Job Info for 6469-50-001

County: BEXAR Highway: FM0471 Date: 11/14/2024 (9 days ago) Engineer's Estimate: $185,057 Control Number: 6469-50-001
Project: BPM - 646950001 District: SAN ANTONIO Time: 27 W Type: EROSION REPAIR
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $185,056.92
BK FIELD OPERATIONS LLC   $174,951.00 1
-5.46% | -$10,105.92
GARRET SHIELDS INFRASTRUCTURE   $217,995.00 2
17.8% | $32,938.08
24.6% | $43,044.00
TEXAS ROAD CONSTRUCTION, LLC   $251,953.00 3
36.15% | $66,896.08
44.01% | $77,002.00
15.58% | $33,958.00
AAD CONTRACTING INC.   $256,698.00 4
38.71% | $71,641.08
46.73% | $81,747.00
1.88% | $4,745.00
FNH CONSTRUCTION, LLC   $343,240.00 5
85.48% | $158,183.08
96.19% | $168,289.00
33.71% | $86,542.00

Bid Items

Items: 20, 0 filtered
BEXAR FM0471  |  SAN ANTONIO  |  6469-50-001  |  11/14/2024  |  $185,057  |  BPM - 646950001  |  EROSION REPAIR  |  27 W
Item code Description Unit Quantity Engineer's Estimate BK FIELD OPERATIONS LLC GARRET SHIELDS INFRASTRUCTURE TEXAS ROAD CONSTRUCTION, LLC AAD CONTRACTING INC. FNH CONSTRUCTION, LLC
104 7007 REMOV CONC (RIPRAP) CY 110.000 $82.730 $110.000 $40.000 $150.000 $15.000 $100.000
110 7002 EXCAV (CHANNEL) CY 10.000 $526.350 $200.000 $50.000 $250.000 $18.000 $100.000
132 7003 EMBANK (FNL)(OC)(TY B) CY 118.000 $18.000 $50.000 $40.000 $100.000 $45.000 $100.000
161 7002 COMPOST MANUF TOPSOIL (4") SY 250.000 $5.170 $20.000 $5.000 $8.000 $6.000 $20.000
164 7004 BROADCAST SEED (PERM_URBAN_CLAY) SY 250.000 $0.290 $1.000 $0.500 $6.000 $1.000 $10.000
169 7001 SOIL RET BLKT(SL_MOD_CLAY_SHORT) SY 250.000 $1.580 $2.000 $5.000 $6.000 $3.000 $30.000
401 7001 FLOWABLE BACKFILL CY 10.000 $270.000 $500.000 $500.000 $150.000 $250.000 $350.000
432 7002 RIPRAP (CONC)(5 IN) CY 82.000 $500.000 $450.000 $525.000 $250.000 $450.000 $650.000
432 7029 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 180.000 $204.140 $115.000 $300.000 $250.000 $140.000 $185.000
459 7007 GABION MATTRESSES (GALV)(12 IN) SY 452.000 $95.000 $112.000 $100.000 $225.000 $200.000 $185.000
459 7014 GABION (1.5' X 3')(GALV) CY 73.000 $210.000 $200.000 $300.000 $200.000 $250.000 $350.000
500 7001 MOBILIZATION LS 1.000 $10,000.000 $5,000.000 $15,000.000 $22,000.000 $25,000.000 $30,000.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $3,500.000 $2,000.000 $5,000.000 $2,000.000 $10,000.000 $8,500.000
505 7001 TMA (STATIONARY) DAY 27.000 $216.800 $1.000 $100.000 $200.000 $350.000 $250.000
506 7020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 112.000 $21.130 $35.000 $20.000 $10.000 $8.000 $40.000
506 7024 CONSTRUCTION EXITS (REMOVE) SY 112.000 $9.730 $15.000 $5.000 $1.000 $1.000 $20.000
506 7044 BIODEG EROSN CONT LOGS (INSTL) (12") LF 100.000 $7.480 $5.000 $8.000 $1.000 $3.000 $18.000
506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 100.000 $1.360 $5.000 $1.000 $1.000 $0.500 $9.000
735 7061 DRIFTWOOD REMOVAL LS 1.000 $500.000 $3,750.000 $5,000.000 $1.000 $10,000.000 $35,000.000
752 7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS) AC 0.200 $2,000.000 $10,000.000 $1,000.000 $100.000 $40,000.000 $35,000.000
Totals: $185,056.92 $174,951.00 $217,995.00 $251,953.00 $256,698.00 $343,240.00