Show Job Controls
Bid Cobra

BEXAR IH 10 (0072-12-202)

Items: 45

County: BEXAR
Length: 0.1550 MILES
Highway: IH 10
District: SAN ANTONIO
Control Number: 0072-12-202
DBE Goal: 0.0%
Project: STP 2026(943)HES
Guaranty: $5,000.00
Time: 26 WORKING DAYS
Engineer's Estimate: $247,586.98
Date: 07/02/2026 1:00 PM CDT (16 days ago) Changed
Contract Number: 7263244
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206799
Contract Type: FEDERAL WAIVED
Project Description: IMPROVE TRAFFIC SIGNALS AND ADD LEFT TURN LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERT STEIGLEDER
MICHAEL DONOVAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$247,586.98
Over/Under Est: 33.22% $82,247.02
Over/Under Est: 70.8% $175,281.02
Amt Left: 28.21% $93,034.00

Bid Items & Bid Tabulations

45 Total 0 of 45
BEXAR  |  IH 10  |  SAN ANTONIO  |  0072-12-202  |  07/02/2026 1:00 PM CDT  |  $247,586.98  |  STP 2026(943)HES  |  HAZARD ELIM & SAFETY  |  26 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
E-Z BEL CONSTRUCTION, LLC
REMOV CONC (MEDIANS)
SY 454.000 $22.000 $49.000 $45.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 534.000 $30.000 $25.000 $45.000
PROOF ROLLING
HR 20.000 $160.000 $364.000 $225.000
TACK COAT
GAL 145.000 $1.500 $10.000 $25.000
D-GR HMA TY-B PG64-22
TON 379.000 $89.000 $133.000 $130.000
SP MIXES SP-C SAC-B PG76-22
TON 59.000 $90.000 $249.000 $185.000
MOBILIZATION
LS 1.000 $21,589.730 $26,400.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $7,500.000 $5,100.000 $12,000.000
TMA (STATIONARY)
DAY 30.000 $200.000 $70.000 $400.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 680.000 $50.000 $83.000 $105.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 680.000 $10.000 $15.000 $23.000
CONC MEDIAN
SY 97.000 $100.000 $153.000 $165.000
CONDT (PVC) (SCH 80) (2")
LF 200.000 $10.000 $22.000 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 300.000 $27.000 $28.000 $27.000
CONDUIT (PREPARE)
LF 1,085.000 $2.500 $1.000 $2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $680.000 $2,223.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $650.000 $581.000 $1,500.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 280.000 $1.100 $10.000 $8.250
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 90.000 $2.000 $10.000 $8.250
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 160.000 $1.000 $1.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 515.000 $1.000 $1.600 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 150.000 $7.000 $9.800 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $150.000 $245.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $170.000 $245.000 $200.000
PAVEMENT SLER 6"
LF 955.000 $0.210 $0.400 $0.300
PAVEMENT SLER 8"
LF 515.000 $0.350 $0.600 $0.400
PAVEMENT SLER 24"
LF 150.000 $2.700 $2.500 $2.000
PAVEMENT SLER (ARROW)
EA 4.000 $60.000 $123.000 $100.000
PAVEMENT SLER (WORD)
EA 4.000 $67.000 $123.000 $100.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 795.000 $0.550 $1.000 $0.750
REFL PAV MRKR TY I-C
EA 52.000 $4.000 $6.500 $5.000
REFL PAV MRKR TY II-C-R
EA 18.000 $4.000 $6.500 $5.000
ELIM EXT PM & MRKS (4")
LF 170.000 $0.250 $11.000 $8.250
PAV SURF PREP FOR MRK (6")
LF 955.000 $0.050 $0.200 $0.050
PAV SURF PREP FOR MRK (8")
LF 515.000 $0.130 $0.200 $0.100
PAV SURF PREP FOR MRK (24")
LF 150.000 $0.800 $1.300 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $17.000 $31.000 $25.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $18.000 $31.000 $25.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $5,000.000 $2,932.000 $4,500.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 6.000 $200.000 $184.000 $700.000
UNDERSEAL COURSE
GAL 54.000 $3.000 $14.000 $25.000
BONDING COURSE
GAL 160.000 $3.500 $9.000 $25.000
RVDS (PRESENCE DETECTION ONLY)
EA 6.000 $8,400.000 $8,929.000 $13,000.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 1,905.000 $3.000 $2.000 $3.000
GROUND BOX (PREPARE)
EA 9.000 $250.000 $400.000 $400.000
Totals: $247,586.980 $329,834.000 $422,868.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $4,500.00