BOSQUE SH 22 (0120-03-031)

Items: 113

County: BOSQUE
Length: N/A
Highway: SH 22
District: WACO
Control Number: 0120-03-031
DBE Goal: N/A
Project: F 2021(784)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $11,178,328.15
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$11,178,328.15
$9,797,442.66
Over/Under Est: -12.35% -$1,380,885.49
Over/Under Est: -10.74% -$1,200,625.85
Amt Left: 1.84% $180,259.64
Over/Under Est: -10.57% -$1,181,049.07
Amt Left: 2.04% $199,836.42
Delta: -0.20% -$19,576.78
Over/Under Est: -9.33% -$1,043,320.39
Amt Left: 3.45% $337,565.10
Delta: -1.38% -$137,728.68
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 12.83% $1,257,011.89
TEX OP CONSTRUCTION, LP 1.74% $170,475.50
BROCK CONSTRUCTION, LLC 1.57% $153,819.85
FORTSON CONTRACTING, INC. 1.52% $148,921.13
DALLAS LITE AND BARRICADE, INC. 1.40% $137,164.20
D. I. J. CONSTRUCTION, INC. 1.16% $113,650.33
SAN-ANN-CO., INC. 1.14% $111,690.85
CEN TEX HYDROSEED, INC. 1.13% $110,711.10
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.67% $65,642.87
AWP SAFETY 0.26% $25,473.35
CROSS PLUS CONSTRUCTION, LLC 0.06% $5,878.47
Total: 23.48% $2,300,439.54

Bid Items & Bid Tabulations

113 Total 0 of 113
BOSQUE  |  SH 22  |  WACO  |  0120-03-031  |  08/05/2021  |  $11,178,328.15  |  F 2021(784)  |  REHAB EXIST ROADWAY  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW
STA 348.100 $3,000.000 $445.000 $1,000.000 $760.000 $580.000
REMOVING CONC (DRIVEWAYS)
SY 127.000 $23.000 $20.500 $25.000 $20.000 $18.000
REMOVING CONCRETE(MOW STRIP)
LF 4,550.000 $9.000 $3.300 $10.000 $5.500 $6.000
REMOVING STAB BASE AND ASPH PAV (5"-8")
SY 47,297.000 $8.000 $1.450 $5.000 $2.950 $2.250
OBLITERATING ABANDONED ROAD
SY 351.000 $15.000 $2.200 $5.000 $8.000 $9.500
EXCAVATION (ROADWAY)
CY 8,198.000 $10.000 $10.810 $15.000 $13.000 $12.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 15,546.000 $15.000 $17.450 $15.000 $11.000 $14.500
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 125,359.000 $0.250 $0.110 $0.120 $0.150 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 125,359.000 $0.250 $0.070 $0.100 $0.100 $0.110
BROADCAST SEED (TEMP) (COOL)
SY 125,362.000 $0.250 $0.080 $0.100 $0.100 $0.110
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 125,362.000 $0.150 $0.110 $0.150 $0.160 $0.150
VEGETATIVE WATERING
MG 4,074.000 $15.000 $0.100 $5.000 $1.000 $18.500
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 19,214.000 $1.000 $1.090 $1.250 $1.390 $1.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 21,998.000 $35.000 $45.650 $55.000 $43.000 $40.150
PRIME COAT(MC-30 OR AE-P)
GAL 19,799.000 $3.500 $3.600 $3.500 $3.700 $4.350
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 2,100.000 $80.000 $67.000 $75.000 $102.000 $90.000
PLANE ASPH CONC PAV (1")
SY 105,060.000 $1.500 $0.750 $1.000 $0.750 $1.100
CEM STABIL BKFL
CY 0.800 $300.000 $1,500.000 $400.000 $330.000 $1,000.000
CUT & RESTORE ASPH PAVING
SY 391.000 $65.000 $100.000 $150.000 $415.000 $735.000
TRENCH EXCAVATION PROTECTION
LF 515.000 $2.100 $1.000 $10.000 $6.150 $1.100
TEMPORARY SPL SHORING
SF 1,536.000 $20.000 $18.000 $50.000 $34.000 $0.010
CL C CONC (HEADWALL)
CY 4.800 $1,600.000 $1,300.000 $1,500.000 $1,080.000 $1,430.000
CL C CONC (RAIL FOUNDATION)
CY 12.300 $375.000 $975.000 $1,000.000 $680.000 $1,075.000
CL C CONC (MISC)
CY 15.700 $1,470.000 $975.000 $1,000.000 $585.000 $1,075.000
RIPRAP (CONC)(5 IN)
CY 581.700 $422.000 $510.000 $425.000 $480.000 $555.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 128.600 $110.000 $195.000 $175.000 $175.000 $148.000
RIPRAP (MOW STRIP)(4 IN)
CY 207.700 $450.000 $510.000 $450.000 $490.000 $555.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 25.000 $1,200.000 $680.000 $900.000 $735.000 $748.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 52.000 $950.000 $720.000 $1,200.000 $785.000 $792.000
RC PIPE (CL III)(18 IN)
LF 304.000 $70.000 $95.000 $60.000 $68.000 $61.000
RC PIPE (CL III)(24 IN)
LF 216.000 $85.000 $142.000 $90.000 $106.000 $74.000
RC PIPE (CL III)(30 IN)
LF 215.000 $110.000 $178.000 $125.000 $139.000 $111.000
RC PIPE (CL III)(36 IN)
LF 891.000 $155.000 $270.000 $150.000 $156.000 $190.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $5,475.000 $4,600.000 $5,000.000 $6,000.000 $5,100.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 4.000 $7,200.000 $6,500.000 $6,000.000 $7,600.000 $7,150.000
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 2.000 $8,000.000 $6,600.000 $6,250.000 $7,600.000 $7,260.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $7,200.000 $4,800.000 $6,000.000 $8,400.000 $5,280.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $7,500.000 $6,500.000 $6,500.000 $7,800.000 $7,150.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,500.000 $9,300.000 $9,500.000 $8,300.000 $10,230.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $7,700.000 $9,600.000 $15,000.000 $10,500.000 $10,560.000
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $16,000.000 $20,000.000 $30,000.000 $14,000.000 $22,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $19,000.000 $21,000.000 $35,000.000 $19,600.000 $23,100.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $25,000.000 $35,000.000 $50,000.000 $28,400.000 $38,500.000
SET (TY I) (36 IN) (3: 1) (C)
EA 5.000 $8,500.000 $3,300.000 $4,000.000 $9,350.000 $3,630.000
SET (TY I) (36 IN) (4: 1) (C)
EA 4.000 $7,000.000 $3,800.000 $7,500.000 $10,500.000 $4,180.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $850.000 $940.000 $900.000 $1,135.000 $1,096.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $850.000 $950.000 $1,040.000 $1,020.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,180.000 $975.000 $1,000.000 $1,175.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $1,180.000 $1,200.000 $1,385.000 $1,350.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $1,100.000 $1,250.000 $1,370.000 $1,300.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,560.000 $1,500.000 $1,500.000 $1,585.000 $1,500.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 3.000 $4,200.000 $2,800.000 $2,000.000 $2,155.000 $2,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $3,300.000 $2,500.000 $2,540.000 $1,300.000
CLEAN EXIST CULVERTS
EA 4.000 $1,100.000 $800.000 $2,500.000 $1,440.000 $1,000.000
REMOV STR (PIPE)
LF 981.000 $16.000 $9.000 $20.000 $9.250 $21.000
MOBILIZATION
LS 1.000 $667,027.000 $583,200.000 $900,000.000 $910,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $7,800.000 $17,900.000 $5,000.000 $6,000.000 $14,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,280.000 $32.000 $26.000 $25.000 $26.500 $36.000
ROCK FILTER DAMS (REMOVE)
LF 2,280.000 $7.000 $9.000 $5.000 $9.000 $6.750
CONSTRUCTION PERIMETER FENCE
LF 375.000 $4.000 $5.000 $3.000 $5.500 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,030.000 $3.250 $2.900 $3.000 $4.200 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,030.000 $0.900 $0.750 $0.500 $0.750 $0.750
ONE-WAY TRAF CONT (PILOT CAR)
HR 100.000 $120.000 $165.000 $125.000 $150.000 $125.000
DRIVEWAYS (CONC)
SY 117.000 $90.000 $85.000 $100.000 $103.000 $170.000
DRIVEWAYS (ACP)
SY 4,813.000 $60.000 $43.100 $35.000 $46.000 $44.750
TURNOUTS (ACP)
SY 54.400 $70.000 $33.000 $50.000 $46.000 $75.000
MTL W-BEAM GD FEN (STEEL POST)
LF 3,925.000 $25.000 $28.500 $35.000 $29.000 $31.500
REMOVE METAL BEAM GUARD FENCE
LF 3,750.000 $2.600 $2.000 $2.000 $2.050 $2.250
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,500.000 $2,600.000 $3,000.000 $2,650.000 $2,860.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $300.000 $200.000 $210.000 $205.000 $220.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 10.000 $180.000 $200.000 $175.000 $205.000 $220.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 4.000 $220.000 $250.000 $250.000 $225.000 $242.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $550.000 $500.000 $675.000 $550.000 $594.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 54.000 $500.000 $475.000 $600.000 $510.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $675.000 $550.000 $800.000 $670.000 $715.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $620.000 $575.000 $750.000 $655.000 $704.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 5.000 $1,650.000 $800.000 $1,700.000 $1,030.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $850.000 $650.000 $1,000.000 $800.000 $860.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000 $800.000 $650.000 $1,000.000 $820.000 $880.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $850.000 $700.000 $900.000 $840.000 $902.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 96.000 $240.000 $200.000 $300.000 $250.000 $418.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 16.000 $60.000 $120.000 $120.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 95.000 $24.000 $32.000 $35.000 $33.000 $36.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,262.000 $1.000 $1.750 $3.000 $3.090 $4.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 35.000 $10.000 $6.000 $10.000 $10.310 $13.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 380.000 $1.000 $2.000 $3.000 $3.090 $4.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,573.000 $1.250 $0.950 $1.000 $1.230 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,536.000 $1.000 $0.950 $1.000 $1.230 $1.200
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,112.000 $1.200 $0.900 $0.750 $0.670 $0.550
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 208.000 $0.850 $1.380 $1.000 $1.030 $1.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,721.000 $1.000 $1.000 $1.000 $0.800 $0.770
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 128.000 $3.250 $4.500 $4.000 $4.120 $7.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 102.000 $6.500 $9.000 $12.000 $12.370 $14.300
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,725.000 $0.400 $0.600 $0.600 $0.620 $0.390
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 70,169.000 $0.750 $0.560 $0.520 $0.540 $0.690
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 73,147.000 $0.750 $0.560 $0.520 $0.540 $0.680
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $365.000 $240.000 $220.000 $225.000 $231.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $500.000 $500.000 $450.000 $435.000 $605.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $420.000 $280.000 $310.000 $319.000 $319.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 20.000 $33.000 $50.000 $60.000 $61.000 $44.000
REFL PAV MRKR TY I-C
EA 380.000 $3.300 $4.000 $4.000 $3.970 $4.400
REFL PAV MRKR TY II-A-A
EA 1,311.000 $3.000 $4.000 $4.000 $3.970 $4.400
REFL PAV MRKR TY II-C-R
EA 20.000 $3.300 $4.000 $4.000 $3.970 $13.200
FULL - WIDTH MOWING
AC 104.000 $162.000 $132.730 $100.000 $45.000 $195.000
D-GR HMA TY-B PG64-22
TON 15,571.000 $68.000 $78.000 $73.000 $73.910 $73.500
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 19,181.000 $80.000 $85.000 $73.000 $80.500 $79.750
SP MIXES SP-C SAC-A PG70-22
TON 21,789.000 $110.000 $95.000 $75.000 $93.000 $84.000
TACK COAT
GAL 29,315.000 $3.000 $2.200 $2.000 $2.500 $2.650
UNDERSEAL COURSE
GAL 23,566.000 $3.000 $3.050 $3.000 $2.850 $4.200
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $70.000 $92.000 $50.000 $150.000 $65.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $2,165.000 $10,000.000 $2,500.000 $14,300.000
TMA (STATIONARY)
DAY 700.000 $210.000 $2.500 $100.000 $1.000 $25.000
TMA (MOBILE OPERATION)
HR 744.000 $40.000 $5.000 $25.000 $1.000 $50.000
Totals: $11,178,328.150 $9,797,442.660 $9,977,702.300 $9,997,279.080 $10,135,007.760