PREPARING ROW
|
STA
|
40.350
|
$1,750.000
|
$15,811.150
|
$5,000.000
|
$4,000.000
|
$2,500.000
|
$33,689.870
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
690.600
|
$15.000
|
$9.480
|
$42.000
|
$12.650
|
$24.000
|
$18.340
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
100.000
|
$20.000
|
$15.440
|
$65.000
|
$35.300
|
$21.000
|
$18.960
|
|
|
REMOVING STAB BASE & ASP PAV (18"-24")
|
SY
|
13,175.000
|
$10.000
|
$10.470
|
$11.000
|
$5.150
|
$5.700
|
$8.850
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,301.000
|
$15.000
|
$15.560
|
$31.000
|
$22.350
|
$22.000
|
$28.390
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,736.000
|
$20.000
|
$10.310
|
$31.000
|
$23.250
|
$15.000
|
$19.350
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
9,019.000
|
$15.000
|
$15.740
|
$27.000
|
$19.000
|
$15.000
|
$21.310
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
25,759.000
|
$0.300
|
$0.320
|
$0.600
|
$0.350
|
$0.700
|
$1.250
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
25,759.000
|
$0.300
|
$0.530
|
$0.500
|
$0.550
|
$0.700
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
220.900
|
$25.000
|
$29.000
|
$41.000
|
$36.900
|
$43.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
18,417.000
|
$2.000
|
$1.450
|
$2.000
|
$1.550
|
$1.050
|
$1.750
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
4,619.000
|
$55.000
|
$57.760
|
$59.000
|
$82.700
|
$68.500
|
$80.260
|
|
|
LIME TRT (NEW BASE)(8")
|
SY
|
19,239.000
|
$5.000
|
$7.090
|
$4.700
|
$10.750
|
$5.300
|
$14.920
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
415.300
|
$190.000
|
$294.450
|
$290.000
|
$300.000
|
$275.000
|
$254.300
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
3,577.000
|
$9.000
|
$7.000
|
$8.000
|
$7.500
|
$8.000
|
$7.000
|
|
|
ASPH (CRS-2)
|
GAL
|
8,049.000
|
$6.000
|
$4.300
|
$5.000
|
$4.600
|
$5.500
|
$4.300
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
142.000
|
$200.000
|
$480.000
|
$580.000
|
$510.000
|
$380.000
|
$480.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,436.000
|
$160.000
|
$157.610
|
$224.000
|
$239.000
|
$215.000
|
$160.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,010.000
|
$30.000
|
$21.070
|
$38.000
|
$33.050
|
$40.000
|
$90.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
450.000
|
$120.000
|
$52.390
|
$120.000
|
$153.000
|
$77.000
|
$220.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,523.000
|
$225.000
|
$198.170
|
$230.000
|
$250.000
|
$252.000
|
$335.000
|
|
|
CL B CONC (FLUME)
|
CY
|
10.400
|
$800.000
|
$818.370
|
$1,850.000
|
$790.000
|
$1,335.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
314.300
|
$1,100.000
|
$1,200.000
|
$885.000
|
$1,350.000
|
$1,200.000
|
$1,700.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
317.500
|
$1,400.000
|
$1,300.000
|
$1,035.000
|
$1,610.000
|
$1,200.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
136.800
|
$1,350.000
|
$1,179.530
|
$1,350.000
|
$1,550.000
|
$1,300.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
63,584.000
|
$22.000
|
$25.000
|
$22.200
|
$22.800
|
$25.000
|
$25.140
|
|
|
APPROACH SLAB
|
CY
|
561.000
|
$550.000
|
$574.050
|
$665.000
|
$750.000
|
$650.000
|
$731.890
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,303.040
|
$185.000
|
$167.820
|
$177.000
|
$190.000
|
$220.000
|
$184.480
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,272.500
|
$190.000
|
$183.870
|
$177.000
|
$195.000
|
$230.000
|
$188.070
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
296.600
|
$450.000
|
$633.960
|
$565.000
|
$820.000
|
$700.000
|
$955.750
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.300
|
$500.000
|
$944.810
|
$1,345.000
|
$820.000
|
$1,050.000
|
$926.790
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
4,465.000
|
$125.000
|
$77.700
|
$170.000
|
$205.000
|
$116.000
|
$138.980
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
181.800
|
$450.000
|
$429.190
|
$1,260.000
|
$580.000
|
$630.000
|
$1,000.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,428.000
|
$60.000
|
$94.940
|
$125.000
|
$77.600
|
$125.000
|
$94.350
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
577.000
|
$130.000
|
$166.250
|
$174.000
|
$221.000
|
$200.000
|
$227.860
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
23.000
|
$350.000
|
$809.970
|
$450.000
|
$650.000
|
$650.000
|
$415.270
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
67.000
|
$100.000
|
$180.040
|
$130.000
|
$195.000
|
$157.000
|
$308.740
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
184.000
|
$150.000
|
$169.450
|
$185.000
|
$221.000
|
$244.000
|
$208.320
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$5,000.000
|
$7,103.740
|
$6,500.000
|
$5,200.000
|
$5,500.000
|
$7,838.490
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$10,000.000
|
$12,613.330
|
$13,000.000
|
$4,990.000
|
$6,500.000
|
$14,259.340
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,683.610
|
$1,900.000
|
$2,600.000
|
$1,350.000
|
$6,381.940
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,750.000
|
$2,084.830
|
$2,000.000
|
$2,700.000
|
$1,735.000
|
$5,015.190
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$5,000.000
|
$5,720.460
|
$4,400.000
|
$7,300.000
|
$4,300.000
|
$8,723.400
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$800.000
|
$906.580
|
$800.000
|
$1,310.000
|
$1,300.000
|
$6,143.940
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$500.000
|
$770.470
|
$1,400.000
|
$350.000
|
$900.000
|
$1,995.210
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,000.000
|
$2,311.410
|
$7,000.000
|
$5,700.000
|
$2,150.000
|
$1,761.380
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$1,500.000
|
$2,311.390
|
$5,000.000
|
$1,890.000
|
$2,150.000
|
$4,571.990
|
|
|
REMOV STR (PIPE)
|
LF
|
29.000
|
$25.000
|
$38.030
|
$40.000
|
$45.200
|
$43.000
|
$251.930
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$55,000.000
|
$96,989.730
|
$73,500.000
|
$75,000.000
|
$150,000.000
|
$116,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$990,000.000
|
$1,200,000.000
|
$1,260,511.290
|
$1,000,000.000
|
$1,300,000.000
|
$1,502,877.150
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$6,500.000
|
$10,000.000
|
$10,001.000
|
$2,490.000
|
$6,000.000
|
$2,293.380
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
376.000
|
$30.000
|
$46.000
|
$40.000
|
$48.450
|
$29.000
|
$37.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
376.000
|
$10.000
|
$4.000
|
$36.000
|
$4.200
|
$11.000
|
$32.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,248.000
|
$30.000
|
$12.500
|
$20.000
|
$13.150
|
$15.000
|
$17.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,248.000
|
$10.000
|
$3.000
|
$14.000
|
$3.150
|
$5.000
|
$12.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,408.000
|
$3.250
|
$2.450
|
$4.000
|
$2.600
|
$5.250
|
$3.950
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,408.000
|
$1.000
|
$0.500
|
$0.700
|
$0.550
|
$1.600
|
$0.650
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,770.000
|
$75.000
|
$74.930
|
$110.000
|
$105.000
|
$90.000
|
$106.130
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
17.000
|
$4,000.000
|
$324.440
|
$5,000.000
|
$1,950.000
|
$5,000.000
|
$1,850.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
5,370.000
|
$40.000
|
$75.310
|
$52.000
|
$84.600
|
$89.000
|
$2.900
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
5,040.000
|
$6.000
|
$6.050
|
$8.000
|
$10.000
|
$14.000
|
$13.500
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
5,370.000
|
$15.000
|
$10.740
|
$9.000
|
$23.400
|
$16.000
|
$25.320
|
|
|
INTERSECTIONS (ACP)
|
SY
|
185.000
|
$100.000
|
$53.880
|
$103.000
|
$92.200
|
$53.000
|
$62.770
|
|
|
DRIVEWAYS (CONC)
|
SY
|
100.000
|
$100.000
|
$115.870
|
$160.000
|
$147.000
|
$120.000
|
$123.960
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
220.000
|
$35.000
|
$47.720
|
$26.000
|
$87.500
|
$30.000
|
$47.130
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
9,890.000
|
$1.250
|
$0.150
|
$0.800
|
$0.350
|
$1.000
|
$0.520
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
4,712.000
|
$1.250
|
$0.320
|
$1.400
|
$0.700
|
$1.000
|
$1.110
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,262.500
|
$35.000
|
$25.500
|
$29.000
|
$30.550
|
$34.000
|
$31.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$2,250.000
|
$2,150.000
|
$2,300.000
|
$2,530.000
|
$3,100.000
|
$2,295.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,113.000
|
$3.000
|
$2.250
|
$2.500
|
$2.100
|
$4.350
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$245.000
|
$225.000
|
$240.000
|
$211.000
|
$270.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$3,250.000
|
$2,700.000
|
$2,800.000
|
$3,110.000
|
$3,150.000
|
$2,905.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$275.000
|
$225.000
|
$240.000
|
$211.000
|
$270.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,800.000
|
$1,000.000
|
$1,100.000
|
$1,430.000
|
$2,600.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
12.000
|
$1,200.000
|
$994.190
|
$900.000
|
$970.000
|
$1,250.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$29,600.000
|
$35,000.000
|
$42,000.000
|
$32,000.000
|
$29,600.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$10,000.000
|
$7,250.000
|
$8,500.000
|
$12,100.000
|
$9,400.000
|
$7,250.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,473.000
|
$19.000
|
$12.000
|
$22.000
|
$26.350
|
$21.000
|
$20.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$500.000
|
$506.780
|
$800.000
|
$370.000
|
$652.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$700.000
|
$562.070
|
$1,100.000
|
$790.000
|
$760.000
|
$945.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$800.000
|
$690.470
|
$1,200.000
|
$910.000
|
$920.000
|
$1,111.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$562.070
|
$1,497.230
|
$1,050.000
|
$975.000
|
$1,255.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
24.000
|
$200.000
|
$25.000
|
$190.000
|
$160.000
|
$200.000
|
$165.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$30.000
|
$20.500
|
$22.000
|
$26.350
|
$30.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
51.000
|
$35.000
|
$25.500
|
$28.000
|
$36.850
|
$48.000
|
$62.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
19,869.000
|
$0.250
|
$0.400
|
$0.600
|
$0.550
|
$0.430
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,482.000
|
$5.000
|
$6.000
|
$6.000
|
$7.550
|
$6.520
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
27,182.000
|
$1.000
|
$0.600
|
$1.100
|
$1.150
|
$0.650
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$10.000
|
$14.000
|
$19.000
|
$17.300
|
$15.220
|
$14.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
60,734.000
|
$1.000
|
$0.600
|
$1.100
|
$0.830
|
$0.650
|
$0.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
48.000
|
$10.000
|
$14.000
|
$17.000
|
$27.000
|
$15.220
|
$14.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,193.000
|
$0.500
|
$0.500
|
$0.500
|
$1.750
|
$0.540
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,383.000
|
$1.000
|
$0.740
|
$0.900
|
$0.850
|
$0.800
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,121.000
|
$1.000
|
$0.740
|
$0.800
|
$1.150
|
$0.800
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,110.000
|
$1.000
|
$0.740
|
$0.900
|
$1.150
|
$0.800
|
$0.740
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
242.000
|
$10.000
|
$7.000
|
$8.000
|
$17.300
|
$7.610
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,819.000
|
$1.000
|
$1.000
|
$0.900
|
$0.850
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,193.000
|
$0.400
|
$0.010
|
$0.700
|
$0.750
|
$0.010
|
$0.010
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
3,913.000
|
$115.000
|
$120.000
|
$132.000
|
$128.000
|
$123.000
|
$120.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
2,856.000
|
$120.000
|
$148.000
|
$162.000
|
$158.000
|
$157.000
|
$148.000
|
|
|
TACK COAT
|
GAL
|
1,741.000
|
$3.500
|
$3.400
|
$4.000
|
$3.650
|
$3.800
|
$3.400
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
224.000
|
$100.000
|
$1.080
|
$82.000
|
$148.000
|
$100.000
|
$61.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
12.000
|
$4,000.000
|
$1.080
|
$30,000.000
|
$9,100.000
|
$5,000.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$175.000
|
$740.140
|
$250.000
|
$340.000
|
$125.000
|
$233.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$70.000
|
$106.030
|
$120.000
|
$87.500
|
$85.000
|
$90.000
|
|
Totals: |
$10,936,141.250
|
$11,989,343.746
|
$13,040,892.300
|
$13,171,746.945
|
$13,183,197.560
|
$15,104,292.945
|