BELL SH 95 (0320-02-039)

Items: 105

County: BELL
Length: N/A
Highway: SH 95
District: WACO
Control Number: 0320-02-039
DBE Goal: N/A
Project: BR 2023(463)
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $10,936,141.25
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$10,936,141.25
$11,989,343.70
Over/Under Est: 9.63% $1,053,202.45
Over/Under Est: 19.25% $2,104,751.05
Amt Left: 8.77% $1,051,548.60
Over/Under Est: 20.44% $2,235,605.69
Amt Left: 9.86% $1,182,403.24
Delta: -1.00% -$130,854.64
Over/Under Est: 20.55% $2,247,056.31
Amt Left: 9.96% $1,193,853.86
Delta: -0.09% -$11,450.62
Over/Under Est: 38.11% $4,168,151.66
Amt Left: 25.98% $3,114,949.21
Delta: -14.57% -$1,921,095.35
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 10.62% $1,248,939.27
M & D FOUNDATION DRILLING INDUSTRIES, INC. 5.05% $593,892.97
GK CONSTRUCTION, LLC 4.17% $490,402.71
FORTSON CONTRACTING, INC. 2.58% $303,414.62
CND CONTRACTING 1.64% $192,868.21
AVERY'S LAWN CARE & LANDSCAPING, LLC 1.08% $127,010.77
D. I. J. CONSTRUCTION, INC. 1.04% $122,306.67
TEX OP CONSTRUCTION, LP 0.95% $111,722.44
AUSTIN WOOD RECYCLING 0.49% $57,625.26
TEXAS TRAFFIC AND BARRICADE, LLC 0.46% $54,097.18
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.31% $36,456.80
ENVIRONMENTAL SAFETY SERVICES, INC. 0.27% $31,752.69
GORDILLO TRUCKING, INC, 0.26% $30,576.67
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.24% $28,224.62
H AND H SIGN COMPANY INC. 0.10% $11,760.26
PROFESSIONAL TRAFFIC CONTROL LLC 0.04% $4,704.10
CLEAN SCAPES L.P. 0.00% $0.00
AVERY'S LAWN CARE & LANDSCAPE 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
Total: 29.30% $3,445,755.24

Bid Items & Bid Tabulations

105 Total 0 of 105
BELL  |  SH 95  |  WACO  |  0320-02-039  |  02/02/2023  |  $10,936,141.25  |  BR 2023(463)  |  BRIDGE REPL  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
INDUS ROAD & BRIDGE, INC.
CAPITAL EXCAVATION COMPANY
KNIFE RIVER CORPORATION - SOUTH
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 40.350 $1,750.000 $15,811.150 $5,000.000 $4,000.000 $2,500.000 $33,689.870
REMOVING CONC (RIPRAP)
SY 690.600 $15.000 $9.480 $42.000 $12.650 $24.000 $18.340
REMOVING CONC (DRIVEWAYS)
SY 100.000 $20.000 $15.440 $65.000 $35.300 $21.000 $18.960
REMOVING STAB BASE & ASP PAV (18"-24")
SY 13,175.000 $10.000 $10.470 $11.000 $5.150 $5.700 $8.850
EXCAVATION (ROADWAY)
CY 1,301.000 $15.000 $15.560 $31.000 $22.350 $22.000 $28.390
EXCAVATION (CHANNEL)
CY 2,736.000 $20.000 $10.310 $31.000 $23.250 $15.000 $19.350
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 9,019.000 $15.000 $15.740 $27.000 $19.000 $15.000 $21.310
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 25,759.000 $0.300 $0.320 $0.600 $0.350 $0.700 $1.250
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 25,759.000 $0.300 $0.530 $0.500 $0.550 $0.700 $0.750
VEGETATIVE WATERING
MG 220.900 $25.000 $29.000 $41.000 $36.900 $43.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 18,417.000 $2.000 $1.450 $2.000 $1.550 $1.050 $1.750
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 4,619.000 $55.000 $57.760 $59.000 $82.700 $68.500 $80.260
LIME TRT (NEW BASE)(8")
SY 19,239.000 $5.000 $7.090 $4.700 $10.750 $5.300 $14.920
LIME (HYD, COM, OR QK(SLURRY))
TON 415.300 $190.000 $294.450 $290.000 $300.000 $275.000 $254.300
PRIME COAT(MC-30 OR AE-P)
GAL 3,577.000 $9.000 $7.000 $8.000 $7.500 $8.000 $7.000
ASPH (CRS-2)
GAL 8,049.000 $6.000 $4.300 $5.000 $4.600 $5.500 $4.300
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 142.000 $200.000 $480.000 $580.000 $510.000 $380.000 $480.000
CEM STABIL BKFL
CY 1,436.000 $160.000 $157.610 $224.000 $239.000 $215.000 $160.000
TEMPORARY SPL SHORING
SF 2,010.000 $30.000 $21.070 $38.000 $33.050 $40.000 $90.000
DRILL SHAFT (18 IN)
LF 450.000 $120.000 $52.390 $120.000 $153.000 $77.000 $220.000
DRILL SHAFT (36 IN)
LF 3,523.000 $225.000 $198.170 $230.000 $250.000 $252.000 $335.000
CL B CONC (FLUME)
CY 10.400 $800.000 $818.370 $1,850.000 $790.000 $1,335.000 $1,500.000
CL C CONC (ABUT)(HPC)
CY 314.300 $1,100.000 $1,200.000 $885.000 $1,350.000 $1,200.000 $1,700.000
CL C CONC (CAP)(HPC)
CY 317.500 $1,400.000 $1,300.000 $1,035.000 $1,610.000 $1,200.000 $2,000.000
CL C CONC (COLUMN)(HPC)
CY 136.800 $1,350.000 $1,179.530 $1,350.000 $1,550.000 $1,300.000 $2,000.000
REINF CONC SLAB
SF 63,584.000 $22.000 $25.000 $22.200 $22.800 $25.000 $25.140
APPROACH SLAB
CY 561.000 $550.000 $574.050 $665.000 $750.000 $650.000 $731.890
PRESTR CONC GIRDER (TX28)
LF 4,303.040 $185.000 $167.820 $177.000 $190.000 $220.000 $184.480
PRESTR CONC GIRDER (TX54)
LF 3,272.500 $190.000 $183.870 $177.000 $195.000 $230.000 $188.070
RIPRAP (CONC)(4 IN)
CY 296.600 $450.000 $633.960 $565.000 $820.000 $700.000 $955.750
RIPRAP (CONC)(5 IN)
CY 4.300 $500.000 $944.810 $1,345.000 $820.000 $1,050.000 $926.790
RIPRAP (STONE PROTECTION)(24 IN)
CY 4,465.000 $125.000 $77.700 $170.000 $205.000 $116.000 $138.980
RIPRAP (MOW STRIP)(4 IN)
CY 181.800 $450.000 $429.190 $1,260.000 $580.000 $630.000 $1,000.000
RAIL (TY SSTR)
LF 2,428.000 $60.000 $94.940 $125.000 $77.600 $125.000 $94.350
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 577.000 $130.000 $166.250 $174.000 $221.000 $200.000 $227.860
CONC BOX CULV (3 FT X 2 FT)
LF 23.000 $350.000 $809.970 $450.000 $650.000 $650.000 $415.270
RC PIPE (CL III)(24 IN)
LF 67.000 $100.000 $180.040 $130.000 $195.000 $157.000 $308.740
RC PIPE (CL III)(36 IN)
LF 184.000 $150.000 $169.450 $185.000 $221.000 $244.000 $208.320
MANH (COMPL)(PRM)(48IN)
EA 1.000 $5,000.000 $7,103.740 $6,500.000 $5,200.000 $5,500.000 $7,838.490
WINGWALL (FW - 0) (HW=3 FT)
EA 2.000 $10,000.000 $12,613.330 $13,000.000 $4,990.000 $6,500.000 $14,259.340
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,500.000 $1,683.610 $1,900.000 $2,600.000 $1,350.000 $6,381.940
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,750.000 $2,084.830 $2,000.000 $2,700.000 $1,735.000 $5,015.190
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $5,000.000 $5,720.460 $4,400.000 $7,300.000 $4,300.000 $8,723.400
REMOV STR (MANHOLE)
EA 1.000 $800.000 $906.580 $800.000 $1,310.000 $1,300.000 $6,143.940
REMOV STR (SET)
EA 3.000 $500.000 $770.470 $1,400.000 $350.000 $900.000 $1,995.210
REMOV STR (WINGWALL)
EA 1.000 $1,000.000 $2,311.410 $7,000.000 $5,700.000 $2,150.000 $1,761.380
REMOV STR (HEADWALL)
EA 3.000 $1,500.000 $2,311.390 $5,000.000 $1,890.000 $2,150.000 $4,571.990
REMOV STR (PIPE)
LF 29.000 $25.000 $38.030 $40.000 $45.200 $43.000 $251.930
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $55,000.000 $96,989.730 $73,500.000 $75,000.000 $150,000.000 $116,000.000
MOBILIZATION
LS 1.000 $990,000.000 $1,200,000.000 $1,260,511.290 $1,000,000.000 $1,300,000.000 $1,502,877.150
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,500.000 $10,000.000 $10,001.000 $2,490.000 $6,000.000 $2,293.380
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 376.000 $30.000 $46.000 $40.000 $48.450 $29.000 $37.500
ROCK FILTER DAMS (REMOVE)
LF 376.000 $10.000 $4.000 $36.000 $4.200 $11.000 $32.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,248.000 $30.000 $12.500 $20.000 $13.150 $15.000 $17.500
CONSTRUCTION EXITS (REMOVE)
SY 1,248.000 $10.000 $3.000 $14.000 $3.150 $5.000 $12.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,408.000 $3.250 $2.450 $4.000 $2.600 $5.250 $3.950
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,408.000 $1.000 $0.500 $0.700 $0.550 $1.600 $0.650
CONSTRUCTING DETOURS
SY 2,770.000 $75.000 $74.930 $110.000 $105.000 $90.000 $106.130
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 17.000 $4,000.000 $324.440 $5,000.000 $1,950.000 $5,000.000 $1,850.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,370.000 $40.000 $75.310 $52.000 $84.600 $89.000 $2.900
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,040.000 $6.000 $6.050 $8.000 $10.000 $14.000 $13.500
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 5,370.000 $15.000 $10.740 $9.000 $23.400 $16.000 $25.320
INTERSECTIONS (ACP)
SY 185.000 $100.000 $53.880 $103.000 $92.200 $53.000 $62.770
DRIVEWAYS (CONC)
SY 100.000 $100.000 $115.870 $160.000 $147.000 $120.000 $123.960
DRIVEWAYS (SURF TREAT)
SY 220.000 $35.000 $47.720 $26.000 $87.500 $30.000 $47.130
RUMBLE STRIPS (SHOULDER)
LF 9,890.000 $1.250 $0.150 $0.800 $0.350 $1.000 $0.520
RUMBLE STRIPS (CENTERLINE)
LF 4,712.000 $1.250 $0.320 $1.400 $0.700 $1.000 $1.110
MTL W-BEAM GD FEN (STEEL POST)
LF 2,262.500 $35.000 $25.500 $29.000 $30.550 $34.000 $31.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $2,250.000 $2,150.000 $2,300.000 $2,530.000 $3,100.000 $2,295.000
REMOVE METAL BEAM GUARD FENCE
LF 2,113.000 $3.000 $2.250 $2.500 $2.100 $4.350 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $245.000 $225.000 $240.000 $211.000 $270.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,250.000 $2,700.000 $2,800.000 $3,110.000 $3,150.000 $2,905.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $275.000 $225.000 $240.000 $211.000 $270.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,800.000 $1,000.000 $1,100.000 $1,430.000 $2,600.000 $1,000.000
CRASH CUSH ATTEN (STKPL)
EA 12.000 $1,200.000 $994.190 $900.000 $970.000 $1,250.000 $850.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $29,600.000 $35,000.000 $42,000.000 $32,000.000 $29,600.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $10,000.000 $7,250.000 $8,500.000 $12,100.000 $9,400.000 $7,250.000
WIRE FENCE (TY C)
LF 1,473.000 $19.000 $12.000 $22.000 $26.350 $21.000 $20.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 3.000 $500.000 $506.780 $800.000 $370.000 $652.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $700.000 $562.070 $1,100.000 $790.000 $760.000 $945.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $800.000 $690.470 $1,200.000 $910.000 $920.000 $1,111.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $562.070 $1,497.230 $1,050.000 $975.000 $1,255.000
REMOVE SM RD SN SUP&AM
EA 24.000 $200.000 $25.000 $190.000 $160.000 $200.000 $165.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $30.000 $20.500 $22.000 $26.350 $30.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 51.000 $35.000 $25.500 $28.000 $36.850 $48.000 $62.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 19,869.000 $0.250 $0.400 $0.600 $0.550 $0.430 $0.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,482.000 $5.000 $6.000 $6.000 $7.550 $6.520 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 27,182.000 $1.000 $0.600 $1.100 $1.150 $0.650 $0.600
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $10.000 $14.000 $19.000 $17.300 $15.220 $14.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 60,734.000 $1.000 $0.600 $1.100 $0.830 $0.650 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 48.000 $10.000 $14.000 $17.000 $27.000 $15.220 $14.000
PAVEMENT SEALER 4"
LF 4,193.000 $0.500 $0.500 $0.500 $1.750 $0.540 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,383.000 $1.000 $0.740 $0.900 $0.850 $0.800 $0.740
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,121.000 $1.000 $0.740 $0.800 $1.150 $0.800 $0.740
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 7,110.000 $1.000 $0.740 $0.900 $1.150 $0.800 $0.740
REFL PAV MRKR TY II-A-A
EA 242.000 $10.000 $7.000 $8.000 $17.300 $7.610 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 13,819.000 $1.000 $1.000 $0.900 $0.850 $1.000 $1.000
PAV SURF PREP FOR MRK (4")
LF 4,193.000 $0.400 $0.010 $0.700 $0.750 $0.010 $0.010
SP MIXES SP-B PG64-22
TON 3,913.000 $115.000 $120.000 $132.000 $128.000 $123.000 $120.000
SP MIXES SP-C SAC-A PG76-22
TON 2,856.000 $120.000 $148.000 $162.000 $158.000 $157.000 $148.000
TACK COAT
GAL 1,741.000 $3.500 $3.400 $4.000 $3.650 $3.800 $3.400
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 224.000 $100.000 $1.080 $82.000 $148.000 $100.000 $61.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 12.000 $4,000.000 $1.080 $30,000.000 $9,100.000 $5,000.000 $100.000
TMA (STATIONARY)
DAY 90.000 $175.000 $740.140 $250.000 $340.000 $125.000 $233.000
TMA (MOBILE OPERATION)
HR 96.000 $70.000 $106.030 $120.000 $87.500 $85.000 $90.000
Totals: $10,936,141.250 $11,989,343.746 $13,040,892.300 $13,171,746.945 $13,183,197.560 $15,104,292.945