Job Info for 0915-00-211

County: BEXAR Highway: VA Date: 06/05/2019 (5 years ago) Engineer's Estimate: $466,337 Control Number: 0915-00-211
Project: STP 2019(796)MM District: SAN ANTONIO Time: 120 WORKING DAYS Type: SIGNAL UPGRADES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $466,336.58
THE LEVY COMPANY, INC.   $409,938.88 1
-12.09% | -$56,397.70
LIGHT IT UP ELECTRIC   $437,205.00 2
-6.25% | -$29,131.58
6.65% | $27,266.12
E-Z BEL CONSTRUCTION, LLC   $780,370.00 3
67.34% | $314,033.42
90.36% | $370,431.12
78.49% | $343,165.00

Bid Items

Items: 25, 0 filtered
BEXAR VA  |  SAN ANTONIO  |  0915-00-211  |  06/05/2019  |  $466,337  |  STP 2019(796)MM  |  SIGNAL UPGRADES  |  120 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate THE LEVY COMPANY, INC. LIGHT IT UP ELECTRIC E-Z BEL CONSTRUCTION, LLC
104 6015 REMOVING CONC (SIDEWALKS) SY 50.000 $9.780 $32.500 $65.000 $15.000
104 6021 REMOVING CONC (CURB) LF 125.000 $1.980 $11.500 $22.000 $5.000
500 6001 MOBILIZATION LS 1.000 $55,000.000 $40,993.880 $30,000.000 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,610.000 $2,950.000 $7,200.000 $8,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 50.000 $1.940 $5.000 $4.200 $1.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 50.000 $0.570 $2.000 $1.000 $1.000
529 6002 CONC CURB (TY II) LF 125.000 $23.000 $15.000 $35.000 $18.000
529 6015 CONC CURB (TY C1) LF 125.000 $58.810 $15.000 $36.000 $85.000
531 6001 CONC SIDEWALKS (4") SY 125.000 $45.000 $35.000 $74.000 $50.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 125.000 $15.210 $7.000 $14.000 $17.000
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 125.000 $36.290 $17.000 $23.000 $28.000
618 6048 CONDT (PVC) (SCH 80) (2") (BORE)(ROCK) LF 125.000 $33.460 $20.000 $31.000 $34.000
618 6050 CONDT (PVC) (SCH 80) (2") (ROCK) LF 125.000 $12.750 $9.000 $14.000 $25.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 6.000 $890.720 $600.000 $900.000 $600.000
624 6010 GROUND BOX TY D (162922)W/APRON EA 6.000 $872.500 $750.000 $1,010.000 $700.000
690 6036 INSTALL OF FND FOR GROUND MNT CABINETS EA 2.000 $5,200.000 $5,700.000 $3,200.000 $4,000.000
690 6038 REMOVAL OF CONTROL CABINET(GRND MNT) EA 7.000 $974.370 $1,200.000 $1,000.000 $500.000
690 6040 INSTALL OF CONTROL CABINET(GRND MNT) EA 7.000 $1,600.000 $1,750.000 $1,300.000 $2,000.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 89.000 $74.150 $75.000 $130.000 $80.000
6004 6031 ITS COM CBL (ETHERNET) LF 10,050.000 $3.160 $2.150 $2.900 $5.000
6027 6003 CONDUIT (PREPARE) LF 5,400.000 $2.520 $1.250 $1.430 $3.000
6027 6008 GROUND BOX (PREPARE) EA 54.000 $135.100 $50.000 $72.000 $450.000
6185 6002 TMA (STATIONARY) DAY 54.000 $284.980 $150.000 $200.000 $150.000
6301 6001 INSTALL TRAF SIGNAL CONT EQUIP (PKG 1) EA 101.000 $1,100.000 $1,100.000 $1,125.000 $2,500.000
6301 6002 INSTALL TRAF SIGNAL CONT EQUIP (PKG 2) EA 68.000 $2,000.000 $2,000.000 $1,745.000 $3,000.000
Totals: $466,336.58 $409,938.88 $437,205.00 $780,370.00