|
|
PREPARING ROW
|
STA
|
186.000
|
|
|
REMOV CONC (PAV)
|
SY
|
38,315.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
9,998.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
18,904.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
3,473.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
6,646.000
|
|
|
REMOV CONC (CURB)
|
LF
|
52,170.000
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
470.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
13,914.000
|
|
|
REMOV CONC (RAIL)
|
LF
|
3,321.000
|
|
|
RMV (4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
39,387.000
|
|
|
RMV (9") TRT/UNTRT BASE & ASPH PAV
|
SY
|
10,452.000
|
|
|
RMV (17") TRT/UNTRT BASE & ASPH PAV
|
SY
|
17,609.000
|
|
|
RMV (27") TRT/UNTRT BASE & ASPH PAV
|
SY
|
48,176.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
70,634.000
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
50,237.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
9,974.000
|
|
|
EMBANK (FNL)(OC)(TY C2)(DS)
|
CY
|
112,233.000
|
|
|
DRILL SEED (PERM_URBAN_CLAY)
|
SY
|
39,710.000
|
|
|
STRAW/HAY MLCH SEED (TEMP_WARM)
|
SY
|
10,899.000
|
|
|
STRAW/HAY MLCH SEED (TEMP_COOL)
|
SY
|
10,899.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
814.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
|
SY
|
39,710.000
|
|
|
PROOF ROLLING
|
HR
|
35.000
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
16,460.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
16,715.000
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
1,394.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
52,601.000
|
|
|
CEM TRT(PLNT MX)(CL L)(TYA)(GR1-2)(6")
|
SY
|
77,134.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
24,592.000
|
|
|
LRA PAV TY-II GR-DS
|
TON
|
5,179.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
39,525.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
6,827.000
|
|
|
TACK COAT
|
GAL
|
9,166.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
19,837.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
22,959.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
37,448.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
4,558.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
324,193.000
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
74,516.000
|
|
|
CONC PVMT(TRANSITION SLAB) (13")
|
SY
|
119.000
|
|
|
CUT & RESTORING PAV
|
SY
|
3,072.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
75.000
|
|
|
CEM STABIL BKFL
|
CY
|
5,839.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
239.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10,356.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
137,813.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
2,378.000
|
|
|
VERIFICATION TESTS
|
EA
|
2.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,848.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
168.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
3,432.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
8,588.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
50.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
1,917.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
2,114.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
6,037.000
|
|
|
DRILL SHAFT (108 IN)
|
LF
|
895.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
34.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
160.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
596.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
928.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
32.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
55.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
130.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
|
|
DRILL SHAFT (HI MST POLE)(48 IN)(ROCK)
|
LF
|
20.000
|
|
|
CL A CONC (MISC)
|
CY
|
191.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
41.000
|
|
|
CL C CONC (ABUT)
|
CY
|
689.000
|
|
|
CL C CONC (CAP)
|
CY
|
666.800
|
|
|
CL C CONC (COLUMN)
|
CY
|
816.900
|
|
|
CL C CONC (FOOTING)(SRC)
|
CY
|
193.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5,621.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
938.000
|
|
|
CL F CONC (CAP)(MASS)
|
CY
|
7,171.800
|
|
|
CL F CONC (CAP)(INVT)(MASS)
|
CY
|
76.900
|
|
|
CL F CONC (CAP)(STRDL)(MASS)
|
CY
|
1,370.100
|
|
|
CL F CONC (COLUMN)(MASS)
|
CY
|
9,983.700
|
|
|
CL F CONC (FOOTING)(MASS)
|
CY
|
1,556.600
|
|
|
CL H CONC (CAP)
|
CY
|
1.400
|
|
|
CL H CONC (CAP)(HPC)
|
CY
|
1.900
|
|
|
CL F CONC (ABUT)
|
CY
|
43.500
|
|
|
CL C CONC (CULV)(EXTEND)
|
CY
|
10.300
|
|
|
REINF CONC SLAB
|
SF
|
1,034,880.000
|
|
|
APPROACH SLAB
|
CY
|
1,528.900
|
|
|
RETAINING WALL (MSE)
|
SF
|
152,370.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
30,437.000
|
|
|
RETAINING WALL (SOIL NAIL) (FASCIA)
|
SF
|
2,622.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
113,857.910
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
11,033.100
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
63.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
113.000
|
|
|
RIPRAP (CONC)(8 IN)
|
CY
|
767.000
|
|
|
RIPRAP (CONC)(SIGN MOUNTS)(CLB)
|
CY
|
21.000
|
|
|
ELASTOMERIC BEARING (EE2)
|
EA
|
12.000
|
|
|
ELASTOMERIC BEARING (E7)
|
EA
|
10.000
|
|
|
ELASTOMERIC BEARING (F4)
|
EA
|
12.000
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
10.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 4)
|
EA
|
20.000
|
|
|
HLMR BEARING (F - 800)
|
EA
|
18.000
|
|
|
HLMR BEARING (GE - 500)
|
EA
|
36.000
|
|
|
HLMR BEARING (GE - 800)
|
EA
|
18.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
980.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
9,177,400.000
|
|
|
RAIL (TY SSTR)
|
LF
|
99,754.500
|
|
|
RAIL (TY T80SS)
|
LF
|
1,160.000
|
|
|
RAIL (CLF-RO)
|
LF
|
668.900
|
|
|
RAIL (TY T80PP)
|
LF
|
300.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
2,949.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
4,237.900
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
448.000
|
|
|
RETROFIT RAIL (TY T80SS)
|
LF
|
448.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,443.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
769.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
131.000
|
|
|
JOINT SEALANT
|
LF
|
980.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
52.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
336.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,439.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
87.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
450.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
190.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
797.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,692.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
67.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,003.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,355.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
96.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
24.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
3.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
|
|
INLET (COMPL)(PCO)(6FT)(LEFT)
|
EA
|
2.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
2.000
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
3.000
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
1.000
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
28.000
|
|
|
INLET (COMPL)(PMBD)(5FT)
|
EA
|
11.000
|
|
|
INLET (COMPL)(PMBD)(6FT)
|
EA
|
7.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
19.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
3.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
16.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
5.000
|
|
|
INLET (COMP)(TY SIDEWALK BRIDGE)
|
EA
|
8.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
9.000
|
|
|
INLET(COMPL)(TY MSE1)
|
EA
|
29.000
|
|
|
JCTBOX (COMPL)(11FT X 6FT)
|
EA
|
1.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 30 IN)
|
EA
|
2.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 30 IN)
|
EA
|
1.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
1.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
129.000
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
17.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
8,015.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
840.000
|
|
|
REMOV STR (INLET)
|
EA
|
34.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
5.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
9.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6,852.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
806.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
1,464.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
52.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
120.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,935.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,935.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,505.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,505.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,953.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,953.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
53,564.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
72.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
32,430.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
15,460.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
740.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
110,580.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
38,880.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,580.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
32,430.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
15,460.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
740.000
|
|
|
PORT CTB (PINNING)
|
EA
|
488.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
8,354.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
557.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
1,989.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
138.000
|
|
|
CONC CURB (TY I)
|
LF
|
11,893.000
|
|
|
CONC CURB (TY II)
|
LF
|
361.000
|
|
|
CONC CURB (TY F3)
|
LF
|
2,929.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,565.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
9,535.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
7.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
8.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
6.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
9.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
3.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,337.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
24.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
30.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
61.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
19.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
13.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
8,568.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
57.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
67.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
34.000
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
8.000
|
|
|
IN RD IL (TY SP) 28S-8-8 (250W EQ) LED
|
EA
|
49.000
|
|
|
IN RD IL (TY SA) 30T-8 (250W EQ) LED
|
EA
|
2.000
|
|
|
IN RD IL (TY SP) 48S-10 (400W EQ) LED
|
EA
|
37.000
|
|
|
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
|
EA
|
10.000
|
|
|
IN RD IL (TY SA) 50B-10 (400W EQ) LED
|
EA
|
79.000
|
|
|
IN RD IL (TY SA) 50B-10-10(400W EQ)LED
|
EA
|
1.000
|
|
|
IN RD IL (TY SA) 50S-10 (400W EQ) LED
|
EA
|
7.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
1.000
|
|
|
TEMP RD IL SETUP AND REMOVE
|
EA
|
30.000
|
|
|
CONDT (HDPE) (1 1/4")
|
LF
|
650.000
|
|
|
CONDT (HDPE) (4") BORE
|
LF
|
325.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
55,450.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
25,305.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,500.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
9,690.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
5,070.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
27,970.000
|
|
|
CONDT (RM) (1")
|
LF
|
2,235.000
|
|
|
CONDT (RM) (2")
|
LF
|
300.000
|
|
|
CONDT (RM) (3")
|
LF
|
1,265.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
960.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
24,445.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
5,070.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
12,840.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
19,700.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
20,240.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,450.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
8,640.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
40,285.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
88,590.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
35,395.000
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
5,970.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
28.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
9.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
10.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
28.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
16.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
90.000
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
2.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
8.000
|
|
|
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
|
EA
|
8.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
|
|
ELC SRV TY A 240/480 125(NS)SS(E)SP(O)
|
EA
|
1.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
|
EA
|
8.000
|
|
|
ELC SRV TY D 120/240 100(NS)AL(E)PS(U)
|
EA
|
3.000
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)SP(O)
|
EA
|
2.000
|
|
|
ELC SRV TY D 120/240 070(NS)GS(N)SP(O)
|
EA
|
1.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
419.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
210.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
5,603.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
74.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
39.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
4.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
17.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
6.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
5.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
7.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
11.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
7.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
128.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
8.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
8.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,578.100
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
2.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
2.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
|
|
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
|
|
INS OH SN SUP(50 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
|
|
INS OH SN SUP(65 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
|
|
INS OH SN SUP(75 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
|
|
INS OH SN SUP(85 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
|
|
INS OH SN SUP(90 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
|
|
INS OH SN SUP(95 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
|
|
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
8.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
1.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
579.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
743.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
21.000
|
|
|
INSTL OM ASSM (OM-1)(WFLX)GND
|
EA
|
16.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
260.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
785.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
14,991.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
4,908.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
89,683.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
3,828.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
365,060.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
7.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
270,233.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
436.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
23,678.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
8,134.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,830.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
66.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
3.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
8.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
49.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
6.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
41.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
109.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
62.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
89,379.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
103,280.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
227,343.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
23,787.000
|
|
|
PAVEMENT SLER 12"
|
LF
|
16,869.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
1,892.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
66.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
49.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
3.000
|
|
|
PAVEMENT SLER (LN REDUCT ARROW)
|
EA
|
4.000
|
|
|
PAVEMENT SLER (RR XING)
|
EA
|
6.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
41.000
|
|
|
PAVEMENT SLER (NUMBER)
|
EA
|
8.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
23,369.000
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
3,278.000
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
10,879.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
203.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
224.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
20.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,222.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
227,343.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
23,590.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
16,869.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,892.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
70.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
3.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
8.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
49.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
6.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
41.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
|
|
REMOVING TRAFFIC SIGNALS (DIAMOND)
|
EA
|
3.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
53.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
25.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
53.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
21.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
53.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
10.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
36.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
44.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
12.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
7.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
9,440.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
|
LF
|
21,065.000
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
12,455.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
|
EA
|
2.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
2.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
3.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
3.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
2.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
1.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-24')
|
EA
|
1.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-28')
|
EA
|
1.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
57.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
48.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
18.000
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
5.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
12.000
|
|
|
REMOVE VID IMAGE VEH DET SYS (VIVDS)
|
EA
|
10.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
27.000
|
|
|
LITTER REMOVAL
|
CYC
|
80.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
80.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
80.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
80.000
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
124,646.000
|
|
|
REP STL BRIDGE MBR (WELD REPAIR)
|
EA
|
6.000
|
|
|
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
|
EA
|
2.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
74,427.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
159.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
|
|
ILSN (6 D)
|
EA
|
12.000
|
|
|
ILSN (8D)
|
EA
|
4.000
|
|
|
ILSN (10D)
|
EA
|
2.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
5.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
2,740.000
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
4.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
24.000
|
|
|
RVDS (ADVANCE DETENTION ONLY)
|
EA
|
13.000
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
8.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
7.000
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
|
|
ITS POLE (55 FT)(RELOCATE)
|
EA
|
1.000
|
|
|
ITS POLE (8 FT)(COSS/OSB)
|
EA
|
4.000
|
|
|
ITS POLE MNTD CAB (TY 2)(CONF 1)
|
EA
|
2.000
|
|
|
ITS POLE(40 FT)(90 MPH)(W/STIFF)
|
EA
|
2.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
7.000
|
|
|
RELOCATE ITS RADIO
|
EA
|
1.000
|
|
|
REMOVE ITS RADIO
|
EA
|
1.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
16.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
8.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
4.000
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
23,420.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
12.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
1,552.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
44.000
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
19,605.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITIONS)
|
EA
|
9.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
26.000
|
|
|
INSTALL WRONG WAY DRIVER DETECTION SYS
|
EA
|
6.000
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
6.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
9.000
|
|
|
ITS GRND MNT CAB (TY 6)(CONF 2)
|
EA
|
2.000
|
|
|
REMOVE DMS
|
EA
|
7.000
|
|
|
REMOVE EXISTING FIBER HUB
|
EA
|
1.000
|
|
|
TEMP CONSTR EQUIPMENT ALERT SYS
|
EA
|
7.000
|
|
|
TEMP CONSTR EQUIP ALERT SYS (RELOCATE)
|
EA
|
12.000
|
|
|
CCTV ON HIGH MAST ILLUMIN. ASSEM.
|
EA
|
2.000
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
1.000
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYSTEM
|
EA
|
8.000
|
|
|
HIGH PRESSURE WATER BLASTING SYSTEM 6"
|
LF
|
134,787.000
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(2")
|
EA
|
3.000
|
|
|
TIE-IN (COMPLETE)(8")
|
EA
|
3.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
120.000
|
|
|
WATER MAIN BREAKS LEAK REPAIR
|
EA
|
2.000
|
|
|
WATER MAIN REMOVAL (16"& SMALLER)
|
LF
|
76.000
|
|
|
WTR (JACK, BORE, OR TUNNEL)(24")
|
LF
|
187.000
|
|
|
CONCRETE ENCASEMENT
|
CY
|
4.900
|
|
|
CARRIER PIPE (IN CASING)(PVC)(8")
|
LF
|
187.000
|
|
|
CONCRETE SADDLE
|
CY
|
5.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
0.500
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
370.000
|
|
|
GATE VALVE AND BOX (COMPLETE)(8")
|
EA
|
2.000
|
|
|
GROUT ABANDONMENT WATER MAIN (8")
|
LF
|
157.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
2.000
|
|
|
PIPE WATER MAIN (PVC)(8")
|
LF
|
107.000
|
|
|
STEEL CASING (24")(BORE)
|
LF
|
187.000
|
|
|
STRUCTURAL EXCAVATION (PIPE)
|
CY
|
5.200
|
|
|
30" FLAT BOTTOM CHECK VALVE
|
EA
|
1.000
|
|
|
NGP (MAIN)(2" PLASTIC W/TW)(OPEN CUT)
|
LF
|
20.000
|
|
|
NGP (MAIN) (8" PLASTIC W/TW) (OPEN CUT)
|
LF
|
100.000
|
|
|
NGP (GROUT ABANDONED MAIN)(8")
|
LF
|
388.000
|
|
|
NGP (REMOVE ABANDONED MAIN)(2")
|
LF
|
12.000
|
|
|
NGP (REMOVE ABANDONED MAIN)(8")
|
LF
|
345.000
|
|
|
NGP(BORING)(8" PLASTIC W/TW)
|
LF
|
775.000
|
|
|
NGP STEEL TIE-IN (2" STEEL)
|
EA
|
1.000
|
|
|
NGP STEEL TIE-IN (8" STEEL)
|
EA
|
2.000
|