Job Info for 0915-00-209

County: BEXAR Highway: VA Date: 05/07/2019 (5 years ago) Engineer's Estimate: $1,628,273 Control Number: 0915-00-209
Project: STP 2019(902) District: SAN ANTONIO Time: 71 WORKING DAYS Type: INTERSECTION OPERATIONAL IMPROVEMENTS-NORTH

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,628,273.13
CURRAN CONTRACTING COMPANY   $1,371,713.34 1
-15.76% | -$256,559.79
E-Z BEL CONSTRUCTION, LLC   $1,627,099.97 2
-0.07% | -$1,173.16
18.62% | $255,386.63
CAPITAL EXCAVATION COMPANY   $1,754,651.50 3
7.76% | $126,378.37
27.92% | $382,938.16
7.84% | $127,551.53
RELMCO, INC.   $1,779,734.00 4
9.3% | $151,460.87
29.75% | $408,020.66
1.43% | $25,082.50
FNH CONSTRUCTION, LLC   $2,657,193.40 5
63.19% | $1,028,920.27
93.71% | $1,285,480.06
49.30% | $877,459.40

Bid Items

Items: 103, 0 filtered
BEXAR VA  |  SAN ANTONIO  |  0915-00-209  |  05/07/2019  |  $1,628,273  |  STP 2019(902)  |  INTERS OPERATIONAL IMPRVS-NORTH  |  71 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CURRAN CONTRACTING COMPANY E-Z BEL CONSTRUCTION, LLC CAPITAL EXCAVATION COMPANY RELMCO, INC. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 46.000 $2,317.860 $850.000 $1,100.000 $3,000.000 $1,000.000 $3,500.000
104 6011 REMOVING CONC (MEDIANS) SY 22.000 $12.030 $38.850 $55.000 $79.190 $60.000 $20.000
106 6001 OBLITERATING ABANDONED ROAD STA 15.000 $705.130 $1,591.150 $1,300.000 $1,305.190 $1,200.000 $850.000
110 6001 EXCAVATION (ROADWAY) CY 4,582.000 $9.220 $9.600 $11.000 $17.000 $12.000 $20.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 7,521.000 $8.850 $4.300 $6.710 $17.000 $12.000 $40.000
150 6002 BLADING HR 26.000 $163.830 $162.650 $149.000 $126.220 $90.000 $150.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 39,468.000 $1.250 $1.750 $2.290 $2.750 $2.750 $2.300
164 6005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY 39,468.000 $0.630 $0.150 $0.180 $0.180 $0.200 $1.000
168 6001 VEGETATIVE WATERING MG 0.700 $23.470 $63.550 $481.000 $500.000 $500.000 $2,500.000
216 6001 PROOF ROLLING HR 6.000 $87.220 $105.250 $75.000 $90.190 $100.000 $150.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 2,644.000 $47.130 $50.000 $59.000 $60.000 $75.000 $55.000
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 3,158.000 $3.600 $4.550 $3.500 $4.000 $3.500 $10.000
316 6410 ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) GAL 10,515.000 $2.830 $4.400 $4.000 $4.000 $3.500 $10.000
316 6431 AGGR (TY-PB GR-4) CY 430.000 $94.840 $112.300 $100.000 $88.000 $80.560 $200.000
344 6120 SUPERPAVE MIXTURES SP-D SAC-B PG70-22 TON 2,553.000 $116.100 $100.000 $95.000 $97.000 $100.000 $110.000
354 6041 PLANE ASPH CONC PAV (1.5") SY 20,461.000 $1.290 $1.600 $1.250 $3.000 $5.000 $6.000
401 6001 FLOWABLE BACKFILL CY 10.000 $132.030 $98.100 $151.000 $205.750 $150.000 $350.000
416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 52.800 $334.240 $193.000 $311.000 $173.000 $330.000 $385.000
432 6001 RIPRAP (CONC)(4 IN) CY 11.000 $449.830 $557.900 $791.000 $600.000 $600.000 $550.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 17.000 $444.670 $560.300 $791.000 $900.000 $500.000 $550.000
460 6003 CMP (GAL STL 24 IN) LF 60.000 $93.100 $166.650 $259.000 $162.890 $80.530 $80.000
460 6010 CMP AR (GAL STL DES 3) LF 32.000 $66.330 $123.050 $301.000 $262.230 $83.900 $95.000
462 6092 CONC BOX CULV(5'X 6.5') LF 9.000 $605.110 $1,361.600 $1,161.000 $488.880 $741.000 $1,500.000
464 6005 RC PIPE (CL III)(24 IN) LF 70.000 $134.200 $100.150 $119.000 $179.020 $111.800 $85.000
464 6007 RC PIPE (CL III)(30 IN) LF 46.000 $118.130 $117.300 $171.000 $267.440 $124.800 $105.000
466 6156 WINGWALL (FW - 0) (HW=9 FT) EA 1.000 $14,135.710 $8,878.850 $9,100.000 $16,999.220 $18,044.000 $17,500.000
467 6005 SET (TY I) (24 IN) (3: 1) (C) EA 2.000 $1,100.000 $2,721.500 $3,251.000 $5,825.240 $1,300.000 $2,000.000
467 6375 SET (TY II) (24 IN) (CMP) (3: 1) (C) EA 4.000 $1,740.680 $728.750 $2,651.000 $1,468.210 $1,300.000 $2,000.000
467 6377 SET (TY II) (24 IN) (CMP) (4: 1) (C) EA 1.000 $1,079.790 $1,332.500 $3,791.000 $3,330.530 $1,300.000 $2,200.000
467 6418 SET (TY II) (30 IN) (RCP) (3: 1) (P) EA 2.000 $2,504.650 $1,764.150 $3,861.000 $2,098.610 $1,547.000 $3,000.000
467 6534 SET (TY II) (DES 3) (CMP) (4: 1) (C) EA 4.000 $2,082.500 $902.050 $2,681.000 $1,634.620 $1,300.000 $2,500.000
496 6005 REMOV STR (WINGWALL) EA 3.000 $1,750.000 $1,145.550 $549.000 $2,238.010 $900.000 $1,500.000
496 6042 REMOV STR (SMALL) EA 5.000 $1,375.040 $609.550 $249.000 $2,014.210 $1,200.000 $2,000.000
500 6001 MOBILIZATION LS 1.000 $175,153.270 $135,000.000 $125,000.000 $194,000.000 $170,000.000 $240,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $8,315.750 $6,895.350 $4,000.000 $10,150.000 $20,000.000 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 6.000 $20.350 $51.000 $142.000 $142.000 $200.000 $40.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 6.000 $7.170 $43.000 $85.000 $85.000 $100.000 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 4,100.000 $2.380 $3.700 $2.350 $2.350 $2.500 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 4,100.000 $0.640 $1.050 $0.250 $0.250 $0.750 $2.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 120.000 $3.700 $4.000 $8.000 $8.000 $8.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 120.000 $1.470 $1.050 $1.500 $1.500 $1.650 $12.000
510 6001 ONE-WAY TRAF CONT (FLAGGER CONT) HR 80.000 $98.600 $88.000 $31.000 $144.200 $150.000 $250.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 2,700.000 $59.430 $30.000 $91.000 $13.630 $42.000 $70.000
512 6025 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 2,580.000 $6.440 $10.250 $4.710 $7.850 $10.000 $20.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 2,700.000 $11.150 $9.000 $6.290 $13.630 $15.000 $20.000
530 6005 DRIVEWAYS (ACP) SY 174.000 $50.990 $43.000 $51.000 $52.620 $19.800 $42.000
533 6002 RUMBLE STRIPS (CENTERLINE) LF 80.000 $0.190 $5.050 $49.000 $100.000 $75.000 $1.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 250.000 $20.400 $25.800 $24.260 $23.100 $25.800 $25.000
544 6004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 4.000 $2,861.500 $2,900.200 $2,885.000 $2,730.000 $2,956.250 $2,850.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 2.000 $12,661.260 $8,000.000 $6,750.000 $6,850.000 $7,500.000 $15,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 $1,525.360 $649.500 $785.000 $1,000.000 $1,500.000 $5,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $800.950 $460.800 $250.000 $500.000 $600.000 $2,500.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 1.000 $283.070 $212.450 $225.000 $200.000 $188.130 $650.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 58.000 $14.090 $8.400 $11.000 $7.890 $21.500 $12.000
618 6053 CONDT (PVC) (SCH 80) (3") LF 116.000 $20.810 $9.200 $19.000 $8.640 $24.730 $15.000
620 6007 ELEC CONDR (NO.8) BARE LF 447.000 $1.780 $1.700 $2.410 $1.610 $1.180 $3.000
620 6009 ELEC CONDR (NO.6) BARE LF 897.000 $1.490 $1.450 $2.410 $1.370 $1.390 $3.000
621 6005 TRAY CABLE (4 CONDR) (12 AWG) LF 480.000 $2.750 $2.750 $3.410 $2.570 $2.580 $3.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 1.000 $2,008.500 $615.100 $1,401.000 $579.000 $779.370 $1,000.000
624 6010 GROUND BOX TY D (162922)W/APRON EA 1.000 $1,037.900 $891.300 $1,649.000 $839.000 $962.120 $1,000.000
625 6002 ZINC-COAT STL WIRE STRAND (3/16") LF 364.000 $3.830 $3.850 $1.510 $3.620 $5.370 $3.000
625 6004 ZINC-COAT STL WIRE STRAND (5/16") LF 364.000 $3.890 $3.900 $2.990 $3.680 $5.370 $5.000
628 6167 ELC SRV TY D 120/240 070(NS)AL(E)TP(O) EA 1.000 $5,910.170 $3,797.900 $9,841.000 $3,575.000 $3,977.500 $6,500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 28.000 $524.080 $556.650 $475.000 $524.000 $510.620 $650.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 6.000 $495.760 $526.950 $425.000 $496.000 $456.870 $550.000
644 6076 REMOVE SM RD SN SUP&AM EA 12.000 $77.670 $132.800 $97.000 $125.000 $104.270 $100.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 20.000 $69.150 $51.900 $52.000 $48.850 $55.900 $100.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 12.000 $30.880 $17.250 $28.000 $16.250 $30.100 $4.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 7,233.000 $0.880 $0.900 $0.800 $0.880 $0.910 $1.500
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 179.000 $5.790 $6.900 $7.000 $5.770 $6.980 $8.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 16.000 $121.740 $132.800 $130.000 $95.000 $134.370 $200.000
666 6072 REFL PAV MRK TY I(W)(LNDP ARW)(100MIL) EA 4.000 $475.000 $292.150 $377.000 $200.000 $296.700 $500.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 16.000 $153.590 $159.350 $151.000 $120.000 $161.250 $200.000
666 6224 PAVEMENT SEALER 4" LF 17,278.000 $0.180 $0.200 $0.200 $0.160 $0.210 $0.500
666 6226 PAVEMENT SEALER 8" LF 7,233.000 $0.270 $0.400 $0.500 $0.300 $0.430 $1.000
666 6230 PAVEMENT SEALER 24" LF 179.000 $2.820 $3.200 $3.300 $3.000 $3.220 $5.000
666 6231 PAVEMENT SEALER (ARROW) EA 16.000 $45.000 $26.550 $67.000 $45.000 $26.870 $100.000
666 6232 PAVEMENT SEALER (WORD) EA 16.000 $47.850 $37.200 $67.000 $60.000 $37.620 $100.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 60.000 $0.460 $0.700 $2.440 $1.000 $0.690 $3.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 11,169.000 $0.480 $0.700 $0.420 $0.550 $0.690 $1.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 6,049.000 $0.520 $0.700 $0.460 $0.550 $0.690 $1.000
672 6007 REFL PAV MRKR TY I-C EA 520.000 $3.630 $5.300 $5.000 $5.300 $5.370 $7.000
672 6009 REFL PAV MRKR TY II-A-A EA 262.000 $3.360 $5.300 $5.000 $6.000 $5.370 $7.000
678 6001 PAV SURF PREP FOR MRK (4") LF 15,070.000 $1.000 $0.010 $0.530 $0.060 $0.010 $1.000
678 6004 PAV SURF PREP FOR MRK (8") LF 7,233.000 $1.000 $0.020 $1.000 $0.120 $0.020 $1.500
678 6008 PAV SURF PREP FOR MRK (24") LF 179.000 $1.430 $0.050 $4.000 $0.550 $0.060 $6.000
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 16.000 $35.000 $1.050 $63.000 $15.000 $1.070 $100.000
678 6016 PAV SURF PREP FOR MRK (WORD) EA 16.000 $50.000 $1.050 $63.000 $20.000 $1.070 $100.000
680 6001 INSTALL HWY TRF SIG (FLASH BEACON) EA 1.000 $4,932.570 $3,680.000 $8,449.000 $3,464.000 $11,825.000 $12,500.000
680 6011 INSTALL HWY TRF SIG (UPGRADE) EA 1.000 $12,181.520 $2,060.950 $6,591.000 $1,940.000 $3,762.500 $25,000.000
682 6003 VEH SIG SEC (12")LED(YEL) EA 2.000 $250.260 $305.950 $331.000 $288.000 $236.500 $285.000
682 6005 VEH SIG SEC (12")LED(RED) EA 2.000 $223.910 $305.950 $331.000 $288.000 $236.500 $285.000
682 6024 BACK PLATE (12")(4 SEC) EA 2.000 $95.560 $80.750 $151.000 $76.000 $91.370 $125.000
684 6009 TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF 325.000 $2.050 $3.250 $2.810 $3.080 $3.010 $3.000
684 6035 TRF SIG CBL (TY A)(14 AWG)(9 CONDR) LF 584.000 $2.190 $3.800 $3.210 $3.590 $3.220 $5.000
686 6007 INS TRF SIG PL AM (S)STR(TY B) EA 2.000 $4,000.000 $3,926.450 $6,141.000 $3,696.000 $4,837.500 $8,500.000
686 6008 INS TRF SIG PL AM (S)STR(TY B)LUM EA 2.000 $4,590.150 $5,419.050 $8,421.000 $5,101.000 $6,557.500 $10,000.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 28.000 $82.780 $39.000 $81.000 $321.000 $215.000 $150.000
6120 6001 DEAD END ROADWAY BARRICADE LF 16.000 $76.530 $123.350 $55.000 $50.000 $59.120 $100.000
6155 6002 RADAR COMMUNICATION CABLE LF 1,024.000 $1.970 $3.850 $11.000 $3.620 $2.950 $5.000
6185 6002 TMA (STATIONARY) DAY 60.000 $207.370 $122.000 $64.910 $75.000 $250.000 $550.000
6185 6005 TMA (MOBILE OPERATION) DAY 36.000 $178.050 $293.000 $401.000 $365.000 $250.000 $850.000
6292 6003 RVDS(PRESENCE AND ADVANCE DET) EA 4.000 $6,792.290 $6,222.200 $8,341.000 $5,857.000 $7,154.120 $15,000.000
Totals: $1,628,273.13 $1,371,713.34 $1,627,099.97 $1,754,651.50 $1,779,734.00 $2,657,193.40