|
|
REMOVING CONC (RIPRAP)
|
SY
|
22,435.000
|
$10.000
|
$5.250
|
$4.500
|
$18.000
|
$4.750
|
$11.950
|
$14.000
|
$9.990
|
$12.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
436.000
|
$16.500
|
$15.280
|
$9.000
|
$20.000
|
$19.000
|
$9.000
|
$14.000
|
$9.990
|
$14.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,668.000
|
$13.000
|
$9.040
|
$6.000
|
$12.300
|
$13.000
|
$11.000
|
$14.000
|
$9.990
|
$12.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,305.000
|
$16.000
|
$12.720
|
$8.000
|
$23.000
|
$22.000
|
$16.000
|
$14.000
|
$15.600
|
$12.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
10,918.000
|
$3.350
|
$3.260
|
$1.500
|
$7.600
|
$4.050
|
$4.000
|
$7.000
|
$6.660
|
$4.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
22.000
|
$20.000
|
$50.310
|
$13.000
|
$20.000
|
$62.000
|
$50.000
|
$14.000
|
$29.970
|
$23.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
184.000
|
$18.000
|
$9.770
|
$8.000
|
$26.000
|
$17.000
|
$15.000
|
$14.000
|
$16.650
|
$11.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
40.000
|
$13.000
|
$38.630
|
$60.000
|
$18.000
|
$300.000
|
$60.000
|
$70.000
|
$99.900
|
$155.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
4,093.000
|
$8.000
|
$3.450
|
$2.500
|
$6.500
|
$13.500
|
$5.000
|
$7.500
|
$6.660
|
$12.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
108,628.000
|
$9.000
|
$12.000
|
$12.000
|
$9.900
|
$12.000
|
$15.300
|
$13.000
|
$14.370
|
$14.450
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
13,195.000
|
$11.000
|
$10.000
|
$12.000
|
$13.000
|
$22.000
|
$9.000
|
$9.000
|
$9.990
|
$7.600
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
16.000
|
$147.000
|
$61.280
|
$65.000
|
$147.000
|
$250.000
|
$71.000
|
$80.000
|
$171.000
|
$170.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
77,157.000
|
$1.600
|
$1.190
|
$1.650
|
$1.000
|
$1.800
|
$2.600
|
$1.750
|
$0.760
|
$0.650
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
9,240.000
|
$0.370
|
$0.340
|
$0.280
|
$0.500
|
$0.340
|
$0.350
|
$0.350
|
$0.340
|
$0.300
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
67,917.000
|
$0.170
|
$0.130
|
$0.120
|
$0.160
|
$0.160
|
$0.180
|
$0.150
|
$0.130
|
$0.130
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
80,626.000
|
$0.090
|
$0.080
|
$0.080
|
$0.210
|
$0.100
|
$0.100
|
$0.100
|
$0.080
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
1,229.000
|
$14.000
|
$23.580
|
$22.000
|
$80.000
|
$6.850
|
$9.000
|
$22.000
|
$16.650
|
$16.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
69,873.000
|
$1.000
|
$0.690
|
$0.680
|
$1.050
|
$0.690
|
$0.710
|
$0.750
|
$0.690
|
$0.950
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$80.000
|
$98.420
|
$85.000
|
$90.000
|
$210.000
|
$46.000
|
$90.000
|
$171.000
|
$87.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
112,000.000
|
$8.000
|
$7.330
|
$9.000
|
$9.500
|
$9.000
|
$7.250
|
$9.000
|
$8.840
|
$8.450
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
112,000.000
|
$3.200
|
$2.890
|
$4.250
|
$3.250
|
$3.150
|
$6.250
|
$2.250
|
$2.050
|
$2.950
|
|
|
LIME (HYD(SLY OR DRY) COM OR QK(DRY)
|
TON
|
1,925.000
|
$170.000
|
$174.410
|
$190.000
|
$175.000
|
$180.000
|
$175.000
|
$200.000
|
$173.250
|
$187.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
22,400.000
|
$3.650
|
$3.510
|
$3.500
|
$3.500
|
$2.550
|
$2.530
|
$3.000
|
$4.060
|
$3.900
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
840.000
|
$110.000
|
$95.000
|
$113.000
|
$70.000
|
$101.000
|
$106.000
|
$106.000
|
$118.950
|
$117.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
12,081.000
|
$100.000
|
$95.000
|
$113.000
|
$70.000
|
$101.000
|
$106.000
|
$106.000
|
$118.950
|
$117.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
93,854.000
|
$1.600
|
$0.900
|
$0.600
|
$1.100
|
$1.000
|
$1.010
|
$1.250
|
$1.820
|
$1.100
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
7,763.000
|
$1.150
|
$1.120
|
$0.550
|
$1.100
|
$1.000
|
$1.010
|
$1.250
|
$1.820
|
$1.950
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
|
SY
|
216,644.000
|
$1.300
|
$0.500
|
$0.700
|
$1.000
|
$0.510
|
$0.510
|
$0.750
|
$1.510
|
$1.550
|
|
|
CUT & RESTORING PAV
|
SY
|
84.000
|
$120.000
|
$138.220
|
$75.000
|
$250.000
|
$280.000
|
$155.000
|
$150.000
|
$250.000
|
$180.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
155.000
|
$2.000
|
$2.000
|
$1.000
|
$12.000
|
$2.550
|
$2.000
|
$12.500
|
$12.950
|
$23.750
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,866.000
|
$13.910
|
$0.960
|
$17.000
|
$16.000
|
$18.000
|
$27.000
|
$25.000
|
$19.820
|
$23.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
45,769.000
|
$18.000
|
$11.660
|
$12.000
|
$20.000
|
$13.000
|
$17.110
|
$19.000
|
$11.910
|
$20.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
201.000
|
$200.000
|
$175.000
|
$210.000
|
$216.000
|
$210.000
|
$210.000
|
$225.000
|
$220.500
|
$225.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$125.000
|
$120.000
|
$130.000
|
$140.000
|
$146.000
|
$145.000
|
$175.000
|
$145.000
|
$155.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
280.000
|
$220.000
|
$225.000
|
$185.000
|
$236.000
|
$240.000
|
$240.000
|
$250.000
|
$240.000
|
$240.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
78.000
|
$215.000
|
$175.000
|
$170.000
|
$217.000
|
$260.000
|
$260.000
|
$275.000
|
$260.000
|
$275.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
56.000
|
$290.000
|
$255.000
|
$300.000
|
$317.000
|
$320.000
|
$315.000
|
$325.000
|
$315.000
|
$335.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$735.000
|
$3,211.620
|
$1,200.000
|
$1,000.000
|
$2,000.000
|
$2,500.000
|
$1,000.000
|
$1,000.000
|
$1,380.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
6.000
|
$1,500.000
|
$2,322.420
|
$1,200.000
|
$1,000.000
|
$12,700.000
|
$1,300.000
|
$950.000
|
$3,500.000
|
$965.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,356.000
|
$380.000
|
$372.990
|
$280.000
|
$450.000
|
$325.000
|
$550.000
|
$400.000
|
$400.000
|
$400.000
|
|
|
CL C CONC (MISC)
|
CY
|
99.000
|
$650.000
|
$562.360
|
$500.000
|
$350.000
|
$700.000
|
$550.000
|
$400.000
|
$615.420
|
$350.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
11,786.000
|
$46.000
|
$47.320
|
$49.000
|
$52.000
|
$52.000
|
$58.000
|
$75.000
|
$38.500
|
$47.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
29,213.000
|
$44.000
|
$45.630
|
$49.000
|
$25.000
|
$42.000
|
$54.000
|
$27.000
|
$58.500
|
$51.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
6,750.000
|
$0.450
|
$0.310
|
$0.310
|
$0.400
|
$0.310
|
$1.000
|
$1.000
|
$5.020
|
$0.350
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,079.000
|
$430.000
|
$335.800
|
$340.000
|
$427.000
|
$325.000
|
$455.000
|
$450.000
|
$325.780
|
$375.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
181.000
|
$415.000
|
$362.040
|
$425.000
|
$460.000
|
$520.000
|
$450.000
|
$475.000
|
$346.700
|
$375.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
150.000
|
$130.000
|
$152.560
|
$130.000
|
$125.000
|
$360.000
|
$209.000
|
$275.000
|
$184.450
|
$235.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
193.000
|
$430.000
|
$411.710
|
$450.000
|
$462.000
|
$460.000
|
$550.000
|
$475.000
|
$393.810
|
$430.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
726.000
|
$20.000
|
$9.000
|
$9.000
|
$20.000
|
$13.500
|
$9.500
|
$80.000
|
$9.000
|
$14.000
|
|
|
RAIL (TY SSTR)
|
LF
|
8,010.000
|
$50.000
|
$45.570
|
$50.000
|
$44.000
|
$48.000
|
$52.000
|
$55.000
|
$56.000
|
$48.500
|
|
|
RAIL (TY C411)
|
LF
|
230.000
|
$215.000
|
$326.160
|
$185.000
|
$220.000
|
$300.000
|
$215.000
|
$175.000
|
$200.000
|
$307.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
387.000
|
$100.000
|
$83.460
|
$107.000
|
$124.000
|
$130.000
|
$85.000
|
$125.000
|
$113.030
|
$116.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
165.000
|
$95.000
|
$96.100
|
$109.500
|
$103.000
|
$159.000
|
$93.000
|
$150.000
|
$129.940
|
$133.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS) (MOD)
|
LF
|
4,548.000
|
$140.000
|
$47.060
|
$52.000
|
$55.000
|
$57.000
|
$57.000
|
$60.000
|
$62.000
|
$56.000
|
|
|
RETROFIT RAIL (TY C411)
|
LF
|
413.000
|
$260.000
|
$193.300
|
$320.000
|
$523.000
|
$550.000
|
$155.000
|
$250.000
|
$400.000
|
$325.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
113.000
|
$400.000
|
$438.760
|
$438.760
|
$730.000
|
$450.000
|
$457.000
|
$75.000
|
$438.760
|
$300.000
|
|
|
JOINT SEALANT
|
LF
|
726.000
|
$17.000
|
$6.000
|
$6.000
|
$18.000
|
$13.000
|
$6.500
|
$70.000
|
$6.000
|
$15.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
52.000
|
$260.000
|
$278.800
|
$265.000
|
$420.000
|
$720.000
|
$550.000
|
$430.000
|
$426.360
|
$425.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
38.000
|
$290.000
|
$359.260
|
$360.000
|
$500.000
|
$1,020.000
|
$700.000
|
$500.000
|
$485.730
|
$485.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
28.000
|
$300.000
|
$411.800
|
$400.000
|
$575.000
|
$920.000
|
$725.000
|
$600.000
|
$588.270
|
$585.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
52.000
|
$60.000
|
$86.550
|
$105.000
|
$95.000
|
$520.000
|
$93.000
|
$95.000
|
$96.070
|
$96.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,019.000
|
$75.000
|
$70.310
|
$85.000
|
$80.000
|
$101.000
|
$95.000
|
$97.000
|
$82.030
|
$82.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,031.000
|
$100.000
|
$80.880
|
$90.000
|
$96.000
|
$117.000
|
$105.000
|
$100.000
|
$94.990
|
$95.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$4,400.000
|
$6,014.700
|
$5,000.000
|
$3,200.000
|
$8,300.000
|
$7,500.000
|
$3,000.000
|
$3,022.290
|
$3,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
7.000
|
$5,500.000
|
$4,961.810
|
$5,400.000
|
$4,500.000
|
$12,900.000
|
$7,000.000
|
$4,500.000
|
$4,332.670
|
$4,315.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$4,900.000
|
$6,448.190
|
$5,300.000
|
$6,500.000
|
$12,700.000
|
$7,000.000
|
$6,500.000
|
$6,368.390
|
$6,300.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$4,200.000
|
$7,616.940
|
$6,600.000
|
$4,700.000
|
$14,900.000
|
$8,000.000
|
$5,000.000
|
$4,533.430
|
$4,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
6.000
|
$6,000.000
|
$4,319.650
|
$6,800.000
|
$3,900.000
|
$15,200.000
|
$9,000.000
|
$4,000.000
|
$3,777.860
|
$3,800.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$6,000.000
|
$5,747.190
|
$7,000.000
|
$6,700.000
|
$14,800.000
|
$9,000.000
|
$7,000.000
|
$6,557.290
|
$6,550.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
3.000
|
$10,811.160
|
$10,000.000
|
$17,000.000
|
$5,000.000
|
$22,000.000
|
$12,000.000
|
$5,000.000
|
$4,857.250
|
$4,850.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$4,000.000
|
$5,875.830
|
$4,800.000
|
$2,900.000
|
$15,400.000
|
$6,500.000
|
$3,000.000
|
$2,644.500
|
$2,600.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$15,000.000
|
$38,800.230
|
$23,000.000
|
$15,000.000
|
$24,000.000
|
$17,500.000
|
$15,000.000
|
$14,571.750
|
$14,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$2,048.050
|
$2,000.000
|
$1,900.000
|
$5,900.000
|
$2,600.000
|
$1,900.000
|
$1,834.960
|
$1,825.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$2,343.800
|
$2,000.000
|
$2,900.000
|
$6,300.000
|
$3,000.000
|
$2,900.000
|
$2,806.410
|
$2,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,343.800
|
$2,900.000
|
$3,300.000
|
$6,300.000
|
$4,300.000
|
$3,200.000
|
$3,130.230
|
$3,100.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
13.000
|
$1,500.000
|
$1,086.910
|
$1,200.000
|
$2,100.000
|
$3,600.000
|
$1,210.000
|
$2,100.000
|
$2,050.840
|
$2,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,622.000
|
$4,877.660
|
$2,800.000
|
$2,800.000
|
$10,200.000
|
$970.000
|
$2,750.000
|
$2,698.470
|
$2,650.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$800.000
|
$360.250
|
$350.000
|
$1,100.000
|
$5,000.000
|
$1,500.000
|
$1,100.000
|
$1,025.420
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,100.000
|
$322.910
|
$350.000
|
$2,900.000
|
$1,720.000
|
$3,500.000
|
$2,800.000
|
$2,698.470
|
$2,650.000
|
|
|
REMOV STR (PIPE)
|
LF
|
730.000
|
$16.000
|
$18.620
|
$17.000
|
$14.000
|
$24.000
|
$35.000
|
$13.000
|
$12.950
|
$13.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,140,000.000
|
$2,229,758.570
|
$2,300,000.000
|
$2,000,000.000
|
$2,483,000.000
|
$1,850,000.000
|
$1,650,000.000
|
$2,466,845.840
|
$2,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$7,000.000
|
$18,000.000
|
$5,000.000
|
$15,000.000
|
$18,000.000
|
$7,000.000
|
$10,000.000
|
$3,192.590
|
$11,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
940.000
|
$24.000
|
$22.050
|
$19.000
|
$25.000
|
$19.500
|
$19.000
|
$24.000
|
$22.050
|
$24.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
380.000
|
$26.000
|
$29.590
|
$23.000
|
$27.000
|
$23.000
|
$23.000
|
$32.000
|
$29.590
|
$32.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
216.000
|
$40.000
|
$52.850
|
$28.000
|
$50.000
|
$28.000
|
$28.000
|
$55.000
|
$52.850
|
$57.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,536.000
|
$9.000
|
$8.360
|
$7.000
|
$9.000
|
$7.100
|
$7.000
|
$9.000
|
$8.360
|
$8.400
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
625.000
|
$14.200
|
$22.730
|
$11.000
|
$23.000
|
$11.000
|
$11.000
|
$25.000
|
$22.730
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
1,560.000
|
$23.000
|
$14.880
|
$50.000
|
$25.000
|
$51.000
|
$50.000
|
$15.000
|
$14.880
|
$16.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,184.000
|
$5.000
|
$6.240
|
$5.000
|
$6.500
|
$5.100
|
$5.000
|
$7.000
|
$6.240
|
$6.250
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
280.000
|
$34.000
|
$40.000
|
$20.000
|
$3.000
|
$122.000
|
$64.840
|
$22.000
|
$23.310
|
$75.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
32.000
|
$75.000
|
$90.000
|
$65.000
|
$73.000
|
$108.000
|
$153.160
|
$80.000
|
$171.000
|
$75.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
325.000
|
$6.000
|
$17.220
|
$5.000
|
$11.000
|
$5.100
|
$5.000
|
$19.000
|
$17.220
|
$18.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,780.000
|
$2.100
|
$2.640
|
$2.500
|
$2.500
|
$1.800
|
$1.750
|
$3.000
|
$2.640
|
$2.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,185.000
|
$0.600
|
$0.430
|
$0.700
|
$0.600
|
$0.710
|
$0.700
|
$1.000
|
$0.430
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,910.000
|
$4.000
|
$3.480
|
$2.900
|
$4.000
|
$2.950
|
$2.900
|
$4.000
|
$3.480
|
$3.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,910.000
|
$0.950
|
$0.430
|
$0.650
|
$1.400
|
$0.660
|
$0.650
|
$1.000
|
$0.430
|
$0.400
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
405.000
|
$4.800
|
$5.850
|
$5.000
|
$4.200
|
$5.100
|
$5.000
|
$6.500
|
$5.850
|
$6.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,354.000
|
$52.000
|
$60.300
|
$65.000
|
$73.000
|
$78.000
|
$80.000
|
$65.000
|
$43.800
|
$67.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
11,160.000
|
$24.000
|
$25.000
|
$38.000
|
$40.000
|
$30.000
|
$22.000
|
$60.000
|
$26.000
|
$25.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
20,780.000
|
$20.000
|
$27.000
|
$10.000
|
$35.000
|
$23.000
|
$29.000
|
$58.000
|
$30.000
|
$39.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
860.000
|
$25.000
|
$27.000
|
$10.000
|
$47.000
|
$123.000
|
$47.000
|
$78.000
|
$40.000
|
$39.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
10,500.000
|
$5.000
|
$6.830
|
$5.000
|
$5.250
|
$7.500
|
$6.040
|
$10.000
|
$9.000
|
$10.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
31,360.000
|
$5.250
|
$4.440
|
$5.000
|
$6.600
|
$3.450
|
$6.000
|
$10.000
|
$11.000
|
$12.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,300.000
|
$8.000
|
$11.040
|
$5.000
|
$12.750
|
$17.000
|
$35.000
|
$50.000
|
$20.000
|
$12.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
280.000
|
$7.500
|
$22.410
|
$7.000
|
$13.200
|
$16.500
|
$6.000
|
$50.000
|
$11.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
11,160.000
|
$7.500
|
$8.670
|
$8.000
|
$7.000
|
$7.650
|
$6.000
|
$11.000
|
$10.000
|
$11.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
20,780.000
|
$7.000
|
$7.240
|
$8.000
|
$6.700
|
$6.000
|
$9.000
|
$10.500
|
$12.000
|
$11.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
860.000
|
$10.000
|
$13.510
|
$8.000
|
$9.000
|
$27.000
|
$16.000
|
$25.000
|
$15.000
|
$11.000
|
|
|
CONC CURB (TY I)
|
LF
|
27,094.000
|
$9.300
|
$8.000
|
$6.500
|
$16.500
|
$8.000
|
$11.000
|
$12.000
|
$10.000
|
$12.000
|
|
|
CONC CURB (TY F2)
|
LF
|
350.000
|
$180.000
|
$123.310
|
$100.000
|
$170.000
|
$121.000
|
$150.000
|
$165.000
|
$150.000
|
$160.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
294.000
|
$276.000
|
$250.000
|
$155.000
|
$300.000
|
$400.000
|
$400.000
|
$265.000
|
$275.000
|
$258.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,655.000
|
$80.000
|
$84.590
|
$65.000
|
$88.000
|
$68.000
|
$96.000
|
$100.000
|
$96.000
|
$98.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
608.000
|
$30.000
|
$26.090
|
$45.000
|
$29.000
|
$58.000
|
$35.000
|
$28.000
|
$39.420
|
$44.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,130.000
|
$30.000
|
$36.220
|
$50.000
|
$19.500
|
$56.000
|
$15.000
|
$60.000
|
$39.420
|
$64.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
16,193.000
|
$44.000
|
$38.860
|
$44.000
|
$48.000
|
$48.000
|
$48.000
|
$50.000
|
$37.800
|
$49.250
|
|
|
CURB RAMPS (TY 2)
|
EA
|
16.000
|
$1,800.000
|
$1,545.310
|
$1,000.000
|
$1,700.000
|
$1,850.000
|
$2,500.000
|
$1,700.000
|
$1,575.020
|
$1,650.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
22.000
|
$1,800.000
|
$1,532.950
|
$1,000.000
|
$1,700.000
|
$1,850.000
|
$2,500.000
|
$1,700.000
|
$1,575.020
|
$1,650.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
9.000
|
$2,400.000
|
$1,780.540
|
$1,000.000
|
$2,590.000
|
$2,100.000
|
$2,500.000
|
$2,400.000
|
$1,785.020
|
$2,365.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$3,200.000
|
$1,772.490
|
$1,000.000
|
$2,700.000
|
$2,100.000
|
$2,500.000
|
$2,600.000
|
$1,785.020
|
$2,580.000
|
|
|
CONC MEDIAN
|
SY
|
445.000
|
$68.000
|
$55.260
|
$50.000
|
$75.000
|
$46.000
|
$135.000
|
$72.000
|
$54.600
|
$93.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
351.000
|
$21.000
|
$29.400
|
$27.860
|
$21.000
|
$21.000
|
$25.900
|
$23.000
|
$20.350
|
$22.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,300.000
|
$1,123.020
|
$1,123.020
|
$1,300.000
|
$1,270.000
|
$1,163.680
|
$1,400.000
|
$1,255.000
|
$1,350.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,100.000
|
$524.020
|
$524.020
|
$690.000
|
$800.000
|
$757.360
|
$900.000
|
$786.000
|
$845.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,157.000
|
$2.500
|
$1.900
|
$1.900
|
$2.500
|
$1.000
|
$2.000
|
$1.250
|
$1.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$150.000
|
$154.870
|
$154.870
|
$251.000
|
$188.000
|
$190.000
|
$200.000
|
$185.000
|
$195.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
8.000
|
$170.000
|
$154.870
|
$154.870
|
$262.000
|
$198.000
|
$176.000
|
$225.000
|
$195.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$220.000
|
$119.330
|
$119.330
|
$271.000
|
$147.000
|
$190.000
|
$160.000
|
$145.000
|
$630.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,650.000
|
$2,789.490
|
$2,789.490
|
$2,620.000
|
$2,600.000
|
$2,900.000
|
$2,800.000
|
$2,530.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$210.000
|
$38.080
|
$38.080
|
$325.000
|
$200.000
|
$211.000
|
$225.000
|
$201.000
|
$215.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$1,000.000
|
$119.330
|
$119.330
|
$1,425.000
|
$500.000
|
$1,250.000
|
$550.000
|
$495.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$600.000
|
$77.430
|
$77.430
|
$815.000
|
$520.000
|
$750.000
|
$550.000
|
$515.000
|
$555.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
12.000
|
$12,450.000
|
$20,896.930
|
$21,200.000
|
$19,500.000
|
$21,000.000
|
$21,550.000
|
$23,000.000
|
$20,770.000
|
$25,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$7,600.000
|
$7,173.750
|
$7,173.750
|
$7,350.000
|
$8,000.000
|
$7,200.000
|
$9,000.000
|
$7,860.000
|
$9,000.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
18.000
|
$3,000.000
|
$1,200.000
|
$1,800.000
|
$2,000.000
|
$2,300.000
|
$2,250.000
|
$2,500.000
|
$2,250.000
|
$2,420.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
18.000
|
$300.000
|
$150.000
|
$325.000
|
$268.000
|
$360.000
|
$360.000
|
$400.000
|
$360.000
|
$387.000
|
|
|
REPLACE LUMINAIRE W/LED (400W EQ)
|
EA
|
38.000
|
$580.000
|
$550.000
|
$680.000
|
$980.000
|
$720.000
|
$710.000
|
$800.000
|
$710.000
|
$763.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
48.000
|
$1,420.000
|
$1,350.000
|
$1,500.000
|
$1,500.000
|
$1,570.000
|
$1,550.000
|
$1,700.000
|
$1,550.000
|
$1,667.000
|
|
|
IN RD IL (TY SA) 50T-12 (400W EQ) LED
|
EA
|
7.000
|
$4,000.000
|
$3,400.000
|
$3,825.000
|
$3,900.000
|
$4,000.000
|
$3,950.000
|
$4,350.000
|
$3,950.000
|
$4,245.000
|
|
|
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
|
EA
|
3.000
|
$4,800.000
|
$4,450.000
|
$4,785.000
|
$4,500.000
|
$4,900.000
|
$4,900.000
|
$5,400.000
|
$4,900.000
|
$5,270.000
|
|
|
TEMP RD IL (RD IL ASM)
|
EA
|
14.000
|
$2,000.000
|
$1,500.000
|
$1,400.000
|
$1,550.000
|
$1,110.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
$1,182.000
|
|
|
CONDT (HDPE) (2") BORE
|
LF
|
1,324.000
|
$25.000
|
$26.000
|
$40.000
|
$26.000
|
$42.000
|
$41.500
|
$45.000
|
$41.500
|
$44.600
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
5,128.000
|
$9.000
|
$8.000
|
$9.000
|
$11.000
|
$13.500
|
$13.500
|
$14.000
|
$13.500
|
$14.500
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
781.000
|
$8.000
|
$11.000
|
$10.000
|
$17.000
|
$23.000
|
$23.000
|
$25.000
|
$23.000
|
$24.750
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,233.000
|
$21.000
|
$24.000
|
$35.000
|
$27.000
|
$41.000
|
$41.000
|
$45.000
|
$41.000
|
$44.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
847.000
|
$15.000
|
$13.000
|
$15.000
|
$20.000
|
$21.000
|
$21.000
|
$23.000
|
$21.000
|
$22.550
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,084.000
|
$30.000
|
$24.000
|
$45.000
|
$22.000
|
$45.000
|
$45.000
|
$49.000
|
$45.000
|
$48.400
|
|
|
CONDT (RM) (3/4")
|
LF
|
626.000
|
$20.000
|
$33.000
|
$22.000
|
$41.000
|
$24.000
|
$24.000
|
$26.000
|
$24.000
|
$25.800
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
8,520.000
|
$1.300
|
$1.150
|
$1.350
|
$1.400
|
$1.350
|
$1.350
|
$1.500
|
$1.350
|
$1.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
18,592.000
|
$1.600
|
$1.250
|
$1.350
|
$1.500
|
$1.350
|
$1.350
|
$1.500
|
$1.350
|
$1.450
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
4,545.000
|
$1.340
|
$1.550
|
$1.750
|
$1.750
|
$1.700
|
$1.700
|
$1.750
|
$1.700
|
$1.830
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,782.000
|
$1.580
|
$1.600
|
$1.750
|
$1.900
|
$1.600
|
$1.600
|
$1.750
|
$1.600
|
$1.720
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
1,515.000
|
$1.700
|
$1.600
|
$1.500
|
$2.500
|
$1.650
|
$1.650
|
$1.750
|
$1.650
|
$1.770
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,503.000
|
$2.000
|
$2.200
|
$1.600
|
$2.400
|
$2.050
|
$2.050
|
$2.250
|
$2.050
|
$2.200
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$990.000
|
$875.000
|
$850.000
|
$1,020.000
|
$930.000
|
$920.000
|
$1,000.000
|
$920.000
|
$990.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
9.000
|
$990.000
|
$1,000.000
|
$1,100.000
|
$1,015.000
|
$1,210.000
|
$1,200.000
|
$1,300.000
|
$1,200.000
|
$1,290.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
$170.000
|
$125.000
|
$175.000
|
$245.000
|
$131.000
|
$130.000
|
$150.000
|
$130.000
|
$140.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$230.000
|
$500.000
|
$580.000
|
$330.000
|
$330.000
|
$375.000
|
$330.000
|
$355.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)EX(O)
|
EA
|
3.000
|
$2,741.000
|
$6,000.000
|
$5,500.000
|
$5,700.000
|
$5,200.000
|
$5,100.000
|
$5,600.000
|
$5,100.000
|
$5,483.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$5,800.000
|
$5,300.000
|
$5,500.000
|
$6,000.000
|
$6,300.000
|
$6,200.000
|
$6,800.000
|
$6,200.000
|
$6,670.000
|
|
|
ELC SRV TY D 120/240 100(NS)AL(E)PS(U)
|
EA
|
2.000
|
$5,500.000
|
$5,750.000
|
$6,600.000
|
$5,900.000
|
$5,700.000
|
$5,600.000
|
$6,100.000
|
$5,600.000
|
$6,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,181.000
|
$25.000
|
$22.750
|
$26.000
|
$27.000
|
$25.000
|
$25.000
|
$27.000
|
$25.000
|
$27.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
20.000
|
$25.000
|
$21.000
|
$26.000
|
$18.000
|
$35.000
|
$25.000
|
$38.000
|
$35.000
|
$22.600
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
210.000
|
$25.000
|
$30.000
|
$26.000
|
$25.000
|
$26.000
|
$26.000
|
$28.000
|
$26.000
|
$28.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
712.000
|
$25.000
|
$30.000
|
$26.000
|
$30.000
|
$37.000
|
$37.000
|
$40.000
|
$37.000
|
$39.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
25.000
|
$435.000
|
$400.000
|
$400.000
|
$570.000
|
$430.000
|
$562.000
|
$525.000
|
$527.690
|
$430.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
85.000
|
$505.000
|
$500.000
|
$500.000
|
$670.000
|
$540.000
|
$658.000
|
$625.000
|
$614.090
|
$537.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
11.000
|
$550.000
|
$365.000
|
$365.000
|
$700.000
|
$400.000
|
$602.000
|
$550.000
|
$520.580
|
$392.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
9.000
|
$650.000
|
$505.000
|
$505.000
|
$720.000
|
$550.000
|
$694.000
|
$725.000
|
$663.430
|
$542.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
13.000
|
$610.000
|
$620.000
|
$620.000
|
$825.000
|
$670.000
|
$778.000
|
$675.000
|
$673.730
|
$667.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$675.000
|
$760.000
|
$760.000
|
$850.000
|
$830.000
|
$820.000
|
$825.000
|
$829.260
|
$817.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$740.000
|
$720.000
|
$720.000
|
$900.000
|
$780.000
|
$867.000
|
$825.000
|
$922.140
|
$774.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$800.000
|
$830.000
|
$830.000
|
$950.000
|
$900.000
|
$893.000
|
$875.000
|
$801.460
|
$892.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
4.000
|
$575.000
|
$760.000
|
$760.000
|
$850.000
|
$830.000
|
$805.000
|
$625.000
|
$657.730
|
$817.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
11.000
|
$700.000
|
$620.000
|
$620.000
|
$890.000
|
$670.000
|
$859.000
|
$825.000
|
$810.960
|
$667.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T-2EXT)
|
EA
|
1.000
|
$800.000
|
$1,250.000
|
$1,250.000
|
$910.000
|
$1,360.000
|
$887.000
|
$2,500.000
|
$1,675.360
|
$1,344.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
3.000
|
$850.000
|
$850.000
|
$850.000
|
$1,100.000
|
$920.000
|
$977.000
|
$1,100.000
|
$856.800
|
$913.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
9.000
|
$1,350.000
|
$1,420.000
|
$1,420.000
|
$1,400.000
|
$1,540.000
|
$1,300.000
|
$1,500.000
|
$1,909.060
|
$1,525.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$2,100.000
|
$1,800.000
|
$2,000.000
|
$2,100.000
|
$1,960.000
|
$2,200.000
|
$2,200.000
|
$2,000.000
|
$2,150.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$2,300.000
|
$2,800.000
|
$6,100.000
|
$3,080.000
|
$3,000.000
|
$2,400.000
|
$850.000
|
$2,833.680
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
181.000
|
$85.000
|
$60.000
|
$50.000
|
$112.000
|
$65.000
|
$92.000
|
$55.000
|
$85.930
|
$64.500
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
6.000
|
$540.000
|
$500.000
|
$435.000
|
$490.000
|
$540.000
|
$240.000
|
$275.000
|
$240.000
|
$258.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
8,688.000
|
$7.000
|
$4.450
|
$3.750
|
$5.000
|
$3.800
|
$3.750
|
$4.000
|
$3.750
|
$4.000
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$3,000.000
|
$3,000.000
|
$3,700.000
|
$4,400.000
|
$3,700.000
|
$3,700.000
|
$4,000.000
|
$3,700.000
|
$3,980.000
|
|
|
REMOVE LRSA
|
EA
|
18.000
|
$700.000
|
$600.000
|
$590.000
|
$1,670.000
|
$600.000
|
$590.000
|
$650.000
|
$590.000
|
$634.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
4.000
|
$7,400.000
|
$5,300.000
|
$4,800.000
|
$7,500.000
|
$4,800.000
|
$4,800.000
|
$5,000.000
|
$4,800.000
|
$5,160.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
169.000
|
$10.000
|
$26.020
|
$15.000
|
$32.000
|
$16.500
|
$15.000
|
$28.000
|
$15.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$28.000
|
$23.000
|
$35.000
|
$25.000
|
$38.000
|
$20.000
|
$28.000
|
$23.350
|
$37.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
24.000
|
$32.000
|
$26.000
|
$35.000
|
$25.000
|
$38.000
|
$20.000
|
$28.000
|
$23.350
|
$37.500
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
77.000
|
$120.000
|
$31.000
|
$65.000
|
$100.000
|
$71.000
|
$83.000
|
$55.000
|
$73.760
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
18.000
|
$75.000
|
$25.000
|
$65.000
|
$100.000
|
$71.000
|
$83.000
|
$45.000
|
$55.350
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
3.000
|
$80.000
|
$25.000
|
$50.000
|
$100.000
|
$54.000
|
$83.000
|
$85.000
|
$73.760
|
$53.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
87.000
|
$0.500
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.010
|
$1.250
|
$1.010
|
$1.080
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
104,879.000
|
$0.260
|
$0.240
|
$0.240
|
$0.270
|
$0.300
|
$0.240
|
$0.400
|
$0.300
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
24,412.000
|
$0.600
|
$0.630
|
$0.630
|
$0.700
|
$0.510
|
$0.640
|
$0.600
|
$0.500
|
$0.540
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
396.000
|
$5.000
|
$5.000
|
$5.000
|
$5.500
|
$8.100
|
$5.040
|
$9.000
|
$8.040
|
$8.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
41.000
|
$120.000
|
$125.000
|
$125.000
|
$130.000
|
$127.000
|
$125.990
|
$150.000
|
$125.630
|
$134.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
57.000
|
$130.000
|
$137.000
|
$137.000
|
$142.000
|
$152.000
|
$138.080
|
$175.000
|
$150.750
|
$161.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
18.000
|
$19.000
|
$34.000
|
$34.000
|
$38.000
|
$51.000
|
$34.270
|
$75.000
|
$50.250
|
$53.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
97,488.000
|
$0.260
|
$0.240
|
$0.240
|
$0.270
|
$0.300
|
$0.240
|
$0.400
|
$0.300
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
385.000
|
$0.600
|
$1.500
|
$1.500
|
$1.700
|
$0.510
|
$1.510
|
$0.750
|
$0.500
|
$0.540
|
|
|
WK ZN PAV MRK REMOV (W)4"(BKN W/MRKR)
|
LF
|
11,790.000
|
$1.250
|
$0.780
|
$0.780
|
$0.850
|
$0.510
|
$0.790
|
$0.750
|
$0.500
|
$0.540
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
21.000
|
$200.000
|
$250.000
|
$250.000
|
$270.000
|
$360.000
|
$251.970
|
$400.000
|
$351.750
|
$376.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
422.000
|
$1.200
|
$0.500
|
$0.500
|
$0.550
|
$1.500
|
$0.500
|
$2.000
|
$1.510
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,485.000
|
$0.840
|
$0.670
|
$0.670
|
$0.720
|
$0.760
|
$0.680
|
$1.000
|
$0.750
|
$0.810
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
264.000
|
$2.850
|
$2.770
|
$2.770
|
$3.000
|
$2.050
|
$2.790
|
$2.250
|
$2.010
|
$2.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,753.000
|
$6.000
|
$4.870
|
$4.870
|
$5.200
|
$7.600
|
$4.910
|
$8.250
|
$7.540
|
$8.060
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
52.000
|
$130.000
|
$111.000
|
$111.000
|
$120.000
|
$102.000
|
$111.870
|
$125.000
|
$100.500
|
$107.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
27.000
|
$190.000
|
$167.000
|
$167.000
|
$180.000
|
$127.000
|
$168.320
|
$150.000
|
$125.630
|
$134.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
3.000
|
$235.000
|
$211.000
|
$211.000
|
$220.000
|
$127.000
|
$212.660
|
$150.000
|
$125.630
|
$134.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
7.000
|
$290.000
|
$288.000
|
$288.000
|
$310.000
|
$178.000
|
$290.270
|
$200.000
|
$175.880
|
$188.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
54.000
|
$145.000
|
$137.000
|
$137.000
|
$145.000
|
$127.000
|
$138.080
|
$150.000
|
$125.630
|
$134.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
14.000
|
$810.000
|
$850.000
|
$850.000
|
$900.000
|
$510.000
|
$856.700
|
$550.000
|
$502.500
|
$537.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
14.000
|
$765.000
|
$850.000
|
$850.000
|
$900.000
|
$510.000
|
$856.700
|
$550.000
|
$502.500
|
$537.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
10.000
|
$34.000
|
$30.000
|
$30.000
|
$33.000
|
$51.000
|
$30.240
|
$55.000
|
$50.250
|
$53.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
7.000
|
$35.000
|
$40.000
|
$40.000
|
$45.000
|
$71.000
|
$40.320
|
$77.000
|
$70.350
|
$75.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
1.000
|
$120.000
|
$250.000
|
$250.000
|
$280.000
|
$127.000
|
$251.970
|
$150.000
|
$125.630
|
$134.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
1.000
|
$170.000
|
$350.000
|
$350.000
|
$380.000
|
$510.000
|
$352.760
|
$225.000
|
$201.000
|
$215.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
3,412.000
|
$1.000
|
$0.670
|
$0.670
|
$0.750
|
$1.000
|
$0.680
|
$1.250
|
$1.010
|
$1.080
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
769.000
|
$6.000
|
$5.000
|
$5.000
|
$5.500
|
$6.600
|
$5.040
|
$7.000
|
$6.530
|
$6.990
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$300.000
|
$344.000
|
$344.000
|
$370.000
|
$510.000
|
$346.710
|
$550.000
|
$502.500
|
$537.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
65,861.000
|
$0.130
|
$0.120
|
$0.120
|
$0.150
|
$0.150
|
$0.120
|
$0.200
|
$0.150
|
$0.160
|
|
|
PAVEMENT SEALER 6"
|
LF
|
114,022.000
|
$0.190
|
$0.170
|
$0.170
|
$0.190
|
$0.200
|
$0.170
|
$0.250
|
$0.200
|
$0.220
|
|
|
PAVEMENT SEALER 8"
|
LF
|
12,419.000
|
$0.500
|
$0.400
|
$0.400
|
$0.430
|
$0.250
|
$0.400
|
$0.300
|
$0.250
|
$0.270
|
|
|
PAVEMENT SEALER 12"
|
LF
|
264.000
|
$1.250
|
$2.770
|
$2.770
|
$3.000
|
$0.510
|
$2.790
|
$0.750
|
$0.500
|
$0.540
|
|
|
PAVEMENT SEALER 24"
|
LF
|
3,522.000
|
$2.200
|
$2.340
|
$2.340
|
$2.700
|
$1.500
|
$2.360
|
$2.000
|
$1.510
|
$1.610
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
52.000
|
$35.000
|
$63.000
|
$63.000
|
$70.000
|
$25.000
|
$63.500
|
$28.000
|
$25.130
|
$26.750
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
54.000
|
$42.000
|
$67.000
|
$67.000
|
$72.000
|
$25.000
|
$67.530
|
$28.000
|
$25.130
|
$26.750
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$120.000
|
$188.000
|
$188.000
|
$200.000
|
$102.000
|
$189.480
|
$115.000
|
$100.500
|
$107.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
27.000
|
$42.000
|
$89.000
|
$89.000
|
$96.000
|
$25.000
|
$89.700
|
$30.000
|
$25.130
|
$26.750
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
3.000
|
$90.000
|
$111.000
|
$111.000
|
$120.000
|
$25.000
|
$111.870
|
$30.000
|
$25.130
|
$26.750
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
7.000
|
$110.000
|
$137.000
|
$137.000
|
$145.000
|
$25.000
|
$138.080
|
$30.000
|
$25.130
|
$26.750
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
14.000
|
$300.000
|
$350.000
|
$350.000
|
$380.000
|
$127.000
|
$352.760
|
$150.000
|
$125.630
|
$134.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
14.000
|
$300.000
|
$350.000
|
$350.000
|
$380.000
|
$127.000
|
$352.760
|
$150.000
|
$125.630
|
$134.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
17.000
|
$15.000
|
$22.000
|
$22.000
|
$25.000
|
$10.000
|
$22.170
|
$12.000
|
$10.050
|
$10.750
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
1.000
|
$50.000
|
$78.000
|
$78.000
|
$85.000
|
$25.000
|
$78.610
|
$28.000
|
$25.130
|
$26.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
1.000
|
$88.000
|
$187.000
|
$187.000
|
$200.000
|
$25.000
|
$188.470
|
$28.000
|
$25.130
|
$26.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
7.000
|
$100.000
|
$111.000
|
$111.000
|
$120.000
|
$25.000
|
$111.870
|
$28.000
|
$25.130
|
$26.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
14,160.000
|
$0.380
|
$0.340
|
$0.340
|
$0.370
|
$0.410
|
$0.340
|
$0.500
|
$0.400
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
16,414.000
|
$0.350
|
$0.340
|
$0.340
|
$0.370
|
$0.360
|
$0.340
|
$0.500
|
$0.350
|
$0.380
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
14,410.000
|
$0.550
|
$0.480
|
$0.480
|
$0.550
|
$0.510
|
$0.480
|
$0.550
|
$0.500
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,861.000
|
$0.340
|
$0.340
|
$0.340
|
$0.370
|
$0.360
|
$0.340
|
$0.500
|
$0.350
|
$0.380
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
46,584.000
|
$0.800
|
$0.940
|
$0.940
|
$1.000
|
$0.760
|
$0.950
|
$0.850
|
$0.750
|
$0.810
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
52,188.000
|
$0.900
|
$0.940
|
$0.940
|
$1.000
|
$0.760
|
$0.950
|
$0.850
|
$0.750
|
$0.810
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
7.000
|
$230.000
|
$244.000
|
$244.000
|
$270.000
|
$250.000
|
$245.920
|
$275.000
|
$251.250
|
$268.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
196.000
|
$7.500
|
$8.000
|
$8.000
|
$9.000
|
$7.600
|
$8.060
|
$8.250
|
$7.540
|
$8.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
431.000
|
$3.200
|
$3.330
|
$3.330
|
$3.500
|
$4.050
|
$3.360
|
$4.500
|
$4.020
|
$4.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,772.000
|
$3.300
|
$3.130
|
$3.130
|
$3.500
|
$4.050
|
$3.150
|
$4.500
|
$4.020
|
$4.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
20,647.000
|
$0.400
|
$0.470
|
$0.470
|
$0.520
|
$0.510
|
$0.470
|
$0.750
|
$0.500
|
$0.540
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$60.000
|
$55.000
|
$55.000
|
$60.000
|
$102.000
|
$55.440
|
$125.000
|
$100.500
|
$107.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
24.000
|
$100.000
|
$100.000
|
$100.000
|
$110.000
|
$127.000
|
$100.790
|
$150.000
|
$125.630
|
$134.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
22.000
|
$24.000
|
$22.000
|
$22.000
|
$25.000
|
$51.000
|
$22.170
|
$55.000
|
$50.250
|
$53.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
85.000
|
$0.050
|
$0.250
|
$0.250
|
$0.300
|
$0.100
|
$0.250
|
$0.150
|
$0.100
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
244.000
|
$0.100
|
$0.500
|
$0.500
|
$0.550
|
$0.250
|
$0.500
|
$0.300
|
$0.250
|
$0.270
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
54.000
|
$1.100
|
$3.000
|
$3.000
|
$3.300
|
$0.410
|
$3.020
|
$0.500
|
$0.400
|
$0.430
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$20.000
|
$30.000
|
$30.000
|
$35.000
|
$25.000
|
$30.240
|
$28.000
|
$25.130
|
$26.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$25.000
|
$60.000
|
$60.000
|
$67.000
|
$25.000
|
$60.480
|
$28.000
|
$25.130
|
$26.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$23.000
|
$34.000
|
$34.000
|
$38.000
|
$25.000
|
$34.270
|
$28.000
|
$25.130
|
$26.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
34.000
|
$0.750
|
$5.000
|
$5.000
|
$5.500
|
$0.250
|
$5.040
|
$0.300
|
$0.250
|
$0.270
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$4,500.000
|
$3,500.000
|
$11,500.000
|
$6,400.000
|
$6,700.000
|
$6,600.000
|
$7,500.000
|
$6,600.000
|
$7,000.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
2.000
|
$12,000.000
|
$13,500.000
|
$11,500.000
|
$17,100.000
|
$10,800.000
|
$10,700.000
|
$11,000.000
|
$10,700.000
|
$11,500.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$46,715.000
|
$45,000.000
|
$55,000.000
|
$69,000.000
|
$107,000.000
|
$106,000.000
|
$110,000.000
|
$106,000.000
|
$114,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
24.000
|
$225.000
|
$225.000
|
$195.000
|
$234.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
11.000
|
$231.000
|
$225.000
|
$195.000
|
$239.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
24.000
|
$225.000
|
$225.000
|
$195.000
|
$294.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$230.000
|
$225.000
|
$195.000
|
$235.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
24.000
|
$225.000
|
$225.000
|
$195.000
|
$238.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$230.000
|
$225.000
|
$195.000
|
$237.000
|
$260.000
|
$260.000
|
$300.000
|
$260.000
|
$279.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
20.000
|
$550.000
|
$540.000
|
$620.000
|
$550.000
|
$690.000
|
$680.000
|
$750.000
|
$680.000
|
$730.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
3.000
|
$90.000
|
$113.000
|
$125.000
|
$110.000
|
$131.000
|
$130.000
|
$150.000
|
$130.000
|
$139.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
4.000
|
$125.000
|
$120.000
|
$135.000
|
$113.000
|
$141.000
|
$140.000
|
$155.000
|
$140.000
|
$150.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
21.000
|
$75.000
|
$110.000
|
$105.000
|
$94.000
|
$101.000
|
$100.000
|
$125.000
|
$100.000
|
$107.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
3,861.000
|
$1.750
|
$1.750
|
$1.500
|
$2.000
|
$1.700
|
$1.700
|
$2.000
|
$1.700
|
$1.830
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
3,387.000
|
$2.200
|
$2.350
|
$2.000
|
$2.500
|
$2.400
|
$2.400
|
$2.750
|
$2.400
|
$2.580
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
2,280.000
|
$1.200
|
$1.450
|
$1.300
|
$1.500
|
$1.400
|
$1.400
|
$1.500
|
$1.400
|
$1.510
|
|
|
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
|
LF
|
5,962.000
|
$1.540
|
$2.250
|
$1.850
|
$3.200
|
$2.100
|
$2.100
|
$2.250
|
$2.100
|
$2.260
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
3,333.000
|
$0.950
|
$1.500
|
$1.100
|
$1.600
|
$1.150
|
$1.150
|
$1.250
|
$1.150
|
$1.240
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
3,817.000
|
$1.300
|
$1.250
|
$1.250
|
$1.450
|
$1.250
|
$1.250
|
$1.500
|
$1.250
|
$1.340
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$9,600.000
|
$8,350.000
|
$12,000.000
|
$11,000.000
|
$9,900.000
|
$9,800.000
|
$10,000.000
|
$9,800.000
|
$10,550.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$10,500.000
|
$9,750.000
|
$12,600.000
|
$11,000.000
|
$10,400.000
|
$10,300.000
|
$11,000.000
|
$10,300.000
|
$11,075.000
|
|
|
IN TRF SG PL AM(S)2ARM(44-36')LUM&ILSN
|
EA
|
2.000
|
$12,000.000
|
$15,000.000
|
$17,500.000
|
$15,000.000
|
$12,800.000
|
$12,700.000
|
$13,000.000
|
$12,700.000
|
$13,655.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
13.000
|
$1,850.000
|
$1,850.000
|
$905.000
|
$2,135.000
|
$970.000
|
$960.000
|
$1,000.000
|
$960.000
|
$1,032.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$786.000
|
$775.000
|
$915.000
|
$815.000
|
$850.000
|
$840.000
|
$900.000
|
$840.000
|
$900.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$3,000.000
|
$2,700.000
|
$3,500.000
|
$2,930.000
|
$3,400.000
|
$3,400.000
|
$3,700.000
|
$3,400.000
|
$3,660.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,900.000
|
$2,446.480
|
$2,800.000
|
$4,200.000
|
$1,350.000
|
$2,250.000
|
$5,500.000
|
$3,491.250
|
$3,978.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$2,250.000
|
$656.320
|
$1,400.000
|
$2,000.000
|
$1,050.000
|
$1,490.000
|
$3,500.000
|
$2,203.360
|
$1,935.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
3.000
|
$1,200.000
|
$344.950
|
$475.000
|
$800.000
|
$600.000
|
$550.000
|
$4,000.000
|
$525.000
|
$645.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
57.000
|
$30.000
|
$48.900
|
$33.810
|
$28.000
|
$83.000
|
$43.000
|
$65.000
|
$51.280
|
$42.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
39,107.000
|
$65.000
|
$58.000
|
$69.000
|
$60.500
|
$57.000
|
$57.000
|
$62.000
|
$90.170
|
$72.000
|
|
|
TACK COAT
|
GAL
|
2,479.000
|
$3.000
|
$3.000
|
$3.000
|
$2.900
|
$2.550
|
$3.000
|
$2.750
|
$3.380
|
$3.150
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
24,383.000
|
$84.000
|
$65.000
|
$76.000
|
$75.000
|
$72.000
|
$72.050
|
$76.000
|
$85.970
|
$81.000
|
|
|
BONDING COURSE
|
GAL
|
26,927.000
|
$3.500
|
$3.250
|
$3.000
|
$3.200
|
$3.050
|
$1.100
|
$3.250
|
$3.380
|
$3.150
|
|
|
UNDERSEAL COURSE
|
GAL
|
42,407.000
|
$3.500
|
$3.250
|
$3.500
|
$3.900
|
$1.000
|
$1.100
|
$1.050
|
$3.380
|
$3.150
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$220.000
|
$396.460
|
$300.000
|
$330.000
|
$540.000
|
$473.000
|
$1,100.000
|
$262.290
|
$370.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
113,106.000
|
$1.400
|
$1.040
|
$1.000
|
$1.200
|
$1.050
|
$2.000
|
$1.500
|
$1.600
|
$1.260
|
|
|
REMOVE CONDUCTOR
|
LF
|
6,721.000
|
$1.700
|
$0.550
|
$0.800
|
$1.900
|
$0.560
|
$0.550
|
$0.750
|
$0.550
|
$0.590
|
|
|
REPLACE LUMINAIRE ARMS
|
EA
|
18.000
|
$800.000
|
$1,300.000
|
$2,335.000
|
$1,135.000
|
$1,310.000
|
$1,300.000
|
$1,500.000
|
$1,300.000
|
$1,400.000
|
|
|
MAINTAIN ROADWAY ILLUMINATION
|
EA
|
56.000
|
$450.000
|
$1,000.000
|
$1,000.000
|
$1,120.000
|
$360.000
|
$360.000
|
$400.000
|
$360.000
|
$387.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
8.000
|
$300.000
|
$125.000
|
$200.000
|
$500.000
|
$131.000
|
$130.000
|
$150.000
|
$130.000
|
$140.000
|
|
|
ILSN (LED) (6 D)
|
EA
|
4.000
|
$4,000.000
|
$3,000.000
|
$3,625.000
|
$3,000.000
|
$2,700.000
|
$2,700.000
|
$3,000.000
|
$2,700.000
|
$2,903.000
|
|
|
ILSN (LED) (8 D)
|
EA
|
2.000
|
$3,300.000
|
$3,100.000
|
$4,225.000
|
$3,300.000
|
$2,900.000
|
$2,900.000
|
$3,100.000
|
$2,900.000
|
$3,120.000
|
|
|
TMA (STATIONARY)
|
DAY
|
255.000
|
$160.000
|
$235.200
|
$215.000
|
$195.000
|
$430.000
|
$370.000
|
$375.000
|
$301.880
|
$134.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
409.000
|
$200.000
|
$300.790
|
$300.000
|
$385.000
|
$550.000
|
$370.000
|
$375.000
|
$452.820
|
$134.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
3.000
|
$6,200.000
|
$7,500.000
|
$9,950.000
|
$7,707.000
|
$11,800.000
|
$11,700.000
|
$12,000.000
|
$11,700.000
|
$12,600.000
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
6.000
|
$7,500.000
|
$8,000.000
|
$9,465.000
|
$8,200.000
|
$10,900.000
|
$10,800.000
|
$11,000.000
|
$10,800.000
|
$11,600.000
|
|
|
RELOCATE RVDS
|
EA
|
1.000
|
$1,000.000
|
$450.000
|
$945.000
|
$642.000
|
$790.000
|
$780.000
|
$850.000
|
$780.000
|
$838.000
|
|
|
SAN SWR STRUCTURES (RECONSTRUCT EX MH)
|
EA
|
2.000
|
$8,000.000
|
$8,820.000
|
$7,369.000
|
$4,000.000
|
$8,500.000
|
$9,000.000
|
$16,000.000
|
$10,000.000
|
$5,988.000
|
|
|
EXISTING MANHOLE ADJUSTMENTS
|
EA
|
1.000
|
$1,500.000
|
$2,420.000
|
$4,012.000
|
$3,260.000
|
$4,600.000
|
$4,500.000
|
$5,500.000
|
$4,000.000
|
$3,060.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
80.000
|
$2.000
|
$15.500
|
$1.000
|
$3.600
|
$1.150
|
$1.000
|
$27.000
|
$5.000
|
$15.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
0.100
|
$5,000.000
|
$13,730.000
|
$2,183.000
|
$5,700.000
|
$2,500.000
|
$2,500.000
|
$11,000.000
|
$5,000.000
|
$14,000.000
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
24.900
|
$170.000
|
$152.000
|
$453.000
|
$205.000
|
$520.000
|
$150.000
|
$450.000
|
$150.000
|
$130.000
|
|
|
CONCRETE SADDLE
|
CY
|
13.300
|
$160.000
|
$651.000
|
$1,109.000
|
$450.000
|
$1,280.000
|
$300.000
|
$825.000
|
$600.000
|
$450.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
1.000
|
$4,500.000
|
$8,930.000
|
$13,552.000
|
$5,200.000
|
$15,600.000
|
$5,500.000
|
$2,200.000
|
$8,000.000
|
$7,985.000
|
|
|
TAPPED FIRE HYDRANT
|
EA
|
1.000
|
$17,000.000
|
$20,980.000
|
$18,933.000
|
$8,000.000
|
$22,000.000
|
$8,100.000
|
$3,300.000
|
$15,000.000
|
$23,000.000
|
|
Totals: |
$23,897,566.880
|
$22,297,585.780
|
$23,585,187.380
|
$24,432,946.210
|
$24,880,649.580
|
$25,395,702.900
|
$26,064,938.750
|
$26,661,530.690
|
$27,107,213.670
|