PREPARING ROW
|
STA
|
10.000
|
$3,000.000
|
$2,000.000
|
|
|
BLADING
|
STA
|
10.000
|
$250.000
|
$800.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
7,406.000
|
$0.350
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,703.000
|
$0.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,703.000
|
$0.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
118.000
|
$15.000
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
21.000
|
$25.000
|
$200.000
|
|
|
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
|
CY
|
37.000
|
$200.000
|
$350.000
|
|
|
ASPH(AC-15P,AC-20XP,AC10-2TR,AC-12-5TR)
|
GAL
|
1,621.000
|
$4.000
|
$12.000
|
|
|
CEM STABIL BKFL
|
CY
|
67.000
|
$200.000
|
$120.000
|
|
|
CUT & RESTORING PAV
|
SY
|
144.000
|
$45.000
|
$110.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
35.000
|
$5.000
|
$30.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
292.000
|
$25.000
|
$35.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$450.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
35.000
|
$120.000
|
$120.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
62.000
|
$450.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
32.000
|
$400.000
|
$1,100.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
73.000
|
$550.000
|
$1,200.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
34.000
|
$500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
72.000
|
$60.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
32.000
|
$70.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
96.000
|
$85.000
|
$140.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
216.000
|
$100.000
|
$140.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$7,000.000
|
$6,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$9,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$5,000.000
|
$4,800.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$7,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
22.000
|
$1,000.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$900.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,350.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,100.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,600.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$2,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$1,000.000
|
$1,400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
447.570
|
$20.000
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$68,000.000
|
$40,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,000.000
|
$3,200.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
550.000
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
550.000
|
$0.500
|
$1.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
20,835.000
|
$0.200
|
$0.400
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,300.000
|
$22.000
|
$23.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$45.000
|
$30.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$750.000
|
$700.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,500.000
|
$2,200.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
44.000
|
$45.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
18.000
|
$30.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,490.000
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,000.000
|
$0.300
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,781.000
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
28,431.000
|
$0.300
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
422.000
|
$3.500
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
25.000
|
$85.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$18,000.000
|
|
Totals: |
$613,049.300
|
$824,244.800
|