BELL US0190 (6413-59-001)

Items: 72

County: BELL
Length: N/A
Highway: US0190
District: WACO
Control Number: 6413-59-001
DBE Goal: N/A
Project: RMC - 641359001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,093,145.00
Date: 10/06/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,093,145.00
$821,056.00
Over/Under Est: -24.89% -$272,089.00
$897,444.50
Over/Under Est: -17.9% -$195,700.50
Amt Left: 9.3% $76,388.50
Over/Under Est: -0.77% -$8,410.00
Amt Left: 32.11% $263,679.00
Delta: -20.87% -$187,290.50
Over/Under Est: 31.19% $340,917.50
Amt Left: 74.66% $613,006.50
Delta: -32.20% -$349,327.50
Subcontractor Percentage Amount
CROSS PLUS CONSTRUCTION, LLC 2.00% $30,014.62
Total: 2.00% $30,014.62

Bid Items & Bid Tabulations

72 Total 0 of 72
BELL  |  US0190  |  WACO  |  6413-59-001  |  10/06/2022  |  $1,093,145.00  |  RMC - 641359001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
RHINO EQUITY, LLC
GARRET SHIELDS INFRASTRUCTURE
B & MS CONSTRUCTION, INC.
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 75.000 $45.000 $1.000 $20.000 $40.000 $46.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $170.000 $25.000 $79.000 $100.000 $287.500
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $500.000 $200.000 $300.000 $500.000 $575.000
RAIL (HANDRAIL)(DECORATIVE)
LF 30.000 $100.000 $100.000 $78.000 $100.000 $172.500
MOBILIZATION (CALLOUT)
EA 12.000 $6,625.000 $1.000 $100.000 $500.000 $3,500.000
MOBILIZATION (EMERGENCY)
EA 60.000 $332.000 $1.000 $100.000 $500.000 $1,500.000
CONC CURB (TY II)
LF 100.000 $20.000 $10.000 $16.000 $20.000 $57.500
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $30.000 $30.000 $30.000 $15.000 $57.500
MTL W-BEAM GD FEN (STEEL POST)
LF 5,000.000 $30.000 $30.000 $45.000 $40.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,600.000 $1,500.000 $1,200.000 $2,500.000 $1,955.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,400.000 $1,200.000 $2,000.000 $2,000.000 $1,495.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $30.000 $20.000 $30.000 $25.000 $57.500
MTL BM GD FEN TRANS (NON - SYM)
EA 20.000 $800.000 $100.000 $110.000 $100.000 $287.500
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $3.000 $0.010 $1.500 $2.000 $8.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $250.000 $2,500.000 $1.000 $200.000 $345.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $250.000 $3,000.000 $110.000 $2,000.000 $575.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 50.000 $3,000.000 $1.000 $1.000 $1,000.000 $2,100.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,000.000 $100.000 $450.000 $500.000 $345.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1.000 $450.000 $500.000 $690.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 2.000 $15,000.000 $13,000.000 $12,000.000 $25,000.000 $18,400.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $20,000.000 $14,000.000 $16,000.000 $25,000.000 $26,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 2.000 $25,000.000 $14,000.000 $20,500.000 $10,000.000 $32,000.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 5.000 $150.000 $10.000 $40.000 $50.000 $86.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $35.000 $10.000 $35.000 $30.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $40.000 $10.000 $45.000 $40.000 $57.500
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $30.000 $24.000 $65.000 $40.000 $50.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $50.000 $20.000 $50.000 $40.000 $65.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $50.000 $20.000 $50.000 $40.000 $63.250
RAISE RAIL ELEMENT
LF 150.000 $5.000 $1.000 $5.000 $4.000 $17.250
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $60.000 $50.000 $500.000 $800.000 $168.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 25.000 $60.000 $50.000 $500.000 $800.000 $190.000
REALIGN POSTS
EA 200.000 $40.000 $10.000 $5.000 $5.000 $55.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $30.000 $10.000 $150.000 $200.000 $23.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 400.000 $35.000 $30.000 $50.000 $35.000 $46.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $70.000 $50.000 $100.000 $200.000 $86.250
REPLACE HINGED TOP SGT STEEL POST
EA 50.000 $60.000 $50.000 $40.000 $50.000 $247.250
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 35.000 $3,300.000 $4,500.000 $3,500.000 $5,000.000 $4,600.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,200.000 $800.000 $550.000 $1,000.000 $1,495.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $100.000 $1.000 $5.000 $1,000.000 $350.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $70.000 $1.000 $1.000 $10.000 $115.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $70.000 $1.000 $1.000 $10.000 $115.000
REPLACE SGT STRUT
EA 2.000 $60.000 $1.000 $1.000 $10.000 $230.000
REPLACE SGT OBJECT MARKER
EA 1.000 $60.000 $30.000 $1,000.000 $100.000 $57.500
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 500.000 $20.000 $1.000 $10.000 $10.000 $11.500
REPLACE POSTS (TL-4)
EA 310.000 $170.000 $160.000 $75.000 $35.000 $195.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $230.000 $150.000 $100.000 $200.000 $230.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 1.000 $200.000 $50.000 $250.000 $300.000 $115.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,500.000 $1,500.000 $450.000 $1,000.000 $1,725.000
REPLACE CABLE (TL-4)
LF 500.000 $4.000 $1.000 $5.000 $3.000 $11.500
CHECK / RE-TENSION CABLE
EA 20.000 $200.000 $10.000 $1.500 $1.000 $517.500
REPLACE POSTS (TL-4)(FURN)
EA 100.000 $50.000 $50.000 $10.000 $100.000 $287.500
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $4.000 $1.000 $2.000 $10.000 $11.500
POST AND CABLE FENCE (NEW INSTALLATION)
LF 400.000 $12.000 $10.000 $11.000 $10.000 $80.500
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 5.000 $60.000 $1.000 $45.000 $50.000 $287.500
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 10.000 $300.000 $100.000 $20.000 $25.000 $86.250
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 250.000 $5.000 $3.000 $2.250 $2.000 $46.000
REMOVE AND REPLACE (FASTRACC) (W)
EA 2.000 $27,000.000 $17,500.000 $20,000.000 $15,000.000 $25,000.000
REPAIR (FASTRACC) (W)
LF 50.000 $100.000 $100.000 $80.000 $100.000 $143.750
REPAIR (FASTRACC) (W) (BAY)
EA 10.000 $500.000 $250.000 $80.000 $1,000.000 $143.750
REPAIR (WIDE TRACC) (BAY)
EA 10.000 $300.000 $100.000 $80.000 $100.000 $345.000
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
EA 10.000 $4,000.000 $2,300.000 $1.000 $1,000.000 $3,277.500
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 20.000 $100.000 $50.000 $45.000 $60.000 $169.000
REP METAL POST W/ BASE PLATE(T4(A)RAIL
EA 20.000 $150.000 $10.000 $25.000 $35.000 $146.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 4.000 $150.000 $200.000 $100.000 $200.000 $172.500
REPAIR (TY T101RC)
LF 20.000 $40.000 $50.000 $45.000 $60.000 $115.000
REPAIR (TY T1 - 101R)
LF 40.000 $40.000 $50.000 $40.000 $200.000 $125.000
REP METAL PST W/ BASE PLATE (TY T101RC)
EA 2.000 $150.000 $200.000 $100.000 $60.000 $300.000
REP METAL PST W/ BASE PLATE(TY T1-101R)
EA 2.000 $150.000 $200.000 $100.000 $300.000 $300.000
REPAIR (ALUMINUM RAIL)
LF 10.000 $100.000 $100.000 $150.000 $200.000 $230.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 50.000 $120.000 $100.000 $75.000 $90.000 $57.500
REPAIR (W-BEAM - T101 RAIL)
LF 2.000 $80.000 $100.000 $100.000 $300.000 $150.000
TMA (STATIONARY)
DAY 120.000 $160.000 $1,000.000 $100.000 $500.000 $345.000
Totals: $1,093,145.000 $821,056.000 $897,444.500 $1,084,735.000 $1,434,062.500