PREPARING ROW
|
STA
|
28.000
|
$3,000.000
|
$1,000.000
|
$15,000.000
|
$1,330.000
|
$16,951.000
|
$28,000.000
|
$4,940.000
|
|
|
REMOVING TRT BASE AND ASPH PAV(13"-17")
|
SY
|
279.000
|
$15.000
|
$25.000
|
$50.000
|
$23.000
|
$51.000
|
$32.000
|
$23.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,667.000
|
$16.000
|
$15.000
|
$15.000
|
$10.600
|
$15.000
|
$11.000
|
$11.500
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
2,616.000
|
$16.000
|
$55.000
|
$35.000
|
$48.010
|
$62.000
|
$26.000
|
$35.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
111,033.000
|
$15.000
|
$13.000
|
$13.000
|
$17.550
|
$18.000
|
$17.500
|
$23.960
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
24,479.000
|
$4.500
|
$2.000
|
$3.000
|
$3.250
|
$3.000
|
$2.000
|
$2.300
|
|
|
STRAW OR HAY MULCHING
|
SY
|
24,479.000
|
$2.500
|
$0.380
|
$0.350
|
$0.750
|
$0.470
|
$0.380
|
$0.400
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
24,479.000
|
$0.250
|
$0.150
|
$0.300
|
$0.250
|
$0.150
|
$0.220
|
$0.230
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
24,479.000
|
$0.300
|
$0.180
|
$0.350
|
$0.300
|
$0.180
|
$0.320
|
$0.340
|
|
|
VEGETATIVE WATERING
|
MG
|
767.000
|
$75.000
|
$32.000
|
$35.000
|
$50.200
|
$33.000
|
$20.000
|
$44.200
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
1,756.000
|
$60.000
|
$70.000
|
$78.000
|
$83.800
|
$101.000
|
$49.000
|
$73.600
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
107.000
|
$350.000
|
$320.000
|
$35.000
|
$340.000
|
$351.000
|
$303.000
|
$399.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
2,457.000
|
$5.000
|
$15.000
|
$5.000
|
$21.250
|
$18.000
|
$8.000
|
$8.100
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,526.000
|
$4.150
|
$6.000
|
$4.670
|
$4.500
|
$5.000
|
$4.000
|
$5.900
|
|
|
CEM STABIL BKFL
|
CY
|
301.000
|
$160.000
|
$150.000
|
$145.000
|
$213.000
|
$156.000
|
$163.000
|
$186.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
240.000
|
$160.000
|
$150.000
|
$80.000
|
$137.000
|
$101.000
|
$83.000
|
$138.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
720.000
|
$370.000
|
$250.000
|
$250.000
|
$255.000
|
$205.000
|
$239.000
|
$265.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
540.000
|
$500.000
|
$350.000
|
$450.000
|
$369.000
|
$303.000
|
$489.000
|
$381.000
|
|
|
CL C CONC (ABUT)
|
CY
|
75.400
|
$1,600.000
|
$1,000.000
|
$966.000
|
$1,140.000
|
$1,840.000
|
$1,502.000
|
$1,020.000
|
|
|
CL C CONC (CAP)
|
CY
|
153.600
|
$1,700.000
|
$1,000.000
|
$799.400
|
$1,240.000
|
$1,300.000
|
$1,596.000
|
$1,580.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
142.200
|
$1,550.000
|
$1,200.000
|
$1,052.800
|
$1,390.000
|
$1,700.000
|
$1,886.000
|
$1,980.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
54.000
|
$530.000
|
$750.000
|
$854.000
|
$750.000
|
$680.000
|
$667.000
|
$745.000
|
|
|
REINF CONC SLAB
|
SF
|
22,000.000
|
$22.500
|
$22.000
|
$24.570
|
$23.600
|
$28.000
|
$27.000
|
$27.500
|
|
|
APPROACH SLAB
|
CY
|
87.000
|
$700.000
|
$500.000
|
$834.400
|
$1,070.000
|
$620.000
|
$844.000
|
$935.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,388.260
|
$250.000
|
$220.000
|
$225.000
|
$185.000
|
$230.000
|
$207.000
|
$242.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
325.000
|
$600.000
|
$400.000
|
$415.000
|
$650.000
|
$580.000
|
$560.000
|
$726.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
479.000
|
$600.000
|
$400.000
|
$415.000
|
$540.000
|
$565.000
|
$534.000
|
$752.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
394.000
|
$500.000
|
$400.000
|
$415.000
|
$710.000
|
$577.000
|
$613.000
|
$765.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
2.000
|
$225.000
|
$350.000
|
$1,500.000
|
$1,340.000
|
$360.000
|
$800.000
|
$1,060.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
8.000
|
$480.000
|
$500.000
|
$1,200.000
|
$940.000
|
$533.000
|
$565.000
|
$1,090.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
420.000
|
$23.000
|
$55.000
|
$30.000
|
$19.400
|
$20.000
|
$18.000
|
$19.400
|
|
|
RAIL (TY T411)(MOD)
|
LF
|
436.000
|
$250.000
|
$200.000
|
$150.000
|
$234.000
|
$208.000
|
$267.000
|
$178.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
38.000
|
$65.000
|
$195.000
|
$215.000
|
$360.000
|
$128.000
|
$299.000
|
$248.000
|
|
|
RAIL (TY C411) (MOD)
|
LF
|
780.000
|
$250.000
|
$200.000
|
$140.000
|
$215.000
|
$218.000
|
$290.000
|
$175.000
|
|
|
RAIL (TY C402) (MOD-1)
|
LF
|
440.000
|
$250.000
|
$260.000
|
$140.000
|
$260.000
|
$175.000
|
$182.000
|
$225.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
162.000
|
$290.000
|
$200.000
|
$190.000
|
$260.000
|
$220.000
|
$204.000
|
$227.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
124.000
|
$200.000
|
$150.000
|
$80.000
|
$111.000
|
$176.000
|
$94.000
|
$149.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,600.000
|
$5,000.000
|
$1,500.000
|
$2,840.000
|
$2,295.000
|
$2,559.000
|
$3,550.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,700.000
|
$5,000.000
|
$1,500.000
|
$2,900.000
|
$2,450.000
|
$2,701.000
|
$3,580.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$8,000.000
|
$6,500.000
|
$2,000.000
|
$1,430.000
|
$2,470.000
|
$3,372.000
|
$3,790.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$740,200.000
|
$374,000.000
|
$800,000.000
|
$695,000.000
|
$880,000.000
|
$800,561.550
|
$815,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$10,000.000
|
$10,000.000
|
$6,500.000
|
$6,600.000
|
$6,490.000
|
$10,000.000
|
$6,580.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
120.000
|
$36.000
|
$30.000
|
$40.260
|
$25.750
|
$22.140
|
$35.000
|
$36.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$13.000
|
$15.000
|
$19.800
|
$15.600
|
$13.440
|
$9.000
|
$9.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$27.000
|
$16.000
|
$51.960
|
$17.900
|
$15.390
|
$19.000
|
$20.300
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$9.000
|
$8.000
|
$19.800
|
$7.450
|
$6.410
|
$5.000
|
$5.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,917.000
|
$4.100
|
$3.000
|
$4.400
|
$2.400
|
$5.000
|
$4.000
|
$3.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,917.000
|
$1.000
|
$2.000
|
$0.830
|
$1.550
|
$1.340
|
$0.250
|
$0.260
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
24.000
|
$9.000
|
$10.000
|
$4.400
|
$10.100
|
$8.710
|
$8.000
|
$8.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
24.000
|
$3.500
|
$5.000
|
$0.820
|
$2.050
|
$1.750
|
$2.000
|
$2.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,946.000
|
$65.000
|
$85.000
|
$79.200
|
$93.400
|
$100.000
|
$80.000
|
$82.600
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,450.000
|
$55.000
|
$30.000
|
$56.000
|
$86.000
|
$65.000
|
$34.000
|
$83.300
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,480.000
|
$12.000
|
$12.000
|
$10.000
|
$11.650
|
$5.000
|
$10.000
|
$14.200
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,800.000
|
$18.000
|
$12.000
|
$15.000
|
$22.250
|
$11.000
|
$12.000
|
$19.700
|
|
|
CONC CURB (TY I)
|
LF
|
1,001.000
|
$15.000
|
$20.000
|
$25.000
|
$30.100
|
$10.000
|
$10.000
|
$38.900
|
|
|
CONC SIDEWALKS (6")
|
SY
|
443.000
|
$77.000
|
$55.000
|
$65.000
|
$73.800
|
$65.000
|
$85.000
|
$95.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$30.000
|
$35.000
|
$43.520
|
$43.150
|
$28.840
|
$30.000
|
$30.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,600.000
|
$2,200.000
|
$3,528.520
|
$2,930.000
|
$2,092.720
|
$2,211.000
|
$2,560.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
1.000
|
$3,300.000
|
$5,500.000
|
$1,500.000
|
$3,610.000
|
$5,558.450
|
$1,500.000
|
$5,290.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,400.000
|
$4,000.000
|
$4,121.470
|
$3,370.000
|
$2,931.540
|
$3,097.000
|
$3,100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$750.000
|
$400.000
|
$800.000
|
$790.000
|
$366.460
|
$387.000
|
$388.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
7.000
|
$8,200.000
|
$8,200.000
|
$8,000.000
|
$8,800.000
|
$7,718.330
|
$8,153.000
|
$8,170.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$750.000
|
$695.000
|
$779.200
|
$750.000
|
$695.000
|
$695.000
|
$736.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$845.000
|
$1,190.290
|
$910.000
|
$845.000
|
$845.000
|
$894.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,200.000
|
$1,175.000
|
$1,033.410
|
$1,270.000
|
$1,175.000
|
$1,175.000
|
$1,240.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,500.000
|
$2,580.000
|
$5,364.130
|
$2,790.000
|
$2,580.000
|
$2,580.000
|
$2,730.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$120.000
|
$95.000
|
$104.500
|
$103.000
|
$95.000
|
$95.000
|
$101.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
1.000
|
$400.000
|
$360.000
|
$3,170.500
|
$390.000
|
$360.000
|
$360.000
|
$381.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
7.000
|
$30.000
|
$22.000
|
$13.200
|
$28.400
|
$22.000
|
$22.000
|
$23.300
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
7.000
|
$30.000
|
$22.000
|
$13.200
|
$28.400
|
$22.000
|
$22.000
|
$23.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
2.000
|
$35.000
|
$28.000
|
$39.600
|
$44.350
|
$28.000
|
$28.000
|
$29.600
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
2.000
|
$30.000
|
$28.000
|
$39.600
|
$44.350
|
$28.000
|
$28.000
|
$29.600
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$120.000
|
$118.000
|
$61.360
|
$110.000
|
$118.000
|
$118.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
789.000
|
$1.800
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$0.950
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
3,446.000
|
$1.000
|
$0.700
|
$0.770
|
$0.750
|
$0.700
|
$0.950
|
$0.740
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
342.000
|
$1.500
|
$1.500
|
$1.650
|
$1.600
|
$1.500
|
$3.000
|
$1.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
36.000
|
$11.000
|
$9.400
|
$10.340
|
$10.150
|
$9.400
|
$8.000
|
$10.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$450.000
|
$245.000
|
$269.500
|
$260.000
|
$245.000
|
$350.000
|
$259.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,212.000
|
$0.600
|
$0.360
|
$0.390
|
$0.400
|
$0.360
|
$0.450
|
$0.380
|
|
|
PAVEMENT SEALER 8"
|
LF
|
50.000
|
$1.000
|
$0.700
|
$0.770
|
$0.750
|
$0.700
|
$1.000
|
$0.740
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
30.000
|
$0.600
|
$0.950
|
$1.040
|
$1.050
|
$0.950
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
775.000
|
$0.700
|
$1.100
|
$1.210
|
$1.200
|
$1.100
|
$0.900
|
$1.150
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,798.000
|
$0.700
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
$1.050
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,228.000
|
$1.400
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
$1.050
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
62.000
|
$5.000
|
$5.000
|
$5.500
|
$5.400
|
$5.000
|
$7.000
|
$5.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,213.000
|
$0.850
|
$0.650
|
$0.710
|
$0.700
|
$0.650
|
$0.750
|
$0.690
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,212.000
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.100
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
50.000
|
$0.600
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.150
|
$0.020
|
|
|
STRIP MOWING
|
CYC
|
7.000
|
$2,300.000
|
$2,400.000
|
$1,500.000
|
$1,220.000
|
$3,600.000
|
$2,345.000
|
$2,530.000
|
|
|
LITTER REMOVAL
|
CYC
|
19.000
|
$1,900.000
|
$500.000
|
$3,500.000
|
$550.000
|
$877.000
|
$1,426.000
|
$2,390.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
38.000
|
$1,400.000
|
$1,000.000
|
$2,000.000
|
$270.000
|
$877.000
|
$1,426.000
|
$3,770.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
19.000
|
$700.000
|
$1,000.000
|
$2,000.000
|
$550.000
|
$877.000
|
$1,426.000
|
$3,770.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
19.000
|
$1,400.000
|
$1,200.000
|
$300.000
|
$480.000
|
$528.000
|
$1,245.000
|
$3,180.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
19.000
|
$1,400.000
|
$1,200.000
|
$1,500.000
|
$480.000
|
$528.000
|
$1,245.000
|
$3,180.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
1,329.000
|
$6.000
|
$5.000
|
$5.500
|
$3.550
|
$3.750
|
$5.000
|
$5.300
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
1.000
|
$350.000
|
$1,000.000
|
$483.630
|
$1,470.000
|
$873.600
|
$1,500.000
|
$476.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,968.000
|
$93.000
|
$115.000
|
$104.500
|
$101.000
|
$84.000
|
$95.000
|
$101.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
1,727.000
|
$100.000
|
$130.000
|
$129.800
|
$125.000
|
$104.000
|
$118.000
|
$125.000
|
|
|
TACK COAT
|
GAL
|
862.000
|
$3.800
|
$6.000
|
$4.120
|
$3.950
|
$4.500
|
$4.000
|
$3.950
|
|
|
UNDERSEAL COURSE
|
GAL
|
1,477.000
|
$4.250
|
$6.000
|
$4.400
|
$4.250
|
$5.500
|
$4.000
|
$4.250
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$500.000
|
$500.000
|
$540.000
|
$500.000
|
$500.000
|
$237.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
570.000
|
$70.000
|
$50.000
|
$200.000
|
$19.950
|
$40.000
|
$53.000
|
$68.500
|
|
|
TMA (STATIONARY)
|
DAY
|
84.000
|
$200.000
|
$400.000
|
$250.000
|
$330.000
|
$149.000
|
$534.000
|
$198.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$300.000
|
$1,000.000
|
$250.000
|
$850.000
|
$592.000
|
$450.000
|
$385.000
|
|
|
TEMP CON EQUIP ALERT SYS
|
EA
|
1.000
|
$27,000.000
|
$24,000.000
|
$30,000.000
|
$29,100.000
|
$22,000.000
|
$23,750.000
|
$40,000.000
|
|
Totals: |
$8,187,290.850
|
$6,869,481.900
|
$7,731,174.280
|
$8,214,804.000
|
$8,829,707.980
|
$8,969,000.000
|
$9,776,188.110
|