BEXAR VA (0915-00-194)

Items: 21

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-00-194
DBE Goal: N/A
Project: NH 2017(558)
Guaranty: N/A
Time: 123 WORKING DAYS
Engineer's Estimate: $1,489,350.60
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: INSTALL DMS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,489,350.60
$1,756,584.32
Over/Under Est: 17.94% $267,233.72
$2,367,681.75
Over/Under Est: 58.97% $878,331.15
Amt Left: 34.79% $611,097.43

Bid Items & Bid Tabulations

21 Total 0 of 21
BEXAR  |  VA  |  SAN ANTONIO  |  0915-00-194  |  02/03/2017  |  $1,489,350.60  |  NH 2017(558)  |  INSTL DMS  |  123 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, L.P.
TRAF-TEX, INC.
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 1.000 $1,000.000 $4,807.100 $1,500.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 252.000 $503.000 $556.960 $948.000
RIPRAP (CONC)(CL B)
CY 17.500 $406.000 $2,700.000 $1,672.000
MOBILIZATION
LS 1.000 $110,400.000 $143,665.610 $202,254.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,000.000 $8,738.350 $2,215.000
MTL W-BEAM GD FEN (TIM POST)
LF 6,300.000 $19.000 $19.770 $26.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 35.000 $1,026.000 $884.510 $887.000
GUARDRAIL END TREATMENT (INSTALL)
EA 38.000 $2,259.000 $2,247.700 $2,200.000
CONDT (PVC) (SCH 80) (2")
LF 2,490.000 $7.870 $9.100 $12.000
CONDT (RM) (1")
LF 700.000 $20.640 $18.830 $17.300
CONDT (RM) (2") (BORE)
LF 5,635.000 $33.490 $46.830 $66.400
ELEC CONDR (NO.4) INSULATED
LF 13,465.000 $2.180 $1.780 $2.300
GROUND BOX TY A (122311)W/APRON
EA 39.000 $829.000 $829.810 $730.000
GROUND BOX TY D (162922)W/APRON
EA 10.000 $922.000 $1,018.510 $805.000
TIMBER POLE (CL 2) 40 FT
EA 14.000 $1,000.000 $2,435.380 $1,255.000
ELC SRV TY D 120/240 060(NS)GS(N)TP(O)
EA 14.000 $2,671.000 $6,655.880 $2,290.000
INS OH SN SUP(30 FT BAL TEE)
EA 14.000 $26,789.000 $25,982.040 $31,975.000
COMM CABLE (UNDRGRND)(22 AWG)(6 PAIR)
LF 3,235.000 $2.070 $2.220 $1.550
CCTV FIELD EQUIP (ANALOG) (INSTL ONLY)
EA 13.000 $1,875.000 $3,426.820 $11,645.000
INSTALL DMS (POLE MTD CABINET)
EA 7.000 $14,883.000 $12,546.200 $35,740.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 7.000 $17,040.000 $17,370.770 $30,527.000
Totals: $1,489,350.600 $1,756,584.320 $2,367,681.750