BOSQUE SH 6 (0258-04-035)

Items: 137

County: BOSQUE
Length: N/A
Highway: SH 6
District: WACO
Control Number: 0258-04-035
DBE Goal: N/A
Project: F 2023(497)
Guaranty: N/A
Time: 495 WORKING DAYS
Engineer's Estimate: $29,200,789.57
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: ADD PASSING LANES AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$29,200,789.57
$26,587,289.90
Over/Under Est: -8.95% -$2,613,499.67
Over/Under Est: -5.37% -$1,568,523.60
Amt Left: 3.93% $1,044,976.07
Over/Under Est: 9.1% $2,657,050.25
Amt Left: 19.82% $5,270,549.92
Delta: -15.29% -$4,225,573.85
Over/Under Est: 12.44% $3,633,252.75
Amt Left: 23.5% $6,246,752.42
Delta: -3.06% -$976,202.50
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 10.64% $2,879,392.82
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.99% $809,152.68
D. I. J. CONSTRUCTION, INC. 1.67% $451,934.78
AUSTIN WOOD RECYCLING 1.08% $292,269.20
SAN-ANN-CO., INC. 0.97% $262,501.04
ROADWAY SPECIALTIES, INC. 0.87% $235,439.07
WEST TEXAS RUMBLE STRIP LLC 0.30% $81,185.89
COLD CREEK CONSTRUCTION, LTD 0.20% $54,123.93
PRIMATE CONSTRUCTION, LP 0.12% $32,474.36
MJS CONSTRUCTION LLC 0.03% $8,118.59
NEXT CONSTRUCTION SOLUTIONS LLC 0.01% $2,706.20
DALLAS LITE AND BARRICADE, INC. 0.00% $0.00
Total: 18.88% $5,109,298.56

Bid Items & Bid Tabulations

137 Total 0 of 137
BOSQUE  |  SH 6  |  WACO  |  0258-04-035  |  03/08/2023  |  $29,200,789.57  |  F 2023(497)  |  ADD PASSING LANES AND OVERLAY  |  495 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW
STA 821.000 $1,051.110 $500.000 $540.000 $200.000 $550.000
REMOVING CONC (DRIVEWAYS)
SY 439.000 $21.490 $25.000 $28.000 $11.000 $9.500
REMOVING CONCRETE(MOW STRIP)
LF 3,200.000 $9.340 $15.000 $10.000 $11.000 $4.200
REMOVING STAB BASE AND ASP PAV(19"-20")
SY 71,508.000 $5.500 $5.000 $6.000 $2.500 $7.000
EXCAVATION (ROADWAY)
CY 59,723.000 $11.000 $15.000 $11.000 $9.300 $10.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 68,450.000 $16.280 $15.000 $11.000 $16.000 $7.000
BACKFILL (TY A OR B)
STA 821.000 $93.090 $200.000 $295.000 $125.000 $125.000
FURNISHING AND PLACING TOPSOIL (4")
SY 537,777.000 $1.200 $0.250 $0.250 $1.000 $4.800
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 537,777.000 $0.180 $0.200 $0.180 $0.170 $0.190
DRILL SEEDING (TEMP) (WARM)
SY 268,896.000 $0.100 $0.150 $0.140 $0.010 $0.130
DRILL SEEDING (TEMP) (COOL)
SY 268,896.000 $0.100 $0.150 $0.140 $0.010 $0.130
VEGETATIVE WATERING
MG 8,735.100 $20.360 $5.000 $1.000 $0.010 $17.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,400.000 $4.340 $3.500 $2.500 $4.000 $1.950
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 35,140.000 $51.820 $65.000 $71.000 $72.000 $50.000
PRIME COAT(MC-30 OR AE-P)
GAL 23,255.000 $4.600 $5.000 $5.400 $5.900 $5.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 20,000.000 $150.000 $60.000 $75.000 $82.000 $70.000
CEM STABIL BKFL
CY 341.000 $191.170 $220.000 $210.000 $150.000 $150.000
TEMPORARY SPL SHORING
SF 12,400.000 $37.180 $25.000 $24.500 $30.000 $45.000
RIPRAP (CONC)(4 IN)
CY 72.000 $450.000 $525.000 $540.000 $750.000 $687.500
RIPRAP (CONC)(5 IN)
CY 94.000 $622.930 $525.000 $525.000 $800.000 $660.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 159.000 $142.220 $200.000 $190.000 $150.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 271.000 $476.050 $550.000 $775.000 $750.000 $742.500
CLEANING AND SEALING JOINTS (CL 3)
LF 88.000 $40.000 $60.000 $80.000 $78.000 $85.800
CLEANING EXISTING JOINTS
LF 132.000 $11.340 $20.000 $17.000 $14.000 $19.800
HEADER TYPE EXPANSION JOINT
CF 18.400 $350.000 $1,200.000 $800.000 $750.000 $858.000
JOINT SEALANT
LF 132.000 $16.180 $15.000 $15.000 $12.000 $17.600
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 32.000 $566.000 $775.000 $822.000 $500.000 $517.220
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 34.000 $838.000 $850.000 $906.000 $550.000 $935.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 62.000 $591.940 $750.000 $760.000 $600.000 $768.460
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 15.000 $803.890 $900.000 $909.000 $600.000 $835.670
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 12.000 $707.210 $950.000 $859.000 $700.000 $713.570
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 72.000 $789.830 $725.000 $717.000 $750.000 $646.250
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 99.000 $1,046.750 $750.000 $653.000 $850.000 $1,232.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 171.000 $591.000 $800.000 $745.000 $900.000 $1,441.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 26.000 $1,132.000 $850.000 $774.000 $1,000.000 $1,485.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 76.000 $950.000 $900.000 $693.000 $1,050.000 $1,650.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 26.000 $1,037.000 $950.000 $854.000 $1,100.000 $1,534.500
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 102.000 $1,145.000 $1,000.000 $924.000 $1,200.000 $2,035.000
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 36.000 $1,800.000 $1,500.000 $1,494.000 $1,350.000 $2,255.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 24.000 $1,451.860 $1,600.000 $1,637.000 $1,600.000 $2,900.700
RC PIPE (CL III)(18 IN)
LF 724.000 $73.620 $90.000 $64.000 $60.000 $105.000
RC PIPE (CL III)(24 IN)
LF 402.000 $89.480 $125.000 $160.000 $150.000 $130.000
RC PIPE (CL III)(36 IN)
LF 15.000 $152.750 $300.000 $265.000 $250.000 $300.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $4,000.000 $7,000.000 $7,500.000 $7,000.000 $4,400.000
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 2.000 $8,647.250 $7,500.000 $12,900.000 $12,000.000 $5,810.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $10,853.000 $9,200.000 $9,600.000 $7,000.000 $9,900.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $13,211.590 $9,500.000 $9,400.000 $8,000.000 $8,300.000
WINGWALL (FW - 0) (HW=6 FT)
EA 4.000 $10,250.880 $10,000.000 $10,400.000 $10,000.000 $15,840.000
WINGWALL (FW - 0) (HW=7 FT)
EA 5.000 $10,288.000 $12,500.000 $11,800.000 $12,000.000 $17,600.000
WINGWALL (FW - 0) (HW=8 FT)
EA 5.000 $22,500.000 $15,000.000 $13,000.000 $17,000.000 $22,500.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $9,286.000 $10,000.000 $10,500.000 $8,000.000 $10,700.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $9,719.000 $10,000.000 $10,200.000 $10,000.000 $10,100.000
WINGWALL (PW - 1) (HW=10 FT)
EA 3.000 $34,325.000 $25,000.000 $24,500.000 $40,000.000 $53,680.000
WINGWALL (PW - 1) (HW=11 FT)
EA 4.000 $47,242.230 $30,000.000 $26,500.000 $48,000.000 $58,960.000
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000 $45,000.000 $45,000.000 $43,000.000 $60,000.000 $68,200.000
WINGWALL (PW - 1) (HW=13 FT)
EA 3.000 $61,666.670 $65,000.000 $63,000.000 $65,000.000 $75,000.000
WINGWALL (PW - 1) (HW=15 FT)
EA 1.000 $62,000.000 $80,000.000 $79,000.000 $90,000.000 $109,600.000
WINGWALL (PW - 1) (HW=16 FT)
EA 1.000 $65,000.000 $95,000.000 $91,000.000 $105,000.000 $128,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $14,115.690 $9,000.000 $9,400.000 $7,000.000 $6,825.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $11,222.220 $10,000.000 $10,500.000 $10,000.000 $10,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $17,615.390 $11,000.000 $10,700.000 $12,000.000 $11,600.000
WINGWALL (PW - 1) (HW=7 FT)
EA 6.000 $14,787.040 $12,500.000 $12,500.000 $18,000.000 $16,830.000
WINGWALL (PW - 1) (HW=8 FT)
EA 9.000 $30,230.000 $12,000.000 $11,700.000 $25,000.000 $31,900.000
WINGWALL (PW - 1) (HW=9 FT)
EA 5.000 $36,756.020 $20,000.000 $19,500.000 $35,000.000 $40,150.000
SET (TY I) (24 IN) (4: 1) (C)
EA 2.000 $5,903.360 $2,000.000 $9,000.000 $8,500.000 $4,730.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,133.400 $1,500.000 $1,075.000 $1,000.000 $1,915.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,481.460 $2,000.000 $2,150.000 $2,000.000 $2,650.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,521.000 $5,000.000 $4,300.000 $4,000.000 $7,850.000
ADJUSTING MANHOLES
EA 2.000 $2,051.990 $2,000.000 $2,000.000 $2,500.000 $2,090.000
CLEAN EXIST CULVERTS
EA 42.000 $1,370.350 $2,000.000 $1,850.000 $1,500.000 $2,200.000
REMOV STR (BOX CULVERT)
EA 27.000 $1,000.000 $100.000 $65.000 $1,500.000 $3,300.000
REMOV STR (WINGWALL)
EA 60.000 $833.970 $1,000.000 $525.000 $2,000.000 $880.000
REMOV STR (HEADWALL)
EA 6.000 $1,018.430 $1,000.000 $525.000 $2,000.000 $880.000
REMOV STR (PIPE)
LF 980.000 $11.110 $15.000 $10.750 $40.000 $20.000
MOBILIZATION
LS 1.000 $1,958,804.370 $2,500,000.000 $2,650,000.000 $3,043,000.000 $2,750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $7,455.650 $5,000.000 $15,000.000 $6,315.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,500.000 $36.220 $50.000 $47.000 $50.000 $41.800
ROCK FILTER DAMS (REMOVE)
LF 2,500.000 $8.020 $17.000 $16.750 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 115,129.000 $3.000 $3.750 $3.350 $3.500 $3.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 115,129.000 $0.730 $1.000 $0.880 $0.250 $0.280
TURNOUTS (ACP)
SY 581.000 $71.850 $80.000 $60.000 $75.000 $80.000
DRIVEWAYS (CONC) (HES)
SY 439.000 $115.000 $150.000 $165.000 $150.000 $160.000
DRIVEWAYS (ACP)(TYPE 1)
SY 9,030.000 $40.000 $20.000 $25.000 $23.000 $30.000
DRIVEWAYS (ACP) (TYPE 2)
SY 9,037.000 $50.640 $45.000 $59.000 $72.000 $68.000
INTERSECTIONS (ACP) (TYPE 1)
SY 5,164.000 $42.750 $20.000 $19.000 $20.000 $30.000
INTERSECTIONS (ACP) (TYPE 2)
SY 4,404.000 $62.750 $45.000 $59.000 $75.000 $68.000
DRIVEWAYS (ACP)(TYPE 3)
SY 2,807.000 $46.000 $50.000 $89.000 $101.000 $68.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,887.500 $36.990 $38.000 $32.000 $29.400 $32.500
REMOVE METAL BEAM GUARD FENCE
LF 3,200.000 $2.420 $5.000 $2.150 $2.500 $2.750
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $3,567.150 $3,700.000 $3,000.000 $2,650.000 $2,915.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $297.830 $350.000 $265.000 $200.000 $220.000
CHAIN LINK FENCE (INSTALL) (6')
LF 190.000 $35.000 $50.000 $40.000 $60.000 $27.500
CHAIN LINK FENCE (REMOVE)
LF 190.000 $7.500 $10.000 $10.000 $10.000 $3.300
WIRE FENCE (TY D)
LF 160.000 $25.500 $30.000 $32.000 $50.000 $11.000
GATE (SPECIAL)
EA 2.000 $1,500.000 $2,500.000 $2,000.000 $3,500.000 $1,650.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $700.000 $700.000 $575.000 $550.000 $742.500
MAILBOX INSTALL-S (TWG-POST) TY 7
EA 56.000 $178.000 $250.000 $265.000 $250.000 $242.000
MAILBOX INSTALL-D (TWG-POST) TY 7
EA 9.000 $200.000 $300.000 $320.000 $300.000 $302.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $746.110 $750.000 $575.000 $550.000 $764.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $850.740 $900.000 $750.000 $700.000 $940.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 21.000 $1,273.740 $1,200.000 $950.000 $900.000 $1,210.000
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
EA 10.000 $1,500.000 $1,500.000 $1,000.000 $950.000 $1,485.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 13.000 $3,173.000 $2,200.000 $1,300.000 $1,250.000 $2,359.500
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 89.000 $445.950 $500.000 $500.000 $475.000 $473.000
REMOVE SM RD SN SUP&AM
EA 139.000 $145.930 $200.000 $215.000 $200.000 $100.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 139.000 $250.000 $250.000 $215.000 $200.000 $750.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 50.000 $35.000 $25.000 $22.000 $20.000 $22.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 14,730.000 $0.160 $0.400 $0.410 $0.380 $0.420
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 58,840.000 $0.130 $0.250 $0.270 $0.250 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 117,780.000 $0.140 $0.350 $0.380 $0.350 $0.390
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,420.000 $0.770 $1.500 $1.500 $1.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 10,490.000 $1.030 $1.500 $1.500 $1.000 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,540.000 $2.250 $1.000 $0.810 $0.750 $0.830
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 120.000 $1.610 $5.000 $4.300 $4.000 $4.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 625.000 $11.250 $15.000 $13.980 $13.000 $14.300
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 13,390.000 $0.750 $0.700 $0.700 $0.650 $0.720
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 204,860.000 $0.650 $0.700 $0.700 $0.650 $0.720
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 710.000 $0.700 $0.700 $0.700 $0.650 $0.720
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,889.000 $0.500 $0.700 $0.700 $0.650 $0.720
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 4,790.000 $1.000 $1.250 $1.250 $1.200 $1.320
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 159,742.000 $1.000 $1.200 $1.150 $1.100 $1.210
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 15.000 $377.500 $700.000 $675.000 $650.000 $715.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $283.250 $600.000 $640.000 $600.000 $660.000
REFL PAV MRKR TY I-C
EA 670.000 $4.340 $6.000 $6.250 $6.000 $6.600
REFL PAV MRKR TY II-A-A
EA 3,650.000 $3.890 $6.000 $5.500 $5.350 $5.890
FULL - WIDTH MOWING
CYC 4.000 $3,720.000 $8,500.000 $9,500.000 $6,400.000 $6,475.000
D-GR HMA TY-B PG64-22
TON 24,877.000 $110.000 $97.000 $111.000 $128.000 $105.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 6,178.000 $112.500 $110.000 $140.000 $144.000 $128.000
SP MIXES SP-C SAC-A PG76-22
TON 62,968.000 $125.000 $121.000 $123.000 $166.000 $145.000
UNDERSEAL COURSE
GAL 145,971.000 $1.220 $2.000 $0.010 $0.010 $7.000
STEEL FENCE (REMOVE)
LF 100.000 $21.000 $50.000 $15.000 $30.000 $6.000
STEEL FENCE (INSTALL)
LF 100.000 $50.000 $200.000 $100.000 $80.000 $55.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $104.380 $75.000 $125.000 $105.000 $105.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $3,889.650 $12,000.000 $7,500.000 $16,300.000 $13,200.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 2,149.000 $4.030 $8.000 $7.500 $7.350 $8.090
TMA (STATIONARY)
DAY 100.000 $278.100 $460.000 $550.000 $980.000 $165.000
TMA (MOBILE OPERATION)
HR 900.000 $53.490 $40.000 $30.000 $40.000 $16.500
Totals: $29,200,789.571 $26,587,289.900 $27,632,265.970 $31,857,839.821 $32,834,042.320