BEXAR VA (0915-00-209)

Items: 103

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-00-209
DBE Goal: N/A
Project: STP 2019(902)
Guaranty: N/A
Time: 71 WORKING DAYS
Engineer's Estimate: $1,628,273.13
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: INTERSECTION OPERATIONAL IMPROVEMENTS-NORTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,628,273.13
$1,371,713.34
Over/Under Est: -15.76% -$256,559.79
Over/Under Est: -0.07% -$1,173.16
Amt Left: 18.62% $255,386.63
Over/Under Est: 7.76% $126,378.37
Amt Left: 27.92% $382,938.16
Delta: -7.84% -$127,551.53
$1,779,734.00
Over/Under Est: 9.3% $151,460.87
Amt Left: 29.75% $408,020.66
Delta: -1.43% -$25,082.50
$2,657,193.40
Over/Under Est: 63.19% $1,028,920.27
Amt Left: 93.71% $1,285,480.06
Delta: -49.30% -$877,459.40

Bid Items & Bid Tabulations

103 Total 0 of 103
BEXAR  |  VA  |  SAN ANTONIO  |  0915-00-209  |  05/07/2019  |  $1,628,273.13  |  STP 2019(902)  |  INTERS OPERATIONAL IMPRVS-NORTH  |  71 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CURRAN CONTRACTING COMPANY
E-Z BEL CONSTRUCTION, LLC
CAPITAL EXCAVATION COMPANY
RELMCO, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 46.000 $2,317.860 $850.000 $1,100.000 $3,000.000 $1,000.000 $3,500.000
REMOVING CONC (MEDIANS)
SY 22.000 $12.030 $38.850 $55.000 $79.190 $60.000 $20.000
OBLITERATING ABANDONED ROAD
STA 15.000 $705.130 $1,591.150 $1,300.000 $1,305.190 $1,200.000 $850.000
EXCAVATION (ROADWAY)
CY 4,582.000 $9.220 $9.600 $11.000 $17.000 $12.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 7,521.000 $8.850 $4.300 $6.710 $17.000 $12.000 $40.000
BLADING
HR 26.000 $163.830 $162.650 $149.000 $126.220 $90.000 $150.000
COMPOST MANUF TOPSOIL (4")
SY 39,468.000 $1.250 $1.750 $2.290 $2.750 $2.750 $2.300
BROADCAST SEED (PERM) (URBAN) (SANDY)
SY 39,468.000 $0.630 $0.150 $0.180 $0.180 $0.200 $1.000
VEGETATIVE WATERING
MG 0.700 $23.470 $63.550 $481.000 $500.000 $500.000 $2,500.000
PROOF ROLLING
HR 6.000 $87.220 $105.250 $75.000 $90.190 $100.000 $150.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 2,644.000 $47.130 $50.000 $59.000 $60.000 $75.000 $55.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,158.000 $3.600 $4.550 $3.500 $4.000 $3.500 $10.000
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 10,515.000 $2.830 $4.400 $4.000 $4.000 $3.500 $10.000
AGGR (TY-PB GR-4)
CY 430.000 $94.840 $112.300 $100.000 $88.000 $80.560 $200.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 2,553.000 $116.100 $100.000 $95.000 $97.000 $100.000 $110.000
PLANE ASPH CONC PAV (1.5")
SY 20,461.000 $1.290 $1.600 $1.250 $3.000 $5.000 $6.000
FLOWABLE BACKFILL
CY 10.000 $132.030 $98.100 $151.000 $205.750 $150.000 $350.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 52.800 $334.240 $193.000 $311.000 $173.000 $330.000 $385.000
RIPRAP (CONC)(4 IN)
CY 11.000 $449.830 $557.900 $791.000 $600.000 $600.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 17.000 $444.670 $560.300 $791.000 $900.000 $500.000 $550.000
CMP (GAL STL 24 IN)
LF 60.000 $93.100 $166.650 $259.000 $162.890 $80.530 $80.000
CMP AR (GAL STL DES 3)
LF 32.000 $66.330 $123.050 $301.000 $262.230 $83.900 $95.000
CONC BOX CULV(5'X 6.5')
LF 9.000 $605.110 $1,361.600 $1,161.000 $488.880 $741.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 70.000 $134.200 $100.150 $119.000 $179.020 $111.800 $85.000
RC PIPE (CL III)(30 IN)
LF 46.000 $118.130 $117.300 $171.000 $267.440 $124.800 $105.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000 $14,135.710 $8,878.850 $9,100.000 $16,999.220 $18,044.000 $17,500.000
SET (TY I) (24 IN) (3: 1) (C)
EA 2.000 $1,100.000 $2,721.500 $3,251.000 $5,825.240 $1,300.000 $2,000.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 4.000 $1,740.680 $728.750 $2,651.000 $1,468.210 $1,300.000 $2,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 1.000 $1,079.790 $1,332.500 $3,791.000 $3,330.530 $1,300.000 $2,200.000
SET (TY II) (30 IN) (RCP) (3: 1) (P)
EA 2.000 $2,504.650 $1,764.150 $3,861.000 $2,098.610 $1,547.000 $3,000.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 4.000 $2,082.500 $902.050 $2,681.000 $1,634.620 $1,300.000 $2,500.000
REMOV STR (WINGWALL)
EA 3.000 $1,750.000 $1,145.550 $549.000 $2,238.010 $900.000 $1,500.000
REMOV STR (SMALL)
EA 5.000 $1,375.040 $609.550 $249.000 $2,014.210 $1,200.000 $2,000.000
MOBILIZATION
LS 1.000 $175,153.270 $135,000.000 $125,000.000 $194,000.000 $170,000.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,315.750 $6,895.350 $4,000.000 $10,150.000 $20,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 6.000 $20.350 $51.000 $142.000 $142.000 $200.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 6.000 $7.170 $43.000 $85.000 $85.000 $100.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,100.000 $2.380 $3.700 $2.350 $2.350 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,100.000 $0.640 $1.050 $0.250 $0.250 $0.750 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 120.000 $3.700 $4.000 $8.000 $8.000 $8.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $1.470 $1.050 $1.500 $1.500 $1.650 $12.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 80.000 $98.600 $88.000 $31.000 $144.200 $150.000 $250.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,700.000 $59.430 $30.000 $91.000 $13.630 $42.000 $70.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,580.000 $6.440 $10.250 $4.710 $7.850 $10.000 $20.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,700.000 $11.150 $9.000 $6.290 $13.630 $15.000 $20.000
DRIVEWAYS (ACP)
SY 174.000 $50.990 $43.000 $51.000 $52.620 $19.800 $42.000
RUMBLE STRIPS (CENTERLINE)
LF 80.000 $0.190 $5.050 $49.000 $100.000 $75.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $20.400 $25.800 $24.260 $23.100 $25.800 $25.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 4.000 $2,861.500 $2,900.200 $2,885.000 $2,730.000 $2,956.250 $2,850.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $12,661.260 $8,000.000 $6,750.000 $6,850.000 $7,500.000 $15,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,525.360 $649.500 $785.000 $1,000.000 $1,500.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.950 $460.800 $250.000 $500.000 $600.000 $2,500.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $283.070 $212.450 $225.000 $200.000 $188.130 $650.000
CONDT (PVC) (SCH 80) (2")
LF 58.000 $14.090 $8.400 $11.000 $7.890 $21.500 $12.000
CONDT (PVC) (SCH 80) (3")
LF 116.000 $20.810 $9.200 $19.000 $8.640 $24.730 $15.000
ELEC CONDR (NO.8) BARE
LF 447.000 $1.780 $1.700 $2.410 $1.610 $1.180 $3.000
ELEC CONDR (NO.6) BARE
LF 897.000 $1.490 $1.450 $2.410 $1.370 $1.390 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 480.000 $2.750 $2.750 $3.410 $2.570 $2.580 $3.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $2,008.500 $615.100 $1,401.000 $579.000 $779.370 $1,000.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,037.900 $891.300 $1,649.000 $839.000 $962.120 $1,000.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 364.000 $3.830 $3.850 $1.510 $3.620 $5.370 $3.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 364.000 $3.890 $3.900 $2.990 $3.680 $5.370 $5.000
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $5,910.170 $3,797.900 $9,841.000 $3,575.000 $3,977.500 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $524.080 $556.650 $475.000 $524.000 $510.620 $650.000
RELOCATE SM RD SN SUP&AM TY S80
EA 6.000 $495.760 $526.950 $425.000 $496.000 $456.870 $550.000
REMOVE SM RD SN SUP&AM
EA 12.000 $77.670 $132.800 $97.000 $125.000 $104.270 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 20.000 $69.150 $51.900 $52.000 $48.850 $55.900 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $30.880 $17.250 $28.000 $16.250 $30.100 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,233.000 $0.880 $0.900 $0.800 $0.880 $0.910 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 179.000 $5.790 $6.900 $7.000 $5.770 $6.980 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $121.740 $132.800 $130.000 $95.000 $134.370 $200.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $475.000 $292.150 $377.000 $200.000 $296.700 $500.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $153.590 $159.350 $151.000 $120.000 $161.250 $200.000
PAVEMENT SEALER 4"
LF 17,278.000 $0.180 $0.200 $0.200 $0.160 $0.210 $0.500
PAVEMENT SEALER 8"
LF 7,233.000 $0.270 $0.400 $0.500 $0.300 $0.430 $1.000
PAVEMENT SEALER 24"
LF 179.000 $2.820 $3.200 $3.300 $3.000 $3.220 $5.000
PAVEMENT SEALER (ARROW)
EA 16.000 $45.000 $26.550 $67.000 $45.000 $26.870 $100.000
PAVEMENT SEALER (WORD)
EA 16.000 $47.850 $37.200 $67.000 $60.000 $37.620 $100.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 60.000 $0.460 $0.700 $2.440 $1.000 $0.690 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 11,169.000 $0.480 $0.700 $0.420 $0.550 $0.690 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,049.000 $0.520 $0.700 $0.460 $0.550 $0.690 $1.000
REFL PAV MRKR TY I-C
EA 520.000 $3.630 $5.300 $5.000 $5.300 $5.370 $7.000
REFL PAV MRKR TY II-A-A
EA 262.000 $3.360 $5.300 $5.000 $6.000 $5.370 $7.000
PAV SURF PREP FOR MRK (4")
LF 15,070.000 $1.000 $0.010 $0.530 $0.060 $0.010 $1.000
PAV SURF PREP FOR MRK (8")
LF 7,233.000 $1.000 $0.020 $1.000 $0.120 $0.020 $1.500
PAV SURF PREP FOR MRK (24")
LF 179.000 $1.430 $0.050 $4.000 $0.550 $0.060 $6.000
PAV SURF PREP FOR MRK (ARROW)
EA 16.000 $35.000 $1.050 $63.000 $15.000 $1.070 $100.000
PAV SURF PREP FOR MRK (WORD)
EA 16.000 $50.000 $1.050 $63.000 $20.000 $1.070 $100.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $4,932.570 $3,680.000 $8,449.000 $3,464.000 $11,825.000 $12,500.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $12,181.520 $2,060.950 $6,591.000 $1,940.000 $3,762.500 $25,000.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $250.260 $305.950 $331.000 $288.000 $236.500 $285.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $223.910 $305.950 $331.000 $288.000 $236.500 $285.000
BACK PLATE (12")(4 SEC)
EA 2.000 $95.560 $80.750 $151.000 $76.000 $91.370 $125.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 325.000 $2.050 $3.250 $2.810 $3.080 $3.010 $3.000
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 584.000 $2.190 $3.800 $3.210 $3.590 $3.220 $5.000
INS TRF SIG PL AM (S)STR(TY B)
EA 2.000 $4,000.000 $3,926.450 $6,141.000 $3,696.000 $4,837.500 $8,500.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $4,590.150 $5,419.050 $8,421.000 $5,101.000 $6,557.500 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $82.780 $39.000 $81.000 $321.000 $215.000 $150.000
DEAD END ROADWAY BARRICADE
LF 16.000 $76.530 $123.350 $55.000 $50.000 $59.120 $100.000
RADAR COMMUNICATION CABLE
LF 1,024.000 $1.970 $3.850 $11.000 $3.620 $2.950 $5.000
TMA (STATIONARY)
DAY 60.000 $207.370 $122.000 $64.910 $75.000 $250.000 $550.000
TMA (MOBILE OPERATION)
DAY 36.000 $178.050 $293.000 $401.000 $365.000 $250.000 $850.000
RVDS(PRESENCE AND ADVANCE DET)
EA 4.000 $6,792.290 $6,222.200 $8,341.000 $5,857.000 $7,154.120 $15,000.000
Totals: $1,628,273.131 $1,371,713.345 $1,627,099.970 $1,754,651.500 $1,779,734.000 $2,657,193.400