Show Job Controls
Bid Cobra

BRAZORIA BS 288B (0111-07-048)

Items: 58

County: BRAZORIA
Length: N/A
Highway: BS 288B
District: HOUSTON
Control Number: 0111-07-048
DBE Goal: N/A
Project: STP 2017(633)
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $5,784,267.15
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$5,784,267.15
$5,258,450.72
Over/Under Est: -9.09% -$525,816.43
Over/Under Est: -5.33% -$308,486.58
Amt Left: 4.13% $217,329.85

Bid Items & Bid Tabulations

58 Total 0 of 58
BRAZORIA  |  BS 288B  |  HOUSTON  |  0111-07-048  |  02/03/2017  |  $5,784,267.15  |  STP 2017(633)  |  PAVMT REPAIR AND ACP OVERLAY  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONCRETE(MOW STRIP)
LF 2,046.250 $11.000 $10.000 $8.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 210.900 $10.000 $10.000 $8.000
BACKFILL (TY A OR B)
STA 80.000 $185.000 $225.000 $290.000
SALV, HAUL & STKPL RCL APH PV (0 TO 2")
SY 22,026.000 $4.000 $2.000 $2.700
SALV, HAUL & STKPL RCL APH PV (3 1/2")
SY 394.000 $2.000 $22.000 $7.600
SALV, HAUL & STKPL RCL APH PV (5"-7")
SY 459.000 $4.000 $22.000 $8.200
ASPH (MULTI OPTION)
GAL 199,243.000 $2.350 $2.100 $2.500
AGGR(TY-PB GR-4 SAC-B)
CY 4,072.000 $90.000 $83.000 $90.400
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 241.000 $105.000 $150.000 $77.250
D-GR HMA TY-D SAC-B PG70-22
TON 44,519.000 $73.000 $68.000 $67.850
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
SY 210.000 $90.000 $55.000 $55.850
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,760.000 $64.000 $56.000 $61.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 370.000 $26.000 $35.000 $26.000
FULL - DEPTH REPAIR CRCP (10")
SY 695.000 $450.000 $250.000 $266.000
CONC STR REPAIR (STANDARD)
SF 4.860 $95.000 $350.000 $430.000
RIPRAP (MOW STRIP)(4 IN)
CY 119.900 $475.000 $500.000 $570.000
MOBILIZATION
LS 1.000 $288,326.000 $240,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $2,000.000 $4,215.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 120.000 $12.000 $30.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 $20.000 $22.000 $19.250
MTL THRIE-BEAM GD FEN (TIM POST)
EA 9.380 $1,600.000 $2,350.000 $2,020.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 0.620 $1,600.000 $2,750.000 $3,725.000
REMOVE METAL BEAM GUARD FENCE
LF 1,962.500 $2.000 $2.000 $1.600
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $190.000 $200.000 $267.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,200.000 $2,475.000 $2,785.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $220.000 $300.000 $267.000
CONDT (PVC) (SCH 80) (2")
LF 1,020.000 $6.620 $8.000 $5.400
CONDT (PVC) (SCH 80) (2") (BORE)
LF 420.000 $14.220 $15.000 $10.500
ELEC CONDR (NO.6) BARE
LF 1,625.000 $1.230 $1.300 $1.400
ZINC-COAT STL WIRE STRAND (5/16")
LF 3,470.000 $3.190 $1.800 $2.200
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 94.000 $20.000 $25.000 $21.400
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 74.000 $20.000 $27.000 $16.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 55,430.000 $0.150 $0.140 $0.120
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 180.000 $0.720 $0.660 $1.350
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 243,724.000 $0.150 $0.120 $0.110
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 19,055.000 $0.320 $0.270 $0.220
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 4,035.000 $0.700 $0.770 $0.800
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 3,760.000 $1.000 $1.400 $1.600
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 2.000 $40.000 $120.000 $43.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000 $40.000 $120.000 $43.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 21,000.000 $0.200 $0.140 $0.120
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 244,332.000 $0.110 $0.120 $0.110
WK ZN PAV MRK NON-REMOV (Y)8"(SLD)
LF 800.000 $0.410 $0.270 $0.220
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 80.000 $1.200 $2.200 $1.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,370.000 $0.820 $0.550 $0.850
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,895.000 $2.500 $2.600 $2.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,690.000 $4.500 $5.300 $5.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $110.000 $240.000 $107.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $125.000 $240.000 $107.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 400.000 $1.150 $1.500 $0.950
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 27,430.000 $0.280 $0.300 $0.370
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 119,352.000 $0.250 $0.300 $0.370
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 10,380.000 $0.400 $0.300 $0.370
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 119,656.000 $0.300 $0.300 $0.370
REFL PAV MRKR TY II-A-A
EA 2,420.000 $2.950 $2.800 $4.250
REFL PAV MRKR TY II-C-R
EA 1,900.000 $2.800 $2.800 $4.250
RADAR PRESENCE DETECTOR
EA 36.000 $7,266.580 $6,900.000 $7,210.000
RADAR ADVANCED DETECTION DEVICE
EA 20.000 $7,245.550 $7,200.000 $7,210.000
Totals: $5,784,267.150 $5,258,450.720 $5,475,780.570