BEXAR SL 368 (0016-08-039)

Items: 168

County: BEXAR
Length: N/A
Highway: SL 368
District: SAN ANTONIO
Control Number: 0016-08-039
DBE Goal: N/A
Project: BR 2021(485)
Guaranty: N/A
Time: 481 WORKING DAYS
Engineer's Estimate: $7,127,369.70
Date: 04/07/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$7,127,369.70
1
$6,974,796.99
Over/Under Est: -2.14% -$152,572.71
$7,495,533.42
Over/Under Est: 5.17% $368,163.72
Amt Left: 7.47% $520,736.43
Over/Under Est: 5.7% $406,508.99
Amt Left: 8.02% $559,081.70
Delta: -0.51% -$38,345.27
$7,724,583.74
Over/Under Est: 8.38% $597,214.04
Amt Left: 10.75% $749,786.75
Delta: -2.53% -$190,705.05
Over/Under Est: 12.02% $856,868.66
Amt Left: 14.47% $1,009,441.37
Delta: -3.36% -$259,654.62
Over/Under Est: 13.43% $957,175.95
Amt Left: 15.91% $1,109,748.66
Delta: -1.26% -$100,307.29
Over/Under Est: 17.96% $1,280,405.91
Amt Left: 20.55% $1,432,978.62
Delta: -4.00% -$323,229.96
Over/Under Est: 28.59% $2,037,786.36
Amt Left: 31.4% $2,190,359.07
Delta: -9.01% -$757,380.45
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 6.35% $459,024.64
TEXAS MATERIALS GROUP, INC. 3.99% $288,426.50
LIGHT IT UP ELECTRIC 3.37% $243,608.35
TEXAS ICON CONSTRUCTION, LLC 0.95% $68,672.98
TORO BRAVO CONSTRUCTION, LLC 0.62% $44,818.15
FLASHER EQUIPMENT COMPANY 0.52% $37,589.42
S & S BRIDGE PAINTING, INC. 0.16% $11,565.98
Total: 15.96% $1,153,706.02

Bid Items & Bid Tabulations

168 Total 0 of 168
BEXAR  |  SL 368  |  SAN ANTONIO  |  0016-08-039  |  04/07/2021  |  $7,127,369.70  |  BR 2021(485)  |  BRIDGE REPL  |  481 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
J.D. ABRAMS, L.P.
CAPITAL EXCAVATION COMPANY
J3 COMPANY, LLC
HARPER BROTHERS CONSTRUCTION LLC
ANGEL BROTHERS HOLDINGS CORP.
STERLING DELAWARE HOLDING COMPANY, INC.
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW
STA 21.500 $5,000.000 $2,500.000 $17,000.000 $2,750.000 $2,500.000 $13,953.000 $23,750.000 $19,700.000 $17,050.000
REMOVING CONC (RIPRAP)
SY 1,524.000 $10.000 $10.000 $9.000 $8.950 $15.000 $9.400 $16.000 $6.000 $12.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 279.000 $16.000 $10.000 $9.000 $13.300 $15.000 $7.770 $22.000 $8.000 $16.500
REMOVING STAB BASE & ASPH PAV (4"-11")
SY 4,674.000 $5.000 $5.000 $2.250 $9.450 $8.000 $4.000 $10.000 $7.000 $14.500
EXCAVATION (ROADWAY)
CY 8,051.000 $10.000 $10.000 $20.000 $24.000 $20.000 $16.000 $17.500 $19.000 $29.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 696.000 $36.000 $18.000 $36.000 $15.750 $60.000 $25.000 $45.000 $45.000 $47.000
COMPOST MANUF TOPSOIL (4")
SY 7,065.000 $2.500 $5.000 $3.000 $3.750 $2.660 $2.850 $2.000 $5.500 $4.650
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 7,065.000 $2.500 $0.960 $0.570 $0.300 $0.580 $0.580 $0.320 $0.580 $0.570
CELL FBR MLCH SEED(TEMP)(WARM)
SY 3,533.000 $0.500 $1.810 $0.590 $0.300 $0.380 $0.380 $0.280 $0.380 $0.590
CELL FBR MLCH SEED(TEMP)(COOL)
SY 3,533.000 $0.500 $1.810 $0.590 $0.300 $0.380 $0.380 $0.280 $0.380 $0.590
VEGETATIVE WATERING
MG 111.000 $11.000 $50.000 $27.000 $20.600 $24.790 $21.000 $25.000 $24.000 $7.680
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 7,065.000 $1.000 $2.000 $2.000 $0.800 $0.750 $0.750 $1.000 $0.750 $1.550
PROOF ROLLING
HR 85.000 $55.000 $85.000 $60.000 $73.600 $65.000 $58.000 $100.000 $105.000 $116.000
FL BS (CMP IN PLC) (TY D GR 1-2) (24")
SY 3,546.000 $50.000 $55.000 $35.000 $32.550 $19.000 $7.000 $39.000 $39.000 $48.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,137.000 $3.500 $3.300 $3.500 $3.050 $3.500 $3.000 $4.000 $3.400 $3.050
D-GR HMA(SQ) TY-B PG64-22
TON 1,967.000 $100.000 $68.750 $66.000 $70.000 $75.000 $85.000 $73.000 $77.000 $63.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 4.000 $180.000 $247.500 $235.000 $228.000 $290.000 $225.000 $275.000 $300.000 $230.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 36.000 $85.000 $220.000 $210.000 $203.000 $290.000 $200.000 $120.000 $300.000 $200.000
PLANE ASPH CONC PAV (2")
SY 11,160.000 $2.500 $1.100 $1.900 $1.000 $2.000 $1.000 $2.950 $1.800 $1.000
STRUCT EXCAV
CY 193.000 $5.000 $25.000 $0.010 $44.300 $20.000 $28.000 $21.000 $40.000 $45.000
STRUCT EXCAV (PIPE)
CY 101.000 $15.000 $30.000 $0.010 $23.850 $20.000 $60.000 $32.000 $40.000 $49.000
STRUCT EXCAV (BRIDGE)
CY 57.000 $100.000 $100.000 $0.010 $27.850 $20.000 $40.000 $85.000 $55.000 $88.000
CEM STABIL BKFL
CY 100.000 $85.000 $125.000 $175.000 $186.000 $140.000 $194.000 $235.000 $200.000 $270.000
CUT & RESTORE ASPH PAVING
SY 116.000 $75.000 $95.000 $75.000 $107.000 $75.000 $150.000 $105.000 $70.000 $220.000
TRENCH EXCAVATION PROTECTION
LF 144.000 $5.000 $20.000 $3.000 $12.950 $6.000 $1.000 $21.000 $1.000 $2.850
TEMPORARY SPL SHORING
SF 9,078.000 $25.000 $25.000 $5.000 $18.550 $20.000 $22.000 $27.500 $21.000 $29.000
DRILL SHAFT (36 IN)
LF 3,350.000 $180.000 $185.000 $150.000 $180.000 $170.000 $175.000 $163.000 $150.000 $188.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $400.000 $423.500 $255.000 $420.000 $405.000 $365.000 $405.000 $365.000 $270.000
CL B CONC (FLUME)
CY 13.000 $550.000 $742.000 $500.000 $840.000 $550.000 $700.000 $1,050.000 $760.000 $970.000
CL C CONC (ABUT)
CY 111.000 $900.000 $831.600 $1,000.000 $900.000 $900.000 $1,200.000 $1,050.000 $1,300.000 $1,450.000
CL C CONC (CAP)
CY 276.000 $900.000 $855.400 $1,250.000 $930.000 $1,000.000 $1,000.000 $1,050.000 $1,400.000 $1,300.000
CL C CONC (COLUMN)
CY 195.000 $900.000 $793.800 $1,250.000 $940.000 $850.000 $910.000 $900.000 $1,400.000 $1,500.000
CL C CONC (FOOTING)
CY 26.000 $520.000 $938.000 $1,150.000 $1,100.000 $800.000 $1,200.000 $1,150.000 $1,000.000 $1,560.000
REINF CONC SLAB
SF 39,980.000 $15.000 $14.000 $20.000 $16.500 $22.000 $15.500 $18.000 $20.000 $18.000
BRIDGE SIDEWALK
SF 8,840.000 $11.000 $10.500 $11.000 $9.000 $9.000 $12.000 $12.000 $11.000 $11.500
APPROACH SLAB
CY 425.100 $580.000 $425.000 $500.000 $660.000 $400.000 $500.000 $475.000 $550.000 $450.000
RETAINING WALL (MSE)
SF 8,226.000 $55.000 $55.000 $90.000 $85.000 $85.000 $75.000 $65.000 $80.000 $70.000
PRESTR CONC GIRDER (TX34)
LF 5,433.600 $140.000 $115.000 $115.000 $124.000 $135.000 $185.500 $117.000 $135.000 $135.000
RIPRAP (CONC)(4 IN)
CY 39.000 $370.000 $375.000 $500.000 $530.000 $550.000 $400.000 $650.000 $620.000 $890.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $450.000 $400.000 $600.000 $580.000 $700.000 $550.000 $500.000 $700.000 $1,800.000
STR STEEL (MISC NON - BRIDGE)
LB 12,600.000 $8.000 $7.000 $3.250 $8.250 $6.000 $13.000 $5.750 $7.000 $11.000
RAIL (TY C223)
LF 1,523.000 $125.000 $110.000 $180.000 $143.000 $115.000 $135.000 $120.000 $150.000 $149.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 312.000 $95.000 $105.000 $105.000 $129.000 $100.000 $110.000 $125.000 $140.000 $152.000
GABION MATTRESSES (GALV)(12 IN)
SY 5,539.900 $80.000 $75.000 $72.000 $63.600 $70.000 $62.000 $70.000 $80.000 $85.000
GABIONS (3' X 3')(GALV)
CY 228.200 $150.000 $185.000 $200.000 $179.000 $225.000 $175.000 $200.000 $200.000 $178.000
RC PIPE (ARCH)(CL III)(DES 4)
LF 112.000 $240.000 $215.000 $165.000 $184.000 $225.000 $220.000 $225.000 $230.000 $290.000
INLET (COMPL)(PSL)(RG)(4FTX4FT)
EA 3.000 $4,400.000 $4,800.000 $4,200.000 $3,750.000 $7,000.000 $7,000.000 $3,500.000 $8,400.000 $10,100.000
INLET (COMPL)(PSL)(RG)(5FTX5FT)
EA 1.000 $5,000.000 $6,500.000 $4,400.000 $4,360.000 $7,000.000 $7,000.000 $3,800.000 $8,600.000 $12,100.000
WINGWALL (SW - 0) (HW=3 FT)
EA 1.000 $6,000.000 $4,250.000 $6,000.000 $2,680.000 $8,000.000 $12,000.000 $13,750.000 $9,400.000 $23,000.000
REMOV STR (PIPE)
LF 68.000 $30.000 $50.000 $30.000 $17.500 $75.000 $50.000 $29.000 $25.000 $73.260
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $150,000.000 $200,000.000 $229,000.000 $300,000.000 $300,000.000 $265,000.000 $224,000.000 $246,000.000
REMOV STR(LRG PED BRG) 0-50 FT LENGTH
EA 1.000 $10,000.000 $25,000.000 $2,727.000 $6,700.000 $10,000.000 $23,500.000 $8,500.000 $7,000.000 $6,500.000
MOBILIZATION
LS 1.000 $648,000.000 $600,000.000 $540,000.000 $720,000.000 $610,000.000 $680,000.000 $800,000.000 $830,000.000 $915,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $8,000.000 $3,500.000 $3,500.000 $3,630.000 $8,000.000 $1,900.000 $7,500.000 $3,600.000 $9,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $15.000 $36.300 $10.000 $10.250 $10.000 $10.000 $15.000 $10.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $7.000 $20.840 $2.000 $2.050 $2.000 $2.000 $2.000 $2.000 $2.050
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,320.000 $2.500 $3.900 $3.000 $1.800 $1.750 $1.750 $2.000 $2.000 $1.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,320.000 $0.750 $1.210 $0.600 $0.600 $0.600 $0.600 $0.600 $0.600 $0.610
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,082.000 $5.000 $9.400 $6.000 $5.650 $5.500 $5.500 $5.500 $5.500 $5.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,082.000 $1.000 $1.480 $1.000 $1.050 $1.000 $1.000 $1.000 $1.000 $1.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 80.000 $4.000 $22.000 $6.000 $5.150 $5.000 $5.000 $5.000 $5.000 $5.100
CONSTRUCTING DETOURS
SY 46.000 $60.000 $150.000 $250.000 $87.700 $100.000 $500.000 $165.000 $235.000 $220.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,000.000 $10.000 $25.000 $45.000 $9.950 $50.000 $25.000 $36.000 $13.000 $46.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,769.000 $15.000 $25.000 $30.000 $38.650 $30.000 $45.000 $36.000 $13.000 $27.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 140.000 $20.000 $25.000 $60.000 $40.600 $50.000 $70.000 $36.000 $13.000 $71.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 438.000 $8.000 $10.000 $12.000 $6.850 $12.000 $8.000 $7.000 $10.000 $11.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 140.000 $8.000 $10.000 $15.000 $10.500 $12.000 $35.000 $7.000 $10.000 $29.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,020.000 $8.000 $12.000 $7.000 $8.050 $20.000 $12.500 $12.000 $10.000 $15.500
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,769.000 $8.000 $12.000 $8.000 $7.400 $20.000 $12.500 $12.000 $11.000 $16.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 180.000 $8.000 $12.000 $10.000 $8.900 $20.000 $25.000 $12.000 $11.000 $26.000
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
LF 40.000 $175.000 $350.000 $165.000 $54.100 $150.000 $60.000 $160.000 $175.000 $470.000
CONC CURB (TY I)
LF 738.000 $10.000 $22.000 $10.000 $20.750 $18.000 $20.000 $27.000 $26.000 $39.000
CONC SIDEWALKS (4")
SY 273.000 $50.000 $55.000 $90.000 $65.700 $50.000 $80.000 $85.000 $75.000 $114.000
CURB RAMPS (TY 1)
EA 2.000 $2,000.000 $1,800.000 $2,200.000 $1,200.000 $1,500.000 $2,000.000 $2,400.000 $2,900.000 $2,700.000
CURB RAMPS (TY 10)
EA 4.000 $2,200.000 $1,800.000 $2,200.000 $3,030.000 $1,500.000 $2,000.000 $3,000.000 $2,900.000 $2,700.000
MTL W-BEAM GD FEN (STEEL POST)
LF 190.500 $32.000 $34.580 $32.000 $28.700 $28.000 $30.000 $30.000 $28.000 $51.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,105.000 $1,534.500 $1,200.000 $1,130.000 $1,100.000 $1,100.000 $1,200.000 $1,100.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 664.000 $2.000 $1.700 $2.000 $2.050 $2.000 $2.000 $2.000 $2.000 $6.100
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,900.000 $2,717.000 $2,600.000 $2,490.000 $2,430.000 $2,500.000 $2,430.000 $2,430.000 $2,900.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 1.000 $16,000.000 $28,000.000 $15,000.000 $15,500.000 $15,140.000 $20,000.000 $16,000.000 $15,140.000 $17,400.000
REMOVE RD IL ASM (U/P)
EA 5.000 $300.000 $434.500 $175.000 $430.000 $430.000 $295.000 $430.000 $295.000 $189.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,400.000 $1,760.000 $1,450.000 $1,750.000 $1,700.000 $1,400.000 $1,700.000 $1,400.000 $1,570.000
CONDT (PVC) (SCH 40) (1")
LF 1,597.000 $15.000 $15.400 $9.000 $15.350 $17.000 $13.000 $17.000 $13.000 $9.750
CONDT (PVC) (SCH 40) (1 1/2")
LF 436.000 $40.000 $18.700 $10.000 $18.650 $20.500 $14.000 $20.500 $14.000 $11.000
CONDT (PVC) (SCH 80) (1")
LF 398.000 $16.000 $38.500 $9.000 $38.400 $26.500 $14.000 $26.500 $14.000 $9.750
CONDT (RM) (1")
LF 677.000 $25.000 $27.500 $21.000 $27.400 $22.000 $25.000 $22.000 $25.000 $23.000
CONDT (RM) (1 1/2")
LF 1,112.000 $25.000 $33.000 $20.000 $32.900 $23.000 $40.000 $23.000 $40.000 $22.000
ELEC CONDR (NO.10) INSULATED
LF 17,162.000 $1.500 $1.430 $1.100 $1.450 $1.800 $1.350 $1.800 $1.350 $1.200
ELEC CONDR (NO.3) INSULATED
LF 98.000 $2.000 $3.460 $2.750 $3.450 $4.600 $4.000 $4.600 $4.000 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 435.000 $2.150 $2.750 $1.950 $2.750 $3.000 $3.000 $3.000 $3.000 $2.100
GROUND BOX TY B (122322)W/APRON
EA 4.000 $1,750.000 $1,061.500 $1,200.000 $1,060.000 $1,200.000 $1,150.000 $1,200.000 $1,150.000 $1,300.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,110.000 $1,210.000 $1,000.000 $1,210.000 $1,450.000 $1,250.000 $1,450.000 $1,250.000 $1,080.000
REMOVE GROUND BOX
EA 5.000 $170.000 $192.500 $150.000 $192.000 $160.000 $225.000 $160.000 $225.000 $162.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 185.000 $2.750 $12.100 $4.000 $12.050 $5.500 $5.000 $5.500 $5.000 $4.350
TIMBER POLE (CL 2) 30 FT
EA 1.000 $520.000 $1,853.500 $520.000 $1,850.000 $2,450.000 $1,750.000 $2,450.000 $1,750.000 $560.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $500.000 $676.500 $225.000 $670.000 $410.000 $400.000 $410.000 $400.000 $240.000
ELC SRV TY D 120/240 100(NS)SS(E)EX(U)
EA 2.000 $6,000.000 $4,950.000 $5,500.000 $4,930.000 $7,500.000 $5,000.000 $7,500.000 $5,000.000 $6,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $500.000 $676.500 $520.000 $510.000 $497.000 $589.520 $520.000 $497.000 $520.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,110.000 $2,194.500 $1,900.000 $2,190.000 $2,400.000 $2,294.560 $1,900.000 $2,753.500 $1,900.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $2,500.000 $2,326.500 $1,900.000 $2,320.000 $2,400.000 $2,329.460 $1,900.000 $2,753.500 $1,900.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $55.000 $75.000 $97.400 $95.000 $250.000 $75.000 $95.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 30.000 $25.000 $30.000 $24.000 $20.500 $20.000 $18.160 $24.000 $20.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $26.000 $30.000 $30.000 $25.650 $25.000 $23.350 $20.000 $25.000 $30.000
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
EA 1.000 $25.000 $100.000 $100.000 $280.000 $275.000 $525.000 $100.000 $275.000 $100.000
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 289.000 $4.000 $3.420 $3.110 $3.200 $3.110 $3.110 $3.110 $3.110 $3.100
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 327.000 $4.000 $3.420 $3.110 $3.200 $3.110 $3.110 $3.110 $3.110 $3.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 11,476.000 $0.750 $0.530 $0.490 $0.500 $0.490 $0.490 $0.490 $0.490 $0.490
WK ZN PAV MRK REMOV (W)(ARROW)
EA 5.000 $160.000 $165.000 $150.000 $154.000 $150.000 $150.000 $150.000 $150.000 $150.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 2,149.000 $0.900 $0.850 $0.780 $0.800 $0.780 $0.780 $0.780 $0.780 $0.780
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 13,864.000 $0.750 $0.530 $0.490 $0.500 $0.490 $0.490 $0.490 $0.490 $0.490
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 113.000 $8.000 $8.800 $8.000 $8.200 $8.000 $8.000 $8.000 $8.000 $8.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 245.000 $1.000 $1.100 $1.000 $1.050 $1.000 $1.000 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 127.000 $6.000 $6.600 $6.000 $6.150 $6.000 $6.000 $6.000 $6.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 10.000 $150.000 $165.000 $150.000 $154.000 $150.000 $150.000 $150.000 $150.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $150.000 $165.000 $150.000 $154.000 $150.000 $150.000 $150.000 $150.000 $150.000
PAVEMENT SEALER 4"
LF 15,994.000 $0.250 $0.160 $0.150 $0.150 $0.150 $0.150 $0.150 $0.150 $0.150
PAVEMENT SEALER 8"
LF 245.000 $1.250 $1.100 $1.000 $1.050 $1.000 $1.000 $1.000 $1.000 $1.000
PAVEMENT SEALER 24"
LF 127.000 $2.000 $3.300 $3.000 $3.100 $3.000 $3.000 $3.000 $3.000 $3.000
PAVEMENT SEALER (ARROW)
EA 10.000 $50.000 $62.700 $57.000 $58.500 $57.000 $57.000 $57.000 $57.000 $57.000
PAVEMENT SEALER (WORD)
EA 2.000 $50.000 $110.000 $100.000 $103.000 $100.000 $100.000 $100.000 $100.000 $100.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,268.000 $0.500 $0.440 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,114.000 $0.500 $0.440 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,297.000 $0.500 $0.440 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,070.000 $0.500 $0.440 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400 $0.400
REFL PAV MRKR TY II-A-A
EA 170.000 $4.000 $5.500 $5.000 $5.150 $5.000 $5.000 $5.000 $5.000 $5.000
REFL PAV MRKR TY II-C-R
EA 160.000 $4.000 $5.500 $5.000 $5.150 $5.000 $5.000 $5.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 11,987.000 $0.300 $0.400 $0.370 $0.400 $0.370 $0.370 $0.370 $0.370 $0.370
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $100.000 $110.000 $100.000 $103.000 $100.000 $100.000 $100.000 $100.000 $100.000
PAV SURF PREP FOR MRK (RPM)
EA 330.000 $0.750 $2.200 $2.000 $2.050 $2.000 $2.000 $2.000 $2.000 $2.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $20,000.000 $4,730.000 $30,000.000 $4,720.000 $14,200.000 $3,500.000 $25,000.000 $3,500.000 $27,000.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $230.000 $297.000 $235.000 $300.000 $350.000 $275.000 $235.000 $275.000 $250.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $230.000 $297.000 $235.000 $300.000 $350.000 $275.000 $235.000 $275.000 $250.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 865.000 $2.000 $4.400 $1.800 $4.400 $2.600 $2.500 $1.800 $2.500 $1.950
TRF SIG CBL (TY A)(18 AWG)(7 CONDR)
LF 5,860.000 $2.750 $3.850 $1.950 $3.850 $3.000 $2.500 $1.950 $2.500 $2.100
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,000.000 $3,850.000 $3,200.000 $3,840.000 $4,100.000 $3,500.000 $3,200.000 $3,500.000 $3,500.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 1.000 $4,200.000 $9,680.000 $5,600.000 $9,700.000 $8,700.000 $7,700.000 $5,600.000 $7,700.000 $6,100.000
REMOVAL OF CABLES
LF 155.000 $0.710 $0.820 $0.500 $0.800 $1.300 $1.350 $0.500 $1.350 $0.540
REMOVAL OF SPAN CABLE ASSM
LF 515.000 $1.000 $0.820 $1.650 $0.800 $1.800 $2.000 $1.650 $2.000 $1.800
REMOVAL OF SIGNAL HEAD ASSM
EA 6.000 $170.930 $192.500 $85.000 $192.000 $100.000 $100.000 $85.000 $100.000 $92.000
REMOVAL OF TRAFFIC SIGNAL POLE FND
LF 26.000 $500.000 $2.200 $450.000 $660.000 $640.000 $400.000 $450.000 $400.000 $490.000
REMOVAL OF SIGNAL POLE ASSM
EA 2.000 $4,250.000 $940.500 $850.000 $940.000 $350.000 $1,500.000 $850.000 $1,500.000 $920.000
FULL - WIDTH MOWING
CYC 10.000 $500.000 $2,500.000 $700.000 $550.000 $820.300 $2,000.000 $1,000.000 $1,900.000 $1,590.000
LITTER REMOVAL
CYC 30.000 $1,500.000 $2,500.000 $450.000 $250.000 $800.000 $200.000 $300.000 $850.000 $1,600.000
CLEAN/SWEEP AREA 1
CYC 30.000 $750.000 $1,500.000 $650.000 $400.000 $450.000 $200.000 $300.000 $250.000 $1,500.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 6,505.000 $1.000 $0.500 $1.750 $0.800 $1.250 $0.790 $0.900 $1.500 $0.790
TREE REMOVAL (18" - 24" DIA)
EA 5.000 $1,000.000 $1,100.000 $1,000.000 $1,000.000 $500.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000
TREE REMOVAL (24" - 30" DIA)
EA 1.000 $2,000.000 $2,200.000 $1,500.000 $2,000.000 $1,000.000 $2,000.000 $2,000.000 $1,300.000 $2,000.000
TREE REMOVAL (30" - 36" DIA)
EA 1.000 $3,000.000 $3,300.000 $2,500.000 $3,000.000 $1,200.000 $3,000.000 $3,000.000 $1,600.000 $3,000.000
SP MIXES SP-D SAC-B PG70-22
TON 1,760.000 $90.000 $85.800 $80.000 $85.000 $84.000 $78.000 $80.000 $85.000 $79.000
TACK COAT
GAL 1,111.000 $3.500 $2.750 $2.600 $2.550 $3.500 $2.500 $3.250 $3.300 $2.550
UNDERSEAL COURSE
GAL 766.000 $3.500 $4.400 $4.250 $4.050 $3.750 $4.000 $3.250 $3.500 $4.050
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $800.000 $200.000 $310.000 $300.000 $100.000 $325.000 $125.000 $1,230.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $8,000.000 $15,000.000 $0.010 $9,400.000 $4,500.000 $14,000.000 $8,000.000 $14,000.000 $19,500.000
CONDUIT (PREPARE)
LF 35.000 $3.000 $2.200 $0.500 $2.200 $4.000 $3.000 $0.500 $3.000 $0.540
GROUND BOX (PREPARE)
EA 2.000 $331.060 $192.500 $125.000 $192.000 $160.000 $200.000 $125.000 $200.000 $135.000
TMA (MOBILE OPERATION)
DAY 3.000 $150.000 $350.000 $750.000 $410.000 $1,000.000 $750.000 $1,600.000 $330.000 $880.000
TRENCH EXCAVATION PROTECTION
LF 227.000 $2.000 $30.000 $14.000 $206.000 $6.000 $1.000 $14.000 $5.000 $6.000
DUCTILE IRON FITTINGS
TON 2.230 $5,000.000 $9,500.000 $9,500.000 $16,100.000 $5,500.000 $2,300.000 $9,110.000 $122.000 $5,400.000
HYDROSTATIC PRESSURE TEST
EA 1.000 $2,000.000 $1,500.000 $3,500.000 $10,500.000 $6,000.000 $1,900.000 $3,225.000 $5,230.000 $4,500.000
TEMPORARY BLOW-OFF(COMPLETE)(2")
EA 3.000 $1,500.000 $1,500.000 $3,125.000 $2,230.000 $5,000.000 $6,000.000 $2,998.000 $2,975.000 $4,300.000
FLOWABLE FILL BACKFILL
CY 11.000 $150.000 $165.000 $200.000 $350.000 $200.000 $110.000 $158.000 $299.000 $200.000
GATE VALVE & BOX (COMPLETE)(16")
EA 1.000 $7,000.000 $4,000.000 $7,250.000 $8,100.000 $18,000.000 $11,028.750 $6,920.000 $9,510.000 $18,300.000
TIE-IN (COMPLETE)(16")
EA 3.000 $3,500.000 $5,000.000 $11,000.000 $6,700.000 $7,500.000 $7,679.790 $10,020.000 $7,060.000 $3,200.000
AIR RELEASE VALVE (COMPLETE)(1")
EA 1.000 $3,000.000 $1,500.000 $2,800.000 $4,000.000 $5,000.000 $6,000.840 $2,592.000 $3,665.000 $3,800.000
PIPE WATER MAIN (PVC) (16")
LF 229.000 $100.000 $100.000 $275.000 $220.000 $200.000 $179.820 $252.000 $296.000 $112.000
STEEL CASING (30") (BORE)
LF 198.000 $150.000 $300.000 $200.000 $215.000 $200.000 $27.350 $171.000 $183.000 $194.000
CARRIER PIPE (PVC)(16")
LF 198.000 $110.000 $65.000 $165.000 $139.000 $200.000 $206.330 $147.000 $159.000 $215.000
WTR(JACK, BORE, OR TUNNEL)(30")
LF 198.000 $350.000 $550.000 $525.000 $630.000 $550.000 $1,000.000 $470.000 $502.000 $515.000
Totals: $7,127,369.700 $6,974,796.990 $7,495,533.420 $7,533,878.690 $7,724,583.740 $7,984,238.360 $8,084,545.650 $8,407,775.610 $9,165,156.060