PREPARING ROW
|
STA
|
318.100
|
$1,500.000
|
$17,000.000
|
$6,700.000
|
$21,895.000
|
$8,986.000
|
$27,783.000
|
$38,225.480
|
|
|
REMOVING CONC (PAV)
|
SY
|
166,228.000
|
$5.300
|
$3.950
|
$4.000
|
$3.200
|
$7.000
|
$7.500
|
$7.960
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
11,872.000
|
$9.000
|
$6.000
|
$7.000
|
$4.600
|
$6.000
|
$10.000
|
$12.530
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,848.000
|
$12.000
|
$17.000
|
$15.000
|
$10.950
|
$9.000
|
$35.000
|
$26.160
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
496.000
|
$33.000
|
$13.250
|
$15.000
|
$18.380
|
$15.000
|
$50.000
|
$54.640
|
|
|
REMOVE CONC (RAIL)
|
LF
|
3,184.000
|
$12.000
|
$15.000
|
$15.000
|
$3.480
|
$10.000
|
$15.000
|
$25.750
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
69,584.000
|
$4.000
|
$4.100
|
$9.000
|
$7.110
|
$8.000
|
$6.000
|
$7.910
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
58,348.000
|
$4.500
|
$4.950
|
$10.000
|
$8.180
|
$10.000
|
$7.000
|
$9.760
|
|
|
REMOV STAB BASE AND ASPH PAV (22")
|
SY
|
18,046.000
|
$5.000
|
$5.350
|
$14.000
|
$9.740
|
$12.000
|
$10.000
|
$11.790
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
275,469.000
|
$6.000
|
$5.000
|
$6.750
|
$9.170
|
$11.000
|
$5.000
|
$17.280
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
88,130.000
|
$8.000
|
$11.750
|
$13.000
|
$14.840
|
$12.000
|
$10.000
|
$38.390
|
|
|
BACKFILL (TY B)
|
STA
|
311.000
|
$210.000
|
$245.000
|
$500.000
|
$636.830
|
$400.000
|
$1,600.000
|
$1,205.210
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
165,602.000
|
$1.000
|
$1.750
|
$1.000
|
$0.780
|
$0.930
|
$1.500
|
$0.890
|
|
|
BROADCAST SEED (PERM) (URBAN) (SANDY)
|
SY
|
21,699.000
|
$0.200
|
$0.130
|
$0.130
|
$0.110
|
$0.160
|
$0.150
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
10,855.000
|
$0.120
|
$0.140
|
$0.130
|
$0.110
|
$0.160
|
$0.150
|
$0.190
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
10,855.000
|
$0.120
|
$0.100
|
$0.100
|
$0.130
|
$0.180
|
$0.170
|
$0.190
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
97,625.000
|
$0.600
|
$0.700
|
$0.670
|
$0.600
|
$0.650
|
$0.810
|
$0.690
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
97,625.000
|
$0.600
|
$0.660
|
$0.640
|
$0.600
|
$0.650
|
$0.810
|
$0.690
|
|
|
BOND FBR MTRX SEED (PERM) (URBAN)(SAND)
|
SY
|
195,239.000
|
$0.700
|
$0.760
|
$0.730
|
$0.720
|
$0.770
|
$0.970
|
$0.740
|
|
|
VEGETATIVE WATERING
|
MG
|
3,529.000
|
$10.000
|
$1.000
|
$7.000
|
$18.170
|
$27.000
|
$5.000
|
$25.490
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
8,684.000
|
$1.330
|
$1.600
|
$1.700
|
$1.190
|
$1.190
|
$1.560
|
$1.150
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
1,587.000
|
$1.000
|
$1.650
|
$2.000
|
$2.990
|
$2.990
|
$4.020
|
$1.560
|
|
|
CEMENT
|
TON
|
375.000
|
$154.000
|
$190.000
|
$165.000
|
$154.530
|
$141.400
|
$180.000
|
$131.310
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
22,100.000
|
$2.000
|
$2.500
|
$3.000
|
$2.570
|
$10.000
|
$4.000
|
$9.090
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
469,966.000
|
$11.000
|
$17.000
|
$17.000
|
$10.290
|
$16.000
|
$18.000
|
$15.150
|
|
|
CEM TRT(PLNT MX) (CL M)(TY E)(GR 4)(8")
|
SY
|
469,996.000
|
$8.000
|
$5.500
|
$9.000
|
$13.620
|
$11.000
|
$19.000
|
$9.090
|
|
|
PRIME COAT (MC-30)
|
GAL
|
93,997.000
|
$4.450
|
$4.000
|
$5.000
|
$6.300
|
$6.300
|
$6.000
|
$6.300
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
25,400.000
|
$48.000
|
$60.000
|
$50.000
|
$67.100
|
$66.300
|
$15.000
|
$101.050
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
20,000.000
|
$33.000
|
$35.000
|
$22.000
|
$32.140
|
$32.020
|
$7.250
|
$64.720
|
|
|
PLANE ASPH CONC PAV(6" TO 8")
|
SY
|
166,228.000
|
$3.750
|
$2.600
|
$4.250
|
$4.100
|
$2.530
|
$4.000
|
$4.650
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
128,383.000
|
$1.600
|
$2.000
|
$4.000
|
$1.800
|
$1.040
|
$2.500
|
$1.650
|
|
|
PLANE ASPH CONC PAV (0" TO 16")
|
SY
|
2,280.000
|
$5.000
|
$3.500
|
$20.000
|
$14.050
|
$6.990
|
$23.000
|
$8.880
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
449,455.000
|
$57.000
|
$65.000
|
$68.000
|
$62.400
|
$70.370
|
$60.000
|
$81.420
|
|
|
CEM STABIL BKFL
|
CY
|
1,049.000
|
$125.000
|
$148.000
|
$125.000
|
$61.340
|
$116.020
|
$85.000
|
$73.330
|
|
|
CUT & RESTORING PAV
|
SY
|
60.000
|
$175.000
|
$100.000
|
$90.000
|
$256.630
|
$60.000
|
$500.000
|
$243.090
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
812.000
|
$2.800
|
$9.000
|
$5.000
|
$10.580
|
$1.440
|
$1.000
|
$15.760
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,200.000
|
$20.000
|
$30.000
|
$18.000
|
$15.480
|
$18.380
|
$33.000
|
$11.630
|
|
|
SHEET PILING (PZ - 22)
|
SF
|
2,112.000
|
$42.000
|
$48.000
|
$25.000
|
$89.740
|
$52.000
|
$120.000
|
$41.500
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,125.000
|
$190.000
|
$220.000
|
$220.000
|
$190.710
|
$189.150
|
$325.000
|
$348.030
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
480.000
|
$240.000
|
$330.000
|
$350.000
|
$499.760
|
$298.600
|
$500.000
|
$662.960
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
79.000
|
$160.000
|
$160.000
|
$140.000
|
$145.000
|
$134.000
|
$340.000
|
$134.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
194.000
|
$230.000
|
$230.000
|
$350.000
|
$210.000
|
$316.500
|
$427.000
|
$316.500
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
79.000
|
$324.000
|
$655.000
|
$480.000
|
$595.000
|
$443.250
|
$572.000
|
$443.250
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
60.000
|
$490.000
|
$760.000
|
$500.000
|
$690.000
|
$454.500
|
$856.000
|
$454.500
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
87.000
|
$510.000
|
$890.000
|
$550.000
|
$810.000
|
$505.750
|
$965.000
|
$505.750
|
|
|
CL A CONC (SEAL)
|
CY
|
11.000
|
$450.000
|
$400.000
|
$300.000
|
$581.650
|
$320.550
|
$1,340.000
|
$1,021.130
|
|
|
CL C CONC (ABUT)
|
CY
|
149.900
|
$900.000
|
$1,000.000
|
$875.000
|
$700.140
|
$1,100.000
|
$1,166.000
|
$1,517.730
|
|
|
CL C CONC (BENT)
|
CY
|
151.600
|
$925.000
|
$1,000.000
|
$1,000.000
|
$851.730
|
$900.000
|
$2,005.000
|
$2,298.670
|
|
|
CL C CONC (CAP)
|
CY
|
144.600
|
$925.000
|
$1,000.000
|
$1,000.000
|
$920.380
|
$950.000
|
$1,750.000
|
$2,195.130
|
|
|
CL C CONC (COLUMN)
|
CY
|
116.800
|
$925.000
|
$875.000
|
$1,100.000
|
$781.030
|
$1,400.000
|
$2,450.000
|
$3,231.050
|
|
|
CL C CONC (FOOTING)
|
CY
|
105.600
|
$700.000
|
$750.000
|
$850.000
|
$629.460
|
$750.000
|
$1,445.000
|
$1,926.770
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
74.400
|
$700.000
|
$675.000
|
$700.000
|
$609.060
|
$650.000
|
$1,600.000
|
$1,220.730
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.000
|
$450.000
|
$1,200.000
|
$677.000
|
$889.010
|
$676.970
|
$2,000.000
|
$600.160
|
|
|
REINF CONC SLAB
|
SF
|
32,940.000
|
$15.000
|
$16.000
|
$22.000
|
$16.650
|
$24.000
|
$29.750
|
$28.260
|
|
|
APPROACH SLAB
|
CY
|
520.000
|
$440.000
|
$450.000
|
$540.000
|
$378.790
|
$476.770
|
$750.000
|
$1,297.980
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
2,784.830
|
$155.000
|
$135.000
|
$175.000
|
$162.540
|
$139.430
|
$186.000
|
$261.380
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,355.390
|
$145.000
|
$142.000
|
$175.000
|
$154.470
|
$137.950
|
$171.000
|
$271.330
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,562.000
|
$430.000
|
$400.000
|
$400.000
|
$293.160
|
$448.160
|
$500.000
|
$405.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
243.000
|
$505.000
|
$425.000
|
$400.000
|
$435.590
|
$540.030
|
$431.000
|
$476.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
537.600
|
$430.000
|
$460.000
|
$425.000
|
$479.810
|
$612.360
|
$600.000
|
$553.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
15,578.680
|
$12.000
|
$5.250
|
$2.000
|
$8.000
|
$14.000
|
$10.000
|
$5.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,188.000
|
$46.000
|
$60.000
|
$75.000
|
$42.120
|
$53.250
|
$62.000
|
$59.850
|
|
|
RAIL (TY T80SS)
|
LF
|
1,505.300
|
$110.000
|
$90.000
|
$90.000
|
$89.730
|
$92.150
|
$84.000
|
$94.240
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
30.000
|
$52.000
|
$125.000
|
$150.000
|
$49.740
|
$536.070
|
$280.000
|
$161.800
|
|
|
RAIL (TY T80SS) (MOD)
|
LF
|
15.000
|
$150.000
|
$125.000
|
$150.000
|
$380.970
|
$361.280
|
$280.000
|
$251.460
|
|
|
ARMOR JOINT
|
LF
|
556.000
|
$70.000
|
$42.000
|
$85.000
|
$99.670
|
$35.510
|
$125.000
|
$95.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
239.300
|
$80.000
|
$80.000
|
$90.000
|
$100.040
|
$158.810
|
$150.000
|
$176.050
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
900.000
|
$58.000
|
$46.000
|
$45.000
|
$59.600
|
$51.590
|
$70.000
|
$92.170
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
812.000
|
$69.000
|
$50.000
|
$65.000
|
$60.230
|
$63.520
|
$90.000
|
$115.420
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$4,000.000
|
$5,000.000
|
$5,000.000
|
$3,220.290
|
$3,725.150
|
$4,000.000
|
$4,631.020
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$4,000.000
|
$4,500.000
|
$5,000.000
|
$3,457.110
|
$4,832.390
|
$4,100.000
|
$6,881.860
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,700.000
|
$6,500.000
|
$8,000.000
|
$4,276.670
|
$5,590.100
|
$4,200.000
|
$7,903.790
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$3,400.000
|
$4,800.000
|
$4,000.000
|
$5,901.560
|
$3,114.210
|
$5,000.000
|
$7,094.730
|
|
|
SLOT DRAIN (GAL STL) (18 IN)
|
LF
|
1,500.000
|
$50.000
|
$100.000
|
$150.000
|
$95.240
|
$77.190
|
$200.000
|
$98.910
|
|
|
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
|
LF
|
78.000
|
$120.000
|
$1,250.000
|
$1,300.000
|
$1,192.370
|
$1,203.920
|
$500.000
|
$1,109.200
|
|
|
ADJUSTING INLETS
|
EA
|
17.000
|
$1,800.000
|
$2,000.000
|
$3,500.000
|
$2,446.980
|
$1,276.490
|
$1,750.000
|
$1,406.650
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
25.000
|
$1,600.000
|
$1,200.000
|
$2,500.000
|
$2,446.980
|
$259.570
|
$1,900.000
|
$1,390.760
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
2,040.000
|
$10.000
|
$18.000
|
$20.000
|
$40.740
|
$25.590
|
$55.000
|
$74.010
|
|
|
REMOV STR (SET)
|
EA
|
15.000
|
$375.000
|
$175.000
|
$500.000
|
$279.940
|
$295.570
|
$500.000
|
$525.760
|
|
|
REMOV STR (PIPE)
|
LF
|
2,978.000
|
$12.000
|
$11.500
|
$11.000
|
$22.740
|
$8.060
|
$25.000
|
$39.320
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$80,000.000
|
$48,000.000
|
$110,000.000
|
$82,198.710
|
$130,150.000
|
$250,000.000
|
$291,388.280
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$6,733,000.000
|
$7,800,000.000
|
$7,550,000.000
|
$9,000,000.000
|
$9,409,000.000
|
$10,400,000.000
|
$12,159,526.390
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
47.000
|
$20,000.000
|
$9,500.000
|
$15,000.000
|
$11,403.520
|
$13,800.000
|
$23,700.320
|
$24,707.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,916.000
|
$30.000
|
$37.000
|
$38.000
|
$26.000
|
$26.000
|
$34.960
|
$39.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
160.000
|
$48.000
|
$60.000
|
$60.000
|
$49.000
|
$49.000
|
$65.880
|
$117.600
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,076.000
|
$9.000
|
$14.000
|
$13.000
|
$10.000
|
$10.000
|
$13.440
|
$17.660
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,560.000
|
$21.750
|
$27.500
|
$28.000
|
$22.000
|
$22.000
|
$29.580
|
$33.070
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,560.000
|
$8.750
|
$14.000
|
$13.000
|
$10.000
|
$10.000
|
$13.440
|
$9.330
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,950.000
|
$2.800
|
$2.850
|
$3.000
|
$2.750
|
$2.750
|
$3.700
|
$3.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,950.000
|
$1.000
|
$1.200
|
$1.100
|
$0.500
|
$0.500
|
$0.670
|
$0.830
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,016.000
|
$4.000
|
$4.200
|
$5.000
|
$3.000
|
$3.000
|
$4.030
|
$3.060
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
600.000
|
$6.000
|
$4.950
|
$7.000
|
$4.000
|
$4.000
|
$5.380
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,616.000
|
$1.000
|
$2.750
|
$2.500
|
$1.000
|
$1.000
|
$1.340
|
$0.830
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
20,697.000
|
$56.000
|
$50.000
|
$55.000
|
$54.530
|
$58.000
|
$7.060
|
$51.480
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
3,398.000
|
$40.000
|
$58.000
|
$60.000
|
$87.920
|
$77.000
|
$11.630
|
$91.880
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
72,180.000
|
$40.000
|
$69.000
|
$65.000
|
$27.640
|
$40.000
|
$80.620
|
$33.740
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
145,260.000
|
$7.000
|
$4.000
|
$3.000
|
$2.230
|
$1.320
|
$11.350
|
$4.280
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
72,180.000
|
$7.000
|
$8.000
|
$2.000
|
$18.530
|
$11.650
|
$10.360
|
$18.380
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
29,059.000
|
$60.000
|
$56.000
|
$60.000
|
$53.950
|
$59.160
|
$61.440
|
$78.820
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
1,968.000
|
$125.000
|
$57.000
|
$180.000
|
$199.870
|
$124.420
|
$285.760
|
$137.960
|
|
|
PERM CTB (SSCB)(TY 3)(MOD)
|
LF
|
10.000
|
$150.000
|
$200.000
|
$200.000
|
$562.460
|
$411.070
|
$285.760
|
$414.590
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
34.000
|
$42.000
|
$60.000
|
$30.000
|
$21.660
|
$13.120
|
$90.710
|
$13.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
488.000
|
$42.000
|
$33.000
|
$35.000
|
$13.080
|
$28.250
|
$90.710
|
$28.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
268.000
|
$56.000
|
$62.000
|
$45.000
|
$57.160
|
$67.400
|
$105.030
|
$63.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,600.000
|
$2,500.000
|
$2,000.000
|
$1,722.130
|
$2,393.950
|
$5,569.800
|
$2,282.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
25,035.000
|
$0.250
|
$0.150
|
$0.300
|
$0.100
|
$0.410
|
$0.170
|
$0.210
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
99,703.000
|
$0.900
|
$0.700
|
$0.750
|
$0.100
|
$0.970
|
$1.080
|
$0.210
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
18,712.500
|
$20.000
|
$21.000
|
$22.000
|
$16.500
|
$21.750
|
$25.540
|
$23.350
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,800.000
|
$1,400.000
|
$1,800.000
|
$1,275.000
|
$817.000
|
$1,747.750
|
$812.340
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
48.000
|
$1,125.000
|
$1,265.000
|
$1,300.000
|
$975.000
|
$1,350.000
|
$1,546.090
|
$1,421.600
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
22,037.500
|
$2.500
|
$2.200
|
$7.000
|
$2.000
|
$5.390
|
$2.690
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
47.000
|
$235.000
|
$220.000
|
$230.000
|
$200.000
|
$110.000
|
$268.890
|
$152.310
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
13.000
|
$235.000
|
$165.000
|
$200.000
|
$250.000
|
$200.000
|
$201.660
|
$203.090
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
13.000
|
$235.000
|
$165.000
|
$200.000
|
$250.000
|
$200.000
|
$201.660
|
$203.090
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
3,959.000
|
$9.000
|
$27.000
|
$35.000
|
$9.600
|
$24.170
|
$14.790
|
$24.370
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
4.000
|
$3,000.000
|
$9,350.000
|
$10,000.000
|
$3,250.000
|
$8,560.680
|
$4,033.280
|
$8,631.150
|
|
|
REMOVE CABLE BARRIER
|
LF
|
30,922.000
|
$3.300
|
$1.900
|
$6.000
|
$3.640
|
$1.710
|
$5.380
|
$4.080
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
20.000
|
$575.000
|
$55.000
|
$100.000
|
$500.000
|
$50.360
|
$672.210
|
$50.770
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
84.000
|
$2,600.000
|
$2,725.000
|
$2,600.000
|
$2,400.000
|
$2,475.000
|
$3,327.450
|
$2,233.940
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
75.000
|
$250.000
|
$220.000
|
$220.000
|
$250.000
|
$250.000
|
$268.890
|
$203.090
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
17.000
|
$1,500.000
|
$2,750.000
|
$2,700.000
|
$3,600.000
|
$3,021.420
|
$4,161.790
|
$3,046.290
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
45.000
|
$1,100.000
|
$825.000
|
$900.000
|
$800.000
|
$503.570
|
$693.630
|
$507.710
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
28.000
|
$25,000.000
|
$24,000.000
|
$23,000.000
|
$20,400.000
|
$5,035.690
|
$31,808.190
|
$5,077.150
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
1.000
|
$16,000.000
|
$23,500.000
|
$23,000.000
|
$21,900.000
|
$22,559.910
|
$32,480.400
|
$22,745.610
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
3.000
|
$22,500.000
|
$33,500.000
|
$33,000.000
|
$32,500.000
|
$29,710.600
|
$50,129.280
|
$29,955.160
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
375.000
|
$47.000
|
$60.000
|
$85.000
|
$50.000
|
$60.000
|
$201.660
|
$45.910
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
21,500.000
|
$11.000
|
$37.000
|
$15.000
|
$21.440
|
$22.550
|
$37.490
|
$42.290
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$1,250.000
|
$1,550.000
|
$1,350.000
|
$1,400.000
|
$1,255.000
|
$2,030.500
|
$1,255.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,190.000
|
$11.000
|
$6.000
|
$12.000
|
$5.500
|
$11.100
|
$17.260
|
$11.100
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
45.000
|
$22.500
|
$33.000
|
$45.000
|
$30.000
|
$41.950
|
$61.690
|
$41.950
|
|
|
CONDT (RM) (1")
|
LF
|
370.000
|
$27.000
|
$16.500
|
$38.000
|
$15.000
|
$34.800
|
$74.030
|
$34.800
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
406.000
|
$1.100
|
$1.400
|
$1.400
|
$1.250
|
$1.200
|
$4.860
|
$1.200
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
812.000
|
$1.150
|
$1.400
|
$1.400
|
$1.250
|
$1.200
|
$4.860
|
$1.200
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,268.000
|
$1.150
|
$2.200
|
$1.500
|
$2.000
|
$1.300
|
$2.260
|
$1.300
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,536.000
|
$1.500
|
$2.200
|
$1.500
|
$2.000
|
$1.350
|
$23.390
|
$1.350
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$1,000.000
|
$740.000
|
$1,500.000
|
$675.000
|
$1,315.000
|
$1,593.900
|
$1,315.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
45.000
|
$25.000
|
$50.000
|
$32.000
|
$26.940
|
$29.200
|
$297.640
|
$29.200
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,544.000
|
$28.000
|
$31.000
|
$20.000
|
$28.000
|
$18.150
|
$47.800
|
$18.150
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
6,567.040
|
$31.000
|
$32.000
|
$24.000
|
$29.000
|
$21.910
|
$44.580
|
$21.910
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$500.000
|
$675.000
|
$750.000
|
$451.690
|
$669.000
|
$672.210
|
$669.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
43.000
|
$600.000
|
$775.000
|
$800.000
|
$749.770
|
$741.000
|
$1,061.340
|
$741.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$660.000
|
$1,000.000
|
$1,200.000
|
$818.920
|
$1,022.000
|
$1,343.920
|
$1,022.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
24.000
|
$1,700.000
|
$1,285.000
|
$2,200.000
|
$1,508.930
|
$2,003.000
|
$1,797.750
|
$2,003.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
9.000
|
$350.000
|
$420.000
|
$500.000
|
$481.550
|
$412.000
|
$712.730
|
$412.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$430.000
|
$525.000
|
$520.000
|
$505.000
|
$494.000
|
$698.100
|
$494.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
108.000
|
$82.000
|
$80.000
|
$230.000
|
$48.430
|
$212.250
|
$368.640
|
$212.250
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,096.000
|
$8.000
|
$6.500
|
$4.600
|
$5.750
|
$4.170
|
$26.910
|
$4.170
|
|
|
RELOCATE LRSA
|
EA
|
49.000
|
$7,300.000
|
$715.000
|
$3,000.000
|
$650.000
|
$2,535.000
|
$2,211.820
|
$2,535.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
9.000
|
$20,500.000
|
$25,000.000
|
$18,000.000
|
$22,800.000
|
$16,440.000
|
$25,023.060
|
$16,440.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
2.000
|
$21,750.000
|
$28,000.000
|
$22,000.000
|
$26,000.000
|
$19,756.000
|
$29,848.300
|
$19,756.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
5.000
|
$23,000.000
|
$34,000.000
|
$25,000.000
|
$31,000.000
|
$22,476.000
|
$36,398.340
|
$22,476.000
|
|
|
INS OH SN SUP(65 FT BRDG)
|
EA
|
1.000
|
$29,000.000
|
$45,000.000
|
$30,000.000
|
$41,000.000
|
$26,696.000
|
$44,214.630
|
$26,696.000
|
|
|
INS OH SN SUP(70 FT BRDG)
|
EA
|
1.000
|
$34,000.000
|
$48,000.000
|
$30,000.000
|
$44,200.000
|
$28,804.000
|
$46,743.390
|
$28,804.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$26,000.000
|
$54,000.000
|
$35,000.000
|
$49,200.000
|
$31,075.000
|
$53,575.150
|
$31,075.000
|
|
|
INS OH SN SUP(85 FT BRDG)
|
EA
|
2.000
|
$35,000.000
|
$56,000.000
|
$35,000.000
|
$51,000.000
|
$32,505.000
|
$55,586.910
|
$32,505.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
$40,000.000
|
$64,000.000
|
$38,000.000
|
$58,400.000
|
$35,535.000
|
$61,910.680
|
$35,535.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
22.000
|
$7,000.000
|
$10,500.000
|
$6,000.000
|
$9,500.000
|
$5,010.000
|
$11,800.860
|
$5,010.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
4.000
|
$750.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
$813.000
|
$1,843.180
|
$813.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BR)
|
EA
|
196.000
|
$100.000
|
$44.000
|
$44.000
|
$40.000
|
$85.000
|
$134.440
|
$58.340
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
25.000
|
$24.000
|
$16.500
|
$25.000
|
$15.000
|
$28.000
|
$28.230
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
237.000
|
$26.000
|
$27.500
|
$30.000
|
$25.000
|
$28.000
|
$37.640
|
$27.110
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
25.000
|
$20.000
|
$16.500
|
$20.000
|
$15.000
|
$28.000
|
$22.850
|
$24.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
148.000
|
$22.000
|
$16.500
|
$20.000
|
$15.000
|
$28.000
|
$29.580
|
$16.960
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
30.000
|
$60.000
|
$70.000
|
$75.000
|
$65.000
|
$100.000
|
$115.620
|
$59.590
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
18,590.000
|
$0.280
|
$0.380
|
$0.380
|
$0.350
|
$0.450
|
$0.470
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
154,129.000
|
$0.270
|
$0.330
|
$0.380
|
$0.300
|
$0.450
|
$0.400
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
10,258.000
|
$0.530
|
$0.550
|
$0.550
|
$0.500
|
$1.300
|
$0.670
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
|
LF
|
1,820.000
|
$2.180
|
$2.750
|
$3.000
|
$2.500
|
$3.000
|
$3.360
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
2,100.000
|
$1.320
|
$2.750
|
$3.000
|
$2.500
|
$3.000
|
$2.960
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
13.000
|
$67.500
|
$132.000
|
$130.000
|
$120.000
|
$145.000
|
$161.330
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
13.000
|
$80.000
|
$155.000
|
$150.000
|
$140.000
|
$265.000
|
$188.220
|
$140.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
98,700.000
|
$0.290
|
$0.330
|
$0.330
|
$0.300
|
$0.450
|
$0.400
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
6,533.000
|
$3.700
|
$2.750
|
$3.000
|
$2.500
|
$4.600
|
$3.360
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
6,728.000
|
$3.700
|
$2.750
|
$3.000
|
$2.500
|
$4.600
|
$3.360
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
13,296.000
|
$3.400
|
$2.750
|
$3.000
|
$2.500
|
$4.600
|
$3.360
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
24,802.000
|
$2.500
|
$1.650
|
$1.600
|
$1.500
|
$1.000
|
$2.020
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
19,861.000
|
$2.500
|
$1.650
|
$1.600
|
$1.500
|
$1.000
|
$2.020
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
4,231.000
|
$1.300
|
$2.200
|
$2.200
|
$2.000
|
$6.150
|
$2.690
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
2,145.000
|
$1.300
|
$2.200
|
$2.200
|
$2.000
|
$6.150
|
$2.690
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
16,955.000
|
$1.000
|
$0.950
|
$0.900
|
$0.880
|
$1.350
|
$1.180
|
$0.880
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
2,271.000
|
$2.500
|
$3.000
|
$3.000
|
$2.700
|
$3.000
|
$3.630
|
$2.700
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
4,192.000
|
$3.000
|
$3.000
|
$3.000
|
$2.700
|
$3.000
|
$3.630
|
$2.700
|
|
|
PAVEMENT SEALER 6"
|
LF
|
160,566.000
|
$0.200
|
$0.220
|
$0.220
|
$0.200
|
$0.160
|
$0.270
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
16,955.000
|
$1.000
|
$0.330
|
$0.330
|
$0.300
|
$0.400
|
$0.400
|
$0.300
|
|
|
PAVEMENT SEALER 10"
|
LF
|
35,310.000
|
$1.000
|
$1.300
|
$1.300
|
$1.200
|
$0.620
|
$1.610
|
$1.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
6,463.000
|
$1.000
|
$2.400
|
$2.400
|
$2.200
|
$0.750
|
$2.960
|
$2.200
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
13.000
|
$40.000
|
$60.000
|
$60.000
|
$55.000
|
$25.000
|
$73.940
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
13.000
|
$40.000
|
$80.000
|
$80.000
|
$75.000
|
$25.000
|
$100.830
|
$75.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
14.000
|
$800.000
|
$275.000
|
$300.000
|
$250.000
|
$740.000
|
$336.110
|
$250.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
11.000
|
$80.000
|
$165.000
|
$165.000
|
$150.000
|
$130.000
|
$201.660
|
$150.000
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
35,310.000
|
$9.000
|
$8.800
|
$9.000
|
$8.000
|
$7.380
|
$10.760
|
$8.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$210.000
|
$200.000
|
$200.000
|
$180.000
|
$355.000
|
$242.000
|
$180.000
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
11.000
|
$150.000
|
$330.000
|
$330.000
|
$300.000
|
$480.000
|
$403.330
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
13.000
|
$260.000
|
$265.000
|
$260.000
|
$240.000
|
$480.000
|
$322.660
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (EXIT GORE)
|
EA
|
14.000
|
$2,900.000
|
$2,750.000
|
$2,700.000
|
$2,500.000
|
$50.000
|
$3,361.060
|
$2,500.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,216.000
|
$3.500
|
$4.150
|
$4.000
|
$3.750
|
$5.000
|
$5.040
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
254,192.000
|
$0.310
|
$0.550
|
$0.550
|
$0.500
|
$0.400
|
$0.670
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
17,826.000
|
$0.660
|
$0.650
|
$0.660
|
$0.600
|
$0.800
|
$0.810
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
10,326.000
|
$1.400
|
$2.200
|
$2.200
|
$2.000
|
$1.400
|
$2.690
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
14.000
|
$70.000
|
$80.000
|
$80.000
|
$75.000
|
$80.000
|
$100.830
|
$75.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
16.000
|
$70.000
|
$80.000
|
$80.000
|
$75.000
|
$130.000
|
$100.830
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
160,566.000
|
$0.040
|
$0.060
|
$0.060
|
$0.050
|
$0.100
|
$0.070
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
16,955.000
|
$0.130
|
$0.110
|
$0.110
|
$0.100
|
$0.300
|
$0.130
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
35,310.000
|
$0.200
|
$0.330
|
$0.330
|
$0.300
|
$0.300
|
$0.400
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,463.000
|
$0.400
|
$0.550
|
$0.550
|
$0.500
|
$0.550
|
$0.670
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
13.000
|
$16.000
|
$27.500
|
$30.000
|
$25.000
|
$25.000
|
$33.610
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
11.000
|
$40.000
|
$55.000
|
$55.000
|
$50.000
|
$60.000
|
$67.220
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
13.000
|
$40.000
|
$55.000
|
$55.000
|
$50.000
|
$60.000
|
$67.220
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
14.000
|
$150.000
|
$220.000
|
$220.000
|
$200.000
|
$1,400.000
|
$268.890
|
$200.000
|
|
|
D-GR HMA TY-C PG70-22 (LEVEL-UP)
|
TON
|
3,602.000
|
$84.000
|
$128.000
|
$110.000
|
$120.000
|
$120.000
|
$147.900
|
$120.000
|
|
|
D-GR HMA TY-F SAC-A PG64-22
|
TON
|
25,845.000
|
$110.000
|
$100.000
|
$99.000
|
$120.000
|
$120.000
|
$125.710
|
$120.000
|
|
|
TACK COAT
|
GAL
|
53,543.000
|
$2.600
|
$3.600
|
$3.000
|
$5.000
|
$5.000
|
$4.030
|
$5.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
1,342.000
|
$96.000
|
$122.000
|
$99.000
|
$140.000
|
$140.000
|
$145.210
|
$140.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
1,331.000
|
$110.000
|
$122.000
|
$105.000
|
$145.000
|
$145.000
|
$151.930
|
$145.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
1,354.000
|
$110.000
|
$122.000
|
$107.000
|
$140.000
|
$140.000
|
$155.970
|
$140.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
14,784.000
|
$102.000
|
$120.000
|
$112.000
|
$140.000
|
$140.000
|
$145.040
|
$140.000
|
|
|
TACK COAT
|
GAL
|
15,935.000
|
$2.600
|
$3.600
|
$3.000
|
$5.000
|
$5.000
|
$6.750
|
$5.000
|
|
|
PERMEABLE CONCRETE EDGE DRAIN
|
LF
|
8,826.000
|
$25.000
|
$80.000
|
$50.000
|
$42.850
|
$34.640
|
$70.050
|
$78.480
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$8,440.000
|
$16,000.000
|
$60,000.000
|
$105.750
|
$8,000.000
|
$23,895.600
|
$10,000.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
2,700.000
|
$16.000
|
$9.000
|
$9.000
|
$18.250
|
$8.000
|
$11.100
|
$31.150
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
2,700.000
|
$2.000
|
$1.100
|
$1.000
|
$1.500
|
$1.000
|
$1.390
|
$4.420
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
1,620.000
|
$8.000
|
$2.200
|
$3.000
|
$4.250
|
$2.000
|
$2.770
|
$14.140
|
|
|
AUTO PORT SMRT TRF MONITOR SYS (PLAN 2)
|
DAY
|
1,200.000
|
$200.000
|
$400.000
|
$250.000
|
$600.000
|
$400.000
|
$554.900
|
$400.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
79,889.000
|
$0.600
|
$0.640
|
$0.620
|
$0.580
|
$0.930
|
$0.780
|
$0.580
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
80,677.000
|
$0.600
|
$0.640
|
$0.620
|
$0.580
|
$0.930
|
$0.780
|
$0.580
|
|
|
TMA (STATIONARY)
|
DAY
|
724.000
|
$140.000
|
$125.000
|
$200.000
|
$487.140
|
$302.820
|
$443.850
|
$229.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
39.000
|
$140.000
|
$125.000
|
$200.000
|
$719.220
|
$600.460
|
$811.850
|
$200.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
1,050.000
|
$266.000
|
$250.000
|
$250.000
|
$105.520
|
$235.640
|
$508.940
|
$300.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
750.000
|
$380.000
|
$250.000
|
$350.000
|
$105.520
|
$148.370
|
$514.490
|
$400.000
|
|
Totals: |
$74,732,487.410
|
$88,870,748.580
|
$89,595,499.990
|
$91,297,977.974
|
$93,992,925.848
|
$108,510,550.978
|
$121,595,262.752
|