Job Info for 0085-04-035

County: BOWIE Highway: US 259 Date: 04/04/2017 (7 years ago) Engineer's Estimate: $5,660,757 Control Number: 0085-04-035
Project: STP 2013(615) District: ATLANTA Time: 317 WORKING DAYS Type: GR,STR,BS,SURF & PAV MRK

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $5,660,757.32
H. H. HOWARD & SONS, INC.   $5,371,369.95 1
-5.11% | -$289,387.37
LONGVIEW BRIDGE AND ROAD, LTD.   $5,907,197.32 2
4.35% | $246,440.00
9.98% | $535,827.37
EAST TEXAS BRIDGE, INC.   $6,577,598.41 3
16.2% | $916,841.09
22.46% | $1,206,228.46
11.35% | $670,401.09

Bid Items

Items: 99, 0 filtered
BOWIE US 259  |  ATLANTA  |  0085-04-035  |  04/04/2017  |  $5,660,757  |  STP 2013(615)  |  GR,STR,BS,SURF & PAV MRK  |  317 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate H. H. HOWARD & SONS, INC. LONGVIEW BRIDGE AND ROAD, LTD. EAST TEXAS BRIDGE, INC.
104 6009 REMOVING CONC (RIPRAP) SY 1,233.000 $15.000 $8.000 $10.500 $12.000
104 6027 REMOVING CONC (APPR SLAB) SY 261.000 $30.000 $15.000 $25.000 $20.000
105 6074 REMOVING STAB BASE AND ASPH PAV (4") SY 15,029.000 $5.000 $2.000 $4.250 $3.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 150.300 $310.000 $300.000 $375.000 $1,600.000
132 6002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 200.000 $15.000 $15.000 $42.000 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 101.000 $10.000 $20.000 $65.000 $15.000
134 6001 BACKFILL (TY A) STA 150.300 $300.000 $250.000 $300.000 $600.000
150 6001 BLADING STA 1.000 $200.000 $20,000.000 $1,600.000 $1,000.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 285.000 $3.000 $2.000 $5.750 $5.000
162 6002 BLOCK SODDING SY 968.000 $5.000 $4.000 $4.400 $5.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 26,858.000 $1.000 $0.900 $1.000 $1.000
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 6,716.000 $0.100 $0.900 $1.000 $1.000
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 6,716.000 $0.100 $0.900 $1.000 $1.000
168 6001 VEGETATIVE WATERING MG 644.600 $8.000 $5.000 $10.000 $15.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 1,280.000 $2.000 $3.000 $2.250 $3.000
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 12,460.000 $40.000 $45.000 $70.000 $72.000
275 6001 CEMENT TON 2,261.000 $155.000 $165.000 $170.000 $165.000
275 6010 CEMENT TREAT (SUBGRADE) (8") SY 33,953.000 $2.400 $3.000 $2.500 $4.000
275 6023 CEMENT TREAT(MX EXST MTL & NW BS)(12") SY 73,468.000 $4.000 $4.000 $3.000 $5.000
310 6009 PRIME COAT (MC-30) GAL 16,097.000 $4.750 $4.000 $4.650 $7.000
316 6005 ASPH (TIER II) GAL 38,095.000 $2.750 $3.500 $4.250 $3.500
316 6124 AGGR(TY-PB GR-3 SAC-A) CY 958.000 $120.000 $125.000 $178.000 $130.000
344 6135 SUPERPAVE MIXTURES SP-D SAC-A PG76-22 TON 12,399.000 $130.000 $100.000 $110.000 $110.000
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 801.000 $1.500 $5.000 $7.500 $4.000
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 3,590.000 $3.000 $3.000 $4.950 $4.000
354 6057 PLANE ASPH CONC PAV (4") SY 43,413.000 $2.000 $3.000 $2.700 $2.500
400 6005 CEM STABIL BKFL CY 78.000 $175.000 $200.000 $255.000 $250.000
403 6001 TEMPORARY SPL SHORING SF 372.800 $40.000 $30.000 $65.000 $45.000
416 6002 DRILL SHAFT (24 IN) LF 832.000 $120.000 $100.000 $155.000 $125.000
420 6019 CL C CONC (ABUT)(EXTEND) CY 21.200 $1,350.000 $2,200.000 $2,150.000 $1,500.000
420 6033 CL C CONC (CAP)(EXTEND) CY 28.000 $1,500.000 $2,200.000 $2,150.000 $1,500.000
420 6037 CL C CONC (COLUMN) CY 16.400 $900.000 $2,400.000 $2,400.000 $1,500.000
422 6015 APPROACH SLAB CY 178.000 $450.000 $800.000 $485.000 $530.000
422 6030 CONCRETE PAN GIRDER (EXTEND) CY 223.200 $1,400.000 $1,200.000 $1,165.000 $1,400.000
432 6002 RIPRAP (CONC)(5 IN) CY 13.000 $800.000 $500.000 $550.000 $500.000
432 6006 RIPRAP (CONC)(CL B) CY 8.000 $390.000 $500.000 $580.000 $500.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 139.000 $200.000 $140.000 $155.000 $115.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 584.500 $130.000 $140.000 $155.000 $115.000
432 6039 BEDDING MATERIAL (6 IN) CY 136.000 $170.000 $140.000 $138.000 $125.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 56.000 $490.000 $500.000 $530.000 $500.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 304.800 $5.000 $16.000 $30.000 $35.000
438 6005 CLEANING AND SEALING JOINTS LF 740.300 $9.000 $16.000 $30.000 $20.000
450 6006 RAIL (TY T223) LF 602.000 $130.000 $100.000 $85.000 $100.000
454 6003 ARMOR JOINT LF 182.000 $100.000 $100.000 $58.000 $50.000
467 6287 SET (TY I)(S= 8 FT)(HW= 8 FT)(4:1) (C) EA 1.000 $13,000.000 $26,000.000 $28,000.000 $23,000.000
496 6056 REMOVE STR (STL SECTIONS) LF 596.000 $75.000 $10.000 $20.000 $50.000
500 6001 MOBILIZATION LS 1.000 $510,829.120 $500,000.000 $475,000.000 $600,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $3,500.000 $2,000.000 $2,600.000 $10,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 401.000 $28.000 $50.000 $22.000 $25.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 72.000 $70.000 $80.000 $28.000 $35.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 473.000 $8.000 $20.000 $10.000 $9.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,075.000 $3.000 $4.000 $3.050 $3.300
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,075.000 $1.000 $1.000 $1.200 $1.100
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 4.000 $5,500.000 $6,000.000 $8,000.000 $10,000.000
512 6017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 630.000 $15.000 $20.000 $20.000 $35.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 630.000 $20.000 $10.000 $8.000 $15.000
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 630.000 $35.000 $20.000 $20.000 $20.000
530 6002 INTERSECTIONS (ACP) SY 1,854.000 $26.000 $54.000 $55.000 $60.000
530 6004 DRIVEWAYS (CONC) SY 983.000 $75.000 $60.000 $80.000 $125.000
530 6019 DRIVEWAYS (ACP)(TYPE 1) SY 871.000 $70.000 $44.000 $48.000 $60.000
530 6021 DRIVEWAYS (ACP) (TYPE 2) SY 105.000 $75.000 $78.700 $78.000 $60.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 36,058.000 $0.200 $0.160 $0.200 $0.500
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 17,981.000 $0.200 $0.200 $0.200 $0.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,075.000 $18.000 $20.000 $23.000 $22.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $1,500.000 $1,500.000 $1,540.000 $1,800.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,875.000 $3.000 $2.000 $3.600 $3.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 8.000 $235.000 $300.000 $240.000 $250.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $220.000 $200.000 $240.000 $250.000
544 6004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 8.000 $2,100.000 $2,200.000 $2,300.000 $2,300.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 4.000 $10,000.000 $10,000.000 $14,000.000 $10,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 4.000 $3,000.000 $3,000.000 $4,000.000 $3,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $1,115.000 $1,000.000 $825.000 $1,200.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 19.000 $160.000 $125.000 $200.000 $200.000
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 2.000 $180.000 $165.000 $220.000 $250.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 22.000 $350.000 $400.000 $605.000 $500.000
644 6002 IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) EA 2.000 $500.000 $495.000 $825.000 $800.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $620.000 $530.000 $740.000 $700.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 7.000 $730.000 $545.000 $770.000 $700.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 4.000 $900.000 $635.000 $910.000 $800.000
644 6038 IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL) EA 3.000 $1,100.000 $795.000 $1,050.000 $1,100.000
644 6051 IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1.000 $1,700.000 $1,250.000 $1,450.000 $1,400.000
644 6076 REMOVE SM RD SN SUP&AM EA 44.000 $60.000 $45.000 $70.000 $100.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 16.000 $33.000 $20.000 $60.000 $30.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 12.000 $46.000 $52.000 $78.000 $60.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 24.000 $35.000 $25.000 $61.500 $30.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 80,036.000 $0.250 $0.100 $0.110 $0.120
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 77,278.000 $0.250 $0.100 $0.110 $0.120
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 65,574.000 $0.750 $0.750 $0.550 $0.550
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 72.000 $6.500 $3.250 $0.550 $0.550
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 63,407.000 $0.750 $0.750 $0.550 $0.550
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,830.000 $0.900 $3.000 $1.000 $2.000
666 6045 REFL PAV MRK TY I (W)18"(SLD)(100MIL) LF 56.000 $8.000 $5.000 $5.500 $6.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 226.000 $11.500 $12.500 $13.750 $15.000
672 6009 REFL PAV MRKR TY II-A-A EA 334.000 $3.000 $3.500 $3.850 $4.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 187,131.000 $0.400 $0.200 $0.220 $0.220
770 6029 REM & RESET SGT IMPACT HEAD EA 10.000 $500.000 $1,000.000 $1,350.000 $1,500.000
6149 6001 REFL PAV MRK AWT (W) 4" (SLD) (100MIL) LF 36,058.000 $0.300 $0.420 $0.460 $0.460
6149 6007 REFL PAV MRK AWT (Y) 4" (SLD) (100MIL) LF 11,127.000 $0.300 $0.420 $0.460 $0.460
6149 6008 REFL PAV MRK AWT (Y) 4" (BRK) (100MIL) LF 3,771.000 $0.350 $0.420 $0.460 $0.460
Totals: $5,660,757.32 $5,371,369.95 $5,907,197.32 $6,577,598.41