Job Info for 0915-00-220

County: BEXAR Highway: VA Date: 06/04/2019 (5 years ago) Engineer's Estimate: $1,907,006 Control Number: 0915-00-220
Project: STP 1902(062) District: SAN ANTONIO Time: 126 WORKING DAYS Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,907,006.20
TI-ZACK CONCRETE, INC.   $2,393,563.50 1
25.51% | $486,557.30
ENCINO LANDSCAPE, INC.   $2,526,361.00 2
32.48% | $619,354.80
5.55% | $132,797.50
FNH CONSTRUCTION, LLC   $2,817,323.00 3
47.74% | $910,316.80
17.7% | $423,759.50
11.52% | $290,962.00

Bid Items

Items: 41, 0 filtered
BEXAR VA  |  SAN ANTONIO  |  0915-00-220  |  06/04/2019  |  $1,907,006  |  STP 1902(062)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  126 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TI-ZACK CONCRETE, INC. ENCINO LANDSCAPE, INC. FNH CONSTRUCTION, LLC
104 6009 REMOVING CONC (RIPRAP) SY 389.000 $9.000 $15.000 $15.000 $20.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 1,511.000 $12.750 $22.000 $15.000 $20.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 1,779.000 $7.100 $10.000 $10.000 $20.000
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY 1,141.000 $15.000 $15.000 $10.000 $20.000
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY 4,993.000 $8.500 $15.000 $15.000 $20.000
161 6018 COMPOST MANUF TOPSOIL CY 500.000 $30.000 $40.000 $50.000 $60.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 10,000.000 $0.100 $0.200 $0.300 $1.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 10,000.000 $0.100 $0.200 $0.300 $1.000
168 6001 VEGETATIVE WATERING MG 6.500 $17.500 $1.000 $200.000 $500.000
432 6001 RIPRAP (CONC)(4 IN) CY 735.000 $350.000 $650.000 $40.000 $450.000
450 6047 RAIL (HANDRAIL)(TY A) LF 344.000 $65.000 $85.000 $100.000 $185.000
465 6233 INLET (COMP) (TY SIDEWALK BRIDGE) EA 17.000 $6,000.000 $4,000.000 $6,000.000 $8,500.000
465 6338 INLET (COMPL)(ARMOR CURB SLOT) EA 17.000 $6,000.000 $2,000.000 $3,000.000 $6,500.000
479 6004 ADJUSTING MANHOLES (SANITARY) EA 5.000 $3,500.000 $500.000 $1,500.000 $2,500.000
479 6005 ADJUSTING MANHOLES (WATER VALVE BOX) EA 5.000 $425.000 $250.000 $500.000 $1,500.000
500 6001 MOBILIZATION LS 1.000 $166,102.000 $175,000.000 $200,000.000 $280,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $6,500.000 $1,000.000 $5,000.000 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 2,000.000 $20.000 $0.100 $30.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 2,000.000 $7.000 $0.100 $10.000 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 5,000.000 $7.000 $0.100 $2.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 5,000.000 $0.600 $0.100 $1.000 $2.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 5,000.000 $7.000 $0.100 $7.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 5,000.000 $1.000 $0.100 $1.000 $9.000
529 6001 CONC CURB (TY I) LF 4,698.000 $8.000 $30.000 $15.000 $28.000
529 6027 CONC CURB (TY C2) LF 431.000 $108.000 $110.000 $200.000 $28.000
530 6004 DRIVEWAYS (CONC) SY 1,608.000 $75.000 $90.000 $100.000 $85.000
530 6005 DRIVEWAYS (ACP) SY 4,569.000 $35.000 $45.000 $80.000 $45.000
531 6003 CONC SIDEWALKS (6") SY 8,772.000 $50.000 $90.000 $100.000 $58.000
531 6019 CURB RAMPS (TY 2) SY 169.000 $120.000 $100.000 $120.000 $200.000
531 6022 CURB RAMPS (TY 5) SY 29.000 $140.000 $100.000 $120.000 $200.000
531 6024 CURB RAMPS (TY 7) SY 64.000 $125.000 $100.000 $120.000 $200.000
531 6027 CURB RAMPS (TY 10) SY 305.000 $130.000 $100.000 $120.000 $200.000
531 6030 CURB RAMPS (TY 21) SY 4.000 $200.000 $100.000 $120.000 $200.000
560 6001 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 1.000 $220.000 $150.000 $500.000 $850.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 26.000 $390.000 $150.000 $500.000 $650.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 2.000 $15.000 $150.000 $500.000 $100.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 1,848.000 $5.600 $11.000 $10.000 $10.000
666 6230 PAVEMENT SEALER 24" LF 1,848.000 $2.500 $2.500 $5.000 $10.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 916.000 $3.000 $6.500 $6.000 $10.000
678 6008 PAV SURF PREP FOR MRK (24") LF 1,848.000 $1.750 $1.000 $5.000 $10.000
6185 6002 TMA (STATIONARY) DAY 185.000 $185.000 $1.000 $400.000 $400.000
Totals: $1,907,006.20 $2,393,563.50 $2,526,361.00 $2,817,323.00