PREPARING ROW
|
STA
|
21.500
|
$5,000.000
|
$2,500.000
|
$17,000.000
|
$2,750.000
|
$2,500.000
|
$13,953.000
|
$23,750.000
|
$19,700.000
|
$17,050.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,524.000
|
$10.000
|
$10.000
|
$9.000
|
$8.950
|
$15.000
|
$9.400
|
$16.000
|
$6.000
|
$12.500
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
279.000
|
$16.000
|
$10.000
|
$9.000
|
$13.300
|
$15.000
|
$7.770
|
$22.000
|
$8.000
|
$16.500
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-11")
|
SY
|
4,674.000
|
$5.000
|
$5.000
|
$2.250
|
$9.450
|
$8.000
|
$4.000
|
$10.000
|
$7.000
|
$14.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,051.000
|
$10.000
|
$10.000
|
$20.000
|
$24.000
|
$20.000
|
$16.000
|
$17.500
|
$19.000
|
$29.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
696.000
|
$36.000
|
$18.000
|
$36.000
|
$15.750
|
$60.000
|
$25.000
|
$45.000
|
$45.000
|
$47.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,065.000
|
$2.500
|
$5.000
|
$3.000
|
$3.750
|
$2.660
|
$2.850
|
$2.000
|
$5.500
|
$4.650
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
7,065.000
|
$2.500
|
$0.960
|
$0.570
|
$0.300
|
$0.580
|
$0.580
|
$0.320
|
$0.580
|
$0.570
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
3,533.000
|
$0.500
|
$1.810
|
$0.590
|
$0.300
|
$0.380
|
$0.380
|
$0.280
|
$0.380
|
$0.590
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
3,533.000
|
$0.500
|
$1.810
|
$0.590
|
$0.300
|
$0.380
|
$0.380
|
$0.280
|
$0.380
|
$0.590
|
|
|
VEGETATIVE WATERING
|
MG
|
111.000
|
$11.000
|
$50.000
|
$27.000
|
$20.600
|
$24.790
|
$21.000
|
$25.000
|
$24.000
|
$7.680
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
7,065.000
|
$1.000
|
$2.000
|
$2.000
|
$0.800
|
$0.750
|
$0.750
|
$1.000
|
$0.750
|
$1.550
|
|
|
PROOF ROLLING
|
HR
|
85.000
|
$55.000
|
$85.000
|
$60.000
|
$73.600
|
$65.000
|
$58.000
|
$100.000
|
$105.000
|
$116.000
|
|
|
FL BS (CMP IN PLC) (TY D GR 1-2) (24")
|
SY
|
3,546.000
|
$50.000
|
$55.000
|
$35.000
|
$32.550
|
$19.000
|
$7.000
|
$39.000
|
$39.000
|
$48.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,137.000
|
$3.500
|
$3.300
|
$3.500
|
$3.050
|
$3.500
|
$3.000
|
$4.000
|
$3.400
|
$3.050
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
1,967.000
|
$100.000
|
$68.750
|
$66.000
|
$70.000
|
$75.000
|
$85.000
|
$73.000
|
$77.000
|
$63.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
4.000
|
$180.000
|
$247.500
|
$235.000
|
$228.000
|
$290.000
|
$225.000
|
$275.000
|
$300.000
|
$230.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
36.000
|
$85.000
|
$220.000
|
$210.000
|
$203.000
|
$290.000
|
$200.000
|
$120.000
|
$300.000
|
$200.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
11,160.000
|
$2.500
|
$1.100
|
$1.900
|
$1.000
|
$2.000
|
$1.000
|
$2.950
|
$1.800
|
$1.000
|
|
|
STRUCT EXCAV
|
CY
|
193.000
|
$5.000
|
$25.000
|
$0.010
|
$44.300
|
$20.000
|
$28.000
|
$21.000
|
$40.000
|
$45.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
101.000
|
$15.000
|
$30.000
|
$0.010
|
$23.850
|
$20.000
|
$60.000
|
$32.000
|
$40.000
|
$49.000
|
|
|
STRUCT EXCAV (BRIDGE)
|
CY
|
57.000
|
$100.000
|
$100.000
|
$0.010
|
$27.850
|
$20.000
|
$40.000
|
$85.000
|
$55.000
|
$88.000
|
|
|
CEM STABIL BKFL
|
CY
|
100.000
|
$85.000
|
$125.000
|
$175.000
|
$186.000
|
$140.000
|
$194.000
|
$235.000
|
$200.000
|
$270.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
116.000
|
$75.000
|
$95.000
|
$75.000
|
$107.000
|
$75.000
|
$150.000
|
$105.000
|
$70.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
144.000
|
$5.000
|
$20.000
|
$3.000
|
$12.950
|
$6.000
|
$1.000
|
$21.000
|
$1.000
|
$2.850
|
|
|
TEMPORARY SPL SHORING
|
SF
|
9,078.000
|
$25.000
|
$25.000
|
$5.000
|
$18.550
|
$20.000
|
$22.000
|
$27.500
|
$21.000
|
$29.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,350.000
|
$180.000
|
$185.000
|
$150.000
|
$180.000
|
$170.000
|
$175.000
|
$163.000
|
$150.000
|
$188.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$400.000
|
$423.500
|
$255.000
|
$420.000
|
$405.000
|
$365.000
|
$405.000
|
$365.000
|
$270.000
|
|
|
CL B CONC (FLUME)
|
CY
|
13.000
|
$550.000
|
$742.000
|
$500.000
|
$840.000
|
$550.000
|
$700.000
|
$1,050.000
|
$760.000
|
$970.000
|
|
|
CL C CONC (ABUT)
|
CY
|
111.000
|
$900.000
|
$831.600
|
$1,000.000
|
$900.000
|
$900.000
|
$1,200.000
|
$1,050.000
|
$1,300.000
|
$1,450.000
|
|
|
CL C CONC (CAP)
|
CY
|
276.000
|
$900.000
|
$855.400
|
$1,250.000
|
$930.000
|
$1,000.000
|
$1,000.000
|
$1,050.000
|
$1,400.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
195.000
|
$900.000
|
$793.800
|
$1,250.000
|
$940.000
|
$850.000
|
$910.000
|
$900.000
|
$1,400.000
|
$1,500.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
26.000
|
$520.000
|
$938.000
|
$1,150.000
|
$1,100.000
|
$800.000
|
$1,200.000
|
$1,150.000
|
$1,000.000
|
$1,560.000
|
|
|
REINF CONC SLAB
|
SF
|
39,980.000
|
$15.000
|
$14.000
|
$20.000
|
$16.500
|
$22.000
|
$15.500
|
$18.000
|
$20.000
|
$18.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
8,840.000
|
$11.000
|
$10.500
|
$11.000
|
$9.000
|
$9.000
|
$12.000
|
$12.000
|
$11.000
|
$11.500
|
|
|
APPROACH SLAB
|
CY
|
425.100
|
$580.000
|
$425.000
|
$500.000
|
$660.000
|
$400.000
|
$500.000
|
$475.000
|
$550.000
|
$450.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
8,226.000
|
$55.000
|
$55.000
|
$90.000
|
$85.000
|
$85.000
|
$75.000
|
$65.000
|
$80.000
|
$70.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
5,433.600
|
$140.000
|
$115.000
|
$115.000
|
$124.000
|
$135.000
|
$185.500
|
$117.000
|
$135.000
|
$135.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
39.000
|
$370.000
|
$375.000
|
$500.000
|
$530.000
|
$550.000
|
$400.000
|
$650.000
|
$620.000
|
$890.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.000
|
$450.000
|
$400.000
|
$600.000
|
$580.000
|
$700.000
|
$550.000
|
$500.000
|
$700.000
|
$1,800.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
12,600.000
|
$8.000
|
$7.000
|
$3.250
|
$8.250
|
$6.000
|
$13.000
|
$5.750
|
$7.000
|
$11.000
|
|
|
RAIL (TY C223)
|
LF
|
1,523.000
|
$125.000
|
$110.000
|
$180.000
|
$143.000
|
$115.000
|
$135.000
|
$120.000
|
$150.000
|
$149.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
312.000
|
$95.000
|
$105.000
|
$105.000
|
$129.000
|
$100.000
|
$110.000
|
$125.000
|
$140.000
|
$152.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
5,539.900
|
$80.000
|
$75.000
|
$72.000
|
$63.600
|
$70.000
|
$62.000
|
$70.000
|
$80.000
|
$85.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
228.200
|
$150.000
|
$185.000
|
$200.000
|
$179.000
|
$225.000
|
$175.000
|
$200.000
|
$200.000
|
$178.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
112.000
|
$240.000
|
$215.000
|
$165.000
|
$184.000
|
$225.000
|
$220.000
|
$225.000
|
$230.000
|
$290.000
|
|
|
INLET (COMPL)(PSL)(RG)(4FTX4FT)
|
EA
|
3.000
|
$4,400.000
|
$4,800.000
|
$4,200.000
|
$3,750.000
|
$7,000.000
|
$7,000.000
|
$3,500.000
|
$8,400.000
|
$10,100.000
|
|
|
INLET (COMPL)(PSL)(RG)(5FTX5FT)
|
EA
|
1.000
|
$5,000.000
|
$6,500.000
|
$4,400.000
|
$4,360.000
|
$7,000.000
|
$7,000.000
|
$3,800.000
|
$8,600.000
|
$12,100.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
1.000
|
$6,000.000
|
$4,250.000
|
$6,000.000
|
$2,680.000
|
$8,000.000
|
$12,000.000
|
$13,750.000
|
$9,400.000
|
$23,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
68.000
|
$30.000
|
$50.000
|
$30.000
|
$17.500
|
$75.000
|
$50.000
|
$29.000
|
$25.000
|
$73.260
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$150,000.000
|
$200,000.000
|
$229,000.000
|
$300,000.000
|
$300,000.000
|
$265,000.000
|
$224,000.000
|
$246,000.000
|
|
|
REMOV STR(LRG PED BRG) 0-50 FT LENGTH
|
EA
|
1.000
|
$10,000.000
|
$25,000.000
|
$2,727.000
|
$6,700.000
|
$10,000.000
|
$23,500.000
|
$8,500.000
|
$7,000.000
|
$6,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$648,000.000
|
$600,000.000
|
$540,000.000
|
$720,000.000
|
$610,000.000
|
$680,000.000
|
$800,000.000
|
$830,000.000
|
$915,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$8,000.000
|
$3,500.000
|
$3,500.000
|
$3,630.000
|
$8,000.000
|
$1,900.000
|
$7,500.000
|
$3,600.000
|
$9,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
448.000
|
$15.000
|
$36.300
|
$10.000
|
$10.250
|
$10.000
|
$10.000
|
$15.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
448.000
|
$7.000
|
$20.840
|
$2.000
|
$2.050
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.050
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,320.000
|
$2.500
|
$3.900
|
$3.000
|
$1.800
|
$1.750
|
$1.750
|
$2.000
|
$2.000
|
$1.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,320.000
|
$0.750
|
$1.210
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.610
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,082.000
|
$5.000
|
$9.400
|
$6.000
|
$5.650
|
$5.500
|
$5.500
|
$5.500
|
$5.500
|
$5.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,082.000
|
$1.000
|
$1.480
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
80.000
|
$4.000
|
$22.000
|
$6.000
|
$5.150
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
46.000
|
$60.000
|
$150.000
|
$250.000
|
$87.700
|
$100.000
|
$500.000
|
$165.000
|
$235.000
|
$220.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,000.000
|
$10.000
|
$25.000
|
$45.000
|
$9.950
|
$50.000
|
$25.000
|
$36.000
|
$13.000
|
$46.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,769.000
|
$15.000
|
$25.000
|
$30.000
|
$38.650
|
$30.000
|
$45.000
|
$36.000
|
$13.000
|
$27.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$20.000
|
$25.000
|
$60.000
|
$40.600
|
$50.000
|
$70.000
|
$36.000
|
$13.000
|
$71.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
438.000
|
$8.000
|
$10.000
|
$12.000
|
$6.850
|
$12.000
|
$8.000
|
$7.000
|
$10.000
|
$11.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$8.000
|
$10.000
|
$15.000
|
$10.500
|
$12.000
|
$35.000
|
$7.000
|
$10.000
|
$29.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,020.000
|
$8.000
|
$12.000
|
$7.000
|
$8.050
|
$20.000
|
$12.500
|
$12.000
|
$10.000
|
$15.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,769.000
|
$8.000
|
$12.000
|
$8.000
|
$7.400
|
$20.000
|
$12.500
|
$12.000
|
$11.000
|
$16.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$8.000
|
$12.000
|
$10.000
|
$8.900
|
$20.000
|
$25.000
|
$12.000
|
$11.000
|
$26.000
|
|
|
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
|
LF
|
40.000
|
$175.000
|
$350.000
|
$165.000
|
$54.100
|
$150.000
|
$60.000
|
$160.000
|
$175.000
|
$470.000
|
|
|
CONC CURB (TY I)
|
LF
|
738.000
|
$10.000
|
$22.000
|
$10.000
|
$20.750
|
$18.000
|
$20.000
|
$27.000
|
$26.000
|
$39.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
273.000
|
$50.000
|
$55.000
|
$90.000
|
$65.700
|
$50.000
|
$80.000
|
$85.000
|
$75.000
|
$114.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$2,000.000
|
$1,800.000
|
$2,200.000
|
$1,200.000
|
$1,500.000
|
$2,000.000
|
$2,400.000
|
$2,900.000
|
$2,700.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$2,200.000
|
$1,800.000
|
$2,200.000
|
$3,030.000
|
$1,500.000
|
$2,000.000
|
$3,000.000
|
$2,900.000
|
$2,700.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
190.500
|
$32.000
|
$34.580
|
$32.000
|
$28.700
|
$28.000
|
$30.000
|
$30.000
|
$28.000
|
$51.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$1,105.000
|
$1,534.500
|
$1,200.000
|
$1,130.000
|
$1,100.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
664.000
|
$2.000
|
$1.700
|
$2.000
|
$2.050
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$6.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,900.000
|
$2,717.000
|
$2,600.000
|
$2,490.000
|
$2,430.000
|
$2,500.000
|
$2,430.000
|
$2,430.000
|
$2,900.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
|
EA
|
1.000
|
$16,000.000
|
$28,000.000
|
$15,000.000
|
$15,500.000
|
$15,140.000
|
$20,000.000
|
$16,000.000
|
$15,140.000
|
$17,400.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
5.000
|
$300.000
|
$434.500
|
$175.000
|
$430.000
|
$430.000
|
$295.000
|
$430.000
|
$295.000
|
$189.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,400.000
|
$1,760.000
|
$1,450.000
|
$1,750.000
|
$1,700.000
|
$1,400.000
|
$1,700.000
|
$1,400.000
|
$1,570.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
1,597.000
|
$15.000
|
$15.400
|
$9.000
|
$15.350
|
$17.000
|
$13.000
|
$17.000
|
$13.000
|
$9.750
|
|
|
CONDT (PVC) (SCH 40) (1 1/2")
|
LF
|
436.000
|
$40.000
|
$18.700
|
$10.000
|
$18.650
|
$20.500
|
$14.000
|
$20.500
|
$14.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 80) (1")
|
LF
|
398.000
|
$16.000
|
$38.500
|
$9.000
|
$38.400
|
$26.500
|
$14.000
|
$26.500
|
$14.000
|
$9.750
|
|
|
CONDT (RM) (1")
|
LF
|
677.000
|
$25.000
|
$27.500
|
$21.000
|
$27.400
|
$22.000
|
$25.000
|
$22.000
|
$25.000
|
$23.000
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
1,112.000
|
$25.000
|
$33.000
|
$20.000
|
$32.900
|
$23.000
|
$40.000
|
$23.000
|
$40.000
|
$22.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
17,162.000
|
$1.500
|
$1.430
|
$1.100
|
$1.450
|
$1.800
|
$1.350
|
$1.800
|
$1.350
|
$1.200
|
|
|
ELEC CONDR (NO.3) INSULATED
|
LF
|
98.000
|
$2.000
|
$3.460
|
$2.750
|
$3.450
|
$4.600
|
$4.000
|
$4.600
|
$4.000
|
$3.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
435.000
|
$2.150
|
$2.750
|
$1.950
|
$2.750
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$2.100
|
|
|
GROUND BOX TY B (122322)W/APRON
|
EA
|
4.000
|
$1,750.000
|
$1,061.500
|
$1,200.000
|
$1,060.000
|
$1,200.000
|
$1,150.000
|
$1,200.000
|
$1,150.000
|
$1,300.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,110.000
|
$1,210.000
|
$1,000.000
|
$1,210.000
|
$1,450.000
|
$1,250.000
|
$1,450.000
|
$1,250.000
|
$1,080.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
$170.000
|
$192.500
|
$150.000
|
$192.000
|
$160.000
|
$225.000
|
$160.000
|
$225.000
|
$162.000
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
185.000
|
$2.750
|
$12.100
|
$4.000
|
$12.050
|
$5.500
|
$5.000
|
$5.500
|
$5.000
|
$4.350
|
|
|
TIMBER POLE (CL 2) 30 FT
|
EA
|
1.000
|
$520.000
|
$1,853.500
|
$520.000
|
$1,850.000
|
$2,450.000
|
$1,750.000
|
$2,450.000
|
$1,750.000
|
$560.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$500.000
|
$676.500
|
$225.000
|
$670.000
|
$410.000
|
$400.000
|
$410.000
|
$400.000
|
$240.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(E)EX(U)
|
EA
|
2.000
|
$6,000.000
|
$4,950.000
|
$5,500.000
|
$4,930.000
|
$7,500.000
|
$5,000.000
|
$7,500.000
|
$5,000.000
|
$6,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$500.000
|
$676.500
|
$520.000
|
$510.000
|
$497.000
|
$589.520
|
$520.000
|
$497.000
|
$520.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,110.000
|
$2,194.500
|
$1,900.000
|
$2,190.000
|
$2,400.000
|
$2,294.560
|
$1,900.000
|
$2,753.500
|
$1,900.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$2,500.000
|
$2,326.500
|
$1,900.000
|
$2,320.000
|
$2,400.000
|
$2,329.460
|
$1,900.000
|
$2,753.500
|
$1,900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$100.000
|
$55.000
|
$75.000
|
$97.400
|
$95.000
|
$250.000
|
$75.000
|
$95.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
30.000
|
$25.000
|
$30.000
|
$24.000
|
$20.500
|
$20.000
|
$18.160
|
$24.000
|
$20.000
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$26.000
|
$30.000
|
$30.000
|
$25.650
|
$25.000
|
$23.350
|
$20.000
|
$25.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
1.000
|
$25.000
|
$100.000
|
$100.000
|
$280.000
|
$275.000
|
$525.000
|
$100.000
|
$275.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
289.000
|
$4.000
|
$3.420
|
$3.110
|
$3.200
|
$3.110
|
$3.110
|
$3.110
|
$3.110
|
$3.100
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
327.000
|
$4.000
|
$3.420
|
$3.110
|
$3.200
|
$3.110
|
$3.110
|
$3.110
|
$3.110
|
$3.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
11,476.000
|
$0.750
|
$0.530
|
$0.490
|
$0.500
|
$0.490
|
$0.490
|
$0.490
|
$0.490
|
$0.490
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
5.000
|
$160.000
|
$165.000
|
$150.000
|
$154.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
2,149.000
|
$0.900
|
$0.850
|
$0.780
|
$0.800
|
$0.780
|
$0.780
|
$0.780
|
$0.780
|
$0.780
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
13,864.000
|
$0.750
|
$0.530
|
$0.490
|
$0.500
|
$0.490
|
$0.490
|
$0.490
|
$0.490
|
$0.490
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
113.000
|
$8.000
|
$8.800
|
$8.000
|
$8.200
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
245.000
|
$1.000
|
$1.100
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
127.000
|
$6.000
|
$6.600
|
$6.000
|
$6.150
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$150.000
|
$165.000
|
$150.000
|
$154.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$150.000
|
$165.000
|
$150.000
|
$154.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
15,994.000
|
$0.250
|
$0.160
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 8"
|
LF
|
245.000
|
$1.250
|
$1.100
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
127.000
|
$2.000
|
$3.300
|
$3.000
|
$3.100
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
10.000
|
$50.000
|
$62.700
|
$57.000
|
$58.500
|
$57.000
|
$57.000
|
$57.000
|
$57.000
|
$57.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$50.000
|
$110.000
|
$100.000
|
$103.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,268.000
|
$0.500
|
$0.440
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,114.000
|
$0.500
|
$0.440
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,297.000
|
$0.500
|
$0.440
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,070.000
|
$0.500
|
$0.440
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
170.000
|
$4.000
|
$5.500
|
$5.000
|
$5.150
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
160.000
|
$4.000
|
$5.500
|
$5.000
|
$5.150
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,987.000
|
$0.300
|
$0.400
|
$0.370
|
$0.400
|
$0.370
|
$0.370
|
$0.370
|
$0.370
|
$0.370
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$100.000
|
$110.000
|
$100.000
|
$103.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
330.000
|
$0.750
|
$2.200
|
$2.000
|
$2.050
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$20,000.000
|
$4,730.000
|
$30,000.000
|
$4,720.000
|
$14,200.000
|
$3,500.000
|
$25,000.000
|
$3,500.000
|
$27,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$230.000
|
$297.000
|
$235.000
|
$300.000
|
$350.000
|
$275.000
|
$235.000
|
$275.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$230.000
|
$297.000
|
$235.000
|
$300.000
|
$350.000
|
$275.000
|
$235.000
|
$275.000
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
865.000
|
$2.000
|
$4.400
|
$1.800
|
$4.400
|
$2.600
|
$2.500
|
$1.800
|
$2.500
|
$1.950
|
|
|
TRF SIG CBL (TY A)(18 AWG)(7 CONDR)
|
LF
|
5,860.000
|
$2.750
|
$3.850
|
$1.950
|
$3.850
|
$3.000
|
$2.500
|
$1.950
|
$2.500
|
$2.100
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$3,000.000
|
$3,850.000
|
$3,200.000
|
$3,840.000
|
$4,100.000
|
$3,500.000
|
$3,200.000
|
$3,500.000
|
$3,500.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
1.000
|
$4,200.000
|
$9,680.000
|
$5,600.000
|
$9,700.000
|
$8,700.000
|
$7,700.000
|
$5,600.000
|
$7,700.000
|
$6,100.000
|
|
|
REMOVAL OF CABLES
|
LF
|
155.000
|
$0.710
|
$0.820
|
$0.500
|
$0.800
|
$1.300
|
$1.350
|
$0.500
|
$1.350
|
$0.540
|
|
|
REMOVAL OF SPAN CABLE ASSM
|
LF
|
515.000
|
$1.000
|
$0.820
|
$1.650
|
$0.800
|
$1.800
|
$2.000
|
$1.650
|
$2.000
|
$1.800
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
6.000
|
$170.930
|
$192.500
|
$85.000
|
$192.000
|
$100.000
|
$100.000
|
$85.000
|
$100.000
|
$92.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
26.000
|
$500.000
|
$2.200
|
$450.000
|
$660.000
|
$640.000
|
$400.000
|
$450.000
|
$400.000
|
$490.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
2.000
|
$4,250.000
|
$940.500
|
$850.000
|
$940.000
|
$350.000
|
$1,500.000
|
$850.000
|
$1,500.000
|
$920.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
10.000
|
$500.000
|
$2,500.000
|
$700.000
|
$550.000
|
$820.300
|
$2,000.000
|
$1,000.000
|
$1,900.000
|
$1,590.000
|
|
|
LITTER REMOVAL
|
CYC
|
30.000
|
$1,500.000
|
$2,500.000
|
$450.000
|
$250.000
|
$800.000
|
$200.000
|
$300.000
|
$850.000
|
$1,600.000
|
|
|
CLEAN/SWEEP AREA 1
|
CYC
|
30.000
|
$750.000
|
$1,500.000
|
$650.000
|
$400.000
|
$450.000
|
$200.000
|
$300.000
|
$250.000
|
$1,500.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
6,505.000
|
$1.000
|
$0.500
|
$1.750
|
$0.800
|
$1.250
|
$0.790
|
$0.900
|
$1.500
|
$0.790
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
5.000
|
$1,000.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
1.000
|
$2,000.000
|
$2,200.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$1,300.000
|
$2,000.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
1.000
|
$3,000.000
|
$3,300.000
|
$2,500.000
|
$3,000.000
|
$1,200.000
|
$3,000.000
|
$3,000.000
|
$1,600.000
|
$3,000.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
1,760.000
|
$90.000
|
$85.800
|
$80.000
|
$85.000
|
$84.000
|
$78.000
|
$80.000
|
$85.000
|
$79.000
|
|
|
TACK COAT
|
GAL
|
1,111.000
|
$3.500
|
$2.750
|
$2.600
|
$2.550
|
$3.500
|
$2.500
|
$3.250
|
$3.300
|
$2.550
|
|
|
UNDERSEAL COURSE
|
GAL
|
766.000
|
$3.500
|
$4.400
|
$4.250
|
$4.050
|
$3.750
|
$4.000
|
$3.250
|
$3.500
|
$4.050
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$800.000
|
$200.000
|
$310.000
|
$300.000
|
$100.000
|
$325.000
|
$125.000
|
$1,230.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
10.000
|
$8,000.000
|
$15,000.000
|
$0.010
|
$9,400.000
|
$4,500.000
|
$14,000.000
|
$8,000.000
|
$14,000.000
|
$19,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
35.000
|
$3.000
|
$2.200
|
$0.500
|
$2.200
|
$4.000
|
$3.000
|
$0.500
|
$3.000
|
$0.540
|
|
|
GROUND BOX (PREPARE)
|
EA
|
2.000
|
$331.060
|
$192.500
|
$125.000
|
$192.000
|
$160.000
|
$200.000
|
$125.000
|
$200.000
|
$135.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$150.000
|
$350.000
|
$750.000
|
$410.000
|
$1,000.000
|
$750.000
|
$1,600.000
|
$330.000
|
$880.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
227.000
|
$2.000
|
$30.000
|
$14.000
|
$206.000
|
$6.000
|
$1.000
|
$14.000
|
$5.000
|
$6.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
2.230
|
$5,000.000
|
$9,500.000
|
$9,500.000
|
$16,100.000
|
$5,500.000
|
$2,300.000
|
$9,110.000
|
$122.000
|
$5,400.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
1.000
|
$2,000.000
|
$1,500.000
|
$3,500.000
|
$10,500.000
|
$6,000.000
|
$1,900.000
|
$3,225.000
|
$5,230.000
|
$4,500.000
|
|
|
TEMPORARY BLOW-OFF(COMPLETE)(2")
|
EA
|
3.000
|
$1,500.000
|
$1,500.000
|
$3,125.000
|
$2,230.000
|
$5,000.000
|
$6,000.000
|
$2,998.000
|
$2,975.000
|
$4,300.000
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
11.000
|
$150.000
|
$165.000
|
$200.000
|
$350.000
|
$200.000
|
$110.000
|
$158.000
|
$299.000
|
$200.000
|
|
|
GATE VALVE & BOX (COMPLETE)(16")
|
EA
|
1.000
|
$7,000.000
|
$4,000.000
|
$7,250.000
|
$8,100.000
|
$18,000.000
|
$11,028.750
|
$6,920.000
|
$9,510.000
|
$18,300.000
|
|
|
TIE-IN (COMPLETE)(16")
|
EA
|
3.000
|
$3,500.000
|
$5,000.000
|
$11,000.000
|
$6,700.000
|
$7,500.000
|
$7,679.790
|
$10,020.000
|
$7,060.000
|
$3,200.000
|
|
|
AIR RELEASE VALVE (COMPLETE)(1")
|
EA
|
1.000
|
$3,000.000
|
$1,500.000
|
$2,800.000
|
$4,000.000
|
$5,000.000
|
$6,000.840
|
$2,592.000
|
$3,665.000
|
$3,800.000
|
|
|
PIPE WATER MAIN (PVC) (16")
|
LF
|
229.000
|
$100.000
|
$100.000
|
$275.000
|
$220.000
|
$200.000
|
$179.820
|
$252.000
|
$296.000
|
$112.000
|
|
|
STEEL CASING (30") (BORE)
|
LF
|
198.000
|
$150.000
|
$300.000
|
$200.000
|
$215.000
|
$200.000
|
$27.350
|
$171.000
|
$183.000
|
$194.000
|
|
|
CARRIER PIPE (PVC)(16")
|
LF
|
198.000
|
$110.000
|
$65.000
|
$165.000
|
$139.000
|
$200.000
|
$206.330
|
$147.000
|
$159.000
|
$215.000
|
|
|
WTR(JACK, BORE, OR TUNNEL)(30")
|
LF
|
198.000
|
$350.000
|
$550.000
|
$525.000
|
$630.000
|
$550.000
|
$1,000.000
|
$470.000
|
$502.000
|
$515.000
|
|
Totals: |
$7,127,369.700
|
$6,974,796.990
|
$7,495,533.420
|
$7,533,878.690
|
$7,724,583.740
|
$7,984,238.360
|
$8,084,545.650
|
$8,407,775.610
|
$9,165,156.060
|