County: BEXAR Highway: IH0035 Date: 01/04/2017 (7 years ago) Engineer's Estimate: $10,620,423 Control Number: 6311-41-001
Project: RMC - 631141001 District: SAN ANTONIO Time: 730 CALENDAR DAYS Type: ROUTINE MAINTENANCE

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $10,620,423.02
ICA MAINTENANCE, INC.   $14,068,094.00 1
32.46% | $3,447,670.98
K-BAR SERVICES, INC.   $14,328,798.20 2
34.92% | $3,708,375.18
1.85% | $260,704.20
DBI SERVICES, LLC   $14,809,990.09 3
39.45% | $4,189,567.07
5.27% | $741,896.09
3.36% | $481,191.89
ISI CONTRACTING, INC.   $15,299,507.00 4
44.06% | $4,679,083.98
8.75% | $1,231,413.00
3.31% | $489,516.91
ROY JORGENSEN ASSOCIATES, INC.   $20,792,148.40 5
95.78% | $10,171,725.38
47.8% | $6,724,054.40
35.90% | $5,492,641.40

Bid Items

Items: 133, 0 filtered
BEXAR IH0035  |  SAN ANTONIO  |  6311-41-001  |  01/04/2017  |  $10,620,423  |  RMC - 631141001  |  ROUTINE MAINT  |  730 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate ICA MAINTENANCE, INC. K-BAR SERVICES, INC. DBI SERVICES, LLC ISI CONTRACTING, INC. ROY JORGENSEN ASSOCIATES, INC.
104 6011 REMOVING CONC (MEDIANS) SY 200.000 $52.000 $18.250 $20.000 $20.240 $40.000 $35.000
104 6021 REMOVING CONC (CURB) LF 100.000 $6.000 $2.550 $20.000 $15.180 $1.300 $20.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 20.000 $65.000 $128.000 $150.000 $151.500 $150.000 $250.000
432 6006 RIPRAP (CONC)(CL B) CY 100.000 $16.000 $1,014.000 $340.000 $310.610 $450.000 $750.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 5.000 $750.000 $450.000 $840.000 $896.500 $750.000 $900.000
500 6033 MOBILIZATION (CALLOUT) EA 300.000 $100.000 $1,341.000 $200.000 $1,200.000 $250.000 $3,250.000
500 6034 MOBILIZATION (EMERGENCY) EA 150.000 $150.000 $308.000 $400.000 $2,000.000 $500.000 $3,500.000
529 6002 CONC CURB (TY II) LF 100.000 $16.000 $23.000 $20.000 $46.430 $8.000 $30.000
531 6001 CONC SIDEWALKS (4") SY 200.000 $66.000 $81.000 $50.000 $68.020 $75.000 $55.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,000.000 $12.000 $19.000 $25.000 $22.500 $18.000 $40.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 100.000 $16.000 $19.000 $40.000 $22.500 $20.000 $45.000
540 6003 MTL THRIE-BEAM GD FEN (TIM POST) LF 50.000 $15.000 $53.000 $75.000 $62.500 $60.000 $105.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 200.000 $985.000 $1,310.000 $1,000.000 $1,500.000 $1,200.000 $1,400.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 15.000 $50.000 $737.000 $1,000.000 $875.000 $250.000 $1,100.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 600.000 $2.000 $2.150 $10.000 $2.500 $2.000 $5.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 3.000 $5.000 $106.000 $400.000 $125.000 $100.000 $750.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 15.000 $50.000 $20.000 $125.000 $6.250 $105.000 $100.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 $1,800.000 $2,737.000 $2,800.000 $3,250.000 $2,500.000 $3,600.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 5.000 $200.000 $375.000 $500.000 $437.500 $450.000 $750.000
550 6001 CHAIN LINK FENCE (INSTALL) (6') LF 200.000 $10.000 $18.000 $20.000 $30.000 $20.000 $25.000
550 6002 CHAIN LINK FENCE (REPAIR) (6') LF 100.000 $5.000 $11.000 $20.000 $12.500 $20.000 $20.000
550 6003 CHAIN LINK FENCE (REMOVE) LF 2,000.000 $1.000 $5.500 $10.000 $7.500 $3.000 $12.000
550 6007 CHAIN LINK FENCE (REPAIR) (4') LF 400.000 $2.000 $11.500 $15.000 $12.500 $20.000 $12.000
550 6016 CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4' EA 8.000 $500.000 $650.000 $600.000 $687.500 $800.000 $1,500.000
550 6020 CHAIN LINK FENCE (INSTALL) (4') LF 200.000 $6.000 $20.000 $15.000 $27.500 $16.000 $20.000
658 6039 INSTL DEL ASSM (D-DW)SZ 1(FLX)GF2 EA 300.000 $20.000 $22.000 $75.000 $31.250 $12.000 $45.000
658 6043 INSTL DEL ASSM (D-DY)SZ 1(FLX)GF2 EA 300.000 $20.000 $30.000 $75.000 $31.250 $12.000 $45.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 200.000 $2.000 $6.150 $20.000 $31.250 $3.000 $25.000
700 6001 POTHOLE REPAIR (STANDARD) SY 1,500.000 $40.000 $62.300 $50.000 $120.750 $80.000 $75.000
700 6009 EMERGENCY MOBILIZATION EA 300.000 $500.000 $63.000 $100.000 $275.000 $100.000 $3,250.000
730 6001 STRIP MOWING AC 8,970.000 $28.820 $37.000 $35.000 $31.500 $40.000 $55.000
730 6002 FULL - WIDTH MOWING AC 32,758.000 $28.480 $41.100 $35.000 $32.200 $40.000 $53.000
730 6003 SPOT MOWING AC 150.000 $50.000 $90.000 $100.000 $41.600 $40.000 $100.000
734 6001 LITTER REMOVAL AC 176,496.000 $6.000 $10.500 $7.250 $8.420 $9.000 $12.000
734 6003 LITTER REMOVAL (SPOT) AC 100.000 $10.000 $75.000 $200.000 $58.830 $15.000 $20.000
735 6002 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) MI 15,436.800 $23.220 $43.750 $50.000 $92.520 $125.000 $65.000
735 6006 DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS) MI 6,679.680 $23.740 $43.750 $40.000 $92.520 $125.000 $55.000
735 6007 DEBRIS REMOVAL (SPOT DEBRIS) MI 500.000 $150.000 $23.000 $300.000 $167.530 $125.000 $70.000
735 6148 DEBRIS REMOVAL (DIRECT CONNECTOR) MI 3,388.800 $150.000 $43.750 $30.000 $102.530 $150.000 $85.000
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI 3,204.000 $210.030 $193.500 $230.000 $127.400 $215.000 $195.000
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI 3,204.000 $129.980 $193.500 $230.000 $127.400 $215.000 $200.000
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 818.400 $122.100 $193.500 $230.000 $127.400 $215.000 $175.000
738 6008 CLEANING / SWEEPING(ENTRANCE/EXIT RAMP) MI 1,766.400 $190.000 $193.500 $230.000 $127.400 $215.000 $175.000
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI 100.000 $160.000 $50.000 $400.000 $142.800 $112.000 $250.000
738 6010 CLEANING / SWEEPING (SPOT) MI 50.000 $160.000 $370.000 $400.000 $142.800 $120.000 $250.000
738 6315 CLEANING / SWEEPING (DIRECT CONNECTOR) MI 1,694.400 $190.000 $193.500 $230.000 $127.400 $215.000 $200.000
740 6002 GRAFFITI REMOVAL (PAINTING) SF 110,000.000 $1.000 $0.450 $1.250 $1.160 $1.000 $4.500
752 6022 TREE TRIMMING AND BRUSH REMOVAL LF 500.000 $5.000 $9.500 $20.000 $12.200 $28.000 $75.000
764 6001 DRAIN INLET CLEANING EA 50.000 $250.000 $122.000 $300.000 $92.770 $135.000 $200.000
764 6002 PUMP STATION WELL CLEANING EA 35.000 $2,500.000 $2,000.000 $2,000.000 $1,855.360 $4,500.000 $3,500.000
764 6003 BASKET AND INLET PIPE CLEANING EA 35.000 $250.000 $500.000 $800.000 $618.450 $350.000 $2,500.000
764 6004 DOWNSPOUT CLEANING EA 50.000 $250.000 $237.000 $200.000 $371.070 $300.000 $200.000
764 6005 SUMP CLEANING EA 6.000 $300.000 $410.000 $800.000 $1,855.360 $1,000.000 $2,500.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 47,000.000 $12.000 $13.930 $15.000 $15.000 $12.000 $19.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 75.000 $10.000 $63.000 $100.000 $75.000 $30.000 $40.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 35.000 $10.000 $63.000 $100.000 $75.000 $25.000 $60.000
770 6008 REALIGN EXISTING RAIL LF 500.000 $5.000 $5.500 $8.000 $6.250 $5.000 $11.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 3,500.000 $20.000 $40.500 $40.000 $46.250 $26.000 $55.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 20.000 $40.000 $110.000 $100.000 $125.000 $34.000 $150.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 15.000 $5.000 $110.000 $150.000 $125.000 $120.000 $500.000
770 6017 REALIGN POSTS EA 2,350.000 $8.000 $15.800 $10.000 $18.750 $5.000 $50.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 13,000.000 $13.000 $14.200 $25.000 $16.250 $13.000 $50.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 1,500.000 $75.000 $71.000 $80.000 $81.250 $30.000 $90.000
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA 5.000 $5.000 $50.000 $200.000 $50.000 $110.000 $150.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 5.000 $5.000 $60.000 $200.000 $62.500 $110.000 $150.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 65.000 $1,800.000 $2,900.000 $3,200.000 $3,312.500 $2,700.000 $3,250.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 65.000 $650.000 $906.000 $900.000 $1,075.000 $930.000 $1,500.000
770 6029 REM & RESET SGT IMPACT HEAD EA 370.000 $270.000 $392.500 $300.000 $450.000 $125.000 $95.000
771 6001 REPLACE POSTS (TL-3) EA 2,000.000 $100.000 $120.000 $120.000 $137.500 $120.000 $100.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 7.000 $10.000 $110.000 $100.000 $125.000 $125.000 $250.000
771 6005 REPAIR CONCRETE FOUNDATION (TL-3) EA 10.000 $10.000 $110.000 $400.000 $125.000 $120.000 $550.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 50.000 $200.000 $2,106.000 $400.000 $2,500.000 $950.000 $550.000
771 6009 REPLACE CABLE (TL-3) LF 1,300.000 $3.000 $3.250 $8.000 $3.750 $2.500 $10.000
772 6001 POST AND CABLE FENCE (REMOVAL) LF 400.000 $1.000 $1.600 $50.000 $1.880 $4.000 $10.000
772 6002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA 5.000 $3.000 $110.000 $100.000 $125.000 $32.000 $300.000
772 6003 POST AND CABLE FENCE (NEW INSTALLATION) LF 3,500.000 $3.000 $10.600 $25.000 $12.500 $5.000 $25.000
772 6004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 15.000 $50.000 $110.000 $100.000 $125.000 $200.000 $500.000
772 6005 POST AND CABLE FENCE(REMV / REPL POSTS) EA 200.000 $25.000 $48.000 $80.000 $56.250 $47.000 $85.000
772 6006 POST AND CABLE FENCE(RMV/REPL CNC ANCH) EA 15.000 $50.000 $110.000 $100.000 $125.000 $150.000 $150.000
772 6007 POST AND CABLE FENCE (REMV/ REPL CABLE) LF 1,000.000 $1.000 $11.000 $10.000 $12.500 $9.000 $7.000
772 6009 POST AND CABLE FENCE (REPAIR) LF 15,000.000 $1.500 $6.350 $8.000 $7.500 $3.000 $15.000
774 6002 REMOVE AND REPLACE (WIDE TRACC) EA 5.000 $14,500.000 $18,500.000 $23,000.000 $19,375.000 $24,000.000 $25,000.000
774 6006 REPAIR (TRACC) EA 16.000 $1,000.000 $2,650.000 $3,500.000 $3,125.000 $3,500.000 $4,250.000
774 6008 REPAIR (WIDE TRACC) EA 10.000 $35.000 $2,650.000 $4,000.000 $3,125.000 $3,500.000 $4,350.000
774 6010 REPAIR (REACT) EA 20.000 $1,000.000 $2,750.000 $4,000.000 $3,250.000 $850.000 $4,500.000
774 6014 REMOVE AND REPLACE (NARROW QUAD) EA 1.000 $13,000.000 $20,500.000 $30,000.000 $21,250.000 $14,000.000 $25,000.000
774 6018 REPAIR (CATGR - FRONT SECTION) EA 3.000 $2,000.000 $2,650.000 $3,500.000 $3,125.000 $5,300.000 $4,500.000
774 6019 REPAIR (CATGR - END SECTION) EA 2.000 $1,000.000 $2,650.000 $2,500.000 $3,125.000 $2,650.000 $4,500.000
774 6027 REPAIR REACT (N) (CYLINDERS) EA 10.000 $1,500.000 $3,370.000 $3,500.000 $4,000.000 $2,600.000 $4,500.000
774 6028 REPAIR (QUAD) (N) (BAY) EA 250.000 $1,225.000 $1,636.000 $1,500.000 $1,725.000 $1,600.000 $1,250.000
774 6029 REPAIR (QUAD) (W) (BAY) EA 10.000 $800.000 $1,580.000 $1,700.000 $1,875.000 $2,900.000 $1,500.000
774 6038 REMOVE AND REPLACE (FASTRACC) EA 1.000 $13,000.000 $21,000.000 $25,000.000 $21,875.000 $12,000.000 $27,000.000
774 6044 REMOVE AND REPLACE (SMTC) (N) EA 3.000 $18,000.000 $28,500.000 $25,000.000 $31,250.000 $21,000.000 $29,000.000
774 6045 REPAIR (SMTC) (N) EA 20.000 $500.000 $2,110.000 $2,000.000 $2,500.000 $700.000 $2,750.000
774 6046 REMOVE AND REPLACE (SMTC) (W) EA 1.000 $18,000.000 $29,000.000 $28,000.000 $31,250.000 $34,000.000 $37,000.000
774 6047 REPAIR (SMTC) (W) EA 3.000 $500.000 $2,150.000 $2,000.000 $2,500.000 $1,200.000 $3,000.000
774 6048 REPAIR (VIA -SAND FILL PLASTIC BARRELS) EA 850.000 $250.000 $327.000 $500.000 $375.000 $260.000 $450.000
776 6009 REPAIR (STL PIPE PEDESTRIAN RAIL - PR1) LF 500.000 $130.000 $158.000 $100.000 $187.500 $75.000 $35.000
776 6037 REPAIR (EXISTING METAL PED. RAIL) LF 500.000 $80.000 $158.000 $130.000 $187.500 $75.000 $30.000
778 6001 CONCRETE RAIL REPAIR (IN-KIND) LF 200.000 $30.000 $101.000 $130.000 $125.000 $130.000 $75.000
5047 6001 REM/REPLACE CURB GUIDANCE SYSTEM EA 15.000 $100.000 $200.000 $500.000 $148.270 $300.000 $140.000
5047 6002 REM/REPLACE CURB EA 150.000 $100.000 $30.000 $50.000 $148.270 $150.000 $75.000
5047 6003 REM/REPLACE VISION STRIP EA 400.000 $50.000 $20.000 $100.000 $38.900 $25.000 $25.000
5047 6004 REM/REPLACE CURB TRANS END SECTION EA 30.000 $100.000 $500.000 $300.000 $103.270 $150.000 $100.000
5047 6005 REM/REPLACE DELINEATOR POST ASSEMBLY EA 300.000 $75.000 $125.000 $100.000 $90.320 $75.000 $65.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 100.000 $100.000 $125.000 $100.000 $120.000 $140.000 $100.000
6044 6001 REPAIR SMALL RDSD SIGN SUPT & ASSEM EA 800.000 $150.000 $259.500 $500.000 $234.780 $275.000 $250.000
6044 6002 RELOC SMALL RDSD SIGN SUPT & ASSEM EA 50.000 $75.000 $133.000 $100.000 $69.060 $275.000 $650.000
6044 6003 REPLACE SMALL RDSD SIGN SUPP & ASSEM EA 200.000 $200.000 $344.000 $325.000 $101.290 $300.000 $750.000
6044 6004 REMV SMALL RDSD SIGN SUPP & ASSEM EA 50.000 $50.000 $21.000 $50.000 $34.530 $68.000 $75.000
6185 6003 TMA (MOBILE OPERATION) HR 500.000 $150.000 $245.000 $60.000 $73.840 $60.000 $90.000
6223 6001 REPAIR LG RDSD SIGN SUPT & ASSEMBLIES EA 500.000 $250.000 $505.000 $1,000.000 $995.280 $730.000 $700.000
6223 6002 RELOC LG RDSD SIGN SUPT & ASSEMBLIES EA 50.000 $200.000 $206.000 $1,500.000 $690.560 $590.000 $7,000.000
6223 6003 REPL LARGE RDSD SIGN SUPP & ASSEM EA 150.000 $100.000 $650.000 $2,000.000 $1,665.560 $750.000 $5,500.000
6223 6004 REMV LARGE RDSD SIGN SUPP & ASSEM EA 250.000 $150.000 $35.000 $300.000 $345.280 $450.000 $750.000
6224 6001 INCIDENT MANAGEMENT (TYPE A) HR 100.000 $600.000 $132.000 $100.000 $275.100 $175.000 $125.000
6224 6002 INCIDENT MANAGEMENT (TYPE B) HR 100.000 $650.000 $184.000 $125.000 $275.100 $200.000 $175.000
6224 6003 INCIDENT MANAGEMENT (TYPE C) HR 200.000 $700.000 $342.000 $150.000 $275.100 $300.000 $250.000
6224 6004 INCIDENT MANAGEMENT (TYPE D) HR 300.000 $800.000 $500.000 $175.000 $454.310 $350.000 $325.000
6224 6005 INCIDENT MANAGEMENT (TYPE E) HR 300.000 $1,100.000 $579.000 $100.000 $454.310 $350.000 $525.000
6224 6006 INCIDENT MANAGEMENT (TYPE F) HR 80.000 $700.000 $184.000 $150.000 $454.310 $320.000 $175.000
6224 6007 INCIDENT MANAGEMENT (TYPE G) HR 80.000 $600.000 $90.000 $150.000 $275.100 $140.000 $90.000
6224 6008 INCIDENT MANAGEMENT (TYPE H) HR 80.000 $700.000 $132.000 $150.000 $275.100 $150.000 $165.000
6224 6009 INCIDENT MANAGEMENT (TYPE I) HR 100.000 $1,000.000 $211.000 $200.000 $454.310 $300.000 $225.000
6224 6010 INCIDENT MANAGEMENT (TYPE J) HR 100.000 $100.000 $368.000 $200.000 $767.140 $53.000 $175.000
6224 6011 INCIDENT MANAGEMENT (TYPE K) HR 200.000 $500.000 $132.000 $100.000 $450.840 $100.000 $100.000
6224 6012 INCIDENT MANAGEMENT (TYPE L) HR 200.000 $500.000 $265.000 $100.000 $449.800 $100.000 $175.000
7013 6001 VACUUM CLEAN DRAIN INLETS AND RACEWAYS CYC 8.000 $5,500.000 $77,400.000 $8,000.000 $17,126.400 $11,000.000 $72,000.000
7013 6002 VACUUM CLEANING OF BRIDGE JOINTS CYC 4.000 $5,000.000 $27,100.000 $10,000.000 $17,126.400 $9,500.000 $35,000.000
7116 6001 SNOW AND ICE CONTROL (TRUCK) HR 1,000.000 $140.000 $100.000 $50.000 $99.370 $80.000 $115.000
7116 6002 SNOW AND ICE CONTROL (SHADOW VEHICLE) HR 1,000.000 $100.000 $100.000 $50.000 $84.360 $75.000 $105.000
7116 6004 SNOW AND ICE CONTROL (SPRAY RIG) HR 500.000 $100.000 $100.000 $50.000 $89.870 $55.000 $110.000
7116 6007 SNOW AND ICE CONTROL SEASON MO 10.000 $10,000.000 $23,570.000 $100,000.000 $20,000.000 $85,000.000 $65,000.000
Totals: $10,620,423.02 $14,068,094.00 $14,328,798.20 $14,809,990.10 $15,299,507.00 $20,792,148.40