PREPARING ROW
|
STA
|
348.100
|
$3,000.000
|
$445.000
|
$1,000.000
|
$760.000
|
$580.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
127.000
|
$23.000
|
$20.500
|
$25.000
|
$20.000
|
$18.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
4,550.000
|
$9.000
|
$3.300
|
$10.000
|
$5.500
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5"-8")
|
SY
|
47,297.000
|
$8.000
|
$1.450
|
$5.000
|
$2.950
|
$2.250
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
351.000
|
$15.000
|
$2.200
|
$5.000
|
$8.000
|
$9.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,198.000
|
$10.000
|
$10.810
|
$15.000
|
$13.000
|
$12.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
15,546.000
|
$15.000
|
$17.450
|
$15.000
|
$11.000
|
$14.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
125,359.000
|
$0.250
|
$0.110
|
$0.120
|
$0.150
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
125,359.000
|
$0.250
|
$0.070
|
$0.100
|
$0.100
|
$0.110
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
125,362.000
|
$0.250
|
$0.080
|
$0.100
|
$0.100
|
$0.110
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
125,362.000
|
$0.150
|
$0.110
|
$0.150
|
$0.160
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
4,074.000
|
$15.000
|
$0.100
|
$5.000
|
$1.000
|
$18.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
19,214.000
|
$1.000
|
$1.090
|
$1.250
|
$1.390
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
21,998.000
|
$35.000
|
$45.650
|
$55.000
|
$43.000
|
$40.150
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
19,799.000
|
$3.500
|
$3.600
|
$3.500
|
$3.700
|
$4.350
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
|
SY
|
2,100.000
|
$80.000
|
$67.000
|
$75.000
|
$102.000
|
$90.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
105,060.000
|
$1.500
|
$0.750
|
$1.000
|
$0.750
|
$1.100
|
|
|
CEM STABIL BKFL
|
CY
|
0.800
|
$300.000
|
$1,500.000
|
$400.000
|
$330.000
|
$1,000.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
391.000
|
$65.000
|
$100.000
|
$150.000
|
$415.000
|
$735.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
515.000
|
$2.100
|
$1.000
|
$10.000
|
$6.150
|
$1.100
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,536.000
|
$20.000
|
$18.000
|
$50.000
|
$34.000
|
$0.010
|
|
|
CL C CONC (HEADWALL)
|
CY
|
4.800
|
$1,600.000
|
$1,300.000
|
$1,500.000
|
$1,080.000
|
$1,430.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
12.300
|
$375.000
|
$975.000
|
$1,000.000
|
$680.000
|
$1,075.000
|
|
|
CL C CONC (MISC)
|
CY
|
15.700
|
$1,470.000
|
$975.000
|
$1,000.000
|
$585.000
|
$1,075.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
581.700
|
$422.000
|
$510.000
|
$425.000
|
$480.000
|
$555.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
128.600
|
$110.000
|
$195.000
|
$175.000
|
$175.000
|
$148.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
207.700
|
$450.000
|
$510.000
|
$450.000
|
$490.000
|
$555.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
25.000
|
$1,200.000
|
$680.000
|
$900.000
|
$735.000
|
$748.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
52.000
|
$950.000
|
$720.000
|
$1,200.000
|
$785.000
|
$792.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
304.000
|
$70.000
|
$95.000
|
$60.000
|
$68.000
|
$61.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
216.000
|
$85.000
|
$142.000
|
$90.000
|
$106.000
|
$74.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
215.000
|
$110.000
|
$178.000
|
$125.000
|
$139.000
|
$111.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
891.000
|
$155.000
|
$270.000
|
$150.000
|
$156.000
|
$190.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,475.000
|
$4,600.000
|
$5,000.000
|
$6,000.000
|
$5,100.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$7,200.000
|
$6,500.000
|
$6,000.000
|
$7,600.000
|
$7,150.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 36 IN)
|
EA
|
2.000
|
$8,000.000
|
$6,600.000
|
$6,250.000
|
$7,600.000
|
$7,260.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,200.000
|
$4,800.000
|
$6,000.000
|
$8,400.000
|
$5,280.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,500.000
|
$6,500.000
|
$6,500.000
|
$7,800.000
|
$7,150.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$9,300.000
|
$9,500.000
|
$8,300.000
|
$10,230.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$7,700.000
|
$9,600.000
|
$15,000.000
|
$10,500.000
|
$10,560.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$16,000.000
|
$20,000.000
|
$30,000.000
|
$14,000.000
|
$22,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$19,000.000
|
$21,000.000
|
$35,000.000
|
$19,600.000
|
$23,100.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$25,000.000
|
$35,000.000
|
$50,000.000
|
$28,400.000
|
$38,500.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
5.000
|
$8,500.000
|
$3,300.000
|
$4,000.000
|
$9,350.000
|
$3,630.000
|
|
|
SET (TY I) (36 IN) (4: 1) (C)
|
EA
|
4.000
|
$7,000.000
|
$3,800.000
|
$7,500.000
|
$10,500.000
|
$4,180.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$850.000
|
$940.000
|
$900.000
|
$1,135.000
|
$1,096.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$850.000
|
$950.000
|
$1,040.000
|
$1,020.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,180.000
|
$975.000
|
$1,000.000
|
$1,175.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,180.000
|
$1,200.000
|
$1,385.000
|
$1,350.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,100.000
|
$1,250.000
|
$1,370.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,560.000
|
$1,500.000
|
$1,500.000
|
$1,585.000
|
$1,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$4,200.000
|
$2,800.000
|
$2,000.000
|
$2,155.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$3,300.000
|
$2,500.000
|
$2,540.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,100.000
|
$800.000
|
$2,500.000
|
$1,440.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
981.000
|
$16.000
|
$9.000
|
$20.000
|
$9.250
|
$21.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$667,027.000
|
$583,200.000
|
$900,000.000
|
$910,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$7,800.000
|
$17,900.000
|
$5,000.000
|
$6,000.000
|
$14,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,280.000
|
$32.000
|
$26.000
|
$25.000
|
$26.500
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,280.000
|
$7.000
|
$9.000
|
$5.000
|
$9.000
|
$6.750
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
375.000
|
$4.000
|
$5.000
|
$3.000
|
$5.500
|
$6.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,030.000
|
$3.250
|
$2.900
|
$3.000
|
$4.200
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,030.000
|
$0.900
|
$0.750
|
$0.500
|
$0.750
|
$0.750
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
100.000
|
$120.000
|
$165.000
|
$125.000
|
$150.000
|
$125.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
117.000
|
$90.000
|
$85.000
|
$100.000
|
$103.000
|
$170.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,813.000
|
$60.000
|
$43.100
|
$35.000
|
$46.000
|
$44.750
|
|
|
TURNOUTS (ACP)
|
SY
|
54.400
|
$70.000
|
$33.000
|
$50.000
|
$46.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,925.000
|
$25.000
|
$28.500
|
$35.000
|
$29.000
|
$31.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,750.000
|
$2.600
|
$2.000
|
$2.000
|
$2.050
|
$2.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,500.000
|
$2,600.000
|
$3,000.000
|
$2,650.000
|
$2,860.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$300.000
|
$200.000
|
$210.000
|
$205.000
|
$220.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
10.000
|
$180.000
|
$200.000
|
$175.000
|
$205.000
|
$220.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$220.000
|
$250.000
|
$250.000
|
$225.000
|
$242.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$550.000
|
$500.000
|
$675.000
|
$550.000
|
$594.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
54.000
|
$500.000
|
$475.000
|
$600.000
|
$510.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$675.000
|
$550.000
|
$800.000
|
$670.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$620.000
|
$575.000
|
$750.000
|
$655.000
|
$704.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
5.000
|
$1,650.000
|
$800.000
|
$1,700.000
|
$1,030.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$850.000
|
$650.000
|
$1,000.000
|
$800.000
|
$860.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$800.000
|
$650.000
|
$1,000.000
|
$820.000
|
$880.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$850.000
|
$700.000
|
$900.000
|
$840.000
|
$902.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
96.000
|
$240.000
|
$200.000
|
$300.000
|
$250.000
|
$418.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
16.000
|
$60.000
|
$120.000
|
$120.000
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
95.000
|
$24.000
|
$32.000
|
$35.000
|
$33.000
|
$36.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,262.000
|
$1.000
|
$1.750
|
$3.000
|
$3.090
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
35.000
|
$10.000
|
$6.000
|
$10.000
|
$10.310
|
$13.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
380.000
|
$1.000
|
$2.000
|
$3.000
|
$3.090
|
$4.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,573.000
|
$1.250
|
$0.950
|
$1.000
|
$1.230
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,536.000
|
$1.000
|
$0.950
|
$1.000
|
$1.230
|
$1.200
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,112.000
|
$1.200
|
$0.900
|
$0.750
|
$0.670
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
208.000
|
$0.850
|
$1.380
|
$1.000
|
$1.030
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,721.000
|
$1.000
|
$1.000
|
$1.000
|
$0.800
|
$0.770
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
128.000
|
$3.250
|
$4.500
|
$4.000
|
$4.120
|
$7.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
102.000
|
$6.500
|
$9.000
|
$12.000
|
$12.370
|
$14.300
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,725.000
|
$0.400
|
$0.600
|
$0.600
|
$0.620
|
$0.390
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
70,169.000
|
$0.750
|
$0.560
|
$0.520
|
$0.540
|
$0.690
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
73,147.000
|
$0.750
|
$0.560
|
$0.520
|
$0.540
|
$0.680
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$365.000
|
$240.000
|
$220.000
|
$225.000
|
$231.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$500.000
|
$500.000
|
$450.000
|
$435.000
|
$605.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$420.000
|
$280.000
|
$310.000
|
$319.000
|
$319.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$33.000
|
$50.000
|
$60.000
|
$61.000
|
$44.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
380.000
|
$3.300
|
$4.000
|
$4.000
|
$3.970
|
$4.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,311.000
|
$3.000
|
$4.000
|
$4.000
|
$3.970
|
$4.400
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
20.000
|
$3.300
|
$4.000
|
$4.000
|
$3.970
|
$13.200
|
|
|
FULL - WIDTH MOWING
|
AC
|
104.000
|
$162.000
|
$132.730
|
$100.000
|
$45.000
|
$195.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
15,571.000
|
$68.000
|
$78.000
|
$73.000
|
$73.910
|
$73.500
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
19,181.000
|
$80.000
|
$85.000
|
$73.000
|
$80.500
|
$79.750
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
21,789.000
|
$110.000
|
$95.000
|
$75.000
|
$93.000
|
$84.000
|
|
|
TACK COAT
|
GAL
|
29,315.000
|
$3.000
|
$2.200
|
$2.000
|
$2.500
|
$2.650
|
|
|
UNDERSEAL COURSE
|
GAL
|
23,566.000
|
$3.000
|
$3.050
|
$3.000
|
$2.850
|
$4.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
30.000
|
$70.000
|
$92.000
|
$50.000
|
$150.000
|
$65.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$2,165.000
|
$10,000.000
|
$2,500.000
|
$14,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
700.000
|
$210.000
|
$2.500
|
$100.000
|
$1.000
|
$25.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
744.000
|
$40.000
|
$5.000
|
$25.000
|
$1.000
|
$50.000
|
|
Totals: |
$11,178,328.150
|
$9,797,442.660
|
$9,977,702.300
|
$9,997,279.080
|
$10,135,007.760
|