BELL FM 2484 (2304-03-012)

Items: 55

County: BELL
Length: N/A
Highway: FM 2484
District: WACO
Control Number: 2304-03-012
DBE Goal: N/A
Project: STP 2017(600)HES
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $613,049.30
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: MILLED CL RUMBLE STRIP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$613,049.30
$824,244.80
Over/Under Est: 34.45% $211,195.50

Bid Items & Bid Tabulations

55 Total 0 of 55
BELL  |  FM 2484  |  WACO  |  2304-03-012  |  02/03/2017  |  $613,049.30  |  STP 2017(600)HES  |  MILLED CL RUMBLE STRIP  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CHAMPION INFRASTRUCTURE, LLC
PREPARING ROW
STA 10.000 $3,000.000 $2,000.000
BLADING
STA 10.000 $250.000 $800.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 7,406.000 $0.350 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 3,703.000 $0.500 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 3,703.000 $0.500 $1.000
VEGETATIVE WATERING
MG 118.000 $15.000 $85.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 21.000 $25.000 $200.000
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
CY 37.000 $200.000 $350.000
ASPH(AC-15P,AC-20XP,AC10-2TR,AC-12-5TR)
GAL 1,621.000 $4.000 $12.000
CEM STABIL BKFL
CY 67.000 $200.000 $120.000
CUT & RESTORING PAV
SY 144.000 $45.000 $110.000
TRENCH EXCAVATION PROTECTION
LF 35.000 $5.000 $30.000
TEMPORARY SPL SHORING
SF 292.000 $25.000 $35.000
RIPRAP (CONC)(4 IN)
CY 2.000 $450.000 $700.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 35.000 $120.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $450.000 $700.000
CONC BOX CULV (5 FT X 2 FT)
LF 32.000 $400.000 $1,100.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 73.000 $550.000 $1,200.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 34.000 $500.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 72.000 $60.000 $80.000
RC PIPE (CL III)(24 IN)
LF 32.000 $70.000 $100.000
RC PIPE (CL III)(30 IN)
LF 96.000 $85.000 $140.000
RC PIPE (CL IV)(30 IN)
LF 216.000 $100.000 $140.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $7,000.000 $6,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $9,000.000 $8,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $5,000.000 $4,800.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $9,000.000 $7,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,500.000 $8,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 22.000 $1,000.000 $1,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 30.000 $900.000 $1,200.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,350.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,100.000 $1,400.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $2,000.000 $1,300.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 10.000 $1,600.000 $1,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $1,800.000 $2,400.000
CLEAN EXIST CULVERTS
EA 16.000 $1,000.000 $1,400.000
REMOV STR (PIPE)
LF 447.570 $20.000 $40.000
MOBILIZATION
LS 1.000 $68,000.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,000.000 $3,200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 550.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 550.000 $0.500 $1.000
RUMBLE STRIPS (CENTERLINE)
LF 20,835.000 $0.200 $0.400
MTL W-BEAM GD FEN (STEEL POST)
LF 1,300.000 $22.000 $23.000
SHORT RADIUS
LF 25.000 $45.000 $30.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $750.000 $700.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $2,200.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 44.000 $45.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $30.000 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,490.000 $1.000 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,000.000 $0.300 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,781.000 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 28,431.000 $0.300 $0.500
REFL PAV MRKR TY II-A-A
EA 422.000 $3.500 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 25.000 $85.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $18,000.000
Totals: $613,049.300 $824,244.800