Job Info for 0320-02-036

County: BELL Highway: SH 95 Date: 10/03/2017 (7 years ago) Engineer's Estimate: $7,449,956 Control Number: 0320-02-036
Project: STP 2017(900) District: WACO Time: 277 WORKING DAYS Type: WDN, GR, SURF, ADD PASS LNS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,449,956.41
BIG CREEK CONSTRUCTION, LTD.   $6,123,477.87 1
-17.81% | -$1,326,478.54
KNIFE RIVER CORPORATION - SOUTH   $6,521,839.88 2
-12.46% | -$928,116.53
6.51% | $398,362.01
OLDCASTLE MATERIALS TEXAS, INC.   $6,824,969.77 3
-8.39% | -$624,986.64
11.46% | $701,491.90
4.65% | $303,129.89
JAMES CONSTRUCTION GROUP, L.L.C.   $7,019,799.47 4
-5.77% | -$430,156.94
14.64% | $896,321.60
2.85% | $194,829.70
TTG UTILITIES, LP   $7,090,927.45 5
-4.82% | -$359,028.96
15.8% | $967,449.58
1.01% | $71,127.98
AUSTIN MATERIALS, LLC   $7,915,586.06 6
6.25% | $465,629.65
29.27% | $1,792,108.19
11.63% | $824,658.61

Bid Items

Items: 108, 0 filtered
BELL SH 95  |  WACO  |  0320-02-036  |  10/03/2017  |  $7,449,956  |  STP 2017(900)  |  WDN, GR, SURF, ADD PASS LNS  |  277 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BIG CREEK CONSTRUCTION, LTD. KNIFE RIVER CORPORATION - SOUTH OLDCASTLE MATERIALS TEXAS, INC. JAMES CONSTRUCTION GROUP, L.L.C. TTG UTILITIES, LP AUSTIN MATERIALS, LLC
100 6002 PREPARING ROW STA 10.000 $1,500.000 $2,000.000 $4,000.000 $1,050.000 $1,750.000 $630.000 $4,000.020
104 6017 REMOVING CONC (DRIVEWAYS) SY 126.000 $17.000 $10.000 $39.000 $40.000 $26.000 $15.000 $20.000
104 6021 REMOVING CONC (CURB) LF 480.000 $6.000 $10.000 $10.000 $10.000 $7.500 $6.500 $10.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 690.000 $9.000 $10.000 $11.000 $9.000 $12.000 $9.000 $15.000
105 6030 REMOVING STAB BASE & ASPH PAV (8"-14") SY 45,824.000 $8.900 $2.500 $1.500 $4.050 $2.500 $3.950 $5.140
110 6001 EXCAVATION (ROADWAY) CY 2,221.000 $8.000 $14.000 $20.000 $16.300 $5.000 $6.700 $9.000
112 6002 SUBGRADE WIDENING (DENS CONT) STA 91.700 $450.000 $900.000 $400.000 $475.000 $500.000 $1,150.000 $350.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 9,480.000 $9.000 $14.000 $10.000 $17.300 $15.000 $16.000 $22.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 79,048.000 $1.000 $0.500 $0.440 $0.900 $0.400 $1.300 $1.300
164 6009 BROADCAST SEED (TEMP) (WARM) SY 39,524.000 $0.350 $0.070 $0.060 $0.060 $0.060 $0.140 $0.130
164 6011 BROADCAST SEED (TEMP) (COOL) SY 39,524.000 $0.350 $0.070 $0.060 $0.060 $0.060 $0.140 $0.130
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 79,048.000 $0.150 $0.100 $0.090 $0.090 $0.090 $0.170 $0.160
168 6001 VEGETATIVE WATERING MG 2,570.000 $13.000 $5.000 $1.000 $0.010 $18.000 $21.000 $28.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 2,672.000 $1.850 $1.500 $1.000 $0.900 $1.500 $1.220 $1.150
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 22,156.000 $38.000 $35.000 $31.000 $28.000 $40.350 $33.500 $42.000
260 6043 LIME (HYD, COM OR QK)(SLURRY) TON 233.000 $135.000 $180.000 $160.000 $158.000 $165.000 $150.000 $140.000
260 6073 LIME TRT (SUBGRADE)(8") SY 11,650.000 $3.250 $5.000 $3.000 $6.400 $4.000 $4.400 $3.000
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 16,773.000 $3.100 $3.000 $2.850 $2.750 $2.860 $2.900 $2.760
316 6022 ASPH (CRS-2) GAL 82,455.000 $1.800 $1.100 $1.800 $1.900 $1.980 $2.000 $2.630
316 6397 AGGR(TY-D GR-4 OR TY-L GR-4) CY 1,466.000 $110.000 $40.000 $91.000 $66.400 $69.730 $71.000 $93.000
341 6008 D-GR HMA TY-B PG64-22 TON 17,532.000 $62.500 $53.000 $58.500 $50.450 $54.150 $60.500 $55.000
341 6020 D-GR HMA TY-C SAC-A PG64-22 TON 19,509.000 $70.000 $60.000 $62.950 $54.000 $57.250 $66.000 $65.000
341 6062 D-GR HMA TY-D PG64-22(LEVEL-UP) TON 19,973.000 $65.000 $53.000 $60.000 $50.000 $57.250 $64.000 $60.500
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 500.000 $45.000 $50.000 $50.000 $48.000 $53.000 $53.000 $64.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 5,282.000 $4.500 $3.000 $3.750 $2.000 $2.050 $2.450 $4.750
356 6021 PAV JT UNDERSEAL (24") LF 172.000 $37.000 $40.000 $35.000 $58.000 $45.000 $38.000 $32.000
400 6005 CEM STABIL BKFL CY 39.000 $160.000 $120.000 $154.000 $153.000 $110.000 $160.000 $157.000
403 6001 TEMPORARY SPL SHORING SF 200.000 $20.000 $35.000 $17.500 $55.000 $50.000 $35.000 $18.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 25.200 $250.000 $1,000.000 $1,350.000 $1,600.000 $900.000 $400.000 $1,378.010
429 6009 CONC STR REPAIR (STANDARD) SF 7.000 $300.000 $500.000 $500.000 $1,350.000 $160.000 $650.000 $317.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 92.000 $115.000 $110.000 $194.000 $192.000 $120.000 $87.000 $198.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 211.000 $433.000 $400.000 $385.000 $340.000 $380.000 $395.000 $393.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 172.000 $40.000 $40.000 $35.000 $48.000 $45.000 $39.000 $32.000
438 6006 CLEANING AND SEALING JOINTS (CL 3) LF 314.000 $42.000 $40.000 $35.000 $48.000 $45.000 $39.000 $32.000
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 81.000 $340.000 $400.000 $346.000 $340.000 $430.000 $264.000 $353.000
462 6047 CONC BOX CULV (4 FT X 2 FT)(EXTEND) LF 35.000 $384.000 $500.000 $364.000 $390.000 $520.000 $375.000 $372.000
462 6051 CONC BOX CULV (5 FT X 3 FT)(EXTEND) LF 25.000 $560.000 $900.000 $592.000 $650.000 $820.000 $500.000 $604.000
462 6130 CONC BOX CULV (3 FT X 1.5 FT)(EXTEND) LF 20.000 $406.000 $400.000 $342.000 $390.000 $580.000 $370.000 $349.000
464 6003 RC PIPE (CL III)(18 IN) LF 434.000 $60.000 $50.000 $48.000 $55.000 $55.000 $50.000 $80.000
464 6007 RC PIPE (CL III)(30 IN) LF 46.000 $90.000 $80.000 $77.000 $135.000 $85.000 $90.000 $130.000
466 6193 WINGWALL (PW - 2) (HW=4 FT) EA 1.000 $9,500.000 $12,000.000 $7,100.000 $6,500.000 $10,200.000 $7,650.000 $7,243.030
467 6106 SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) EA 6.000 $6,030.000 $5,500.000 $8,000.000 $5,200.000 $6,500.000 $5,320.000 $8,209.040
467 6112 SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C) EA 2.000 $5,233.000 $8,500.000 $9,300.000 $6,050.000 $8,300.000 $3,740.000 $9,497.040
467 6117 SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C) EA 2.000 $6,500.000 $7,000.000 $8,700.000 $5,700.000 $8,000.000 $5,900.000 $8,902.040
467 6118 SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C) EA 1.000 $9,840.000 $12,000.000 $10,900.000 $6,800.000 $10,600.000 $9,360.000 $11,193.050
467 6139 SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C) EA 2.000 $6,900.000 $6,500.000 $8,300.000 $6,000.000 $8,200.000 $6,050.000 $8,547.040
467 6144 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 1.000 $5,600.000 $9,000.000 $9,600.000 $7,200.000 $11,000.000 $6,600.000 $9,833.040
467 6150 SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C) EA 1.000 $9,400.000 $12,000.000 $10,600.000 $7,700.000 $11,500.000 $8,625.000 $10,845.050
467 6177 SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C) EA 6.000 $8,700.000 $5,000.000 $7,800.000 $6,500.000 $7,800.000 $6,500.000 $8,022.040
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 26.000 $900.000 $750.000 $950.000 $945.000 $700.000 $620.000 $1,200.010
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 2.000 $2,205.000 $1,400.000 $1,750.000 $2,000.000 $1,650.000 $2,200.000 $1,700.010
496 6004 REMOV STR (SET) EA 28.000 $350.000 $250.000 $625.000 $650.000 $230.000 $280.000 $800.000
496 6005 REMOV STR (WINGWALL) EA 2.000 $1,500.000 $1,000.000 $1,040.000 $2,500.000 $2,800.000 $1,580.000 $2,200.010
496 6007 REMOV STR (PIPE) LF 411.000 $15.000 $10.000 $9.250 $30.000 $10.500 $15.000 $25.000
500 6001 MOBILIZATION LS 1.000 $595,000.000 $450,000.180 $480,000.000 $497,000.000 $700,000.000 $550,000.000 $790,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13.000 $6,000.000 $2,500.000 $8,000.000 $60,000.000 $25,000.000 $8,000.000 $31,025.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 168.000 $28.000 $25.000 $23.000 $25.000 $25.000 $33.500 $22.190
506 6011 ROCK FILTER DAMS (REMOVE) LF 168.000 $9.000 $3.000 $6.000 $7.000 $6.000 $12.000 $6.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 78.000 $29.000 $10.000 $12.500 $19.000 $20.000 $26.000 $18.570
506 6024 CONSTRUCTION EXITS (REMOVE) SY 78.000 $12.000 $1.000 $3.500 $6.000 $6.000 $10.000 $6.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 10,822.000 $2.400 $3.000 $3.000 $2.150 $3.300 $2.750 $2.150
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 10,822.000 $0.500 $0.300 $0.250 $0.250 $0.440 $0.850 $0.250
530 6004 DRIVEWAYS (CONC) SY 126.000 $70.000 $80.000 $78.000 $85.000 $90.000 $60.000 $74.000
530 6019 DRIVEWAYS (ACP)(TYPE 1) SY 817.000 $15.000 $10.000 $18.600 $19.000 $26.500 $21.000 $31.500
530 6021 DRIVEWAYS (ACP) (TYPE 2) SY 1,475.000 $34.000 $30.000 $35.000 $51.000 $39.000 $37.000 $54.500
530 6022 INTERSECTIONS (ACP) (TYPE 1) SY 329.000 $15.000 $15.000 $35.000 $31.000 $37.000 $33.000 $38.890
530 6023 INTERSECTIONS (ACP) (TYPE 2) SY 541.000 $65.000 $50.000 $63.000 $98.000 $78.000 $56.000 $62.300
533 6002 RUMBLE STRIPS (CENTERLINE) LF 33,497.000 $0.250 $0.250 $0.340 $0.130 $0.130 $0.210 $0.130
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,152.000 $23.000 $25.000 $19.250 $18.760 $18.760 $20.000 $18.760
540 6005 TERMINAL ANCHOR SECTION EA 3.000 $900.000 $700.000 $800.000 $783.040 $783.040 $830.000 $783.040
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 16.000 $1,500.000 $1,600.000 $1,990.000 $1,439.000 $1,439.000 $1,530.000 $1,739.010
540 6014 SHORT RADIUS LF 106.000 $31.000 $30.000 $25.500 $25.140 $25.140 $27.000 $25.140
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,694.000 $2.250 $2.000 $1.000 $1.000 $1.000 $1.050 $1.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 16.000 $150.000 $125.000 $100.000 $100.000 $100.000 $107.000 $100.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 20.000 $2,300.000 $2,400.000 $2,375.000 $2,327.000 $2,327.000 $2,470.000 $2,327.010
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 20.000 $272.000 $125.000 $100.000 $100.000 $100.000 $107.000 $100.000
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 2.000 $412.500 $280.000 $460.000 $375.000 $450.000 $475.000 $375.000
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 40.000 $195.000 $110.000 $180.000 $150.000 $175.000 $185.000 $150.000
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 1.000 $215.000 $150.000 $205.000 $195.000 $200.000 $210.000 $195.000
644 6008 IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL) EA 2.000 $730.000 $600.000 $618.000 $795.090 $600.000 $640.000 $795.090
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 30.000 $315.000 $300.000 $309.000 $349.290 $300.000 $320.000 $349.290
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 24.000 $340.000 $300.000 $360.000 $374.430 $350.000 $370.000 $374.430
644 6076 REMOVE SM RD SN SUP&AM EA 57.000 $100.000 $60.000 $67.000 $75.000 $80.000 $80.000 $75.000
644 6080 RELOCATE SM RD SN SUP & AM TY TEMP EA 42.000 $192.000 $200.000 $180.000 $175.000 $175.000 $185.000 $410.000
658 6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 10.000 $47.000 $50.000 $41.000 $40.000 $40.000 $53.000 $40.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 60.000 $50.000 $25.000 $10.250 $10.000 $10.000 $21.000 $10.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 35.000 $56.000 $55.000 $41.000 $40.000 $40.000 $53.000 $40.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 33.000 $50.000 $30.000 $21.000 $20.330 $20.330 $53.000 $20.330
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 59,965.000 $0.130 $0.140 $0.120 $0.120 $0.150 $0.130 $0.130
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 380.000 $0.270 $0.140 $0.120 $0.120 $0.500 $0.130 $1.000
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 61,752.000 $0.160 $0.140 $0.120 $0.120 $0.150 $0.130 $0.130
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 59,965.000 $0.520 $0.200 $0.410 $0.400 $0.600 $0.420 $0.380
662 6093 WK ZN PAV MRK REMOV (Y)4"(BRK) LF 380.000 $0.850 $0.200 $0.410 $0.400 $1.000 $0.420 $1.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 61,752.000 $0.600 $0.200 $0.410 $0.400 $0.600 $0.420 $0.380
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 180.000 $1.500 $1.000 $0.520 $0.500 $0.700 $0.530 $0.650
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 332.000 $7.000 $6.000 $5.770 $5.600 $5.500 $6.000 $6.000
666 6168 REFL PAV MRK TY II (W) 4" (DOT) LF 303.000 $0.200 $1.000 $0.310 $0.300 $1.000 $0.320 $1.000
666 6224 PAVEMENT SEALER 4" LF 6,170.000 $0.280 $0.500 $0.410 $0.400 $0.250 $0.420 $0.200
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 4,340.000 $0.370 $0.280 $0.280 $0.270 $0.340 $0.290 $0.330
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 72,398.000 $0.320 $0.280 $0.280 $0.270 $0.320 $0.290 $0.300
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 7,835.000 $0.350 $0.280 $0.280 $0.270 $0.340 $0.290 $0.330
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 30,512.000 $0.340 $0.280 $0.280 $0.270 $0.320 $0.290 $0.330
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 $250.000 $200.000 $190.000 $185.000 $238.000 $200.000 $200.000
668 6083 PREFAB PAV MRK TY C (W) (LNDP ARROW) EA 4.000 $465.000 $550.000 $520.000 $505.000 $490.000 $540.000 $320.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 1.000 $300.000 $300.000 $262.000 $255.000 $299.000 $270.000 $275.000
672 6007 REFL PAV MRKR TY I-C EA 217.000 $4.000 $5.000 $4.400 $4.300 $3.000 $4.600 $5.000
672 6009 REFL PAV MRKR TY II-A-A EA 867.000 $4.000 $4.000 $3.850 $3.750 $3.000 $4.000 $4.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 99,280.000 $0.340 $0.380 $0.490 $0.500 $0.300 $1.100 $0.520
Totals: $7,449,956.41 $6,123,477.87 $6,521,839.88 $6,824,969.77 $7,019,799.47 $7,090,927.45 $7,915,586.06