BOWIE VARIOUS (0919-19-087)

Items: 68

County: BOWIE
Length: N/A
Highway: VARIOUS
District: ATLANTA
Control Number: 0919-19-087
DBE Goal: N/A
Project: STP 2022(679)TAPS
Guaranty: N/A
Time: 185 WORKING DAYS
Engineer's Estimate: $1,969,249.46
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,969,249.46
$1,958,509.10
Over/Under Est: -0.55% -$10,740.36
Over/Under Est: 20.06% $394,992.05
Amt Left: 20.72% $405,732.41
$2,819,845.64
Over/Under Est: 43.19% $850,596.18
Amt Left: 43.98% $861,336.54
Delta: -19.27% -$455,604.13
Subcontractor Percentage Amount
SKC EARTHWORKS LIMITED LIABILITY COMPANY 68.86% $883,094.53
MOORE CONSTRUCTION SERVICES, LLC 18.57% $238,150.82
DRAKE COMPANIES LLC 15.83% $203,011.71
J. H. ODEN CONTRACTING COMPANY 6.13% $78,614.14
TERRY BLACK CONSTRUCTION COMPANY 2.72% $34,882.62
DIAMOND ELITE BARRICADES, LLC 0.64% $8,207.68
Total: 112.75% $1,445,961.50

Bid Items & Bid Tabulations

68 Total 0 of 68
BOWIE  |  VARIOUS  |  ATLANTA  |  0919-19-087  |  09/06/2023  |  $1,969,249.46  |  STP 2022(679)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  185 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
TRUE ROADS CONSTRUCTION, LLC
THK CONSTRUCTION LLC
PREPARING ROW
STA 63.800 $2,400.000 $1,000.000 $2,500.000 $1,200.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 4.000 $1,000.000 $500.000 $2,000.000 $5,000.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 106.000 $40.000 $10.000 $30.000 $50.000
EXCAVATION (ROADWAY)
CY 16,981.000 $12.000 $20.000 $14.500 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,364.000 $15.000 $30.000 $18.000 $18.000
FURNISHING AND PLACING TOPSOIL (4")
STA 165.500 $250.000 $4.000 $650.000 $600.000
BLOCK SODDING
SY 137.000 $7.500 $10.000 $11.000 $22.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 68,338.000 $0.750 $0.600 $0.660 $0.561
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 34,169.000 $0.750 $0.600 $0.605 $0.550
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 34,169.000 $0.750 $0.600 $0.605 $0.550
VEGETATIVE WATERING
MG 1,093.300 $10.000 $40.000 $5.000 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,614.000 $1.500 $3.000 $2.200 $1.485
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 2,194.000 $80.000 $85.000 $135.000 $182.000
REWORK BS MTL (TY B) (9-18") (ORD COMP)
SY 101.000 $10.000 $20.000 $72.000 $50.000
CUT & RESTORING PAV
SY 325.000 $110.000 $150.000 $120.000 $200.000
FLOWABLE BACKFILL
CY 3.000 $400.000 $600.000 $985.000 $2,000.000
TRENCH EXCAVATION PROTECTION
LF 86.000 $6.000 $10.000 $25.000 $20.000
CL A CONC (PLUG)
EA 2.000 $750.000 $1,000.000 $1,250.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 436.000 $85.000 $75.000 $70.000 $60.000
RC PIPE (CL III)(24 IN)
LF 468.000 $105.000 $100.000 $112.000 $90.000
RC PIPE (CL III)(36 IN)
LF 48.000 $155.000 $200.000 $184.000 $140.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $7,000.000 $3,000.000 $10,000.000 $10,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 10.000 $1,000.000 $1,000.000 $1,000.000 $700.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,150.000 $1,000.000 $1,400.000 $800.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 2.000 $1,750.000 $2,000.000 $1,500.000 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,750.000 $2,000.000 $1,600.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,750.000 $2,000.000 $1,700.000 $1,200.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $2,750.000 $5,000.000 $3,100.000 $4,300.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,750.000 $5,000.000 $3,800.000 $4,300.000
REMOV STR (HEADWALL)
EA 4.000 $1,250.000 $2,000.000 $3,500.000 $1,000.000
REMOV STR (PIPE)
LF 238.000 $25.000 $20.000 $48.000 $20.000
MOBILIZATION
LS 1.000 $140,000.000 $160,000.000 $200,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,000.000 $5,000.000 $1,800.000 $1,792.090
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 258.000 $35.000 $40.000 $60.000 $37.400
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 18.000 $50.000 $80.000 $77.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 276.000 $12.500 $5.000 $16.500 $13.200
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 877.000 $27.500 $10.000 $44.000 $33.000
CONSTRUCTION EXITS (REMOVE)
SY 877.000 $10.000 $10.000 $11.000 $13.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,669.000 $4.000 $4.000 $3.850 $3.575
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,669.000 $1.500 $1.000 $0.550 $0.715
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 740.000 $7.000 $10.000 $6.600 $8.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 740.000 $1.500 $1.000 $1.100 $4.400
CONC SIDEWALKS (4")
SY 296.000 $78.000 $120.000 $120.000 $80.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 10.000 $750.000 $1,000.000 $560.000 $558.250
DECOMPOSED GRANITE PAVING MATERIALS
SY 17,891.000 $18.880 $10.000 $18.000 $37.000
INSTALL REMOVABLE BOLLARD
EA 28.000 $500.000 $500.000 $1,200.000 $400.000
TMA (STATIONARY)
DAY 185.000 $250.000 $400.000 $150.000 $350.000
MOBILIZATION
LS 0.010 $21,668.000 $1,000,000.000 $1,100.000 $2,000,000.000
1 1/2" C901 DR 9 POLYETHELENE TUBING
LF 115.000 $32.500 $15.000 $89.000 $44.000
8" C900 DR 18 PVC
LF 653.000 $68.750 $110.000 $74.250 $110.000
8" RJ C900 DR 18 PVC
LF 340.000 $77.500 $120.000 $47.000 $176.000
CONCRETE ENCASEMENT OF PIPE
LF 234.000 $90.000 $45.000 $170.000 $88.000
6" TAPPING SLEEVE AND VALVE
LF 1.000 $6,375.000 $6,000.000 $4,800.000 $6,600.000
5 1/4" FLUSH ASSY WITH VALVE & FITTINGS
LF 1.000 $2,775.000 $8,000.000 $10,000.000 $9,240.000
TESTING/FLUSHING LOCATION
EA 0.780 $25,000.000 $4,000.000 $3,000.000 $9,872.000
DUCTILE IRON FITTINGS
TON 1.000 $2,125.000 $6,000.000 $25,000.000 $9,900.000
CUST SVCS TRANSFER & METER RELO
EA 1.000 $2,456.910 $3,000.000 $2,400.000 $7,700.000
ASPHALT DRIVEWAY REPAIR
LF 1.000 $2,775.000 $100.000 $2,200.000 $3,000.000
RESEEDING DISTURBED AREAS
LF 234.000 $7.630 $6.000 $2.200 $8.800
3" RJ SDR 21 CL 200 PVC
LF 236.000 $41.250 $40.000 $36.000 $25.000
8" DIRECTIONAL DRILL
LF 73.000 $142.500 $80.000 $145.000 $110.000
6" STEEL ENCASEMENT
LF 220.000 $78.750 $70.000 $57.000 $71.500
6" DRY BORE
LF 220.000 $106.250 $90.000 $184.000 $121.000
14" STEEL ENCASEMENT
LF 251.000 $158.750 $85.000 $123.000 $110.000
14" DRY BORE
LF 249.000 $148.750 $230.000 $355.000 $231.000
SAND EMBEDMENT
LF 35.100 $93.750 $35.000 $95.000 $11.000
ABAN EX 6" WATERLINE WITH CELLULAR GRT
LF 1,125.000 $30.000 $8.000 $31.000 $19.800
ABAN EX 2" WATERLINE WITH CELLULAR GRT
LF 75.000 $12.500 $4.000 $78.000 $66.000
Totals: $1,969,249.465 $1,958,509.100 $2,364,241.520 $2,819,845.658