PREPARING ROW
|
STA
|
136.000
|
$12,000.000
|
$70,000.000
|
$126,700.000
|
$52,162.220
|
$75,000.000
|
$39,800.000
|
$139,700.000
|
$162,698.520
|
|
|
REMOV CONC (PAV)
|
SY
|
817.000
|
$15.000
|
$27.450
|
$25.000
|
$21.530
|
$25.000
|
$24.000
|
$13.660
|
$14.460
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
7,274.000
|
$16.000
|
$3.680
|
$5.000
|
$7.650
|
$4.000
|
$4.000
|
$4.100
|
$4.450
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
27,346.000
|
$15.000
|
$7.320
|
$7.000
|
$6.470
|
$9.000
|
$8.000
|
$20.000
|
$15.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
269.000
|
$15.000
|
$36.450
|
$20.000
|
$17.890
|
$25.000
|
$13.000
|
$20.000
|
$20.980
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
3,328.000
|
$20.000
|
$17.020
|
$15.000
|
$24.630
|
$15.000
|
$14.000
|
$20.000
|
$19.870
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
4,717.000
|
$18.000
|
$5.600
|
$9.000
|
$13.880
|
$10.000
|
$10.000
|
$20.000
|
$11.170
|
|
|
REMOV CONC (CURB)
|
LF
|
26,053.000
|
$12.000
|
$2.130
|
$3.000
|
$5.120
|
$4.000
|
$5.000
|
$3.120
|
$4.570
|
|
|
REMOV CONC (RETAINING WALLS)
|
SY
|
1,070.000
|
$60.000
|
$39.090
|
$55.000
|
$31.430
|
$25.000
|
$39.000
|
$18.340
|
$108.330
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
11,236.000
|
$9.000
|
$5.520
|
$7.000
|
$7.920
|
$18.000
|
$44.000
|
$7.780
|
$9.080
|
|
|
REMOV CONC (RAIL)
|
LF
|
1,410.000
|
$30.000
|
$19.880
|
$14.000
|
$20.680
|
$24.000
|
$40.000
|
$18.000
|
$46.720
|
|
|
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,905.000
|
$20.000
|
$7.500
|
$6.000
|
$8.000
|
$4.000
|
$5.000
|
$16.000
|
$6.460
|
|
|
RMV(12"-24") TRT/UNTRT BASE & ASPH PAV
|
SY
|
190,415.000
|
$7.000
|
$5.500
|
$10.000
|
$7.960
|
$6.000
|
$2.000
|
$8.530
|
$6.930
|
|
|
EXCAV (ROADWAY)
|
CY
|
312,785.939
|
$12.000
|
$7.250
|
$24.000
|
$17.040
|
$18.000
|
$10.000
|
$21.480
|
$18.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
202,043.170
|
$20.000
|
$5.300
|
$8.000
|
$12.150
|
$12.000
|
$9.000
|
$7.500
|
$33.750
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
153,915.000
|
$2.000
|
$1.350
|
$1.000
|
$1.460
|
$3.750
|
$4.000
|
$2.210
|
$3.980
|
|
|
BLOCK SODDING
|
SY
|
16,120.000
|
$9.000
|
$7.080
|
$6.720
|
$6.720
|
$6.720
|
$7.000
|
$7.180
|
$6.720
|
|
|
DRILL SEED (PERM_URBAN_CLAY)
|
SY
|
137,795.000
|
$1.020
|
$0.190
|
$0.180
|
$0.180
|
$0.180
|
$0.200
|
$0.260
|
$0.180
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
137,795.000
|
$0.250
|
$0.180
|
$0.170
|
$0.170
|
$0.170
|
$0.200
|
$0.220
|
$0.170
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,401.000
|
$52.000
|
$15.000
|
$44.310
|
$24.520
|
$50.000
|
$44.000
|
$29.760
|
$64.180
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
153,915.000
|
$1.000
|
$0.720
|
$0.680
|
$0.680
|
$0.680
|
$1.000
|
$1.030
|
$0.680
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
108,209.000
|
$35.000
|
$30.000
|
$20.000
|
$29.820
|
$54.000
|
$38.000
|
$56.470
|
$50.000
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
13,047.000
|
$30.000
|
$40.000
|
$30.000
|
$48.010
|
$60.000
|
$66.770
|
$60.000
|
$60.000
|
|
|
CEM TRT(PLNT MX)(CL L)(TYA)(GR1-2)(6")
|
SY
|
296.000
|
$3.000
|
$78.000
|
$100.000
|
$36.400
|
$35.000
|
$25.000
|
$58.160
|
$76.220
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
67,372.000
|
$5.000
|
$0.100
|
$4.750
|
$0.100
|
$0.100
|
$0.200
|
$0.100
|
$0.100
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
120,086.000
|
$75.000
|
$76.920
|
$80.000
|
$74.560
|
$76.810
|
$77.000
|
$75.860
|
$74.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
9,536.000
|
$150.000
|
$85.030
|
$95.000
|
$82.310
|
$84.910
|
$85.000
|
$83.290
|
$81.250
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
46,787.000
|
$90.000
|
$90.000
|
$95.000
|
$87.060
|
$89.880
|
$98.000
|
$95.850
|
$93.500
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
56,726.000
|
$100.000
|
$107.790
|
$105.000
|
$104.060
|
$107.640
|
$109.000
|
$107.130
|
$104.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,526.000
|
$60.000
|
$57.650
|
$110.000
|
$51.000
|
$53.300
|
$53.000
|
$60.200
|
$51.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
18,350.000
|
$10.000
|
$2.760
|
$7.000
|
$2.350
|
$1.050
|
$1.000
|
$1.030
|
$2.020
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
160,693.000
|
$2.100
|
$2.470
|
$6.000
|
$2.630
|
$1.990
|
$2.000
|
$1.950
|
$2.850
|
|
|
CONC PVMT (CRCP) (12")
|
SY
|
348.000
|
$150.000
|
$153.000
|
$112.460
|
$177.830
|
$150.000
|
$350.000
|
$169.430
|
$241.210
|
|
|
CONC PVMT(TRANSITION SLAB) (12")
|
SY
|
296.000
|
$305.000
|
$247.000
|
$220.050
|
$279.300
|
$200.000
|
$495.000
|
$142.250
|
$311.960
|
|
|
STRUCT EXCAV
|
CY
|
13,047.000
|
$28.000
|
$3.000
|
$7.000
|
$17.370
|
$20.000
|
$2.000
|
$21.110
|
$32.640
|
|
|
CUT & RESTORING PAV
|
SY
|
828.000
|
$150.000
|
$170.000
|
$155.000
|
$184.050
|
$145.000
|
$154.000
|
$202.310
|
$376.180
|
|
|
CEM STABIL BKFL
|
CY
|
14,855.000
|
$80.000
|
$82.000
|
$70.000
|
$224.090
|
$130.000
|
$164.000
|
$117.800
|
$150.990
|
|
|
FLOWABLE BACKFILL
|
CY
|
266.000
|
$450.000
|
$164.000
|
$240.000
|
$224.060
|
$170.000
|
$217.000
|
$180.090
|
$327.260
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
15,309.000
|
$10.000
|
$3.680
|
$3.500
|
$6.240
|
$4.160
|
$5.000
|
$5.720
|
$13.580
|
|
|
TEMPORARY SPL SHORING
|
SF
|
64,079.000
|
$20.000
|
$21.000
|
$7.000
|
$28.230
|
$28.560
|
$37.000
|
$23.090
|
$34.730
|
|
|
TEMPORARY SPECIAL SHORING (SOIL NAIL)
|
SF
|
105,972.000
|
$25.000
|
$30.930
|
$12.000
|
$36.400
|
$30.000
|
$30.850
|
$31.370
|
$33.260
|
|
|
SOIL NAIL ANCHORS
|
LF
|
416,590.000
|
$31.000
|
$22.000
|
$20.000
|
$20.230
|
$21.000
|
$23.000
|
$26.880
|
$27.100
|
|
|
SOIL NAIL ANCHORS (HOLLOW CORE)
|
LF
|
22,605.000
|
$50.000
|
$30.270
|
$28.000
|
$59.080
|
$29.000
|
$58.000
|
$30.320
|
$42.580
|
|
|
VERIFICATION TESTS
|
EA
|
232.000
|
$1,200.000
|
$283.510
|
$275.000
|
$374.760
|
$275.000
|
$395.000
|
$287.540
|
$1,543.130
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
108.000
|
$110.000
|
$159.000
|
$125.000
|
$183.470
|
$124.980
|
$228.000
|
$197.650
|
$175.550
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,574.000
|
$235.000
|
$280.000
|
$310.000
|
$260.400
|
$251.760
|
$340.000
|
$254.250
|
$352.850
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,781.000
|
$350.000
|
$483.000
|
$550.000
|
$455.110
|
$491.270
|
$460.000
|
$498.230
|
$523.530
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
5,444.000
|
$450.000
|
$440.000
|
$675.000
|
$466.480
|
$530.710
|
$705.000
|
$427.010
|
$575.790
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
42.000
|
$170.000
|
$91.330
|
$150.000
|
$75.000
|
$150.000
|
$150.000
|
$153.760
|
$228.010
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
84.000
|
$280.000
|
$145.420
|
$240.000
|
$130.230
|
$250.000
|
$250.000
|
$256.270
|
$284.660
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
766.000
|
$560.000
|
$526.880
|
$500.000
|
$450.000
|
$500.000
|
$1,000.000
|
$461.290
|
$462.160
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
359.000
|
$860.000
|
$864.080
|
$820.000
|
$680.000
|
$865.000
|
$865.000
|
$886.710
|
$686.620
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
104.000
|
$478.070
|
$368.820
|
$350.000
|
$398.000
|
$375.000
|
$375.000
|
$384.410
|
$401.870
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$435.280
|
$516.340
|
$490.000
|
$456.000
|
$475.000
|
$475.000
|
$486.920
|
$460.440
|
|
|
CORE HOLE
|
EA
|
185.000
|
$1,175.000
|
$200.000
|
$750.000
|
$1,180.490
|
$500.000
|
$836.000
|
$1,281.380
|
$500.000
|
|
|
CL A CONC (MISC)
|
CY
|
28.000
|
$610.000
|
$1,523.560
|
$1,200.000
|
$889.870
|
$150.000
|
$890.000
|
$749.540
|
$1,197.660
|
|
|
CL A CONC (COLLAR)
|
EA
|
45.000
|
$2,500.000
|
$650.000
|
$1,300.000
|
$5,266.650
|
$1,744.960
|
$1,592.000
|
$1,872.560
|
$1,300.000
|
|
|
CL A CONC (PLUG)
|
EA
|
17.000
|
$1,400.000
|
$650.000
|
$1,300.000
|
$2,500.000
|
$1,439.520
|
$1,444.000
|
$1,270.450
|
$1,200.000
|
|
|
CL C CONC (ABUT)
|
CY
|
1,013.700
|
$1,200.000
|
$1,050.000
|
$1,000.000
|
$1,151.990
|
$1,206.960
|
$1,493.000
|
$1,041.130
|
$1,150.000
|
|
|
CL C CONC (CAP)
|
CY
|
1,009.600
|
$1,400.000
|
$1,500.000
|
$1,000.000
|
$1,430.710
|
$1,721.760
|
$2,021.000
|
$1,600.640
|
$1,420.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,813.000
|
$1,000.000
|
$1,800.000
|
$1,500.000
|
$1,641.940
|
$1,706.060
|
$1,908.000
|
$1,388.540
|
$1,520.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
168.000
|
$1,079.000
|
$860.000
|
$1,900.000
|
$1,904.090
|
$1,693.020
|
$2,666.000
|
$1,469.220
|
$1,460.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
4,582.000
|
$600.000
|
$310.000
|
$400.000
|
$498.870
|
$544.980
|
$504.000
|
$623.240
|
$729.610
|
|
|
REINF CONC SLAB
|
SF
|
204,755.000
|
$20.000
|
$20.000
|
$18.000
|
$20.850
|
$23.000
|
$26.000
|
$25.240
|
$31.050
|
|
|
BRIDGE MEDIAN
|
SF
|
2,438.000
|
$15.000
|
$14.500
|
$11.500
|
$22.680
|
$17.200
|
$17.000
|
$14.330
|
$30.470
|
|
|
BRIDGE SIDEWALK
|
SF
|
14,850.000
|
$20.000
|
$11.000
|
$10.750
|
$13.610
|
$9.140
|
$25.000
|
$10.710
|
$17.130
|
|
|
APPROACH SLAB
|
CY
|
1,230.800
|
$730.000
|
$680.000
|
$400.000
|
$728.760
|
$710.620
|
$839.000
|
$671.050
|
$925.800
|
|
|
RETAINING WALL (MSE)
|
SF
|
194,694.000
|
$62.000
|
$68.000
|
$50.000
|
$102.670
|
$100.000
|
$91.000
|
$81.330
|
$87.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
22,742.000
|
$20.000
|
$7.000
|
$20.000
|
$27.170
|
$35.000
|
$32.000
|
$26.240
|
$36.440
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
2,766.000
|
$104.000
|
$68.000
|
$115.000
|
$84.320
|
$115.000
|
$92.000
|
$99.940
|
$108.640
|
|
|
RETAINING WALL (SOLDIER PILE) (FASCIA)
|
SF
|
5,556.000
|
$80.000
|
$132.000
|
$120.000
|
$88.250
|
$110.000
|
$145.000
|
$67.080
|
$150.000
|
|
|
RETAINING WALL (SOIL NAIL) (FASCIA)
|
SF
|
95,208.000
|
$60.000
|
$68.000
|
$50.000
|
$77.820
|
$77.000
|
$63.000
|
$49.910
|
$82.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
18,584.210
|
$230.000
|
$200.000
|
$110.000
|
$198.810
|
$188.800
|
$304.000
|
$189.450
|
$215.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,783.870
|
$225.000
|
$215.000
|
$125.000
|
$206.230
|
$193.660
|
$201.000
|
$202.650
|
$235.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,731.000
|
$550.000
|
$400.000
|
$450.000
|
$450.600
|
$448.500
|
$525.000
|
$828.850
|
$445.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
198.000
|
$500.000
|
$425.000
|
$500.000
|
$508.350
|
$518.040
|
$766.000
|
$849.310
|
$475.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
160.000
|
$500.000
|
$500.000
|
$600.000
|
$601.820
|
$617.360
|
$630.000
|
$914.710
|
$750.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
18.000
|
$867.500
|
$510.000
|
$600.000
|
$603.740
|
$699.690
|
$871.000
|
$915.270
|
$750.000
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
37.000
|
$850.000
|
$585.640
|
$600.000
|
$624.700
|
$622.820
|
$656.000
|
$862.400
|
$790.130
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,115.000
|
$200.000
|
$481.390
|
$500.000
|
$511.970
|
$519.280
|
$742.000
|
$972.350
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
49.000
|
$205.000
|
$479.160
|
$250.000
|
$363.390
|
$279.890
|
$341.000
|
$271.110
|
$344.370
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
2,322.000
|
$30.000
|
$34.160
|
$15.000
|
$25.500
|
$14.260
|
$28.000
|
$18.330
|
$24.490
|
|
|
RAIL (TY SSTR)
|
LF
|
39,682.300
|
$70.000
|
$50.000
|
$50.000
|
$53.140
|
$53.220
|
$28.000
|
$57.250
|
$45.000
|
|
|
RAIL (TY C221)
|
LF
|
3,496.000
|
$225.000
|
$100.000
|
$75.000
|
$108.320
|
$91.720
|
$164.000
|
$84.230
|
$107.030
|
|
|
RAIL (TY C402)
|
LF
|
6,457.000
|
$150.000
|
$200.000
|
$150.000
|
$179.970
|
$171.400
|
$155.000
|
$136.380
|
$140.000
|
|
|
RAIL (TY PR11)
|
LF
|
3,064.000
|
$165.000
|
$140.000
|
$190.000
|
$104.880
|
$123.160
|
$202.000
|
$97.620
|
$157.770
|
|
|
RAIL (CLF-RO)
|
LF
|
660.000
|
$110.000
|
$118.000
|
$210.000
|
$200.300
|
$204.380
|
$157.000
|
$231.670
|
$190.270
|
|
|
RAIL (TY T80PP)
|
LF
|
1,451.000
|
$400.000
|
$120.000
|
$180.000
|
$142.060
|
$166.210
|
$273.000
|
$91.660
|
$240.200
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
1,184.000
|
$400.000
|
$345.000
|
$180.000
|
$250.510
|
$326.560
|
$506.000
|
$418.810
|
$541.870
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
1,278.000
|
$165.000
|
$180.840
|
$160.000
|
$150.180
|
$153.210
|
$230.000
|
$146.570
|
$173.950
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
1,801.000
|
$200.000
|
$198.000
|
$170.000
|
$253.270
|
$228.910
|
$321.000
|
$211.300
|
$358.580
|
|
|
CMP (GAL STL 84 IN)
|
LF
|
16.000
|
$1,200.000
|
$594.230
|
$525.000
|
$1,093.770
|
$1,267.800
|
$1,096.000
|
$562.250
|
$1,025.380
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,219.000
|
$545.000
|
$370.000
|
$425.000
|
$420.560
|
$466.030
|
$555.000
|
$383.560
|
$664.240
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
188.000
|
$550.000
|
$470.000
|
$440.000
|
$460.950
|
$506.160
|
$555.000
|
$439.890
|
$669.620
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
24.000
|
$750.000
|
$550.000
|
$555.000
|
$702.810
|
$806.830
|
$926.000
|
$1,758.280
|
$1,229.460
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
27.000
|
$1,400.000
|
$4,600.000
|
$585.000
|
$1,436.610
|
$1,548.970
|
$1,440.000
|
$1,380.910
|
$1,183.210
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
54.000
|
$1,600.000
|
$2,800.000
|
$750.000
|
$1,588.550
|
$1,362.570
|
$1,602.000
|
$970.790
|
$1,351.960
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
112.000
|
$140.000
|
$62.000
|
$110.000
|
$127.840
|
$135.290
|
$147.000
|
$139.030
|
$111.740
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
12,556.000
|
$100.000
|
$70.000
|
$125.000
|
$121.110
|
$104.110
|
$127.000
|
$114.200
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
3,754.000
|
$135.000
|
$120.000
|
$150.000
|
$130.420
|
$140.770
|
$152.000
|
$122.050
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,553.000
|
$200.000
|
$130.000
|
$195.000
|
$177.730
|
$194.680
|
$222.260
|
$162.450
|
$220.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
71.000
|
$400.000
|
$175.000
|
$260.000
|
$289.420
|
$257.730
|
$286.000
|
$233.690
|
$372.200
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
7.000
|
$450.000
|
$260.000
|
$575.000
|
$487.590
|
$477.360
|
$866.000
|
$608.160
|
$1,016.740
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
59.000
|
$200.000
|
$100.000
|
$140.000
|
$254.760
|
$167.390
|
$177.000
|
$99.400
|
$163.970
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,904.000
|
$160.000
|
$110.000
|
$165.000
|
$143.250
|
$123.770
|
$173.000
|
$120.630
|
$229.400
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
156.000
|
$190.000
|
$160.000
|
$245.000
|
$194.500
|
$167.490
|
$339.000
|
$142.680
|
$271.520
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
64.000
|
$300.000
|
$170.000
|
$270.000
|
$220.760
|
$234.130
|
$396.000
|
$195.160
|
$312.700
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
49.000
|
$320.000
|
$220.000
|
$325.000
|
$349.480
|
$308.830
|
$373.000
|
$260.010
|
$379.030
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
824.000
|
$475.000
|
$280.000
|
$375.000
|
$321.220
|
$413.300
|
$498.000
|
$335.730
|
$496.380
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
150.000
|
$500.000
|
$263.720
|
$315.000
|
$217.820
|
$182.540
|
$136.000
|
$191.850
|
$320.160
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$11,000.000
|
$10,367.920
|
$8,750.000
|
$8,413.930
|
$7,001.530
|
$10,771.000
|
$7,883.050
|
$13,955.470
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
30.000
|
$7,200.000
|
$6,100.000
|
$5,500.000
|
$5,932.380
|
$4,181.130
|
$5,574.000
|
$5,826.440
|
$10,155.710
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
9.000
|
$8,000.000
|
$7,910.290
|
$5,900.000
|
$7,178.550
|
$6,027.500
|
$7,241.000
|
$6,406.250
|
$11,023.030
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
2.000
|
$10,000.000
|
$9,509.690
|
$6,325.000
|
$7,255.580
|
$7,073.840
|
$7,418.000
|
$6,985.460
|
$11,756.860
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
4.000
|
$18,000.000
|
$11,950.080
|
$8,475.000
|
$11,929.120
|
$13,032.560
|
$11,763.000
|
$8,803.420
|
$14,294.210
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
3.000
|
$20,000.000
|
$18,689.060
|
$13,885.000
|
$19,066.290
|
$22,702.890
|
$21,621.000
|
$15,624.330
|
$20,999.760
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
56.000
|
$7,500.000
|
$6,000.000
|
$5,250.000
|
$7,372.200
|
$6,313.370
|
$10,259.000
|
$6,683.580
|
$11,301.870
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$7,800.000
|
$8,378.350
|
$5,310.000
|
$7,359.200
|
$5,459.000
|
$9,992.000
|
$6,868.100
|
$11,554.960
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$7,750.000
|
$8,380.630
|
$5,310.000
|
$7,154.890
|
$6,318.840
|
$10,198.000
|
$6,867.550
|
$12,246.890
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
2.000
|
$7,750.000
|
$6,860.110
|
$5,670.000
|
$9,273.250
|
$6,697.010
|
$13,826.000
|
$7,245.490
|
$12,061.000
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$7,800.000
|
$9,395.480
|
$6,030.000
|
$10,837.030
|
$8,834.600
|
$15,922.000
|
$7,614.520
|
$12,567.110
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
16.000
|
$6,200.000
|
$9,319.780
|
$5,725.000
|
$6,485.180
|
$5,457.340
|
$9,050.000
|
$7,442.730
|
$11,048.830
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
10.000
|
$8,600.000
|
$9,995.540
|
$6,200.000
|
$7,982.000
|
$7,167.580
|
$11,064.000
|
$8,320.860
|
$11,681.430
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
2.000
|
$8,700.000
|
$11,800.440
|
$6,710.000
|
$9,392.970
|
$7,940.070
|
$12,161.000
|
$8,943.680
|
$12,440.560
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$14,000.000
|
$14,778.270
|
$8,950.000
|
$11,776.750
|
$15,344.680
|
$14,944.000
|
$11,110.730
|
$15,140.760
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
3.000
|
$22,000.000
|
$21,143.290
|
$14,600.000
|
$19,616.430
|
$24,373.780
|
$23,846.000
|
$17,306.520
|
$24,720.970
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
5.000
|
$7,200.000
|
$9,318.860
|
$5,700.000
|
$7,121.520
|
$4,537.810
|
$10,131.000
|
$7,479.060
|
$13,964.440
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
16.000
|
$8,500.000
|
$10,256.940
|
$6,300.000
|
$8,779.350
|
$6,548.580
|
$12,330.000
|
$8,255.630
|
$11,934.470
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
1.000
|
$8,500.000
|
$10,771.340
|
$6,655.000
|
$9,144.250
|
$6,823.350
|
$12,472.000
|
$8,654.770
|
$15,565.110
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
7.000
|
$8,600.000
|
$11,294.030
|
$7,015.000
|
$10,039.300
|
$8,071.930
|
$13,007.000
|
$9,055.370
|
$16,114.390
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
|
EA
|
1.000
|
$22,000.000
|
$28,258.330
|
$18,375.000
|
$20,465.590
|
$33,965.290
|
$25,299.000
|
$22,310.120
|
$31,748.600
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$7,500.000
|
$10,772.570
|
$7,000.000
|
$8,963.190
|
$8,202.460
|
$11,841.000
|
$8,634.780
|
$12,440.600
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$10,645.430
|
$7,675.000
|
$12,300.970
|
$6,606.920
|
$12,525.000
|
$8,542.510
|
$15,438.600
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
2.000
|
$15,300.000
|
$10,648.280
|
$7,625.000
|
$13,009.140
|
$6,614.320
|
$12,866.000
|
$8,542.150
|
$18,037.840
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
1.000
|
$100,000.000
|
$35,517.690
|
$31,500.000
|
$54,715.020
|
$27,280.290
|
$89,331.000
|
$30,184.420
|
$57,537.980
|
|
|
INLET (COMPL) (TY MSE2)
|
EA
|
89.000
|
$10,000.000
|
$5,500.000
|
$7,050.000
|
$11,293.960
|
$9,290.800
|
$14,954.000
|
$6,524.520
|
$12,513.260
|
|
|
INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)
|
EA
|
3.000
|
$5,000.000
|
$30,000.000
|
$28,295.000
|
$16,548.850
|
$25,177.940
|
$24,583.000
|
$15,857.100
|
$26,043.030
|
|
|
INLET (COMPL) (PMBD)(5FT)(MOD)
|
EA
|
172.000
|
$11,350.000
|
$6,100.000
|
$7,275.000
|
$9,530.980
|
$7,487.530
|
$9,258.000
|
$7,916.610
|
$9,000.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 54 IN)
|
EA
|
1.000
|
$16,500.000
|
$13,679.300
|
$25,000.000
|
$10,599.590
|
$27,095.180
|
$17,652.000
|
$25,627.610
|
$14,561.080
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$17,260.000
|
$7,514.910
|
$22,000.000
|
$11,653.990
|
$15,180.240
|
$15,173.000
|
$22,552.290
|
$14,167.400
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$19,500.000
|
$15,711.100
|
$24,500.000
|
$15,076.370
|
$23,144.620
|
$16,551.000
|
$34,340.990
|
$15,083.930
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
1.000
|
$25,000.000
|
$24,978.150
|
$38,500.000
|
$13,673.670
|
$27,477.540
|
$35,698.000
|
$39,979.060
|
$29,485.890
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$26,000.000
|
$14,560.250
|
$36,500.000
|
$19,126.790
|
$26,085.150
|
$26,542.000
|
$37,928.850
|
$22,389.030
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$17,165.610
|
$44,250.000
|
$23,630.870
|
$33,975.550
|
$42,827.000
|
$56,380.720
|
$31,350.900
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
3.000
|
$42,085.000
|
$70,000.000
|
$47,500.000
|
$39,990.450
|
$66,386.070
|
$56,742.000
|
$57,405.820
|
$57,128.300
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$50,000.000
|
$51,230.990
|
$49,400.000
|
$39,674.810
|
$91,985.500
|
$65,915.000
|
$59,968.590
|
$57,379.280
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$2,411.230
|
$1,780.000
|
$3,043.850
|
$1,561.800
|
$2,449.000
|
$3,705.350
|
$1,780.080
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,200.000
|
$2,411.300
|
$1,780.000
|
$3,043.880
|
$1,561.790
|
$4,558.000
|
$3,705.350
|
$1,780.110
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$4,000.000
|
$2,379.460
|
$1,750.000
|
$2,590.950
|
$1,310.500
|
$2,946.000
|
$3,359.220
|
$2,201.610
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$4,000.000
|
$2,595.590
|
$1,925.000
|
$3,890.570
|
$1,591.800
|
$5,578.000
|
$3,833.700
|
$2,314.470
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$4,000.000
|
$2,760.860
|
$2,100.000
|
$3,946.550
|
$1,801.800
|
$5,309.000
|
$4,336.360
|
$2,401.140
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$3,040.640
|
$2,100.000
|
$4,755.940
|
$2,225.760
|
$6,700.000
|
$4,348.330
|
$2,546.610
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$5,074.900
|
$3,455.000
|
$4,960.090
|
$2,697.760
|
$6,700.000
|
$6,357.710
|
$3,610.830
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$5,589.820
|
$4,200.000
|
$6,623.760
|
$3,597.370
|
$9,159.000
|
$6,561.140
|
$3,880.210
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$4,500.000
|
$6,734.080
|
$4,990.000
|
$7,355.170
|
$4,327.370
|
$10,848.000
|
$7,940.080
|
$4,478.830
|
|
|
JACK BOR OR TUN PIPE(48 IN)(RC)(CL IV)
|
LF
|
484.000
|
$2,500.000
|
$1,431.690
|
$2,250.000
|
$1,262.520
|
$1,292.010
|
$3,235.000
|
$1,376.560
|
$2,137.030
|
|
|
JACK BOR TUN BOX CULV (5 FT X 3 FT)
|
LF
|
107.000
|
$3,000.000
|
$3,400.000
|
$4,500.000
|
$3,434.330
|
$3,678.150
|
$4,923.000
|
$3,559.730
|
$7,381.110
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
25.000
|
$1,000.000
|
$1,721.650
|
$6,695.000
|
$4,631.510
|
$1,725.610
|
$1,880.000
|
$3,542.560
|
$1,783.620
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
3.000
|
$2,000.000
|
$1,721.670
|
$3,275.000
|
$5,449.570
|
$1,925.650
|
$2,024.000
|
$4,796.560
|
$4,434.050
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$5,000.000
|
$17,600.580
|
$6,030.000
|
$9,371.230
|
$8,118.750
|
$9,118.000
|
$36,704.360
|
$39,079.410
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
140.000
|
$50.000
|
$47.490
|
$50.000
|
$57.140
|
$34.020
|
$17.000
|
$42.850
|
$298.760
|
|
|
REMOV STR (INLET)
|
EA
|
6.000
|
$1,000.000
|
$1,916.660
|
$695.000
|
$928.210
|
$1,116.590
|
$1,480.000
|
$1,493.700
|
$1,591.910
|
|
|
REMOV STR (SET)
|
EA
|
14.000
|
$680.000
|
$1,443.420
|
$665.000
|
$909.770
|
$580.790
|
$692.000
|
$486.760
|
$341.120
|
|
|
REMOV STR (HEADWALL)
|
EA
|
10.000
|
$2,150.000
|
$2,823.160
|
$1,645.000
|
$1,991.370
|
$1,697.380
|
$3,436.000
|
$2,156.010
|
$541.550
|
|
|
REMOV STR (PIPE)
|
LF
|
3,111.000
|
$60.000
|
$34.930
|
$42.000
|
$36.310
|
$29.620
|
$20.000
|
$18.040
|
$26.590
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
36.000
|
$120.000
|
$72.350
|
$90.000
|
$106.210
|
$156.150
|
$56.000
|
$133.870
|
$209.280
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
6.000
|
$80,000.000
|
$262,908.160
|
$25,000.000
|
$216,667.050
|
$164,669.340
|
$257,650.000
|
$109,676.530
|
$200,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$16,766,753.770
|
$16,774,112.110
|
$18,895,259.000
|
$18,050,000.000
|
$19,000,000.000
|
$19,000,000.000
|
$19,000,000.000
|
$22,127,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
33.000
|
$20,000.000
|
$9,317.930
|
$20,000.000
|
$80,000.000
|
$75,000.000
|
$34,445.000
|
$45,000.000
|
$64,584.670
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$15,000.000
|
$25,381.930
|
$100.000
|
$12,162.350
|
$20,000.000
|
$26,263.000
|
$19,419.320
|
$23,231.080
|
|
|
TMA (STATIONARY)
|
DAY
|
598.000
|
$250.000
|
$192.000
|
$283.000
|
$125.950
|
$350.000
|
$325.000
|
$231.230
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1,449.000
|
$120.000
|
$1,332.390
|
$645.000
|
$368.970
|
$375.000
|
$802.000
|
$503.340
|
$750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
260.000
|
$76.320
|
$129.420
|
$75.000
|
$155.370
|
$126.830
|
$155.000
|
$87.130
|
$155.370
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
245.000
|
$53.780
|
$54.940
|
$40.000
|
$56.200
|
$53.840
|
$56.000
|
$66.640
|
$56.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
505.000
|
$20.000
|
$12.470
|
$10.000
|
$24.720
|
$12.220
|
$24.000
|
$15.380
|
$24.720
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
1,867.000
|
$80.000
|
$66.000
|
$38.000
|
$40.000
|
$78.000
|
$70.000
|
$41.010
|
$67.610
|
|
|
TEMP PAVED FLUME (REMOVE)
|
SY
|
1,867.000
|
$10.000
|
$9.450
|
$6.500
|
$10.000
|
$10.000
|
$11.000
|
$10.250
|
$20.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$38.330
|
$25.410
|
$25.000
|
$41.860
|
$24.900
|
$42.000
|
$39.980
|
$41.860
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$10.550
|
$6.470
|
$7.000
|
$14.990
|
$6.340
|
$15.000
|
$12.300
|
$14.990
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
32.000
|
$150.000
|
$189.120
|
$150.000
|
$105.340
|
$170.570
|
$168.000
|
$76.580
|
$303.900
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
80.000
|
$6.000
|
$4.590
|
$4.000
|
$8.000
|
$4.500
|
$10.000
|
$9.230
|
$5.040
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,826.000
|
$3.630
|
$3.520
|
$3.000
|
$6.480
|
$3.450
|
$6.000
|
$5.130
|
$15.040
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,826.000
|
$1.320
|
$0.260
|
$1.000
|
$1.540
|
$0.250
|
$2.000
|
$1.030
|
$9.690
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,848.000
|
$6.100
|
$6.420
|
$5.000
|
$8.120
|
$6.290
|
$8.000
|
$7.180
|
$8.120
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,848.000
|
$2.000
|
$0.870
|
$1.000
|
$1.540
|
$0.850
|
$2.000
|
$2.050
|
$1.540
|
|
|
CONSTRUCTING DETOURS (TY1)
|
SY
|
39,935.000
|
$90.000
|
$76.000
|
$145.000
|
$68.040
|
$90.000
|
$67.000
|
$67.210
|
$47.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
33,910.000
|
$30.000
|
$35.000
|
$5.000
|
$25.960
|
$25.000
|
$65.000
|
$35.790
|
$26.790
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
21,070.000
|
$30.000
|
$62.000
|
$5.000
|
$30.400
|
$20.000
|
$66.000
|
$43.820
|
$46.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$40.000
|
$87.330
|
$5.000
|
$70.930
|
$40.000
|
$62.000
|
$44.210
|
$72.160
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
93,660.000
|
$5.000
|
$4.000
|
$5.000
|
$8.830
|
$6.000
|
$11.000
|
$7.100
|
$10.060
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
47,260.000
|
$7.000
|
$5.000
|
$5.000
|
$13.490
|
$6.000
|
$19.000
|
$7.870
|
$8.780
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,380.000
|
$20.000
|
$7.000
|
$5.000
|
$35.600
|
$8.000
|
$21.000
|
$12.300
|
$9.740
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
35,859.000
|
$6.000
|
$11.000
|
$7.000
|
$6.610
|
$8.000
|
$25.000
|
$10.230
|
$11.640
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
21,070.000
|
$10.000
|
$11.000
|
$5.000
|
$13.850
|
$9.000
|
$28.000
|
$9.190
|
$12.060
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
560.000
|
$10.000
|
$20.000
|
$5.000
|
$12.530
|
$9.000
|
$35.000
|
$10.710
|
$12.350
|
|
|
PORT CTB (PINNING)
|
EA
|
510.000
|
$80.000
|
$160.000
|
$120.000
|
$49.520
|
$155.000
|
$124.000
|
$60.420
|
$72.380
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (48 )
|
LF
|
8,476.000
|
$110.000
|
$87.750
|
$65.000
|
$81.560
|
$87.630
|
$62.000
|
$69.600
|
$96.780
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (48 )
|
LF
|
3,170.000
|
$230.000
|
$243.160
|
$165.000
|
$286.370
|
$237.380
|
$70.000
|
$140.760
|
$267.270
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
554.000
|
$80.000
|
$103.120
|
$85.000
|
$81.000
|
$97.700
|
$121.000
|
$96.020
|
$150.000
|
|
|
CONC CURB (TY I)
|
LF
|
21,395.000
|
$20.000
|
$14.640
|
$13.750
|
$13.750
|
$13.000
|
$10.000
|
$14.100
|
$23.750
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
100.000
|
$350.000
|
$479.160
|
$550.000
|
$450.000
|
$280.000
|
$658.000
|
$461.290
|
$400.000
|
|
|
CONC CURB (TY F3)
|
LF
|
986.000
|
$200.000
|
$127.780
|
$135.000
|
$152.850
|
$245.840
|
$198.000
|
$123.010
|
$332.510
|
|
|
CONC CURB (TY C2)
|
LF
|
924.000
|
$160.000
|
$122.450
|
$130.000
|
$115.000
|
$190.000
|
$157.000
|
$117.880
|
$324.680
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,507.000
|
$100.000
|
$76.670
|
$100.000
|
$97.340
|
$110.780
|
$139.000
|
$86.790
|
$137.960
|
|
|
DRIVEWAYS (ACP) (TY 2)
|
SY
|
3,035.000
|
$88.000
|
$62.170
|
$75.000
|
$55.000
|
$71.930
|
$72.000
|
$70.400
|
$70.410
|
|
|
CONC SIDEWALKS (4")
|
SY
|
27,177.000
|
$65.000
|
$55.000
|
$75.000
|
$54.430
|
$55.200
|
$67.000
|
$59.100
|
$60.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
18.000
|
$2,500.000
|
$4,548.680
|
$3,000.000
|
$2,900.000
|
$2,900.000
|
$3,294.000
|
$3,255.190
|
$4,142.300
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$2,200.000
|
$4,545.310
|
$3,000.000
|
$2,900.000
|
$2,900.000
|
$3,332.000
|
$3,440.290
|
$4,934.300
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$3,500.000
|
$5,986.730
|
$3,000.000
|
$2,900.000
|
$2,900.000
|
$3,362.000
|
$3,890.100
|
$3,592.880
|
|
|
CURB RAMPS (TY 22)
|
EA
|
6.000
|
$3,500.000
|
$6,044.180
|
$3,600.000
|
$2,900.000
|
$2,900.000
|
$4,006.000
|
$3,408.160
|
$5,591.470
|
|
|
CONC MEDIAN
|
SY
|
392.000
|
$230.000
|
$131.750
|
$120.000
|
$95.000
|
$101.870
|
$73.000
|
$110.530
|
$66.380
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,875.000
|
$30.000
|
$31.250
|
$20.990
|
$20.990
|
$21.640
|
$21.000
|
$21.520
|
$21.100
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$2,250.000
|
$2,189.540
|
$1,936.000
|
$1,499.000
|
$1,545.360
|
$1,500.000
|
$1,536.630
|
$1,506.930
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,800.000
|
$1,265.070
|
$1,114.000
|
$1,114.000
|
$1,148.460
|
$1,114.000
|
$1,141.980
|
$1,119.900
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,270.000
|
$1,216.410
|
$1,209.000
|
$1,209.000
|
$1,246.390
|
$1,209.000
|
$1,239.360
|
$1,215.400
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,782.000
|
$8.000
|
$3.240
|
$3.000
|
$3.000
|
$3.090
|
$3.000
|
$3.080
|
$3.020
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$530.000
|
$237.880
|
$300.000
|
$300.000
|
$309.280
|
$300.000
|
$307.530
|
$301.590
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
12.000
|
$200.000
|
$248.690
|
$225.000
|
$225.000
|
$231.960
|
$225.000
|
$230.640
|
$226.190
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$300.000
|
$281.130
|
$250.000
|
$250.000
|
$257.730
|
$250.000
|
$256.270
|
$251.320
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$3,500.000
|
$3,676.270
|
$3,228.000
|
$3,228.000
|
$338.140
|
$3,228.000
|
$3,309.040
|
$3,245.080
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
19.000
|
$275.000
|
$356.810
|
$275.000
|
$275.000
|
$283.510
|
$275.000
|
$281.900
|
$276.460
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
22.000
|
$2,000.000
|
$1,638.100
|
$750.000
|
$750.000
|
$773.200
|
$750.000
|
$768.820
|
$3,321.350
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
23.000
|
$800.000
|
$875.820
|
$750.000
|
$750.000
|
$773.200
|
$750.000
|
$768.820
|
$549.960
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
10.000
|
$25,000.000
|
$29,556.120
|
$24,850.000
|
$24,850.000
|
$25,618.560
|
$24,850.000
|
$25,473.850
|
$24,981.510
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
4.000
|
$10,000.000
|
$7,785.040
|
$6,450.000
|
$6,450.000
|
$6,649.490
|
$6,450.000
|
$6,611.920
|
$6,484.140
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$8,000.000
|
$8,714.920
|
$8,200.000
|
$8,200.000
|
$8,453.610
|
$8,200.000
|
$8,405.850
|
$8,243.400
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
3.000
|
$800.000
|
$1,059.630
|
$4,500.000
|
$1,200.000
|
$329.290
|
$3,077.000
|
$1,793.930
|
$2,146.070
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
19,393.000
|
$28.000
|
$34.340
|
$25.000
|
$36.260
|
$35.800
|
$47.000
|
$32.390
|
$39.220
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$740.000
|
$337.210
|
$2,320.000
|
$388.000
|
$500.000
|
$500.000
|
$512.550
|
$391.780
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
52.000
|
$1,030.000
|
$1,369.890
|
$1,300.000
|
$851.000
|
$975.000
|
$975.000
|
$999.470
|
$859.280
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
6.000
|
$54,200.000
|
$52,582.660
|
$49,900.000
|
$47,757.000
|
$47,000.000
|
$47,000.000
|
$48,179.890
|
$48,221.810
|
|
|
HI MST IL POLE (175 FT)( 80 MPH)
|
EA
|
9.000
|
$67,300.000
|
$66,808.430
|
$63,400.000
|
$59,983.000
|
$58,000.000
|
$58,000.000
|
$59,456.030
|
$60,566.800
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
7.000
|
$34,800.000
|
$46,997.730
|
$44,600.000
|
$42,051.000
|
$38,500.000
|
$38,500.000
|
$39,466.500
|
$42,460.270
|
|
|
LED HI MST IL ASM (6 FIXT) (TY B)
|
EA
|
4.000
|
$45,000.000
|
$45,522.470
|
$43,200.000
|
$41,154.000
|
$38,500.000
|
$38,500.000
|
$39,466.500
|
$41,554.540
|
|
|
LED HI MST IL ASM(6 FIXT) (TY A)SHLD
|
EA
|
2.000
|
$45,000.000
|
$45,522.470
|
$43,200.000
|
$36,686.000
|
$35,250.000
|
$35,250.000
|
$36,134.920
|
$37,043.060
|
|
|
LED HI MST IL ASM(6 FIXT) (TY B)SHLD
|
EA
|
2.000
|
$40,000.000
|
$45,522.470
|
$43,200.000
|
$36,686.000
|
$35,250.000
|
$35,250.000
|
$36,134.920
|
$37,043.060
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10,300.000
|
$15.000
|
$12.650
|
$12.000
|
$12.000
|
$11.000
|
$11.000
|
$11.280
|
$12.120
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,025.000
|
$45.000
|
$30.560
|
$29.000
|
$16.000
|
$30.000
|
$30.000
|
$30.750
|
$16.160
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
9,170.000
|
$52.400
|
$32.670
|
$31.000
|
$19.000
|
$32.000
|
$32.000
|
$32.810
|
$19.180
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
16,850.000
|
$40.000
|
$25.290
|
$24.000
|
$21.300
|
$21.250
|
$21.000
|
$21.780
|
$21.510
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
5,282.000
|
$25.000
|
$20.020
|
$19.000
|
$13.000
|
$12.000
|
$12.000
|
$12.300
|
$13.130
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,375.000
|
$35.000
|
$29.510
|
$28.000
|
$17.000
|
$31.000
|
$31.000
|
$31.780
|
$17.170
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
2,285.000
|
$32.190
|
$14.750
|
$14.000
|
$18.000
|
$13.000
|
$13.000
|
$13.330
|
$18.180
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,610.000
|
$50.000
|
$25.290
|
$24.000
|
$20.000
|
$33.000
|
$33.000
|
$33.830
|
$20.190
|
|
|
CONDT (RM) (3")
|
LF
|
370.000
|
$95.570
|
$101.160
|
$96.000
|
$37.000
|
$53.000
|
$53.000
|
$54.330
|
$37.360
|
|
|
CONDUIT (PREPARE)
|
LF
|
450.000
|
$4.500
|
$1.740
|
$1.650
|
$1.000
|
$1.000
|
$1.000
|
$1.030
|
$1.010
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
16,040.000
|
$1.240
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$1.000
|
$1.030
|
$1.010
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
1,787.000
|
$2.000
|
$1.740
|
$1.650
|
$1.200
|
$1.550
|
$2.000
|
$1.590
|
$1.210
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
3,574.000
|
$2.000
|
$1.740
|
$1.650
|
$1.200
|
$1.850
|
$2.000
|
$1.900
|
$1.210
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
13,437.000
|
$2.000
|
$1.740
|
$1.650
|
$1.800
|
$1.750
|
$2.000
|
$1.790
|
$1.820
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
41,836.000
|
$2.800
|
$1.840
|
$1.750
|
$1.800
|
$1.900
|
$2.000
|
$1.950
|
$1.820
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10,703.000
|
$2.300
|
$2.110
|
$2.000
|
$2.200
|
$1.950
|
$2.000
|
$2.000
|
$2.220
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
4,742.000
|
$2.700
|
$2.320
|
$2.200
|
$2.200
|
$2.200
|
$2.000
|
$2.260
|
$2.220
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,710.000
|
$4.050
|
$3.370
|
$3.200
|
$3.100
|
$3.000
|
$3.000
|
$3.080
|
$3.130
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
2,540.000
|
$5.150
|
$5.010
|
$4.750
|
$4.300
|
$4.300
|
$4.000
|
$4.410
|
$4.340
|
|
|
ELEC CONDR (1/0) INSULATED
|
LF
|
2,940.000
|
$8.250
|
$6.800
|
$6.450
|
$5.500
|
$5.300
|
$5.000
|
$5.430
|
$5.550
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
2,032.000
|
$6.750
|
$2.530
|
$2.400
|
$2.500
|
$3.000
|
$3.000
|
$3.080
|
$2.520
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,844.000
|
$2.820
|
$3.110
|
$2.950
|
$3.000
|
$3.500
|
$4.000
|
$3.590
|
$3.030
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
27.000
|
$7,200.000
|
$5,163.430
|
$4,900.000
|
$3,900.000
|
$5,200.000
|
$5,200.000
|
$5,330.550
|
$3,937.960
|
|
|
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
|
EA
|
3.000
|
$12,200.000
|
$8,430.090
|
$8,000.000
|
$6,382.000
|
$7,800.000
|
$7,800.000
|
$7,995.820
|
$6,444.110
|
|
|
GROUND BOX TY A (122311)
|
EA
|
21.000
|
$1,060.000
|
$1,053.760
|
$1,000.000
|
$1,064.000
|
$900.000
|
$900.000
|
$922.590
|
$1,074.360
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
44.000
|
$1,420.000
|
$1,369.890
|
$1,300.000
|
$1,360.000
|
$1,080.000
|
$1,080.000
|
$1,107.110
|
$1,373.240
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
48.000
|
$1,700.000
|
$1,686.020
|
$1,600.000
|
$1,478.000
|
$1,320.000
|
$1,320.000
|
$1,353.140
|
$1,492.390
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$338.000
|
$126.450
|
$120.000
|
$355.000
|
$250.000
|
$250.000
|
$256.270
|
$358.460
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$1,045.520
|
$421.510
|
$700.000
|
$485.000
|
$600.000
|
$600.000
|
$615.060
|
$489.720
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
4.000
|
$9,000.000
|
$8,430.090
|
$8,000.000
|
$8,259.000
|
$7,200.000
|
$7,200.000
|
$7,380.760
|
$8,339.380
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)PS(U)
|
EA
|
1.000
|
$6,508.000
|
$7,903.210
|
$7,500.000
|
$7,833.000
|
$9,200.000
|
$9,200.000
|
$9,430.960
|
$7,909.240
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
2.000
|
$8,177.070
|
$6,744.070
|
$6,400.000
|
$6,668.000
|
$7,050.000
|
$7,050.000
|
$7,226.990
|
$6,732.900
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
345.000
|
$42.880
|
$30.260
|
$38.000
|
$56.780
|
$32.000
|
$32.000
|
$32.810
|
$19.870
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
325.000
|
$47.380
|
$36.310
|
$37.000
|
$63.580
|
$30.000
|
$30.000
|
$30.750
|
$26.470
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
5,943.000
|
$59.210
|
$35.130
|
$31.000
|
$59.980
|
$31.000
|
$31.000
|
$31.780
|
$30.220
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
22.000
|
$870.570
|
$794.380
|
$735.000
|
$410.000
|
$757.050
|
$678.000
|
$845.700
|
$1,142.490
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
142.000
|
$947.210
|
$918.670
|
$850.000
|
$410.000
|
$875.500
|
$777.000
|
$896.960
|
$1,150.190
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
3.000
|
$1,450.940
|
$1,064.580
|
$985.000
|
$655.000
|
$1,014.550
|
$833.000
|
$1,640.170
|
$1,257.120
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$971.340
|
$1,151.040
|
$1,065.000
|
$433.000
|
$1,096.950
|
$969.000
|
$999.470
|
$1,244.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
2.000
|
$1,358.010
|
$1,945.420
|
$1,800.000
|
$1,050.000
|
$1,854.000
|
$1,957.000
|
$1,742.680
|
$2,412.980
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,862.140
|
$2,107.540
|
$1,950.000
|
$210.000
|
$2,008.500
|
$2,236.000
|
$1,845.190
|
$2,599.960
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$946.370
|
$1,194.270
|
$1,105.000
|
$1,050.000
|
$1,138.150
|
$927.000
|
$1,127.620
|
$1,451.340
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,271.700
|
$1,415.830
|
$1,310.000
|
$970.000
|
$1,349.300
|
$1,107.000
|
$1,332.640
|
$2,210.570
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,470.000
|
$1,469.870
|
$1,360.000
|
$1,260.000
|
$1,400.800
|
$1,175.000
|
$1,383.890
|
$2,312.010
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
3.000
|
$1,888.740
|
$2,010.270
|
$1,860.000
|
$1,750.000
|
$1,915.800
|
$2,500.000
|
$2,306.480
|
$2,562.630
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$3,520.130
|
$2,291.270
|
$2,000.000
|
$410.000
|
$2,183.600
|
$2,200.000
|
$2,255.230
|
$3,192.910
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$4,260.500
|
$2,350.720
|
$2,100.000
|
$410.000
|
$2,240.250
|
$2,200.000
|
$2,255.230
|
$3,289.910
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
27.000
|
$4,730.000
|
$4,161.030
|
$3,850.000
|
$380.000
|
$3,965.500
|
$5,975.000
|
$6,125.000
|
$1,510.770
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
174.000
|
$167.810
|
$118.890
|
$160.000
|
$155.000
|
$113.300
|
$120.000
|
$123.010
|
$148.990
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
5,700.000
|
$15.650
|
$6.160
|
$4.850
|
$8.000
|
$7.500
|
$7.500
|
$7.690
|
$12.130
|
|
|
RELOCATE LRSA
|
EA
|
4.000
|
$4,230.000
|
$7,846.520
|
$1,950.000
|
$2,500.000
|
$5,500.000
|
$5,500.000
|
$5,638.080
|
$3,636.080
|
|
|
REMOVE LRSA
|
EA
|
14.000
|
$860.000
|
$794.380
|
$1,290.000
|
$954.550
|
$800.000
|
$800.000
|
$820.080
|
$1,027.270
|
|
|
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$31,100.000
|
$31,846.990
|
$28,100.000
|
$22,900.000
|
$21,800.000
|
$21,800.000
|
$22,347.270
|
$32,702.070
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$32,150.000
|
$34,113.680
|
$30,100.000
|
$24,743.000
|
$23,500.000
|
$23,500.000
|
$24,089.950
|
$34,745.980
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$35,000.000
|
$35,927.030
|
$31,700.000
|
$26,588.000
|
$25,800.000
|
$25,800.000
|
$26,447.680
|
$36,166.320
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
5.000
|
$36,250.000
|
$37,627.050
|
$33,200.000
|
$28,871.000
|
$28,800.000
|
$28,800.000
|
$29,522.980
|
$37,490.790
|
|
|
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$75,000.000
|
$76,840.780
|
$67,800.000
|
$73,511.000
|
$75,000.000
|
$75,000.000
|
$76,882.800
|
$72,314.040
|
|
|
INS OH SN SUP(90 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$90,171.000
|
$90,327.590
|
$79,700.000
|
$90,533.000
|
$82,500.000
|
$82,500.000
|
$84,571.070
|
$83,364.990
|
|
|
INS OH SN SUP(95 FT BRDG)(SPAN ONLY)
|
EA
|
4.000
|
$100,000.000
|
$94,407.630
|
$83,300.000
|
$100,112.000
|
$88,900.000
|
$88,900.000
|
$91,131.740
|
$86,967.770
|
|
|
INS OH SN SUP(105 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$115,000.000
|
$105,514.410
|
$93,100.000
|
$112,807.000
|
$103,000.000
|
$103,000.000
|
$105,585.710
|
$93,850.090
|
|
|
INS OH SN SUP(125 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$140,625.000
|
$115,827.850
|
$102,200.000
|
$122,111.000
|
$128,000.000
|
$128,000.000
|
$131,213.310
|
$126,276.050
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
6.000
|
$6,500.000
|
$8,613.420
|
$11,100.000
|
$7,748.000
|
$6,500.000
|
$6,500.000
|
$6,663.180
|
$7,433.460
|
|
|
REM & RELOCATE OVHD SIGN & SUP
|
EA
|
1.000
|
$27,957.950
|
$1.130
|
$3,500.000
|
$8,738.000
|
$18,000.000
|
$18,000.000
|
$18,451.880
|
$10,839.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
|
EA
|
34.000
|
$42.580
|
$17.000
|
$30.000
|
$80.000
|
$5.870
|
$30.000
|
$31.780
|
$7.230
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
234.000
|
$33.040
|
$28.000
|
$36.000
|
$80.000
|
$30.900
|
$24.500
|
$39.980
|
$49.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
|
EA
|
367.000
|
$51.250
|
$17.000
|
$30.000
|
$80.000
|
$24.720
|
$18.500
|
$31.780
|
$10.900
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
105.000
|
$43.600
|
$28.000
|
$36.000
|
$80.000
|
$30.900
|
$24.500
|
$39.980
|
$42.440
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
66,067.000
|
$1.000
|
$0.890
|
$0.880
|
$0.880
|
$0.880
|
$1.000
|
$0.900
|
$0.880
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
2,326.000
|
$2.000
|
$1.860
|
$1.840
|
$1.840
|
$1.840
|
$1.000
|
$1.890
|
$1.840
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
290,964.000
|
$0.700
|
$0.700
|
$0.690
|
$0.690
|
$0.690
|
$1.000
|
$0.710
|
$0.690
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
5,132.000
|
$2.000
|
$1.670
|
$1.650
|
$1.650
|
$1.650
|
$2.000
|
$1.690
|
$1.650
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
65,466.000
|
$1.000
|
$1.230
|
$1.220
|
$1.220
|
$1.220
|
$2.000
|
$1.250
|
$1.220
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
7,346.000
|
$12.000
|
$2.220
|
$2.200
|
$2.200
|
$2.200
|
$4.000
|
$2.260
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
227.000
|
$70.000
|
$32.830
|
$32.500
|
$32.500
|
$32.500
|
$10.000
|
$33.320
|
$32.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
235,213.000
|
$0.700
|
$0.700
|
$0.690
|
$0.690
|
$0.690
|
$1.000
|
$0.710
|
$0.690
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
145,536.000
|
$0.400
|
$1.880
|
$2.000
|
$0.890
|
$0.100
|
$1.000
|
$1.130
|
$0.920
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
47,050.000
|
$1.000
|
$1.910
|
$2.000
|
$0.870
|
$0.100
|
$1.000
|
$0.480
|
$1.370
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
424.000
|
$1.200
|
$1.410
|
$1.400
|
$1.400
|
$1.400
|
$1.000
|
$1.440
|
$1.400
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
944.000
|
$2.260
|
$1.620
|
$1.600
|
$1.600
|
$1.600
|
$1.000
|
$1.640
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
24,349.000
|
$1.590
|
$0.930
|
$0.920
|
$0.920
|
$0.920
|
$1.000
|
$0.940
|
$0.920
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
4,244.000
|
$2.640
|
$1.780
|
$1.760
|
$1.760
|
$1.760
|
$1.500
|
$1.800
|
$1.760
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,512.000
|
$4.410
|
$3.640
|
$3.600
|
$3.600
|
$3.600
|
$2.000
|
$3.690
|
$3.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
5,461.000
|
$16.570
|
$7.320
|
$7.250
|
$7.250
|
$7.250
|
$7.000
|
$7.430
|
$7.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
43.000
|
$293.020
|
$141.410
|
$140.000
|
$140.000
|
$140.000
|
$159.000
|
$143.510
|
$140.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
19.000
|
$228.650
|
$176.770
|
$175.000
|
$175.000
|
$175.000
|
$199.000
|
$179.390
|
$175.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
8.000
|
$225.000
|
$181.820
|
$180.000
|
$180.000
|
$180.000
|
$200.000
|
$184.520
|
$180.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
45.000
|
$181.500
|
$176.770
|
$175.000
|
$175.000
|
$175.000
|
$165.000
|
$179.390
|
$175.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
53.000
|
$434.150
|
$186.870
|
$185.000
|
$185.000
|
$185.000
|
$225.000
|
$189.650
|
$185.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,608.000
|
$8.210
|
$7.320
|
$7.250
|
$7.250
|
$7.250
|
$7.000
|
$7.430
|
$7.250
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
4,600.000
|
$6.170
|
$0.810
|
$0.800
|
$0.800
|
$0.800
|
$1.000
|
$0.820
|
$0.800
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
35,639.000
|
$0.910
|
$0.690
|
$0.680
|
$0.680
|
$0.680
|
$0.500
|
$0.700
|
$0.680
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
140,073.000
|
$0.880
|
$0.640
|
$0.630
|
$0.630
|
$0.630
|
$0.500
|
$0.650
|
$0.630
|
|
TY I HIGH PERF PM (Y)4"(SLD)(100MIL)
|
LF
|
5,067.000
|
$0.800
|
$0.450
|
$0.450
|
$0.450
|
$0.450
|
$0.500
|
$0.460
|
$0.450
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
88,886.000
|
$0.880
|
$0.640
|
$0.630
|
$0.630
|
$0.630
|
$0.500
|
$0.650
|
$0.630
|
|
|
PAVEMENT SLER 4"
|
LF
|
5,491.000
|
$0.250
|
$0.250
|
$0.250
|
$0.250
|
$0.250
|
$0.200
|
$0.260
|
$0.250
|
|
|
PAVEMENT SLER 6"
|
LF
|
270,142.000
|
$0.430
|
$0.250
|
$0.250
|
$0.250
|
$0.250
|
$0.200
|
$0.260
|
$0.250
|
|
|
PAVEMENT SLER 8"
|
LF
|
24,349.000
|
$0.610
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
$0.400
|
|
|
PAVEMENT SLER 12"
|
LF
|
9,756.000
|
$1.000
|
$1.260
|
$1.250
|
$1.250
|
$1.250
|
$0.500
|
$1.280
|
$1.250
|
|
|
PAVEMENT SLER 24"
|
LF
|
7,069.000
|
$3.070
|
$2.830
|
$2.800
|
$2.800
|
$2.800
|
$0.500
|
$2.870
|
$2.800
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
43.000
|
$144.530
|
$76.770
|
$76.000
|
$76.000
|
$76.000
|
$18.000
|
$77.900
|
$76.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
45.000
|
$57.430
|
$89.900
|
$89.000
|
$89.000
|
$89.000
|
$18.000
|
$91.230
|
$89.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
19.000
|
$83.290
|
$78.790
|
$78.000
|
$78.000
|
$78.000
|
$22.000
|
$79.950
|
$78.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
8.000
|
$93.000
|
$106.060
|
$105.000
|
$105.000
|
$105.000
|
$22.000
|
$107.630
|
$105.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
53.000
|
$40.130
|
$116.160
|
$115.000
|
$115.000
|
$115.000
|
$22.000
|
$117.880
|
$115.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
909.000
|
$5.700
|
$4.290
|
$4.250
|
$4.250
|
$4.250
|
$4.000
|
$4.360
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
128.000
|
$6.690
|
$4.290
|
$4.250
|
$4.250
|
$4.250
|
$4.000
|
$4.360
|
$4.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,296.000
|
$5.990
|
$4.290
|
$4.250
|
$4.250
|
$4.250
|
$4.000
|
$4.360
|
$4.250
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
42,832.000
|
$0.700
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
$0.500
|
$0.310
|
$0.300
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
10,553.000
|
$1.000
|
$0.660
|
$0.650
|
$0.650
|
$0.650
|
$1.000
|
$0.670
|
$0.650
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
551.000
|
$4.000
|
$1.520
|
$1.500
|
$1.500
|
$1.500
|
$1.000
|
$1.540
|
$1.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
3,298.000
|
$4.000
|
$2.580
|
$2.550
|
$2.550
|
$2.550
|
$3.000
|
$2.560
|
$2.550
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
22.000
|
$125.000
|
$42.420
|
$42.000
|
$42.000
|
$42.000
|
$54.000
|
$43.060
|
$42.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
2.000
|
$130.000
|
$51.520
|
$51.000
|
$51.000
|
$51.000
|
$1,000.000
|
$52.290
|
$51.000
|
|
|
ELIM EXT PM & MRKS (UTURN ARROW)
|
EA
|
1.000
|
$100.000
|
$65.660
|
$65.000
|
$65.000
|
$65.000
|
$76.000
|
$66.650
|
$65.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
13.000
|
$125.000
|
$42.420
|
$42.000
|
$42.000
|
$42.000
|
$54.000
|
$43.060
|
$42.000
|
|
|
ELIM EXT PM & MRKS (SYMBOL)
|
EA
|
18.000
|
$140.000
|
$50.510
|
$50.000
|
$50.000
|
$50.000
|
$75.000
|
$51.260
|
$50.000
|
|
|
ELIM EXT PM & MRKS (MED NOSE)
|
EA
|
3.000
|
$165.000
|
$80.810
|
$80.000
|
$80.000
|
$80.000
|
$100.000
|
$82.000
|
$80.000
|
|
|
ELIM EXT PM & MRKS (36")(YLD TRI)
|
EA
|
4.000
|
$60.000
|
$30.300
|
$30.000
|
$30.000
|
$30.000
|
$15.000
|
$30.750
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
28,381.000
|
$1.110
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
$0.200
|
$0.310
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,160.000
|
$0.460
|
$0.610
|
$0.600
|
$0.600
|
$0.600
|
$0.500
|
$0.620
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
582.000
|
$2.990
|
$2.530
|
$2.500
|
$2.500
|
$2.500
|
$1.000
|
$2.560
|
$2.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$27.160
|
$40.400
|
$40.000
|
$40.000
|
$40.000
|
$18.000
|
$41.010
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$40.220
|
$50.510
|
$50.000
|
$50.000
|
$50.000
|
$22.000
|
$51.260
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$25.450
|
$50.510
|
$50.000
|
$50.000
|
$50.000
|
$18.000
|
$51.260
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
4.000
|
$16.910
|
$50.510
|
$50.000
|
$50.000
|
$50.000
|
$22.000
|
$51.260
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
317.000
|
$2.710
|
$0.610
|
$0.600
|
$0.600
|
$0.600
|
$0.500
|
$0.620
|
$0.600
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$8,800.000
|
$9,273.100
|
$11,300.000
|
$11,919.000
|
$6,500.000
|
$6,500.000
|
$6,663.180
|
$12,035.010
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
2.000
|
$18,000.000
|
$6,849.450
|
$6,500.000
|
$14,723.000
|
$21,500.000
|
$21,500.000
|
$22,039.740
|
$14,866.300
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$100,000.000
|
$195,578.110
|
$185,600.100
|
$43,677.000
|
$118,000.000
|
$118,000.000
|
$120,962.270
|
$44,102.100
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
28.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
16.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
28.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
16.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
28.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$320.000
|
$316.130
|
$300.000
|
$213.000
|
$300.000
|
$300.000
|
$307.530
|
$215.070
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
24.000
|
$850.000
|
$832.470
|
$790.000
|
$674.000
|
$775.000
|
$775.000
|
$794.450
|
$680.560
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
24.000
|
$210.000
|
$189.680
|
$180.000
|
$128.000
|
$175.000
|
$175.000
|
$179.390
|
$129.250
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
8.000
|
$270.000
|
$221.290
|
$210.000
|
$195.000
|
$200.000
|
$200.000
|
$205.020
|
$196.900
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
4.000
|
$300.000
|
$410.970
|
$390.000
|
$213.000
|
$220.000
|
$220.000
|
$225.530
|
$215.070
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
5,330.000
|
$2.670
|
$2.850
|
$2.700
|
$2.800
|
$3.000
|
$3.000
|
$3.080
|
$2.830
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
7,133.000
|
$3.620
|
$4.370
|
$4.150
|
$4.300
|
$4.000
|
$4.000
|
$4.100
|
$4.340
|
|
|
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
|
LF
|
10,424.000
|
$2.790
|
$3.900
|
$3.700
|
$3.800
|
$3.300
|
$3.300
|
$3.380
|
$3.840
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
5,190.000
|
$1.760
|
$1.630
|
$1.550
|
$1.700
|
$1.600
|
$1.500
|
$1.640
|
$1.720
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
5,325.000
|
$1.860
|
$1.630
|
$1.550
|
$1.700
|
$1.700
|
$2.000
|
$1.740
|
$1.720
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
5.000
|
$17,000.000
|
$13,172.010
|
$12,500.000
|
$14,286.000
|
$15,000.000
|
$15,000.000
|
$15,376.580
|
$14,425.040
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
3.000
|
$28,000.000
|
$14,963.400
|
$14,200.000
|
$14,567.000
|
$15,800.000
|
$15,800.000
|
$16,196.640
|
$14,708.780
|
|
|
INS TRF SIG PL AM(S)2 ARM(55-44')LUM
|
EA
|
1.000
|
$50,000.000
|
$49,421.380
|
$46,900.000
|
$38,110.000
|
$41,500.000
|
$41,500.000
|
$42,541.820
|
$38,480.910
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-44')LUM
|
EA
|
1.000
|
$55,000.000
|
$50,053.640
|
$47,500.000
|
$41,214.000
|
$44,200.000
|
$44,200.000
|
$45,309.600
|
$41,615.120
|
|
|
PED POLE ASSEMBLY
|
EA
|
24.000
|
$3,320.000
|
$2,529.030
|
$2,400.000
|
$3,184.000
|
$2,200.000
|
$2,200.000
|
$2,255.230
|
$3,214.990
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
24.000
|
$900.000
|
$1,159.140
|
$1,100.000
|
$1,178.000
|
$975.000
|
$975.000
|
$999.470
|
$1,189.470
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$3,300.000
|
$231.830
|
$220.000
|
$122.000
|
$2,000.000
|
$2,000.000
|
$2,050.210
|
$123.190
|
|
|
REMOVAL OF CONDUIT
|
LF
|
460.000
|
$18.000
|
$8.060
|
$7.650
|
$3.400
|
$5.500
|
$5.500
|
$5.640
|
$3.430
|
|
|
POTHOLE REPAIR (STANDARD)
|
TON
|
250.000
|
$300.000
|
$365.000
|
$400.000
|
$305.000
|
$275.000
|
$300.000
|
$410.040
|
$423.050
|
|
|
STRIP MOWING
|
CYC
|
9.000
|
$3,600.000
|
$3,000.000
|
$3,500.000
|
$3,500.000
|
$1,000.000
|
$5,000.000
|
$4,715.480
|
$1,735.660
|
|
|
LITTER REMOVAL
|
CYC
|
66.000
|
$2,000.000
|
$1,200.000
|
$4,000.000
|
$1,503.100
|
$600.000
|
$2,437.000
|
$2,665.270
|
$1,946.190
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
65.000
|
$9.000
|
$1,200.000
|
$500.000
|
$73.760
|
$250.000
|
$30.000
|
$256.270
|
$923.350
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
594.000
|
$150.000
|
$65.000
|
$199.000
|
$199.000
|
$90.000
|
$136.000
|
$204.000
|
$267.370
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
MI
|
297.000
|
$1,200.000
|
$130.000
|
$199.000
|
$199.000
|
$90.000
|
$139.000
|
$204.000
|
$559.610
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
297.000
|
$100.000
|
$130.000
|
$199.000
|
$199.000
|
$90.000
|
$139.000
|
$204.000
|
$340.430
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
66.000
|
$3,500.000
|
$4,200.000
|
$1,150.000
|
$1,150.000
|
$750.000
|
$3,000.000
|
$1,178.860
|
$1,862.800
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
66.000
|
$3,000.000
|
$2,100.000
|
$1,995.000
|
$1,995.000
|
$750.000
|
$3,100.000
|
$2,045.090
|
$2,231.480
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
66.000
|
$2,000.000
|
$2,100.000
|
$1,125.000
|
$1,125.000
|
$300.000
|
$2,000.000
|
$1,153.230
|
$3,542.050
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
5.000
|
$2,500.000
|
$2,100.000
|
$1,125.000
|
$1,125.000
|
$300.000
|
$5,017.000
|
$1,153.240
|
$2,747.910
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
226,504.000
|
$0.860
|
$0.970
|
$1.000
|
$0.850
|
$0.970
|
$1.000
|
$0.990
|
$0.820
|
|
|
UNDERSEAL COURSE
|
GAL
|
162,070.000
|
$2.500
|
$0.100
|
$4.750
|
$0.100
|
$4.150
|
$0.200
|
$0.100
|
$0.100
|
|
|
BONDING COURSE
|
GAL
|
87,896.000
|
$3.500
|
$0.100
|
$4.750
|
$0.100
|
$4.150
|
$0.200
|
$0.100
|
$0.100
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
10.000
|
$400.000
|
$500.000
|
$500.000
|
$350.000
|
$500.000
|
$500.000
|
$512.550
|
$360.560
|
|
|
STR PL PIPE ARCH (CORR STL)(455INX104IN
|
LF
|
536.000
|
$8,045.710
|
$5,870.000
|
$4,875.000
|
$5,054.590
|
$5,200.000
|
$8,143.000
|
$7,526.370
|
$6,564.200
|
|
|
PRESTRESSED GROUND ANCHORS
|
LF
|
16,882.000
|
$80.000
|
$41.240
|
$40.000
|
$48.020
|
$40.000
|
$40.000
|
$41.830
|
$69.990
|
|
|
INSTALL BAT HOUSE MEDIUM
|
EA
|
8.000
|
$1,500.000
|
$1,868.400
|
$5,000.000
|
$7,500.000
|
$800.000
|
$979.000
|
$2,562.760
|
$11,885.480
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
1.000
|
$18,000.000
|
$11,275.240
|
$10,700.000
|
$11,377.000
|
$12,000.000
|
$12,000.000
|
$12,301.250
|
$11,487.730
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
370.000
|
$2.500
|
$1.260
|
$1.200
|
$1.900
|
$2.000
|
$2.000
|
$2.050
|
$1.920
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
1.000
|
$9,500.000
|
$7,797.830
|
$400.000
|
$9,044.000
|
$8,425.000
|
$8,425.000
|
$8,636.510
|
$9,132.020
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
12.000
|
$10,000.000
|
$4,952.680
|
$4,700.000
|
$10,020.000
|
$6,500.000
|
$6,500.000
|
$6,663.180
|
$10,117.520
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
8.000
|
$10,000.000
|
$4,952.680
|
$4,700.000
|
$7,645.000
|
$7,100.000
|
$7,100.000
|
$7,278.240
|
$7,719.410
|
|
|
RADAR PRESENCE DETECTOR COMM CABLE
|
LF
|
10,007.000
|
$3.000
|
$1.840
|
$1.750
|
$1.900
|
$3.250
|
$3.000
|
$3.330
|
$1.920
|
|
|
ITS RVSD SYSTEM (DATA COLLECTION ONLY)
|
EA
|
3.000
|
$16,400.000
|
$12,434.380
|
$11,800.000
|
$12,499.000
|
$9,975.000
|
$9,975.000
|
$10,225.420
|
$12,620.650
|
|
|
ITS POLE (60 FT)(RELOCATE)
|
EA
|
3.000
|
$4,500.000
|
$3,266.660
|
$4,600.000
|
$5,895.000
|
$2,500.000
|
$2,500.000
|
$2,562.760
|
$5,952.370
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
|
EA
|
3.000
|
$928.240
|
$695.480
|
$660.000
|
$1,793.000
|
$1,200.000
|
$1,200.000
|
$1,230.130
|
$1,810.450
|
|
|
GROUND BOX (PREPARE)
|
EA
|
11.000
|
$250.000
|
$305.590
|
$290.000
|
$194.000
|
$350.000
|
$350.000
|
$358.790
|
$195.890
|
|
|
RELOCATE ITS RADIO
|
EA
|
8.000
|
$1,000.000
|
$2,002.150
|
$1,900.000
|
$194.000
|
$1,000.000
|
$1,000.000
|
$1,025.100
|
$195.890
|
|
|
REMOVE ITS RADIO
|
EA
|
9.000
|
$697.870
|
$337.200
|
$320.000
|
$97.000
|
$400.000
|
$400.000
|
$410.040
|
$97.940
|
|
|
TEMP SPEED MONITOR (2 SYS)
|
DAY
|
1,684.000
|
$60.000
|
$45.690
|
$40.000
|
$150.000
|
$75.000
|
$28.000
|
$38.440
|
$39.840
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
2.000
|
$8,000.000
|
$716.560
|
$680.000
|
$775.000
|
$800.000
|
$800.000
|
$820.080
|
$782.550
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
3.000
|
$9,691.430
|
$10,959.110
|
$10,400.000
|
$5,659.000
|
$8,500.000
|
$8,500.000
|
$8,713.380
|
$5,714.080
|
|
|
CCTV MOUNT (POLE)
|
EA
|
2.000
|
$30.000
|
$158.070
|
$150.000
|
$122.000
|
$300.000
|
$300.000
|
$307.530
|
$123.190
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$1,500.000
|
$442.580
|
$1,920.000
|
$291.000
|
$500.000
|
$500.000
|
$512.550
|
$293.830
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
2,030.000
|
$7.500
|
$5.640
|
$5.350
|
$1.500
|
$4.500
|
$4.500
|
$4.610
|
$1.510
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
4.000
|
$2,112.500
|
$1,580.640
|
$1,500.000
|
$1,062.000
|
$1,200.000
|
$1,200.000
|
$1,230.130
|
$1,072.340
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
300.000
|
$270.000
|
$79.030
|
$75.000
|
$34.000
|
$100.000
|
$100.000
|
$102.510
|
$34.330
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
4.000
|
$2,313.690
|
$1,159.140
|
$1,100.000
|
$1,353.000
|
$1,075.000
|
$1,075.000
|
$1,101.990
|
$1,366.170
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
11,570.000
|
$5.000
|
$5.010
|
$4.750
|
$3.800
|
$5.500
|
$5.500
|
$5.640
|
$3.840
|
|
|
RELOCATE FIBER OPTIC CABLE
|
LF
|
285.000
|
$14.000
|
$5.580
|
$5.300
|
$2.000
|
$5.000
|
$5.000
|
$5.130
|
$2.020
|
|
|
FO CBL (144 SMF) (INS ONLY)
|
LF
|
3,540.000
|
$2.500
|
$2.530
|
$2.400
|
$1.600
|
$4.250
|
$4.500
|
$4.360
|
$1.620
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
4.000
|
$1,000.000
|
$432.040
|
$410.000
|
$388.000
|
$350.000
|
$350.000
|
$358.790
|
$391.780
|
|
|
REMOVE EXIST GND MT COMM CABINET
|
EA
|
1.000
|
$3,500.000
|
$1,369.890
|
$1,300.000
|
$485.500
|
$2,000.000
|
$2,000.000
|
$2,050.210
|
$490.230
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
1.000
|
$18,000.000
|
$11,064.490
|
$10,500.000
|
$12,733.000
|
$10,300.000
|
$10,300.000
|
$10,558.560
|
$12,857.910
|
|
|
REMOVE DMS
|
EA
|
1.000
|
$13,500.000
|
$3,898.910
|
$8,700.000
|
$3,000.000
|
$4,500.000
|
$4,500.000
|
$4,612.970
|
$3,029.200
|
|
|
TEMP Q-DETECT (TY1) (2 SYS)
|
DAY
|
1,684.000
|
$60.000
|
$12.180
|
$15.000
|
$100.000
|
$300.000
|
$138.000
|
$10.250
|
$130.150
|
|
|
TEMP CONSTR EQUIPMENT ALERT (2 SYS)
|
DAY
|
1,684.000
|
$60.000
|
$12.180
|
$15.000
|
$100.000
|
$275.000
|
$116.000
|
$10.250
|
$112.400
|
|
|
TEMP TRAVEL TIME SYSTEM (2 SYS)
|
DAY
|
1,684.000
|
$60.000
|
$73.110
|
$65.000
|
$150.000
|
$250.000
|
$51.000
|
$61.510
|
$78.140
|
|
|
LED WW SGN W/BASIC SOL PWR KIT
|
EA
|
12.000
|
$5,000.000
|
$2,634.400
|
$2,500.000
|
$4,647.000
|
$3,600.000
|
$3,600.000
|
$3,690.380
|
$4,692.230
|
|
|
ADJUST VALVE BOX
|
EA
|
22.000
|
$1,500.000
|
$1,807.630
|
$1,475.000
|
$1,475.000
|
$2,558.760
|
$1,892.000
|
$432.590
|
$2,519.800
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(2")
|
EA
|
4.000
|
$2,500.000
|
$3,860.360
|
$3,150.000
|
$3,150.000
|
$3,894.850
|
$4,704.000
|
$4,014.310
|
$3,835.530
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,091.000
|
$5.000
|
$18.380
|
$15.000
|
$15.000
|
$13.920
|
$4.000
|
$8.200
|
$13.710
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
5.900
|
$5,000.000
|
$28,370.570
|
$23,150.000
|
$23,150.000
|
$1,379.380
|
$16,808.000
|
$31,368.170
|
$1,358.380
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
3,111.000
|
$250.000
|
$214.460
|
$175.000
|
$175.000
|
$198.970
|
$210.000
|
$190.670
|
$195.940
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
3.000
|
$3,500.000
|
$1,531.890
|
$1,250.000
|
$1,250.000
|
$4,626.290
|
$4,627.000
|
$1,568.410
|
$4,555.840
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
4.000
|
$7,000.000
|
$8,517.300
|
$6,950.000
|
$6,950.000
|
$10,251.550
|
$20,768.000
|
$9,628.810
|
$10,095.430
|
|
|
GROUT ABANDONMENT WATER MAIN (42")
|
LF
|
377.000
|
$150.000
|
$116.420
|
$95.000
|
$95.000
|
$160.820
|
$90.000
|
$133.260
|
$158.380
|
|
|
JACK AND BORE (42") (STEEL CASING)
|
LF
|
397.000
|
$300.000
|
$410.550
|
$335.000
|
$335.000
|
$458.250
|
$500.000
|
$493.530
|
$451.270
|
|
|
RELOC EXIST METER AND NEW METER BOX
|
EA
|
1.000
|
$2,500.000
|
$1,225.510
|
$1,000.000
|
$1,000.000
|
$3,753.610
|
$4,342.000
|
$1,978.450
|
$451.270
|
|
|
PERMANENT BLOW-OFF (COMPLETE)(2")
|
EA
|
1.000
|
$5,500.000
|
$4,289.290
|
$350.000
|
$3,500.000
|
$7,178.350
|
$6,631.000
|
$5,335.670
|
$7,069.040
|
|
|
TIE-IN (COMPLETE)(16")
|
EA
|
2.000
|
$10,000.000
|
$11,182.780
|
$9,125.000
|
$9,125.000
|
$10,029.900
|
$6,517.000
|
$11,829.710
|
$9,877.160
|
|
|
DUCTILE IRON PIPE (16")
|
LF
|
462.000
|
$300.000
|
$349.270
|
$285.000
|
$285.000
|
$365.460
|
$273.000
|
$291.130
|
$356.000
|
|
|
GATE VALVE AND BOX (COMPLETE)(16")
|
EA
|
3.000
|
$12,000.000
|
$10,723.220
|
$8,750.000
|
$8,750.000
|
$12,384.540
|
$21,401.000
|
$10,386.360
|
$12,195.940
|
|
|
STEEL CASING (30")(OPEN CUT)
|
LF
|
50.000
|
$350.000
|
$496.330
|
$405.000
|
$405.000
|
$344.330
|
$350.000
|
$365.960
|
$339.090
|
|
|
STEEL CASING (30")(BORE)
|
LF
|
799.000
|
$200.000
|
$238.970
|
$195.000
|
$195.000
|
$278.350
|
$350.000
|
$253.200
|
$274.110
|
|
|
WTR (JACK, BORE, OR TUNNEL)(30")
|
LF
|
799.000
|
$1,000.000
|
$1,225.510
|
$1,000.000
|
$1,000.000
|
$942.270
|
$1,000.000
|
$719.620
|
$959.040
|
|
|
AIR RELEASE VALVE (COMPLETE)(2")
|
EA
|
5.000
|
$10,000.000
|
$25,472.230
|
$20,785.000
|
$20,785.000
|
$26,277.840
|
$36,693.000
|
$26,257.020
|
$25,877.670
|
|
|
WTR (JACK, BORE, OR TUNNEL)(42")
|
LF
|
397.000
|
$2,000.000
|
$1,489.000
|
$1,215.000
|
$1,215.000
|
$1,068.660
|
$1,200.000
|
$1,099.930
|
$1,052.280
|
|
|
CARRIER PIPE (IN CASING)(DI)(16")
|
LF
|
849.000
|
$180.000
|
$435.060
|
$355.000
|
$355.000
|
$240.210
|
$235.000
|
$199.900
|
$226.400
|
|
|
CARRIER PIPE (IN CASING)(DI)(24")
|
LF
|
430.000
|
$240.000
|
$287.990
|
$235.000
|
$235.000
|
$351.030
|
$387.000
|
$307.530
|
$345.690
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(4")
|
EA
|
2.000
|
$3,500.000
|
$4,718.220
|
$3,850.000
|
$3,850.000
|
$8,938.150
|
$21,633.000
|
$8,895.850
|
$8,802.030
|
|
|
ADJUST METER BOX
|
EA
|
5.000
|
$120.000
|
$459.570
|
$375.000
|
$375.000
|
$2,526.800
|
$3,469.000
|
$581.230
|
$2,488.320
|
|
|
24" DUCTILE IRON PIPE
|
LF
|
677.000
|
$360.000
|
$435.060
|
$355.000
|
$355.000
|
$593.300
|
$369.000
|
$371.090
|
$584.260
|
|
|
BUTTERFLY VALVE AND BOX (COMPL)(24")
|
EA
|
2.000
|
$35,000.000
|
$29,822.800
|
$24,335.000
|
$24,335.000
|
$33,505.160
|
$58,157.000
|
$29,303.620
|
$32,994.930
|
|
|
TIE-IN (COMPLETE)(24")
|
EA
|
2.000
|
$20,000.000
|
$22,671.940
|
$18,500.000
|
$18,500.000
|
$72,763.920
|
$6,952.000
|
$42,015.940
|
$71,655.840
|
|
|
STEEL CASING (42")(OPEN CUT)
|
LF
|
33.000
|
$400.000
|
$716.920
|
$585.000
|
$585.000
|
$535.570
|
$830.000
|
$369.040
|
$527.410
|
|
|
TAPPED FIRE HYDRANT
|
EA
|
7.000
|
$20,000.000
|
$11,623.970
|
$9,485.000
|
$9,485.000
|
$31,675.260
|
$12,727.000
|
$23,915.690
|
$31,192.890
|
|
|
CUT-IN-TEE (COMPLETE)(16"X16")
|
EA
|
1.000
|
$18,000.000
|
$14,442.640
|
$11,785.000
|
$11,785.000
|
$16,869.590
|
$12,691.000
|
$15,776.350
|
$16,612.690
|
|
|
GROUT ABANDONMENT WATER MAIN (30")
|
LF
|
506.000
|
$100.000
|
$91.910
|
$75.000
|
$75.000
|
$83.510
|
$46.000
|
$85.590
|
$82.230
|
|
|
WATER MAIN REMOVAL (LARGER THAN 16")
|
EA
|
799.000
|
$150.000
|
$30.640
|
$25.000
|
$25.000
|
$28.350
|
$34.000
|
$260.370
|
$27.920
|
|
|
AIR RELEASE VALVE (COMPLETE)( 1")
|
EA
|
3.000
|
$8,000.000
|
$11,440.140
|
$9,335.000
|
$9,335.000
|
$13,138.140
|
$53,076.000
|
$12,458.100
|
$12,938.070
|
|
|
CUT-IN TEE (COMPLETE)(30"X16")
|
EA
|
1.000
|
$45,000.000
|
$20,754.020
|
$16,936.000
|
$16,935.000
|
$45,591.240
|
$67,365.000
|
$42,695.580
|
$44,896.950
|
|
|
DUCTILE IRON PIPE (30")
|
LF
|
10.000
|
$450.000
|
$508.590
|
$415.000
|
$415.000
|
$487.630
|
$755.000
|
$864.160
|
$480.200
|
|
|
NGP MOBILIZATION
|
LS
|
1.000
|
$12,250.000
|
$5,754.800
|
$4,225.800
|
$4,225.800
|
$2,500.000
|
$4,225.000
|
$20,502.080
|
$270.670
|
|
|
NGP ADJUST GAS FACILITY ACCESS COVER
|
EA
|
1.000
|
$1,700.000
|
$14,126.870
|
$10,373.490
|
$10,373.490
|
$5,000.000
|
$10,373.000
|
$20,502.080
|
$4,502.260
|
|
|
TEMPORARY WATER MAIN (12")
|
LF
|
1,095.000
|
$90.000
|
$116.420
|
$95.000
|
$95.000
|
$117.010
|
$95.000
|
$116.860
|
$105.230
|
|
Totals: |
$175,294,461.048
|
$167,741,121.112
|
$172,339,298.736
|
$183,565,490.595
|
$190,390,569.366
|
$194,282,367.000
|
$194,747,208.708
|
$221,270,000.002
|