Bid Cobra

BEXAR US 90 (0024-07-063)

Items: 103

County: BEXAR
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-07-063
DBE Goal: N/A
Project: F 2021(778)
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $2,508,772.56
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (11)
E
Engineer's Estimate
$2,508,772.56
$2,885,970.95
Over/Under Est: 15.04% $377,198.39
Over/Under Est: 15.88% $398,307.66
Amt Left: 0.73% $21,109.27
Over/Under Est: 21.78% $546,314.09
Amt Left: 5.86% $169,115.70
Delta: -5.09% -$148,006.43
$3,077,905.71
Over/Under Est: 22.69% $569,133.15
Amt Left: 6.65% $191,934.76
Delta: -0.75% -$22,819.06
Over/Under Est: 27.43% $688,207.38
Amt Left: 10.78% $311,008.99
Delta: -3.87% -$119,074.23
$3,232,754.63
Over/Under Est: 28.86% $723,982.07
Amt Left: 12.02% $346,783.68
Delta: -1.12% -$35,774.69
$3,269,110.65
Over/Under Est: 30.31% $760,338.09
Amt Left: 13.28% $383,139.70
Delta: -1.12% -$36,356.02
Over/Under Est: 31.59% $792,596.79
Amt Left: 14.39% $415,398.40
Delta: -0.99% -$32,258.70
Over/Under Est: 37.4% $938,158.54
Amt Left: 19.44% $560,960.15
Delta: -4.41% -$145,561.75
Over/Under Est: 44.15% $1,107,654.23
Amt Left: 25.31% $730,455.84
Delta: -4.92% -$169,495.69
Over/Under Est: 47.31% $1,186,861.28
Amt Left: 28.06% $809,662.89
Delta: -2.19% -$79,207.05

Bid Items & Bid Tabulations

103 Total 0 of 103
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-07-063  |  08/05/2021  |  $2,508,772.56  |  F 2021(778)  |  INTERS IMPRV  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
CAPITAL EXCAVATION COMPANY
HARPER BROTHERS CONSTRUCTION LLC
RELMCO, INC.
HILL COUNTRY BRIDGE, INC.
J.D. ABRAMS, L.P.
J3 COMPANY, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
JORDAN FOSTER CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (RIPRAP)
SY 213.000 $7.500 $12.000 $11.350 $18.000 $15.000 $21.150 $35.000 $20.000 $15.000 $13.000 $22.920 $50.000
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 1,021.000 $7.000 $8.500 $9.600 $14.000 $5.000 $19.100 $15.000 $10.000 $16.000 $12.000 $18.910 $19.000
EXCAVATION (ROADWAY)
CY 7,749.000 $11.000 $15.000 $7.500 $9.000 $12.000 $12.710 $5.500 $12.000 $15.000 $17.000 $14.430 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 8,121.000 $15.000 $18.000 $25.000 $30.000 $32.000 $34.020 $14.000 $15.000 $23.000 $30.000 $8.940 $14.000
COMPOST MANUF TOPSOIL (4")
SY 4,964.000 $2.000 $2.500 $4.750 $1.250 $4.000 $4.810 $2.500 $2.000 $3.780 $4.310 $4.140 $6.000
BLOCK SODDING
SY 4,964.000 $3.500 $4.500 $4.500 $5.500 $6.391 $4.750 $4.500 $6.500 $6.000 $4.500 $6.070 $6.000
VEGETATIVE WATERING
MG 78.000 $23.000 $10.000 $20.900 $29.000 $60.000 $38.300 $45.000 $25.000 $180.000 $60.000 $106.880 $30.000
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
SY 6,228.000 $8.000 $10.000 $11.850 $15.000 $18.000 $11.040 $12.000 $12.500 $9.890 $18.000 $14.290 $13.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,246.000 $3.500 $2.500 $2.550 $2.500 $2.688 $2.640 $4.500 $4.750 $4.770 $2.500 $5.210 $5.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,624.000 $45.000 $41.000 $41.600 $41.000 $44.075 $43.260 $50.000 $54.000 $54.890 $41.000 $45.760 $47.000
PLANE ASPH CONC PAV (2")
SY 23,120.000 $1.100 $1.500 $1.000 $1.750 $1.075 $1.060 $2.650 $2.750 $0.700 $1.000 $2.780 $2.100
CEM STABIL BKFL
CY 196.000 $60.000 $125.000 $174.000 $109.000 $120.000 $125.500 $150.000 $125.000 $125.000 $200.000 $169.600 $185.000
DRILL SHAFT (18 IN)
LF 40.000 $103.000 $150.000 $126.000 $100.000 $90.000 $95.100 $125.000 $130.000 $150.000 $104.000 $282.210 $180.000
DRILL SHAFT (36 IN)
LF 360.000 $168.000 $215.000 $226.000 $190.000 $225.000 $206.250 $225.000 $210.000 $250.000 $220.000 $275.640 $300.000
DRILL SHAFT (48 IN)
LF 144.000 $282.000 $310.000 $290.000 $160.000 $435.000 $302.500 $300.000 $280.000 $300.000 $290.000 $441.890 $350.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 10.000 $235.000 $450.000 $390.000 $390.000 $247.500 $411.500 $390.000 $400.000 $390.000 $390.000 $438.910 $500.000
CL C CONC (ABUT)
CY 59.400 $871.000 $800.000 $980.000 $1,200.000 $1,200.000 $910.000 $1,200.000 $650.000 $1,300.000 $1,200.000 $1,323.970 $1,200.000
CL C CONC (CAP)
CY 34.000 $991.000 $950.000 $1,300.000 $1,400.000 $1,400.000 $1,020.000 $1,600.000 $1,750.000 $1,500.000 $1,700.000 $1,599.000 $1,600.000
CL C CONC (COLUMN)
CY 33.900 $849.000 $850.000 $1,800.000 $1,300.000 $1,400.000 $1,165.000 $1,800.000 $1,550.000 $1,700.000 $1,760.000 $1,464.440 $2,000.000
CL C CONC (RAIL FOUNDATION)
CY 32.000 $230.000 $400.000 $620.000 $1,200.000 $687.750 $638.000 $475.000 $550.000 $600.000 $640.000 $1,545.530 $900.000
REINF CONC SLAB
SF 8,139.000 $12.500 $23.000 $18.000 $24.000 $20.000 $22.240 $22.000 $28.000 $19.500 $26.000 $30.910 $25.000
APPROACH SLAB
CY 54.000 $482.000 $470.000 $650.000 $600.000 $714.000 $724.000 $585.000 $500.000 $600.000 $770.000 $758.140 $650.000
PRESTR CONC GIRDER (TX54)
LF 1,617.710 $111.000 $200.000 $162.000 $166.000 $165.000 $178.900 $175.000 $210.000 $180.000 $181.000 $196.310 $250.000
RIPRAP (CONC)(4 IN)
CY 67.000 $361.000 $420.000 $520.000 $650.000 $395.000 $508.000 $411.900 $600.000 $402.330 $560.000 $649.950 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 164.000 $505.000 $410.000 $480.000 $680.000 $395.000 $461.000 $435.340 $600.000 $352.150 $540.000 $661.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 55.000 $456.000 $450.000 $670.000 $450.000 $425.000 $720.000 $467.150 $600.000 $391.800 $850.000 $739.490 $500.000
RAIL (TY T551)
LF 227.000 $75.000 $85.000 $95.700 $178.000 $86.800 $104.500 $0.010 $110.000 $174.450 $180.000 $168.750 $110.000
RAIL (TY T411)(MOD)
LF 613.800 $172.000 $125.000 $159.000 $165.000 $150.000 $149.500 $225.000 $120.000 $223.850 $200.000 $159.340 $200.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 62.000 $117.000 $125.000 $160.000 $124.000 $176.400 $147.900 $175.000 $135.000 $134.980 $169.000 $182.620 $250.000
MOBILIZATION
LS 1.000 $233,000.000 $280,000.000 $225,000.000 $200,000.000 $200,000.000 $319,800.000 $320,000.000 $245,000.000 $319,000.000 $344,000.000 $440,702.510 $308,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,700.000 $10,000.000 $8,700.000 $8,000.000 $8,500.000 $9,620.000 $6,500.000 $8,500.000 $14,000.000 $11,900.000 $3,570.000 $20,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $29.000 $30.000 $16.900 $28.500 $23.050 $17.800 $20.000 $20.960 $25.000 $17.000 $27.040 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $7.000 $18.000 $2.050 $18.000 $8.660 $6.250 $5.000 $7.880 $2.000 $5.900 $7.680 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,005.000 $2.500 $3.000 $1.850 $2.500 $2.620 $2.640 $4.000 $2.390 $1.800 $2.500 $2.240 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,005.000 $0.550 $0.500 $0.620 $0.500 $0.890 $0.370 $0.250 $0.810 $0.600 $0.350 $0.760 $0.100
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,060.000 $31.000 $22.000 $24.000 $20.000 $15.000 $35.250 $60.000 $25.000 $50.000 $31.000 $40.110 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,200.000 $34.000 $13.000 $12.050 $38.000 $15.000 $19.150 $60.000 $22.000 $55.000 $18.000 $42.610 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $33.000 $13.000 $15.850 $100.000 $15.000 $33.850 $80.000 $60.000 $55.000 $121.000 $23.620 $40.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,060.000 $7.000 $6.000 $11.750 $6.500 $14.000 $15.700 $3.000 $15.000 $5.240 $9.800 $7.670 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,200.000 $6.000 $6.000 $12.050 $10.000 $14.000 $12.300 $3.000 $12.000 $5.920 $9.150 $8.590 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $8.000 $6.000 $15.850 $26.000 $14.000 $21.450 $3.000 $40.000 $18.280 $63.000 $142.060 $10.000
CONC CURB (TY I)
LF 1,052.000 $9.000 $10.500 $10.000 $26.000 $18.000 $19.000 $10.000 $15.000 $10.000 $22.000 $12.580 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000 $20.000 $25.000 $22.550 $22.000 $25.850 $24.800 $22.000 $25.000 $22.000 $25.000 $24.300 $28.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,535.000 $1,200.000 $1,180.000 $1,150.000 $935.000 $897.000 $1,150.000 $1,200.000 $1,150.000 $1,160.000 $1,364.090 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,236.000 $1,200.000 $560.000 $550.000 $1,265.000 $1,213.000 $550.000 $1,150.000 $550.000 $1,110.000 $629.770 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 233.000 $3.500 $3.000 $1.900 $1.850 $2.200 $2.110 $1.850 $1.850 $1.850 $3.000 $2.460 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $209.000 $225.000 $205.000 $200.000 $165.000 $158.250 $200.000 $225.000 $200.000 $220.000 $269.550 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,580.000 $3,000.000 $560.000 $550.000 $2,915.000 $2,796.000 $550.000 $3,000.000 $550.000 $2,800.000 $629.770 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $464.000 $650.000 $260.000 $250.000 $800.000 $548.000 $500.000 $650.000 $250.000 $600.000 $299.770 $500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 4.000 $20,000.000 $8,000.000 $21,000.000 $18,170.000 $23,000.000 $7,790.000 $15,000.000 $22,400.000 $20,450.000 $22,000.000 $22,519.770 $25,000.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $1,180.000 $3,250.000 $2,700.000 $2,700.000 $1,650.000 $2,849.000 $2,700.000 $2,800.000 $2,700.000 $2,700.000 $3,069.090 $3,000.000
CONDT (PVC) (SCH 40) (2")
LF 447.000 $11.500 $18.000 $18.000 $18.000 $16.500 $19.000 $18.000 $18.000 $18.000 $18.000 $20.020 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 115.000 $45.000 $50.000 $50.000 $50.000 $55.000 $52.750 $50.000 $50.000 $50.000 $50.000 $55.860 $56.000
ELEC CONDR (NO.8) INSULATED
LF 2,286.000 $1.300 $2.000 $2.000 $2.000 $1.920 $2.110 $2.000 $2.000 $2.000 $2.000 $2.240 $2.290
GROUND BOX TY A (122311)
EA 2.000 $654.000 $1,350.000 $1,300.000 $1,300.000 $990.000 $1,372.000 $1,300.000 $1,300.000 $1,300.000 $1,300.000 $1,479.550 $1,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $606.000 $600.000 $590.000 $575.000 $704.000 $607.000 $575.000 $575.000 $575.000 $580.000 $637.220 $650.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $2,062.000 $1,600.000 $1,590.000 $1,550.000 $1,430.000 $1,635.000 $1,550.000 $1,500.000 $1,550.000 $1,550.000 $1,797.160 $1,800.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,826.000 $3,300.000 $2,130.000 $2,075.000 $3,080.000 $2,189.000 $2,075.000 $2,950.000 $2,950.000 $2,100.000 $2,381.590 $2,300.000
REMOVE SM RD SN SUP&AM
EA 29.000 $103.000 $100.000 $85.100 $83.000 $22.000 $87.600 $83.000 $85.000 $83.000 $83.000 $94.720 $93.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $41.000 $24.000 $24.600 $24.000 $22.000 $21.100 $24.000 $25.000 $24.000 $24.000 $38.790 $27.420
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $26.000 $24.000 $24.600 $24.000 $25.300 $24.250 $24.000 $25.000 $24.000 $24.000 $46.220 $27.420
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 230.000 $0.350 $0.500 $0.500 $0.500 $0.550 $0.470 $0.450 $0.450 $0.500 $0.450 $0.980 $0.550
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,521.000 $0.300 $0.280 $0.300 $0.280 $0.300 $0.420 $0.400 $0.400 $0.280 $0.400 $0.320 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 693.000 $0.650 $0.700 $0.700 $0.700 $0.770 $0.840 $0.800 $0.800 $0.700 $0.800 $0.910 $0.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 89.000 $6.000 $6.000 $6.150 $6.000 $6.600 $6.350 $6.000 $6.000 $6.000 $6.000 $7.710 $6.860
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 2.000 $125.000 $150.000 $154.000 $150.000 $165.000 $84.400 $80.000 $80.000 $150.000 $80.000 $214.550 $150.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 1.000 $200.000 $250.000 $260.000 $250.000 $275.000 $105.500 $100.000 $100.000 $250.000 $100.000 $374.090 $280.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000 $137.000 $150.000 $154.000 $150.000 $165.000 $116.100 $110.000 $110.000 $150.000 $110.000 $214.550 $165.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 17.000 $34.000 $50.000 $51.300 $5.000 $55.000 $31.650 $30.000 $30.000 $50.000 $30.000 $60.830 $56.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,644.000 $0.300 $0.280 $0.300 $0.280 $0.300 $0.420 $0.400 $0.400 $0.280 $0.400 $0.320 $0.320
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,140.000 $0.710 $0.700 $0.700 $0.700 $0.770 $0.790 $0.750 $0.750 $0.700 $0.750 $0.860 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 139.000 $5.350 $6.000 $6.150 $6.000 $6.600 $7.400 $7.000 $7.000 $6.000 $7.000 $7.310 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $130.000 $150.000 $154.000 $150.000 $165.000 $190.000 $180.000 $180.000 $150.000 $180.000 $214.550 $200.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $181.000 $250.000 $260.000 $250.000 $275.000 $221.500 $210.000 $210.000 $250.000 $210.000 $324.550 $300.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 1.000 $222.000 $300.000 $310.000 $300.000 $330.000 $263.750 $250.000 $250.000 $300.000 $250.000 $429.090 $300.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 2.000 $850.000 $850.000 $870.000 $850.000 $935.000 $485.250 $460.000 $460.000 $850.000 $460.000 $984.550 $800.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 4.000 $880.000 $850.000 $870.000 $850.000 $95.000 $485.250 $460.000 $460.000 $850.000 $460.000 $959.770 $800.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 37.000 $45.000 $44.000 $45.150 $44.000 $48.400 $31.650 $30.000 $30.000 $44.000 $30.000 $51.080 $50.000
PAVEMENT SEALER 4"
LF 15,596.000 $0.120 $0.150 $0.150 $0.150 $0.160 $0.210 $0.200 $0.200 $0.150 $0.200 $0.170 $0.150
PAVEMENT SEALER 8"
LF 1,140.000 $0.370 $0.500 $0.500 $0.500 $0.550 $0.420 $0.400 $0.400 $0.500 $0.400 $0.640 $0.500
PAVEMENT SEALER 24"
LF 139.000 $3.000 $3.000 $3.100 $3.000 $3.300 $2.320 $2.200 $2.200 $3.000 $2.200 $4.010 $3.000
PAVEMENT SEALER (ARROW)
EA 2.000 $53.000 $55.000 $56.400 $55.000 $60.500 $42.200 $40.000 $40.000 $55.000 $40.000 $110.050 $50.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $91.000 $105.000 $108.000 $105.000 $115.500 $52.750 $50.000 $50.000 $105.000 $50.000 $165.050 $100.000
PAVEMENT SEALER (UTURN ARROW)
EA 1.000 $114.000 $120.000 $123.000 $120.000 $132.000 $52.750 $50.000 $50.000 $120.000 $50.000 $231.090 $100.000
PAVEMENT SEALER (ENTR GORE)
EA 2.000 $242.000 $450.000 $460.000 $450.000 $495.000 $126.600 $120.000 $120.000 $450.000 $120.000 $544.550 $500.000
PAVEMENT SEALER (EXIT GORE)
EA 4.000 $268.000 $450.000 $460.000 $450.000 $495.000 $126.600 $120.000 $120.000 $450.000 $120.000 $519.770 $500.000
PAVEMENT SEALER (YLD TRI)
EA 37.000 $14.000 $22.000 $22.550 $22.000 $24.200 $19.000 $18.000 $18.000 $22.000 $18.000 $26.880 $25.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 760.000 $0.350 $0.750 $0.750 $0.750 $0.820 $2.110 $2.000 $2.000 $0.750 $2.000 $0.960 $0.850
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,625.000 $0.330 $0.500 $0.500 $0.500 $0.550 $0.470 $0.450 $0.450 $0.500 $0.450 $0.560 $0.570
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,211.000 $0.320 $0.500 $0.500 $0.500 $0.550 $0.470 $0.450 $0.450 $0.500 $0.450 $0.560 $0.570
REFL PAV MRKR TY I-C
EA 6.000 $4.000 $25.000 $25.650 $25.000 $27.500 $6.350 $6.000 $6.000 $25.000 $6.000 $44.020 $28.000
REFL PAV MRKR TY II-C-R
EA 68.000 $3.000 $15.000 $15.400 $15.000 $16.500 $6.350 $6.000 $6.000 $15.000 $6.000 $17.960 $16.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,751.000 $0.510 $0.750 $0.750 $0.750 $0.820 $0.420 $0.400 $0.400 $0.750 $0.400 $0.840 $0.850
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $95.000 $65.000 $66.700 $65.000 $71.500 $105.500 $100.000 $100.000 $65.000 $100.000 $170.590 $75.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $67.000 $65.000 $66.700 $65.000 $71.500 $105.500 $100.000 $100.000 $65.000 $100.000 $170.590 $75.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 17.000 $32.000 $25.000 $25.650 $25.000 $27.500 $52.750 $50.000 $50.000 $25.000 $50.000 $33.330 $28.000
TEMP TRAF SIGNALS
EA 1.000 $24,000.000 $25,000.000 $20,600.000 $20,600.000 $7,000.000 $21,740.000 $20,600.000 $20,600.000 $20,600.000 $21,000.000 $35,343.190 $35,000.000
D-GR HMA TY-B PG64-22
TON 2,741.000 $55.000 $70.000 $70.000 $65.000 $69.870 $68.600 $75.000 $78.000 $64.410 $65.000 $75.900 $80.000
TACK COAT
GAL 623.000 $3.000 $2.000 $2.050 $2.000 $2.150 $2.110 $4.500 $5.000 $3.050 $2.000 $5.520 $3.000
SP MIXES SP-C SAC-A PG76-22
TON 3,376.000 $70.000 $92.000 $92.000 $87.000 $93.520 $91.800 $105.000 $108.000 $69.040 $87.000 $85.060 $96.000
UNDERSEAL COURSE
GAL 5,870.000 $3.000 $1.000 $1.000 $1.000 $1.075 $1.060 $3.000 $3.250 $4.000 $1.000 $4.590 $4.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $160.000 $500.000 $320.000 $208.790 $500.000 $775.000 $1,000.000 $500.000 $200.000 $540.000 $3,399.090 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 168.000 $81.000 $120.000 $61.300 $100.000 $250.000 $134.300 $20.000 $125.000 $95.360 $152.000 $165.590 $60.000
Totals: $2,508,772.560 $2,885,970.950 $2,907,080.220 $3,055,086.650 $3,077,905.722 $3,196,979.949 $3,232,754.630 $3,269,110.650 $3,301,369.350 $3,446,931.100 $3,616,426.806 $3,695,633.840