Show Job Controls
Bid Cobra

BEXAR IH 35 (0017-02-078)

Items: 88

County: BEXAR
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-02-078
DBE Goal: N/A
Project: C 17-2-78
Guaranty: N/A
Time: 243 WORKING DAYS
Engineer's Estimate: $16,458,260.17
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$16,458,260.17
$13,319,023.16
Over/Under Est: -19.07% -$3,139,237.01
Over/Under Est: -5.11% -$840,257.50
Amt Left: 17.26% $2,298,979.51
Over/Under Est: -3.16% -$520,119.69
Amt Left: 19.66% $2,619,117.32
Delta: -2.05% -$320,137.81
Over/Under Est: 5.94% $978,355.98
Amt Left: 30.92% $4,117,592.99
Delta: -9.40% -$1,498,475.67
$20,535,040.17
Over/Under Est: 24.77% $4,076,780.00
Amt Left: 54.18% $7,216,017.01
Delta: -17.77% -$3,098,424.02
Subcontractor Percentage Amount
ROADWAY SPECIALTIES, INC. 8.49% $1,137,415.37
FLASHER EQUIPMENT COMPANY 4.00% $535,884.75
A K FUQUAY CONSTRUCTION 1.59% $213,014.19
GREYCO CONSTRUCTION, LLC 1.20% $160,765.42
PRIMATE CONSTRUCTION, LP 1.19% $159,425.71
WEST TEXAS ROCK RESOURCES, LLC 0.08% $10,717.69
Total: 16.55% $2,217,223.13

Bid Items & Bid Tabulations

88 Total 0 of 88
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-02-078  |  03/07/2023  |  $16,458,260.17  |  C 17-2-78  |  RESURF ROADWAY  |  243 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CLARK CONSTRUCTION OF TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
LONE STAR PAVING COMPANY
HUNTER INDUSTRIES, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 34,831.000 $6.000 $5.300 $8.000 $6.000 $5.000 $12.800
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 245.000 $20.000 $31.000 $80.000 $15.050 $34.000 $19.900
EXCAVATION (ROADWAY)
CY 124.000 $15.000 $82.000 $160.000 $53.540 $135.000 $154.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 158.000 $20.000 $59.000 $45.000 $32.180 $240.000 $115.500
BLADING
HR 8.000 $200.000 $122.000 $250.000 $174.460 $190.000 $180.000
COMPOST MANUF TOPSOIL (4")
SY 326.000 $1.750 $7.400 $8.000 $8.000 $8.000 $2.780
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 326.000 $0.700 $3.850 $2.000 $1.500 $4.000 $3.930
VEGETATIVE WATERING
MG 5.000 $20.000 $190.000 $50.000 $201.000 $25.000 $154.000
PROOF ROLLING
HR 2.000 $200.000 $132.000 $100.000 $126.100 $100.000 $180.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 19,673.000 $60.000 $44.200 $54.880 $72.000 $55.000 $71.350
PLANE ASPH CONC PAV (3")
SY 331,008.000 $1.900 $2.640 $1.580 $3.310 $4.000 $3.780
PLANE ASPH CONC PAV (3"- 5")
SY 5,315.000 $10.000 $2.640 $1.580 $3.300 $8.250 $3.780
PLANE ASPH CONC PAV (1" TO 4")
SY 12,312.000 $15.000 $3.600 $1.580 $2.430 $4.500 $3.780
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 8.000 $250.000 $945.000 $242.000 $1,050.000 $2,200.000 $1,250.000
RIPRAP (CONC) (CL A )
CY 817.000 $600.000 $380.000 $565.000 $433.790 $250.000 $824.340
RIPRAP (MOW STRIP)(4 IN)
CY 372.000 $600.000 $478.000 $575.000 $538.000 $400.000 $843.170
CLEANING AND SEALING JOINTS
LF 1,624.000 $40.000 $11.750 $11.750 $11.750 $11.750 $11.750
HEADER TYPE EXPANSION JOINT
CF 394.800 $300.000 $350.000 $349.570 $349.570 $350.000 $349.570
MOBILIZATION
LS 1.000 $1,557,535.570 $448,000.000 $500,000.000 $1,592,220.230 $772,000.000 $1,793,371.990
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $10,000.000 $8,457.000 $2,000.000 $2,110.000 $58,000.000 $3,435.810
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 9,566.000 $6.000 $4.500 $6.500 $4.500 $6.000 $4.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 9,566.000 $1.750 $1.000 $1.000 $1.100 $3.000 $1.050
RUMBLE STRIPS (SHOULDER)
LF 104,435.000 $0.200 $0.160 $0.100 $0.410 $0.400 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 4,826.000 $26.000 $23.450 $28.000 $23.470 $24.000 $23.940
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,200.000 $2,520.000 $3,500.000 $1,916.040 $2,500.000 $1,954.360
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 24.000 $1,450.000 $1,415.000 $1,500.000 $1,414.490 $1,300.000 $1,442.780
REMOVE METAL BEAM GUARD FENCE
LF 4,337.500 $3.000 $4.000 $1.750 $4.000 $1.000 $4.080
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $320.000 $275.000 $400.000 $274.900 $150.000 $280.400
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $200.000 $92.000 $800.000 $91.630 $150.000 $93.460
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $250.000 $184.000 $150.000 $183.270 $150.000 $186.940
CABLE BARRIER SYSTEM (TL-4)
LF 28,030.000 $15.500 $13.850 $14.950 $14.470 $16.000 $13.360
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 18.000 $4,500.000 $2,160.000 $3,450.000 $2,160.130 $5,500.000 $2,203.330
REMOVE CABLE BARRIER
LF 28,030.000 $4.500 $4.500 $3.900 $4.500 $4.000 $4.590
REMOVE CABLE BARRIER TERMINAL SECTION
EA 18.000 $700.000 $281.000 $515.000 $280.350 $400.000 $285.960
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $3,400.000 $3,470.000 $3,300.000 $3,469.770 $2,775.000 $3,539.170
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $300.000 $275.000 $300.000 $274.900 $200.000 $280.400
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $500.000 $695.000 $600.000 $695.000 $1,000.000 $695.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 20.000 $30.000 $25.000 $65.000 $25.000 $40.000 $25.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 2.000 $50.000 $85.000 $150.000 $85.000 $150.000 $85.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 27.000 $30.000 $25.000 $65.000 $25.000 $40.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 84.000 $40.000 $22.800 $65.000 $35.000 $30.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $35.000 $31.550 $65.000 $35.000 $30.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 37.000 $50.000 $22.800 $65.000 $35.000 $30.000 $35.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 36,436.000 $1.000 $0.280 $0.550 $0.450 $0.450 $0.550
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 160,584.000 $0.850 $0.240 $0.550 $0.400 $0.400 $0.550
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 22.000 $600.000 $498.000 $450.000 $750.000 $750.000 $450.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 22.000 $600.000 $498.000 $750.000 $750.000 $750.000 $750.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 58.000 $4.000 $35.500 $25.000 $65.000 $65.000 $25.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 158,232.000 $0.850 $0.240 $0.550 $0.400 $0.400 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 13,662.000 $1.850 $1.150 $0.770 $1.500 $1.000 $1.760
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,104.000 $1.850 $1.150 $0.770 $1.500 $1.000 $1.760
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 327.000 $3.500 $1.460 $3.500 $1.500 $1.500 $3.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 236.000 $4.500 $3.900 $5.000 $4.000 $4.000 $5.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 11.000 $750.000 $753.000 $550.000 $800.000 $800.000 $550.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 11.000 $750.000 $1,345.000 $850.000 $800.000 $800.000 $850.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 58.000 $60.000 $48.000 $25.000 $70.000 $70.000 $25.000
PAVEMENT SEALER 6"
LF 178,196.000 $0.250 $0.360 $0.450 $0.150 $0.150 $0.450
PAVEMENT SEALER 12"
LF 236.000 $1.000 $1.090 $2.500 $0.700 $0.700 $2.500
PAVEMENT SEALER (ENTR GORE)
EA 11.000 $300.000 $288.000 $250.000 $200.000 $200.000 $250.000
PAVEMENT SEALER (EXIT GORE)
EA 11.000 $300.000 $410.000 $450.000 $200.000 $200.000 $450.000
PAVEMENT SEALER (YLD TRI)
EA 58.000 $20.000 $30.000 $15.000 $10.000 $10.000 $15.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 18,218.000 $0.800 $0.760 $0.900 $0.750 $0.750 $0.900
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 80,685.000 $0.700 $0.760 $0.900 $0.650 $0.650 $0.900
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 79,113.000 $0.700 $0.760 $0.900 $0.650 $0.650 $0.900
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 180.000 $28.000 $33.500 $30.000 $50.000 $50.000 $30.000
REFL PAV MRKR TY I-R
EA 252.000 $10.000 $4.600 $15.000 $6.500 $6.500 $15.000
REFL PAV MRKR TY II-C-R
EA 1,522.000 $5.000 $3.960 $5.000 $4.000 $4.000 $5.000
ELIM EXT PAV MRK & MRKS (6")
LF 178,196.000 $1.000 $0.670 $0.200 $0.500 $0.500 $0.200
ELIM EXT PAV MRK & MRKS (10")
LF 180.000 $4.000 $1.680 $0.750 $1.500 $1.500 $0.750
ELIM EXT PAV MRK & MRKS (12")
LF 300.000 $4.000 $1.850 $0.950 $2.000 $2.000 $0.950
ELIM EXT PAV MRK & MRKS (ARROW)
EA 18.000 $80.000 $70.000 $100.000 $100.000 $100.000 $100.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 11.000 $250.000 $390.000 $300.000 $350.000 $350.000 $300.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 11.000 $250.000 $390.000 $300.000 $350.000 $350.000 $300.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 58.000 $20.000 $25.000 $15.000 $35.000 $35.000 $15.000
PAV SURF PREP FOR MRK (6")
LF 180.000 $0.350 $0.100 $0.020 $2.000 $2.000 $0.020
LITTER REMOVAL
CYC 15.000 $2,000.000 $1,200.000 $3,500.000 $2,010.000 $2,500.000 $2,417.270
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 161.000 $100.000 $127.000 $121.000 $490.000 $200.000 $643.180
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 15.000 $2,500.000 $1,835.000 $4,200.000 $5,500.000 $2,500.000 $8,250.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 12.000 $100.000 $1,400.000 $675.000 $1,400.000 $2,800.000 $1,800.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 352.000 $120.000 $120.000 $243.470 $185.000 $255.000 $136.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 24,210.000 $140.000 $100.000 $134.890 $107.270 $118.000 $147.000
TACK COAT
GAL 306.000 $4.000 $3.650 $3.170 $2.900 $3.350 $6.800
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 40,152.000 $140.000 $139.000 $164.850 $145.000 $183.000 $204.200
BONDING COURSE
GAL 41,897.000 $5.000 $3.550 $4.600 $5.000 $3.350 $4.440
UNDERSEAL COURSE
GAL 67,367.000 $4.500 $3.550 $4.600 $5.000 $3.850 $4.890
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 206.000 $100.000 $100.000 $77.000 $90.000 $145.000 $150.000
TMA (STATIONARY)
DAY 206.000 $200.000 $200.000 $225.000 $230.000 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 138.000 $300.000 $400.000 $250.000 $230.000 $300.000 $750.000
Totals: $16,458,260.170 $13,319,023.160 $15,618,002.681 $15,938,140.486 $17,436,616.150 $20,535,040.176