Job Info for 1835-02-056

County: BELL Highway: FM 1741 Date: 08/07/2019 (5 years ago) Engineer's Estimate: $2,996,784 Control Number: 1835-02-056
Project: STP 1902(272) District: WACO Time: 105 WORKING DAYS Type: MILL/OVLY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,996,783.69
LONE STAR PAVING COMPANY   $3,284,016.20 1
9.58% | $287,232.51
TEXAS MATERIALS GROUP, INC.   $3,465,480.40 2
15.64% | $468,696.71
5.53% | $181,464.20
BIG CREEK CONSTRUCTION, LTD.   $4,024,911.10 3
34.31% | $1,028,127.41
22.56% | $740,894.90
16.14% | $559,430.70

Bid Items

Items: 82, 0 filtered
BELL FM 1741  |  WACO  |  1835-02-056  |  08/07/2019  |  $2,996,784  |  STP 1902(272)  |  MILL/OVLY  |  105 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LONE STAR PAVING COMPANY TEXAS MATERIALS GROUP, INC. BIG CREEK CONSTRUCTION, LTD.
104 6001 REMOVING CONC (PAV) SY 12.000 $5.460 $32.500 $175.000 $100.000
104 6009 REMOVING CONC (RIPRAP) SY 97.000 $18.000 $23.000 $16.000 $35.000
104 6010 REMOVING CONC (RIPRAP) CY 3.700 $96.000 $105.000 $413.000 $450.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 294.000 $15.000 $29.500 $37.000 $50.000
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF 91.000 $10.000 $8.000 $26.000 $30.000
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 25.000 $12.000 $25.000 $22.000 $50.000
110 6003 EXCAVATION (SPECIAL) CY 50.000 $10.000 $44.000 $40.000 $40.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 50.000 $15.000 $55.000 $65.000 $40.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 672.000 $3.700 $11.500 $7.050 $2.000
162 6002 BLOCK SODDING SY 672.000 $4.200 $10.000 $5.000 $10.000
168 6001 VEGETATIVE WATERING MG 5.500 $12.000 $50.000 $250.000 $20.000
340 6066 D-GR HMA(SQ) TY-C PG76-22 TON 12.000 $162.000 $195.000 $260.000 $200.000
346 6014 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 13,882.000 $110.000 $128.000 $140.000 $135.000
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 10,800.000 $40.000 $57.000 $45.000 $65.000
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 62.000 $12.000 $3.000 $14.000 $6.500
354 6024 PLANE ASPH CONC PAV(2" TO 4") SY 126,166.000 $2.000 $1.250 $1.550 $3.250
360 6032 CONC PAV (JOINT REINF) (10") SY 12.000 $61.000 $262.000 $150.000 $1,000.000
420 6002 CL A CONC (MISC) CY 5.000 $666.000 $820.000 $750.000 $700.000
420 6011 CL B CONC (FLUME) CY 4.100 $475.000 $795.000 $750.000 $700.000
420 6074 CL C CONC (MISC) CY 1.400 $992.000 $920.000 $750.000 $700.000
432 6001 RIPRAP (CONC)(4 IN) CY 1.600 $445.000 $582.000 $750.000 $750.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 62.000 $490.000 $485.000 $475.000 $525.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 106.000 $75.580 $99.000 $148.000 $200.000
465 6233 INLET (COMP) (TY SIDEWALK BRIDGE) EA 1.000 $5,886.000 $15,670.000 $5,500.000 $20,000.000
471 6003 GRATE & FRAME EA 6.000 $1,460.000 $950.000 $850.000 $1,750.000
479 6001 ADJUSTING MANHOLES EA 2.000 $960.000 $450.000 $1,000.000 $2,000.000
479 6008 ADJUSTING MANHOLES (WATER METER) EA 1.000 $600.000 $420.000 $1,000.000 $750.000
500 6001 MOBILIZATION LS 1.000 $300,000.000 $120,000.000 $304,600.000 $400,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $5,000.000 $20,150.000 $7,500.000 $5,000.000
506 6035 SANDBAGS FOR EROSION CONTROL EA 500.000 $13.000 $8.000 $7.000 $8.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 500.000 $2.850 $5.000 $5.000 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 500.000 $0.630 $2.000 $1.000 $2.000
529 6002 CONC CURB (TY II) LF 24.000 $25.000 $25.000 $66.000 $40.000
529 6008 CONC CURB & GUTTER (TY II) LF 80.000 $17.000 $31.000 $45.000 $50.000
530 6004 DRIVEWAYS (CONC) SY 329.000 $75.000 $154.000 $87.810 $115.000
531 6001 CONC SIDEWALKS (4") SY 1,162.000 $50.000 $77.000 $62.630 $40.000
531 6002 CONC SIDEWALKS (5") SY 75.000 $51.000 $80.000 $81.030 $50.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 1,175.000 $29.000 $22.000 $22.060 $30.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,100.000 $1,086.000 $1,086.000 $1,500.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,175.000 $2.600 $1.500 $1.500 $7.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $217.000 $150.000 $150.000 $250.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,724.000 $2,883.000 $2,883.000 $3,500.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 2.000 $284.000 $250.000 $256.000 $300.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 3.000 $464.000 $500.000 $603.000 $750.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 5.000 $523.000 $600.000 $671.000 $800.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 55.000 $37.000 $26.000 $25.950 $40.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 4,001.000 $0.980 $0.500 $1.000 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,718.000 $0.740 $0.500 $1.000 $1.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 1,570.000 $1.650 $0.800 $1.000 $0.800
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 5,816.000 $0.770 $0.800 $0.800 $0.800
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 2,118.000 $5.630 $6.000 $5.500 $6.000
666 6147 REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF 235.000 $5.510 $6.000 $5.500 $6.000
666 6224 PAVEMENT SEALER 4" LF 8,316.000 $0.180 $0.150 $0.200 $0.150
666 6226 PAVEMENT SEALER 8" LF 2,377.000 $0.620 $0.300 $0.300 $0.300
666 6230 PAVEMENT SEALER 24" LF 330.000 $1.910 $2.500 $2.000 $2.500
666 6231 PAVEMENT SEALER (ARROW) EA 7.000 $33.060 $55.000 $40.000 $55.000
666 6232 PAVEMENT SEALER (WORD) EA 7.000 $39.450 $65.000 $80.000 $65.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 38,997.000 $0.300 $0.350 $0.440 $0.340
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 15,828.000 $0.300 $0.350 $0.440 $0.340
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 33,135.000 $0.300 $0.350 $0.400 $0.340
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 43.000 $210.130 $225.000 $185.000 $225.000
668 6078 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 16.000 $344.980 $400.000 $320.000 $400.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 43.000 $275.000 $275.000 $235.000 $275.000
672 6007 REFL PAV MRKR TY I-C EA 869.000 $3.870 $3.200 $3.800 $3.200
672 6009 REFL PAV MRKR TY II-A-A EA 810.000 $3.750 $3.200 $3.800 $3.200
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 8,316.000 $0.570 $1.000 $0.500 $1.000
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 2,377.000 $0.960 $1.000 $0.750 $1.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 330.000 $6.360 $3.000 $3.000 $3.000
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 7.000 $150.000 $28.000 $100.000 $28.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 7.000 $150.000 $29.000 $150.000 $29.000
688 6002 PED DETECT PUSH BUTTON (STANDARD) EA 1.000 $314.000 $400.000 $400.000 $500.000
690 6005 INSTALL OF VEHICLE DETECTORS LF 125.000 $0.780 $28.000 $28.000 $30.000
690 6030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA 1.000 $105.000 $150.000 $150.000 $250.000
3002 6001 MEMBRANE UNDERSEAL GAL 31,546.000 $2.780 $2.400 $2.800 $3.850
5003 6004 RETROFIT DET WARN SURF(SURF APPLIED) EA 2.000 $291.000 $200.000 $500.000 $1,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $5,000.000 $5,000.000 $5,000.000 $10,000.000
6002 6001 VIVDS PROCESSOR SYSTEM EA 1.000 $8,300.000 $4,500.000 $4,500.000 $6,500.000
6002 6002 VIVDS CAMERA ASSEMBLY EA 2.000 $2,400.000 $1,800.000 $1,800.000 $2,000.000
6002 6003 VIVDS SET-UP SYSTEM EA 1.000 $595.570 $300.000 $300.000 $500.000
6002 6005 VIVDS COMMUNICATION CABLE (COAXIAL) LF 350.000 $7.000 $8.000 $8.000 $12.000
6185 6002 TMA (STATIONARY) DAY 10.000 $150.000 $185.000 $310.000 $250.000
6185 6003 TMA (MOBILE OPERATION) HR 240.000 $45.000 $35.000 $20.000 $100.000
Totals: $2,996,783.69 $3,284,016.20 $3,465,480.40 $4,024,911.10