Job Info for 6355-76-001

County: BOSQUE Highway: FM0219 Date: 06/04/2020 (4 years ago) Engineer's Estimate: $1,037,076 Control Number: 6355-76-001
Project: RMC - 635576001 District: WACO Time: 365 CALENDAR DAYS Type: BASE FAILURE PAVEMENT REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,037,075.54
TEXAS MATERIALS GROUP, INC.   $488,477.49 1
-52.9% | -$548,598.05
BIG CREEK CONSTRUCTION, LTD.   $495,937.75 2
-52.18% | -$541,137.79
1.53% | $7,460.26
KNIFE RIVER CORPORATION - SOUTH   $497,510.15 3
-52.03% | -$539,565.39
1.85% | $9,032.66
0.32% | $1,572.40
NORTHEASTERN PAVERS, LLC   $510,353.64 4
-50.79% | -$526,721.90
4.48% | $21,876.15
2.58% | $12,843.49

Bid Items

Items: 15, 0 filtered
BOSQUE FM0219  |  WACO  |  6355-76-001  |  06/04/2020  |  $1,037,076  |  RMC - 635576001  |  BASE FAILURE PAVMT REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. BIG CREEK CONSTRUCTION, LTD. KNIFE RIVER CORPORATION - SOUTH NORTHEASTERN PAVERS, LLC
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 3,112.000 $49.200 $42.850 $42.500 $47.500 $44.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 15,376.000 $44.200 $20.500 $21.250 $20.700 $22.000
500 6033 MOBILIZATION (CALLOUT) EA 2.000 $38,410.130 $7,555.000 $250.000 $595.000 $10,000.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 100.000 $2.160 $0.900 $1.000 $1.000 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 790.000 $0.720 $0.900 $1.000 $1.000 $1.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 40.000 $14.400 $22.000 $10.000 $23.450 $8.200
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 200.000 $1.200 $0.950 $1.250 $1.000 $1.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 15,790.000 $1.200 $0.840 $0.850 $0.900 $0.500
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 1,974.000 $0.960 $0.950 $1.250 $1.000 $0.500
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 7,895.000 $0.720 $0.850 $1.250 $0.900 $0.500
672 6007 REFL PAV MRKR TY I-C EA 30.000 $8.160 $9.000 $10.000 $9.600 $7.000
672 6009 REFL PAV MRKR TY II-A-A EA 99.000 $5.760 $8.000 $10.000 $8.550 $7.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 132.000 $271.200 $0.010 $25.000 $1.000 $0.010
6185 6002 TMA (STATIONARY) DAY 132.000 $432.000 $0.010 $25.000 $1.000 $0.010
6185 6003 TMA (MOBILE OPERATION) HR 50.000 $115.200 $0.500 $25.000 $70.000 $0.010
Totals: $1,037,075.54 $488,477.49 $495,937.75 $497,510.15 $510,353.64