Job Info for 0017-10-286

County: BEXAR Highway: IH 35 Date: 07/11/2018 (6 years ago) Engineer's Estimate: $551,722 Control Number: 0017-10-286
Project: NH 1802(386) District: SAN ANTONIO Time: 82 WORKING DAYS Type: LANDSCAPE PLANTING AND IRRIGATION

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $551,721.50
ENCINO LANDSCAPE, INC.   $542,994.35 1
-1.58% | -$8,727.15
APEX LANDSCAPE & IRRIGATION, LLC   $690,000.00 2
25.06% | $138,278.50
27.07% | $147,005.65

Bid Items

Items: 19, 0 filtered
BEXAR IH 35  |  SAN ANTONIO  |  0017-10-286  |  07/11/2018  |  $551,722  |  NH 1802(386)  |  LANDSCAPE PLANTING AND IRRIGATION  |  82 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. APEX LANDSCAPE & IRRIGATION, LLC
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY 314.000 $5.250 $20.000 $25.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 105.000 $30.000 $30.000 $25.000
161 6012 GENERAL USE COMPOST CY 1,365.000 $30.000 $30.000 $25.000
170 6001 IRRIGATION SYSTEM LS 1.000 $84,200.000 $80,000.000 $175,000.000
192 6004 PLANT MATERIAL (5-GAL) EA 1,780.000 $25.000 $30.000 $30.000
192 6013 MULCH SY 12,411.000 $3.000 $5.000 $4.000
192 6016 PLANT BED PREPARATION SY 12,290.000 $3.000 $3.000 $2.500
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA 163.000 $250.000 $300.000 $265.000
192 6049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA 15.000 $250.000 $300.000 $500.000
192 6050 PLANT MATERIAL (MIN 6' TRNK HT) (PALM) EA 28.000 $400.000 $500.000 $600.000
192 6052 PLANT MATERIAL (MIN 10' TRNK HT) (PALM) EA 32.000 $500.000 $700.000 $800.000
192 6054 PLANT MATERIAL (MIN 14' TRNK HT) (PALM) EA 15.000 $700.000 $800.000 $1,000.000
193 6001 PLANT MAINTENANCE MO 36.000 $2,500.000 $1,000.000 $2,500.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 36.000 $1,500.000 $1,000.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $38,230.000 $60,000.000 $62,698.500
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $3,000.000 $3,000.000 $3,500.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 935.000 $3.000 $8.000 $2.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 935.000 $1.000 $0.010 $0.500
6185 6002 TMA (STATIONARY) DAY 80.000 $250.000 $50.000 $250.000
Totals: $551,721.50 $542,994.35 $690,000.00