Show Job Controls
Bid Cobra

BEXAR IH0010 (6311-42-001)

Items: 139

County: BEXAR
Length: N/A
Highway: IH0010
District: SAN ANTONIO
Control Number: 6311-42-001
DBE Goal: N/A
Project: RMC - 631142001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $13,145,215.52
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: ROUTINE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$13,145,215.52
$12,422,429.32
Over/Under Est: -5.5% -$722,786.20
$12,764,906.00
Over/Under Est: -2.89% -$380,309.52
Amt Left: 2.76% $342,476.68
$14,106,862.50
Over/Under Est: 7.32% $961,646.98
Amt Left: 13.56% $1,684,433.18
Delta: -10.51% -$1,341,956.50
$14,244,527.65
Over/Under Est: 8.36% $1,099,312.13
Amt Left: 14.67% $1,822,098.33
Delta: -0.98% -$137,665.15
Over/Under Est: 13.79% $1,812,857.48
Amt Left: 20.41% $2,535,643.68
Delta: -5.01% -$713,545.35

Bid Items & Bid Tabulations

139 Total 0 of 139
BEXAR  |  IH0010  |  SAN ANTONIO  |  6311-42-001  |  02/02/2017  |  $13,145,215.52  |  RMC - 631142001  |  ROUTINE MAINT  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ICA MAINTENANCE, INC.
K-BAR SERVICES, INC.
ISI CONTRACTING, INC.
DEANGELO BROTHERS LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (MEDIANS)
SY 200.000 $20.000 $21.000 $20.000 $40.000 $21.540 $25.000
REMOVING CONC (CURB)
LF 100.000 $20.000 $6.000 $20.000 $1.500 $10.770 $20.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $125.000 $138.000 $150.000 $50.000 $107.360 $145.000
RIPRAP (CONC)(CL B)
CY 225.000 $500.000 $403.000 $340.000 $470.000 $330.490 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $500.000 $661.000 $840.000 $800.000 $684.680 $750.000
MOBILIZATION (CALLOUT)
EA 300.000 $500.000 $876.000 $198.000 $250.000 $750.000 $1,300.000
MOBILIZATION (EMERGENCY)
EA 150.000 $500.000 $281.000 $400.000 $1,000.000 $1,000.000 $1,750.000
CONC CURB (TY II)
LF 100.000 $20.000 $25.000 $20.000 $7.500 $40.710 $25.000
CONC SIDEWALKS (4")
SY 200.000 $66.000 $88.000 $50.000 $80.000 $66.930 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,000.000 $20.000 $28.000 $23.000 $20.000 $23.940 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $20.000 $50.000 $40.000 $22.000 $23.940 $21.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 80.000 $50.000 $90.000 $75.000 $64.000 $66.500 $55.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 200.000 $1,000.000 $1,192.000 $1,000.000 $1,200.000 $1,596.000 $1,300.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $750.000 $1,100.000 $1,000.000 $450.000 $931.000 $925.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.000 $11.000 $10.000 $2.000 $2.660 $2.250
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $450.000 $400.000 $100.000 $133.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $50.000 $150.000 $775.000 $100.000 $133.000 $105.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,800.000 $3,036.000 $2,800.000 $2,300.000 $3,458.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $400.000 $545.000 $500.000 $400.000 $465.500 $375.000
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $18.000 $19.000 $20.000 $16.000 $31.920 $29.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $12.000 $12.000 $20.000 $14.000 $13.300 $12.000
CHAIN LINK FENCE (REMOVE)
LF 250.000 $6.000 $5.750 $10.000 $1.000 $7.980 $10.000
CHAIN LINK FENCE (REPAIR) (4')
LF 250.000 $15.000 $12.250 $15.000 $21.000 $13.300 $12.000
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
EA 8.000 $600.000 $680.000 $600.000 $830.000 $73.150 $750.000
CHAIN LINK FENCE (INSTALL) (4')
LF 175.000 $20.000 $25.000 $15.000 $17.000 $29.260 $18.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GF2
EA 300.000 $30.000 $24.000 $60.000 $13.000 $33.250 $30.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GF2
EA 300.000 $30.000 $32.500 $60.000 $13.000 $33.250 $30.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 200.000 $20.000 $6.750 $20.000 $3.500 $66.500 $30.000
POTHOLE REPAIR (STANDARD)
SY 1,500.000 $50.000 $62.000 $50.000 $85.000 $99.010 $65.000
EMERGENCY MOBILIZATION
EA 300.000 $200.000 $221.000 $250.000 $225.000 $500.000 $275.000
STRIP MOWING
AC 1,718.000 $35.820 $35.000 $35.000 $40.000 $39.330 $45.000
FULL - WIDTH MOWING
AC 30,112.000 $40.480 $34.320 $35.000 $40.000 $30.000 $42.000
SPOT MOWING
AC 150.000 $100.000 $100.000 $100.000 $40.000 $36.670 $45.000
LITTER REMOVAL
AC 144,744.000 $10.000 $8.460 $7.250 $8.500 $9.430 $10.500
LITTER REMOVAL (SPOT)
AC 100.000 $75.000 $81.000 $200.000 $50.000 $15.780 $25.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 7,567.200 $45.000 $26.600 $50.000 $90.000 $61.410 $65.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 3,069.600 $40.000 $26.600 $40.000 $90.000 $85.970 $60.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 500.000 $150.000 $35.000 $100.000 $125.000 $107.460 $70.000
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 1,809.600 $50.000 $26.600 $30.000 $90.000 $107.460 $80.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 4,168.800 $210.000 $163.500 $210.000 $215.000 $199.500 $195.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 4,168.800 $200.000 $163.500 $210.000 $215.000 $199.500 $195.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 1,908.000 $190.000 $163.500 $210.000 $215.000 $199.500 $195.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 2,032.800 $210.000 $163.500 $210.000 $215.000 $199.500 $195.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $100.000 $215.000 $400.000 $115.000 $242.060 $195.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $250.000 $430.000 $400.000 $115.000 $242.060 $195.000
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 1,809.600 $190.000 $163.500 $210.000 $215.000 $199.500 $195.000
GRAFFITI REMOVAL (PAINTING)
SF 110,000.000 $1.000 $0.420 $0.750 $1.500 $3.060 $2.500
TREE TRIMMING AND BRUSH REMOVAL
LF 500.000 $15.000 $17.000 $17.000 $29.000 $34.440 $75.000
DRAIN INLET CLEANING
EA 50.000 $150.000 $107.000 $300.000 $135.000 $642.240 $200.000
PUMP STATION WELL CLEANING
EA 20.000 $2,000.000 $1,700.000 $2,500.000 $4,500.000 $2,812.050 $2,000.000
BASKET AND INLET PIPE CLEANING
EA 20.000 $500.000 $425.000 $800.000 $350.000 $280.800 $750.000
DOWNSPOUT CLEANING
EA 50.000 $250.000 $207.000 $200.000 $300.000 $280.800 $250.000
SUMP CLEANING
EA 6.000 $400.000 $1,075.000 $800.000 $540.000 $337.500 $1,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 50,000.000 $12.000 $15.700 $15.000 $12.000 $16.200 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $50.000 $120.000 $100.000 $30.000 $81.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $50.000 $120.000 $100.000 $24.000 $81.000 $60.000
REALIGN EXISTING RAIL
LF 500.000 $10.000 $9.000 $8.000 $5.000 $6.750 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 3,500.000 $40.000 $43.500 $40.000 $30.000 $49.950 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $100.000 $110.000 $100.000 $35.000 $135.000 $150.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $150.000 $250.000 $150.000 $117.000 $135.000 $100.000
REALIGN POSTS
EA 1,350.000 $15.000 $11.000 $10.000 $6.000 $6.750 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 12,400.000 $15.000 $21.700 $16.000 $14.000 $17.550 $15.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,200.000 $75.000 $54.250 $80.000 $30.000 $87.750 $70.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $50.000 $300.000 $200.000 $110.000 $54.000 $125.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $60.000 $300.000 $200.000 $260.000 $67.500 $150.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $3,000.000 $3,469.000 $3,000.000 $2,500.000 $3,510.000 $2,900.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $1,000.000 $976.000 $900.000 $1,000.000 $1,161.000 $925.000
REM & RESET SGT IMPACT HEAD
EA 265.000 $300.000 $325.000 $300.000 $100.000 $486.000 $350.000
REPLACE POSTS (TL-3)
EA 1,800.000 $100.000 $129.000 $140.000 $80.000 $148.500 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 7.000 $100.000 $108.000 $100.000 $125.000 $135.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $100.000 $450.000 $400.000 $125.000 $135.000 $550.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 50.000 $1,000.000 $430.000 $400.000 $1,000.000 $2,700.000 $2,000.000
REPLACE CABLE (TL-3)
LF 1,200.000 $3.000 $9.000 $8.000 $2.000 $4.050 $10.000
POST AND CABLE FENCE (REMOVAL)
LF 175.000 $5.000 $54.000 $50.000 $4.500 $2.030 $3.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $100.000 $108.000 $100.000 $34.000 $135.000 $150.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 6,700.000 $18.000 $27.000 $10.000 $4.500 $13.500 $14.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 30.000 $100.000 $108.000 $100.000 $222.000 $135.000 $250.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 380.000 $45.000 $86.000 $80.000 $49.000 $60.750 $65.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 17.000 $100.000 $108.000 $100.000 $160.000 $135.000 $175.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $10.000 $11.000 $10.000 $8.000 $13.500 $11.000
POST AND CABLE FENCE (REPAIR)
LF 10,000.000 $5.000 $8.600 $8.000 $3.000 $9.450 $8.000
REMOVE AND REPLACE (WIDE TRACC)
EA 5.000 $18,000.000 $25,000.000 $23,000.000 $24,000.000 $1,400.000 $19,000.000
REPAIR (TRACC)
EA 10.000 $2,000.000 $4,000.000 $3,500.000 $3,600.000 $1,215.000 $2,800.000
REPAIR (WIDE TRACC)
EA 10.000 $2,500.000 $4,400.000 $4,000.000 $4,000.000 $1,400.000 $3,250.000
REPAIR (REACT)
EA 30.000 $3,000.000 $4,400.000 $4,000.000 $870.000 $2,025.000 $3,750.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $20,000.000 $34,000.000 $30,000.000 $14,000.000 $24,300.000 $20,000.000
REPAIR (CATGR - FRONT SECTION)
EA 7.000 $2,500.000 $4,000.000 $3,500.000 $5,400.000 $3,375.000 $3,100.000
REPAIR (CATGR - END SECTION)
EA 3.000 $1,900.000 $2,800.000 $2,500.000 $2,700.000 $3,375.000 $3,100.000
REPAIR REACT (N) (CYLINDERS)
EA 40.000 $3,000.000 $3,800.000 $3,500.000 $2,800.000 $4,320.000 $3,500.000
REPAIR (QUAD) (N) (BAY)
EA 400.000 $1,500.000 $1,627.000 $1,500.000 $1,100.000 $2,025.000 $1,600.000
REPAIR (QUAD) (W) (BAY)
EA 15.000 $1,500.000 $1,850.000 $1,800.000 $1,100.000 $2,025.000 $1,650.000
REMOVE AND REPLACE (FASTRACC)
EA 1.000 $21,000.000 $32,000.000 $25,000.000 $12,000.000 $23,625.000 $20,500.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $25,000.000 $30,000.000 $25,000.000 $21,000.000 $33,750.000 $26,500.000
REPAIR (SMTC) (N)
EA 10.000 $2,000.000 $2,200.000 $2,000.000 $1,200.000 $2,700.000 $2,250.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $25,000.000 $35,000.000 $28,000.000 $35,000.000 $33,750.000 $29,500.000
REPAIR (SMTC) (W)
EA 3.000 $2,500.000 $2,500.000 $2,000.000 $1,300.000 $3,375.000 $2,500.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 240.000 $450.000 $545.000 $400.000 $260.000 $391.500 $450.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 500.000 $160.000 $109.000 $100.000 $100.000 $202.500 $160.000
REPAIR (EXISTING METAL PED. RAIL)
LF 500.000 $160.000 $141.000 $130.000 $100.000 $135.000 $160.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 150.000 $100.000 $141.000 $130.000 $160.000 $135.000 $105.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 15.000 $200.000 $108.000 $250.000 $300.000 $160.130 $145.000
REM/REPLACE CURB
EA 150.000 $30.000 $215.000 $100.000 $90.000 $157.510 $70.000
REM/REPLACE VISION STRIP
EA 400.000 $20.000 $54.000 $50.000 $25.000 $39.380 $20.000
REM/REPLACE CURB TRANS END SECTION
EA 30.000 $500.000 $215.000 $300.000 $140.000 $108.910 $190.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 300.000 $125.000 $108.000 $100.000 $75.000 $94.790 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $100.000 $135.000 $70.000 $200.000 $135.000 $115.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 800.000 $250.000 $256.000 $300.000 $290.000 $70.500 $245.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $125.000 $143.000 $100.000 $300.000 $120.000 $325.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 200.000 $300.000 $340.000 $325.000 $250.000 $238.850 $350.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 50.000 $50.000 $108.000 $50.000 $75.000 $28.200 $20.000
TMA (MOBILE OPERATION)
HR 500.000 $150.000 $31.000 $60.000 $60.000 $85.000 $150.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 500.000 $550.000 $545.000 $500.000 $1,000.000 $564.000 $750.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 50.000 $200.000 $200.000 $1,500.000 $750.000 $1,128.000 $900.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 150.000 $650.000 $700.000 $2,000.000 $2,000.000 $876.500 $950.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 250.000 $150.000 $270.000 $300.000 $500.000 $564.000 $200.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $150.000 $135.000 $100.000 $190.000 $73.840 $120.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $190.000 $190.000 $125.000 $220.000 $136.500 $170.000
INCIDENT MANAGEMENT (TYPE C)
HR 200.000 $350.000 $350.000 $150.000 $330.000 $273.000 $215.000
INCIDENT MANAGEMENT (TYPE D)
HR 300.000 $500.000 $515.000 $175.000 $370.000 $273.000 $315.000
INCIDENT MANAGEMENT (TYPE E)
HR 300.000 $600.000 $595.000 $200.000 $410.000 $273.000 $505.000
INCIDENT MANAGEMENT (TYPE F)
HR 80.000 $150.000 $190.000 $75.000 $218.000 $450.840 $170.000
INCIDENT MANAGEMENT (TYPE G)
HR 80.000 $100.000 $95.000 $75.000 $150.000 $450.840 $90.000
INCIDENT MANAGEMENT (TYPE H)
HR 80.000 $145.000 $135.000 $125.000 $182.000 $450.840 $160.000
INCIDENT MANAGEMENT (TYPE I)
HR 100.000 $250.000 $215.000 $150.000 $315.000 $273.000 $220.000
INCIDENT MANAGEMENT (TYPE J)
HR 100.000 $275.000 $376.000 $40.000 $60.000 $273.000 $170.000
INCIDENT MANAGEMENT (TYPE K)
HR 200.000 $500.000 $135.000 $225.000 $150.000 $565.500 $100.000
INCIDENT MANAGEMENT (TYPE L)
HR 200.000 $500.000 $270.000 $225.000 $182.000 $565.500 $175.000
VACUUM CLEAN DRAIN INLETS AND RACEWAYS
CYC 8.000 $16,500.000 $1,750.000 $15,000.000 $14,000.000 $6,361.390 $19,000.000
SITE INSPECTION AND CLEANING
EA 600.000 $200.000 $102.000 $120.000 $110.000 $126.350 $125.000
TRASH, DEBRIS, AND SEDIMENT REMOVAL
CYC 150.000 $150.000 $250.000 $280.000 $260.000 $305.900 $350.000
REPLACING FILTER CARTRIDGES
EA 5,000.000 $28.000 $32.250 $35.000 $34.000 $39.900 $50.000
ROTATION OF FILTER CARTRIDGES
EA 2,000.000 $6.000 $10.750 $15.000 $11.000 $13.300 $25.000
MOWING AND TRIMMING
CYC 40.000 $200.000 $172.000 $250.000 $180.000 $212.800 $550.000
REPLACE BLADDER VALVE
EA 15.000 $50.000 $135.000 $100.000 $140.000 $166.250 $350.000
REPLACE BATTERY
EA 50.000 $60.000 $54.000 $100.000 $57.000 $66.500 $100.000
SNOW AND ICE CONTROL (TRUCK)
HR 1,000.000 $100.000 $86.000 $50.000 $85.000 $81.800 $95.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,000.000 $100.000 $76.000 $50.000 $60.000 $56.800 $80.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $100.000 $86.000 $50.000 $45.000 $46.800 $90.000
SNOW AND ICE CONTROL SEASON
MO 10.000 $23,000.000 $16,000.000 $30,000.000 $95,000.000 $10,000.000 $65,000.000
Totals: $13,145,215.520 $12,422,429.320 $12,764,906.000 $14,106,862.500 $14,244,527.660 $14,958,073.000