Show Job Controls
Bid Cobra

BELL FM 2410 (2304-02-044)

Items: 122

County: BELL
Length: N/A
Highway: FM 2410
District: WACO
Control Number: 2304-02-044
DBE Goal: N/A
Project: C 2304-2-44
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $10,121,008.16
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$10,121,008.16
$9,585,340.60
Over/Under Est: -5.29% -$535,667.56
Over/Under Est: 4.71% $476,197.73
Amt Left: 10.56% $1,011,865.29
Subcontractor Percentage Amount
BEAR CREEK CONSTRUCTION, LLC 16.02% $1,413,380.06
J. H. ODEN CONTRACTING COMPANY 4.69% $413,779.80
TRP CONSTRUCTION GROUP, LLC 2.02% $178,216.46
SAN-ANN-CO., INC. 1.88% $165,864.83
DUSTROL, INC. 0.80% $70,580.78
CEN-TREE SOLUTIONS LLC 0.54% $47,642.02
FORTSON CONTRACTING, INC. 0.13% $11,469.38
Total: 26.08% $2,300,933.33

Bid Items & Bid Tabulations

122 Total 0 of 122
BELL  |  FM 2410  |  WACO  |  2304-02-044  |  03/08/2023  |  $10,121,008.16  |  C 2304-2-44  |  REHAB EXIST ROADWAY  |  150 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
PREPARING ROW
STA 152.000 $3,095.000 $500.000 $1,000.000
EXCAVATION (ROADWAY)
CY 746.000 $17.800 $0.010 $50.000
SUBGRADE WIDENING (ORD COMP)
STA 284.000 $350.000 $385.000 $1,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 8,751.000 $24.750 $34.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 223,979.000 $2.000 $1.350 $0.700
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 223,979.000 $0.250 $0.180 $0.160
DRILL SEEDING (TEMP) (WARM)
SY 111,990.000 $0.210 $0.140 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 111,990.000 $0.180 $0.140 $0.100
VEGETATIVE WATERING
MG 3,690.000 $34.000 $40.000 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 9,766.000 $1.640 $2.000 $2.000
PROOF ROLLING
HR 54.000 $110.000 $125.000 $155.000
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
CY 1,498.000 $41.000 $95.000 $80.000
FOG SEAL (SS-1)
GAL 10,507.000 $3.750 $5.000 $7.500
ASPH (CRS-2)
GAL 45,831.000 $4.400 $4.000 $5.500
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 754.000 $155.000 $180.000 $225.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 2,000.000 $131.500 $125.000 $125.000
PLANE ASPH CONC PAV (2")
SY 48,528.000 $2.450 $1.850 $4.000
CEM STABIL BKFL
CY 150.000 $275.000 $229.000 $250.000
CUT & RESTORING PAV
SY 126.000 $100.000 $113.000 $150.000
TRENCH EXCAVATION PROTECTION
LF 201.000 $17.000 $8.000 $10.000
TEMPORARY SPL SHORING
SF 3,180.000 $37.000 $23.000 $28.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 532.000 $625.000 $247.000 $290.000
RIPRAP (MOW STRIP)(4 IN)
CY 8.000 $650.000 $950.000 $1,100.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 64.000 $968.750 $528.000 $600.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 18.000 $1,518.750 $891.000 $1,025.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 28.000 $1,462.500 $566.000 $650.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 64.000 $991.000 $608.000 $700.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 36.000 $1,250.000 $715.000 $825.000
RC PIPE (CL III)(36 IN)
LF 120.000 $225.000 $240.000 $275.000
RC PIPE (CL III)(42 IN)
LF 54.000 $318.750 $367.000 $425.000
RC PIPE (CL IV)(24 IN)
LF 132.000 $156.250 $154.000 $175.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $9,500.000 $6,972.000 $8,025.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $11,250.000 $8,256.000 $9,500.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $10,000.000 $8,712.000 $10,100.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $13,750.000 $10,875.000 $12,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $25,000.000 $12,034.000 $13,400.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $31,250.000 $12,155.000 $14,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $37,550.000 $14,310.000 $16,500.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $15,775.000 $7,756.000 $8,900.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 70.000 $1,437.500 $1,186.000 $1,350.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $2,125.000 $1,214.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 90.000 $1,300.000 $1,412.000 $1,625.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $3,312.500 $2,209.000 $2,550.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 1.000 $3,950.000 $3,528.000 $4,050.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 1.000 $4,495.000 $4,308.000 $4,950.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $6,705.000 $4,768.000 $5,500.000
CLEAN EXIST CULVERTS
EA 9.000 $2,500.000 $2,500.000 $2,900.000
REMOV STR (SET)
EA 54.000 $387.500 $551.000 $775.000
REMOV STR (WINGWALL)
EA 16.000 $2,000.000 $1,377.000 $2,500.000
REMOV STR (PIPE)
LF 2,590.000 $10.920 $10.000 $18.000
MOBILIZATION
LS 1.000 $595,000.000 $819,400.000 $1,060,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $7,240.000 $5,600.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 5,424.000 $44.000 $50.000 $32.000
ROCK FILTER DAMS (REMOVE)
LF 5,424.000 $10.000 $9.000 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 17,275.000 $5.000 $3.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 17,275.000 $1.750 $0.450 $1.000
CONSTRUCTING DETOURS
SY 2,950.000 $76.000 $60.000 $100.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $3,500.000 $4,200.000 $7,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 240.000 $29.000 $68.500 $15.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,880.000 $11.330 $48.000 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 240.000 $28.670 $68.000 $14.000
DRIVEWAYS (CONC)
SY 644.000 $125.000 $160.000 $200.000
DRIVEWAYS (ACP)
SY 9,607.000 $55.000 $45.000 $40.000
TURNOUTS (ACP)
SY 967.000 $94.600 $75.000 $55.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $50.000 $26.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,643.750 $2,650.000 $4,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 26.000 $2,245.000 $1,430.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,330.000 $1,050.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,350.000 $7,970.000 $11,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 39.000 $327.000 $225.000 $260.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 11.000 $347.000 $275.000 $320.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 14.000 $875.000 $550.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 110.000 $1,201.000 $550.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $600.000 $600.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 22.000 $1,365.000 $700.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $765.000 $800.000 $925.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 6.000 $1,930.000 $900.000 $1,035.000
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
EA 3.000 $1,500.000 $900.000 $1,035.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,983.000 $900.000 $1,035.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,615.000 $1,000.000 $1,150.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 87.000 $215.000 $200.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $56.000 $40.000 $45.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 60.000 $95.000 $65.000 $70.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,290.000 $0.250 $0.180 $0.330
WK ZN PAV MRK NON-REMOV (W)4"(LNDP)
LF 55.000 $1.000 $1.000 $0.550
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 65,842.000 $0.130 $0.200 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 683.000 $0.760 $1.000 $0.650
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,284.000 $0.250 $0.350 $0.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 344.000 $3.970 $4.500 $5.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 27.000 $80.620 $45.000 $75.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 12.000 $87.000 $55.000 $82.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 5.000 $3.840 $15.000 $35.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,362.000 $0.150 $0.180 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 73,072.000 $0.130 $0.180 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 700.000 $1.000 $1.050 $1.500
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 55.000 $1.500 $1.000 $0.800
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 683.000 $1.000 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,248.000 $2.050 $0.820 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 344.000 $13.040 $6.710 $12.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,291.000 $0.750 $0.510 $2.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 65,442.000 $0.850 $0.880 $1.000
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 3,821.000 $1.050 $0.880 $1.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 60,688.000 $0.850 $0.880 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 27.000 $210.000 $290.000 $230.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $265.000 $290.000 $295.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 5.000 $50.000 $70.000 $50.000
REFL PAV MRKR TY I-C
EA 191.000 $4.000 $3.740 $4.500
REFL PAV MRKR TY II-A-A
EA 1,228.000 $4.000 $3.740 $4.500
FULL - WIDTH MOWING
AC 138.900 $100.000 $45.000 $45.000
SP MIXES SP-C SAC-B PG70-22
TON 16,206.000 $126.500 $125.000 $135.000
UNDERSEAL COURSE
GAL 9,706.000 $2.400 $5.000 $6.000
CEMENT
TON 581.000 $188.000 $230.000 $350.000
ASPHALT BINDER (PG 64-22)
TON 1,334.000 $570.000 $675.000 $700.000
FOAMED ASPHALT TREAT (12")(DC)
SY 98,801.000 $2.640 $6.000 $5.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $3,520.000 $16,300.000 $10,000.000
TMA (STATIONARY)
DAY 370.000 $335.000 $0.010 $300.000
TMA (MOBILE OPERATION)
HR 300.000 $42.100 $34.000 $100.000
1
THERMO PIPE(18")(HDPE)(TY S)(CSB)
LF 1,688.000 $53.750 $0.000 $0.000
1A
RC PIPE (CL III)(18 IN)
LF 1,688.000 $53.750 $69.000 $80.000
2
RC PIPE (CL III)(24 IN)
LF 100.000 $100.000 $0.000 $0.000
2
THERMO PIPE(24")(HDPE)(TY S)(CSB)
LF 2,056.000 $100.000 $0.000 $0.000
2A
RC PIPE (CL III)(24 IN)
LF 2,156.000 $100.000 $90.000 $100.000
Totals: $10,427,338.160 $9,585,340.600 $10,597,205.890