.000 $302.000 $500.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $5,700.150 $4,325.280 $5,500.000 $4,546.000 $6,800.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $7,000.000 $8,585.280 $8,200.000 $9,025.000 $10,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $9,141.140 $10,859.040 $11,000.000 $11,415.000 $13,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $9,650.790 $11,107.440 $10,000.000 $11,675.000 $12,300.000
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $17,632.900 $25,659.720 $24,000.000 $27,000.000 $30,000.000
LITTER REMOVAL
CYC 5.000 $1,510.000 $1,667.290 $2,000.000 $410.000 $4,000.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 5.000 $550.000 $2,000.000 $550.000 $268.000 $2,800.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 21.000 $1,067.000 $1,488.890 $1,000.000 $1,400.000 $2,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,044.000 $75.000 $74.120 $35.000 $88.000 $80.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 15,215.000 $0.660 $0.480 $0.480 $0.930 $1.100
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 3,590.000 $1.800 $0.500 $0.500 $0.930 $1.100
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 1,075.000 $1.250 $0.650 $0.650 $1.370 $1.650
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 515.000 $3.680 $2.500 $2.500 $4.630 $5.600
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 430.000 $8.000 $5.000 $5.000 $8.750 $10.500
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 16,497.000 $0.670 $0.480 $0.480 $0.930 $1.100
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 2,253.000 $0.680 $0.500 $0.500 $0.930 $1.100
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 365.000 $6.800 $5.000 $5.000 $8.750 $10.500
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 3,580.000 $0.850 $0.550 $0.550 $0.930 $1.100
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,300.000 $6,179.400 $6,000.000 $6,362.850 $7,400.000
TMA (STATIONARY)
DAY 337.000 $163.940 $168.320 $275.000 $310.000 $200.000
TMA (MOBILE OPERATION)
HR 160.000 $50.000 $62.030 $100.000 $48.000 $100.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 4.000 $544.000 $863.520 $700.000 $907.000 $860.000
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 3.000 $493.000 $863.520 $700.000 $907.000 $860.000
INSTALLATION OF CELLULAR MODEM
EA 1.000 $1,000.000 $197.660 $175.000 $207.000 $215.000
Totals: $7,638,229.005 $8,923,164.889 $9,563,559.624 $9,839,746.005 $11,348,999.996