BEXAR SS 371 (0024-09-028)

Items: 29

County: BEXAR
Length: 1.7810 MILES
Highway: SS 371
District: SAN ANTONIO
Control Number: 0024-09-028
DBE Goal: 0.0%
Project: F 2026(183)
Guaranty: $74,000.00
Time: 163 WORKING DAYS
Engineer's Estimate: $1,826,588.00
Date: 12/02/2025 (6 months ago)
Contract Number: 12253027
Type: INFRASTRUCTURE IMPROVEMENTS
Project ID: A00207949
Contract Type: Federal
Project Description: UPGRADE EXISTING ILLUMINATION TO LED
Mail/Deliver Bids To: N/A
CHRISTEN LONGORIA
ELVIA VALDEZ
MICHAEL DONOVAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$1,826,588.00
$1,759,160.95
Over/Under Est: -3.69% -$67,427.05
$1,907,478.86
Over/Under Est: 4.43% $80,890.86
Amt Left: 8.43% $148,317.91
Over/Under Est: 13.94% $254,669.48
Amt Left: 18.31% $322,096.53
Delta: -9.11% -$173,778.62
Over/Under Est: 20.27% $370,212.00
Amt Left: 24.88% $437,639.05
Delta: -5.55% -$115,542.52
Over/Under Est: 24.13% $440,831.00
Amt Left: 28.89% $508,258.05
Delta: -3.21% -$70,619.00
Over/Under Est: 31.32% $572,083.00
Amt Left: 36.35% $639,510.05
Delta: -5.79% -$131,252.00
Over/Under Est: 36.64% $669,192.35
Amt Left: 41.87% $736,619.40
Delta: -4.05% -$97,109.35

Bid Items & Bid Tabulations

29 Total 0 of 29
BEXAR  |  SS 371  |  SAN ANTONIO  |  0024-09-028  |  12/02/2025  |  $1,826,588.00  |  F 2026(183)  |  INFRASTRUCT IMPRVS  |  163 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
THE LEVY COMPANY, LLC
E-Z BEL CONSTRUCTION, LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
ELECNOR BELCO ELECTRIC, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
F & W ELECTRICAL CONTRACTORS, INC.
DRILL SHAFT (HIGH MAST POLE) (48 IN)
LF 22.000 $600.000 $500.000 $460.440 $480.000 $1,015.000 $505.000 $892.580 $480.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 988.000 $300.000 $225.000 $244.060 $280.000 $465.000 $333.000 $286.180 $261.000
RIPRAP (CONC)(CL B)
CY 43.050 $550.000 $650.000 $864.910 $970.000 $1,035.000 $300.000 $1,035.970 $925.000
MOBILIZATION
LS 1.000 $200,000.000 $95,000.000 $190,747.880 $200,000.000 $217,000.000 $122,000.000 $237,973.420 $146,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $3,000.000 $6,398.400 $7,800.000 $10,785.000 $4,000.000 $10,933.060 $15,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $4,500.000 $4,364.450 $4,000.000 $157.000 $2,500.000 $13,333.000 $12,056.000
TMA (STATIONARY)
DAY 213.000 $150.000 $150.000 $54.910 $300.000 $157.000 $168.000 $257.570 $1,131.000
TMA (MOBILE OPERATION)
DAY 10.000 $200.000 $150.000 $54.910 $580.000 $157.000 $335.000 $380.680 $1,108.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 60.000 $6.500 $1.000 $5.040 $5.550 $172.000 $6.000 $13.330 $28.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $1.000 $1.000 $1.880 $1.250 $18.000 $3.000 $1.330 $22.000
REMOVE RD IL ASM (TRANS-BASE)
EA 156.000 $350.000 $650.000 $863.830 $750.000 $725.000 $910.000 $671.600 $585.000
REPLACE LUMINAIRE W/(250W EQ) LED
EA 5.000 $625.000 $550.000 $603.260 $540.000 $500.000 $625.000 $682.760 $658.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $1,200.000 $800.000 $2,158.600 $2,300.000 $1,290.000 $2,374.000 $1,699.140 $1,050.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 121.000 $3,000.000 $4,500.000 $3,723.460 $4,750.000 $4,465.000 $5,572.000 $4,907.840 $4,840.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 2.000 $4,650.000 $4,800.000 $4,315.290 $5,000.000 $4,743.000 $5,913.000 $5,851.410 $5,200.000
HI MST IL POLE (100 FT)( 80 MPH)
EA 1.000 $37,000.000 $40,000.000 $33,892.060 $80,000.000 $31,861.500 $35,062.640 $44,385.210 $84,650.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 1.000 $36,000.000 $42,000.000 $49,777.290 $13,000.000 $42,900.000 $50,915.000 $44,903.010 $9,050.000
CONDT (PVC) (SCH 40) (2")
LF 24,509.000 $14.000 $9.500 $12.170 $9.000 $10.500 $13.520 $11.560 $17.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,734.000 $20.000 $11.000 $26.710 $27.200 $15.800 $19.850 $33.130 $33.800
CONDT (RM) (1")
LF 764.000 $25.000 $18.000 $29.490 $26.000 $19.400 $37.920 $20.990 $44.200
CONDUIT (PREPARE)
LF 744.000 $2.500 $2.000 $1.370 $1.120 $3.750 $10.280 $2.880 $6.800
ELEC CONDR (NO.8) BARE
LF 28,007.000 $1.500 $1.850 $1.480 $1.700 $1.350 $2.540 $2.290 $1.700
ELEC CONDR (NO.8) INSULATED
LF 63,148.000 $1.750 $2.000 $1.580 $2.000 $1.750 $2.600 $2.480 $1.500
GROUND BOX TY A (122311)
EA 36.000 $950.000 $1,200.000 $1,240.840 $850.000 $545.000 $1,435.000 $1,686.920 $980.000
GROUND BOX TY A (122311)W/APRON
EA 21.000 $1,500.000 $1,500.000 $1,540.410 $850.000 $1,300.000 $1,368.000 $1,927.010 $1,340.000
REMOVE GROUND BOX
EA 20.000 $320.000 $500.000 $95.630 $520.000 $277.000 $398.000 $660.730 $240.000
REMOVE ELECTRICAL SERVICES
EA 3.000 $450.000 $500.000 $323.220 $480.000 $290.000 $1,130.000 $746.420 $730.000
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
EA 4.000 $7,000.000 $8,500.000 $8,050.580 $9,000.000 $7,865.000 $6,464.000 $11,989.150 $9,320.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 30.000 $25.000 $100.000 $34.240 $10.000 $155.000 $190.000 $255.110 $34.000
Totals: $1,826,588.000 $1,759,160.950 $1,907,478.856 $2,081,257.480 $2,196,800.000 $2,267,419.000 $2,398,670.998 $2,495,780.350