Job Info for 0915-12-592

County: BEXAR Highway: VA Date: 08/09/2017 (7 years ago) Engineer's Estimate: $646,384 Control Number: 0915-12-592
Project: NH 1702(679) District: SAN ANTONIO Time: 82 WORKING DAYS Type: LANDSCAPE DEVELOPEMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $646,384.00
ENCINO LANDSCAPE, INC.   $682,419.00 1
5.57% | $36,035.00
YELLOWSTONE LANDSCAPE - CENTRAL, INC.   $700,099.56 2
8.31% | $53,715.56
2.59% | $17,680.56
CHAMPION INFRASTRUCTURE, LLC   $1,140,025.00 3
76.37% | $493,641.00
67.06% | $457,606.00
62.84% | $439,925.44

Bid Items

Items: 21, 0 filtered
BEXAR VA  |  SAN ANTONIO  |  0915-12-592  |  08/09/2017  |  $646,384  |  NH 1702(679)  |  LANDSCAPE DEVELOPEMENT  |  82 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. YELLOWSTONE LANDSCAPE - CENTRAL, INC. CHAMPION INFRASTRUCTURE, LLC
161 6012 GENERAL USE COMPOST CY 881.000 $25.000 $30.000 $45.769 $80.000
170 6001 IRRIGATION SYSTEM LS 1.000 $170,000.000 $200,000.000 $278,641.339 $220,000.000
192 6002 PLANT MATERIAL (1-GAL) EA 153.000 $20.000 $10.000 $7.276 $25.000
192 6004 PLANT MATERIAL (5-GAL) EA 485.000 $50.000 $30.000 $30.777 $45.000
192 6013 MULCH SY 2,663.000 $3.000 $3.000 $3.634 $15.000
192 6015 LANDSCAPE EDGE LF 245.000 $8.000 $20.000 $13.167 $40.000
192 6016 PLANT BED PREPARATION SY 2,585.000 $10.000 $2.000 $0.474 $20.000
192 6025 PLANT MATERIAL (45 GAL) (TREE) EA 131.000 $650.000 $400.000 $380.434 $900.000
192 6027 PLANT MATERIAL (100 GAL) (TREE) EA 75.000 $1,500.000 $1,000.000 $908.411 $2,100.000
192 6033 PLANT MATERIAL (15 GAL) (SHRUB) EA 40.000 $210.000 $125.000 $115.085 $250.000
193 6001 PLANT MAINTENANCE MO 36.000 $1,500.000 $3,000.000 $3,027.213 $4,500.000
193 6003 PLANT REPLACEMENT (1-GAL) EA 5.000 $20.000 $10.000 $36.952 $60.000
193 6005 PLANT REPLACEMENT (5-GAL) EA 10.000 $50.000 $30.000 $62.685 $120.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 36.000 $1,300.000 $2,000.000 $557.204 $4,500.000
193 6009 PLANT REPLACEMENT (15 GAL) EA 5.000 $210.000 $100.000 $92.889 $250.000
193 6011 PLANT REPLACEMENT (65 GAL) EA 5.000 $900.000 $500.000 $359.605 $800.000
193 6016 PLANT REPLACEMENT (45 GAL) EA 5.000 $650.000 $400.000 $529.326 $1,200.000
500 6001 MOBILIZATION LS 1.000 $56,000.000 $85,000.000 $69,354.839 $80,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,000.000 $3,000.000 $3,968.842 $3,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 100.000 $5.000 $10.000 $4.480 $15.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 100.000 $5.000 $1.000 $0.205 $8.000
Totals: $646,384.00 $682,419.00 $700,099.64 $1,140,025.00