PREPARING ROW
|
STA
|
33.000
|
$1,909.350
|
$7,400.000
|
$10,000.000
|
$2,150.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19.000
|
$8.270
|
$120.000
|
$41.450
|
$62.200
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
176.000
|
$15.010
|
$130.000
|
$126.180
|
$34.600
|
|
|
BACKFILL (TY A)
|
STA
|
24.400
|
$179.300
|
$195.000
|
$445.870
|
$145.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,689.000
|
$0.990
|
$3.500
|
$0.510
|
$6.000
|
|
|
ROLL SODDING
|
SY
|
5,689.000
|
$2.890
|
$3.560
|
$3.800
|
$3.900
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,689.000
|
$0.120
|
$0.320
|
$0.880
|
$0.900
|
|
|
VEGETATIVE WATERING
|
MG
|
92.800
|
$5.240
|
$18.500
|
$23.690
|
$20.700
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$75.000
|
$52.000
|
$63.540
|
$92.200
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
1,558.000
|
$62.500
|
$140.000
|
$128.000
|
$138.000
|
|
|
CEM STABIL BKFL
|
CY
|
521.000
|
$129.870
|
$155.000
|
$109.890
|
$171.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
187.000
|
$63.600
|
$91.000
|
$102.140
|
$98.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
549.000
|
$143.920
|
$252.000
|
$159.560
|
$234.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
48.000
|
$48.000
|
$310.000
|
$239.390
|
$330.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
89.500
|
$828.660
|
$1,060.000
|
$565.760
|
$920.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
62.900
|
$1,057.450
|
$1,250.000
|
$1,127.010
|
$1,360.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
53.000
|
$838.330
|
$1,660.000
|
$1,380.430
|
$1,660.000
|
|
|
CL C CONC (COLUMN)(HPC)(MASS)
|
CY
|
42.000
|
$969.890
|
$1,210.000
|
$982.110
|
$1,660.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
78.000
|
$405.110
|
$490.000
|
$537.160
|
$570.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
14,348.000
|
$21.000
|
$20.000
|
$18.280
|
$18.050
|
|
|
APPROACH SLAB
|
CY
|
190.800
|
$1,325.000
|
$437.000
|
$377.900
|
$560.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,776.470
|
$130.000
|
$169.000
|
$247.000
|
$163.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
884.000
|
$422.220
|
$482.000
|
$284.640
|
$440.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$454.400
|
$500.000
|
$604.760
|
$570.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,332.000
|
$41.750
|
$0.010
|
$89.410
|
$50.600
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
892.600
|
$44.000
|
$49.000
|
$89.290
|
$60.800
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
151.000
|
$87.720
|
$124.000
|
$96.460
|
$133.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$270,000.000
|
$24,424.210
|
$325,659.640
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$5,000.000
|
$3,481.950
|
$11,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
61.000
|
$10.000
|
$49.000
|
$33.400
|
$25.650
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
61.000
|
$40.000
|
$21.500
|
$18.000
|
$12.800
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
156.000
|
$30.000
|
$45.000
|
$33.000
|
$15.400
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$5.000
|
$10.000
|
$10.000
|
$10.250
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,175.000
|
$2.250
|
$3.500
|
$2.980
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,175.000
|
$0.600
|
$0.800
|
$0.960
|
$1.050
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,560.000
|
$5.860
|
$35.000
|
$54.000
|
$73.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,420.000
|
$6.820
|
$4.200
|
$12.080
|
$14.650
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$9.170
|
$4.200
|
$14.280
|
$14.650
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$4.970
|
$6.200
|
$4.790
|
$14.650
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,936.000
|
$5.970
|
$4.700
|
$9.930
|
$14.650
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$7.870
|
$8.500
|
$11.930
|
$14.650
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
484.000
|
$6.860
|
$6.100
|
$10.190
|
$14.650
|
|
|
CONC CURB (TY II)
|
LF
|
1,105.000
|
$16.650
|
$15.000
|
$23.630
|
$10.900
|
|
|
CONC MEDIAN
|
SY
|
122.000
|
$58.140
|
$66.000
|
$86.830
|
$64.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
850.000
|
$22.650
|
$21.000
|
$21.890
|
$27.050
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,666.210
|
$1,722.000
|
$1,661.000
|
$1,900.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,667.210
|
$1,000.000
|
$1,144.000
|
$970.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
225.000
|
$2.700
|
$2.100
|
$3.280
|
$5.150
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$100.000
|
$132.000
|
$189.160
|
$205.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,373.010
|
$2,520.000
|
$2,732.430
|
$2,950.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$216.940
|
$210.000
|
$209.760
|
$510.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$777.500
|
$370.000
|
$1,250.000
|
$1,030.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
|
EA
|
4.000
|
$16,178.000
|
$7,900.000
|
$21,000.000
|
$10,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$400.000
|
$755.000
|
$434.140
|
$840.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
4.000
|
$3,800.000
|
$2,900.000
|
$1,610.000
|
$3,130.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
7.000
|
$2,800.000
|
$3,600.000
|
$3,700.000
|
$3,910.000
|
|
|
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
|
EA
|
1.000
|
$4,000.000
|
$4,100.000
|
$5,750.190
|
$4,460.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
100.000
|
$9.360
|
$11.500
|
$9.850
|
$12.300
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,988.000
|
$15.000
|
$12.500
|
$13.450
|
$13.400
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
533.000
|
$40.000
|
$8.300
|
$12.500
|
$8.950
|
|
|
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
|
LF
|
397.000
|
$40.000
|
$9.400
|
$29.350
|
$10.050
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
460.000
|
$1.000
|
$2.100
|
$1.000
|
$2.250
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
920.000
|
$1.050
|
$3.100
|
$1.050
|
$3.350
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,696.000
|
$1.310
|
$2.100
|
$1.050
|
$2.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,146.000
|
$1.150
|
$2.600
|
$1.590
|
$2.800
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$700.000
|
$810.000
|
$875.000
|
$890.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$900.000
|
$1,310.000
|
$955.000
|
$1,450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$550.000
|
$552.000
|
$524.720
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$675.000
|
$641.950
|
$930.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,000.000
|
$730.000
|
$692.720
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$650.000
|
$345.000
|
$326.540
|
$410.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$300.000
|
$2,600.000
|
$2,475.190
|
$2,430.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
1.000
|
$250.000
|
$268.000
|
$254.540
|
$231.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$85.000
|
$91.000
|
$85.930
|
$154.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$300.000
|
$602.000
|
$573.020
|
$1,280.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
6.000
|
$85.000
|
$368.000
|
$242.000
|
$360.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
11.000
|
$25.000
|
$25.200
|
$18.000
|
$17.450
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
9.000
|
$20.000
|
$25.200
|
$18.250
|
$17.450
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
9.000
|
$25.000
|
$25.200
|
$18.250
|
$17.450
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
2.000
|
$50.000
|
$60.000
|
$53.950
|
$50.300
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
4.000
|
$80.000
|
$105.000
|
$103.410
|
$97.400
|
|
|
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
|
EA
|
9.000
|
$35.000
|
$37.800
|
$31.950
|
$50.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
546.000
|
$0.300
|
$0.270
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,182.000
|
$0.200
|
$0.270
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
358.000
|
$0.670
|
$0.270
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,188.000
|
$0.300
|
$0.270
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
54.000
|
$7.000
|
$10.500
|
$10.000
|
$10.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
140.000
|
$1.020
|
$1.000
|
$1.000
|
$1.200
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
200.000
|
$0.750
|
$1.050
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,452.000
|
$0.750
|
$0.840
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
357.000
|
$0.750
|
$4.200
|
$4.000
|
$4.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
170.000
|
$5.000
|
$7.350
|
$7.000
|
$7.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
599.000
|
$0.500
|
$1.050
|
$1.000
|
$1.050
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,227.000
|
$0.500
|
$0.620
|
$0.590
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,634.000
|
$0.500
|
$0.620
|
$0.590
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
9.000
|
$200.000
|
$284.000
|
$270.000
|
$280.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$350.000
|
$389.000
|
$370.000
|
$380.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
3.000
|
$400.000
|
$389.000
|
$370.000
|
$380.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$250.000
|
$315.000
|
$300.000
|
$310.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$30.000
|
$47.500
|
$45.000
|
$46.150
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
176.000
|
$3.250
|
$3.800
|
$3.500
|
$3.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,274.000
|
$0.580
|
$0.800
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
458.000
|
$1.000
|
$0.800
|
$0.750
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$45.240
|
$26.500
|
$25.000
|
$25.650
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$48.230
|
$26.500
|
$25.000
|
$25.650
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
6,015.000
|
$1.970
|
$3.100
|
$2.150
|
$3.350
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
3,010.000
|
$3.470
|
$4.100
|
$4.000
|
$4.450
|
|
|
REMOVAL OF CABLES
|
LF
|
1.000
|
$1.040
|
$3.200
|
$1.000
|
$3.350
|
|
|
REMOVAL OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$994.010
|
$1,600.000
|
$1,310.000
|
$1,670.000
|
|
|
INSTALL OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$4,234.220
|
$7,100.000
|
$3,136.600
|
$7,800.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$1,000.000
|
$0.010
|
$250.000
|
$2,200.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
16.000
|
$3,000.000
|
$0.010
|
$3,093.440
|
$600.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
16.000
|
$3,000.000
|
$0.010
|
$3,093.440
|
$600.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
6.000
|
$3,000.000
|
$0.010
|
$3,093.440
|
$600.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,693.000
|
$57.120
|
$69.000
|
$65.000
|
$70.300
|
|
|
UNDERSEAL COURSE
|
GAL
|
3,541.000
|
$2.670
|
$2.550
|
$2.400
|
$12.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
240.000
|
$80.250
|
$74.000
|
$16.070
|
$119.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,438.390
|
$0.010
|
$2,250.000
|
$8,900.000
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
2,805.000
|
$3.850
|
$5.100
|
$3.520
|
$5.600
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$209.770
|
$0.010
|
$81.670
|
$290.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
360.000
|
$47.830
|
$0.010
|
$66.010
|
$48.550
|
|
|
VIVDS CABLING
|
LF
|
85.000
|
$3.160
|
$9.500
|
$3.450
|
$10.050
|
|
Totals: |
$3,095,819.357
|
$3,098,000.000
|
$3,612,620.003
|
$3,748,941.350
|