Show Job Controls
Bid Cobra

BELL IH 14 (0231-03-147)

Items: 122

County: BELL
Length: N/A
Highway: IH 14
District: WACO
Control Number: 0231-03-147
DBE Goal: N/A
Project: STP 2020(941)MM
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $3,095,819.36
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,095,819.36
$3,098,000.00
Over/Under Est: 0.07% $2,180.64
Over/Under Est: 16.69% $516,800.62
Amt Left: 16.61% $514,619.98
Over/Under Est: 21.1% $653,121.99
Amt Left: 21.01% $650,941.35
Delta: -3.77% -$136,321.37

Bid Items & Bid Tabulations

122 Total 0 of 122
BELL  |  IH 14  |  WACO  |  0231-03-147  |  07/09/2020  |  $3,095,819.36  |  STP 2020(941)MM  |  CONSTRUCT WEST TO EAST TURNAROUND @...  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J.D. ABRAMS, L.P.
JAMES CONSTRUCTION GROUP, L.L.C.
CAPITAL EXCAVATION COMPANY
PREPARING ROW
STA 33.000 $1,909.350 $7,400.000 $10,000.000 $2,150.000
EXCAVATION (ROADWAY)
CY 19.000 $8.270 $120.000 $41.450 $62.200
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 176.000 $15.010 $130.000 $126.180 $34.600
BACKFILL (TY A)
STA 24.400 $179.300 $195.000 $445.870 $145.000
FURNISHING AND PLACING TOPSOIL (4")
SY 5,689.000 $0.990 $3.500 $0.510 $6.000
ROLL SODDING
SY 5,689.000 $2.890 $3.560 $3.800 $3.900
DRILL SEED (TEMP)(WARM OR COOL)
SY 5,689.000 $0.120 $0.320 $0.880 $0.900
VEGETATIVE WATERING
MG 92.800 $5.240 $18.500 $23.690 $20.700
PROOF ROLLING
HR 8.000 $75.000 $52.000 $63.540 $92.200
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 1,558.000 $62.500 $140.000 $128.000 $138.000
CEM STABIL BKFL
CY 521.000 $129.870 $155.000 $109.890 $171.000
DRILL SHAFT (18 IN)
LF 187.000 $63.600 $91.000 $102.140 $98.000
DRILL SHAFT (36 IN)
LF 549.000 $143.920 $252.000 $159.560 $234.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $48.000 $310.000 $239.390 $330.000
CL C CONC (ABUT)(HPC)
CY 89.500 $828.660 $1,060.000 $565.760 $920.000
CL C CONC (CAP)(HPC)
CY 62.900 $1,057.450 $1,250.000 $1,127.010 $1,360.000
CL C CONC (COLUMN)(HPC)
CY 53.000 $838.330 $1,660.000 $1,380.430 $1,660.000
CL C CONC (COLUMN)(HPC)(MASS)
CY 42.000 $969.890 $1,210.000 $982.110 $1,660.000
CL C CONC (RAIL FOUNDATION)
CY 78.000 $405.110 $490.000 $537.160 $570.000
REINF CONC SLAB (HPC)
SF 14,348.000 $21.000 $20.000 $18.280 $18.050
APPROACH SLAB
CY 190.800 $1,325.000 $437.000 $377.900 $560.000
PRESTR CONC GIRDER (TX54)
LF 1,776.470 $130.000 $169.000 $247.000 $163.000
RIPRAP (CONC)(5 IN)
CY 884.000 $422.220 $482.000 $284.640 $440.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $454.400 $500.000 $604.760 $570.000
RAIL (TY SSTR)
LF 1,332.000 $41.750 $0.010 $89.410 $50.600
RAIL (TY SSTR)(HPC)
LF 892.600 $44.000 $49.000 $89.290 $60.800
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 151.000 $87.720 $124.000 $96.460 $133.000
MOBILIZATION
LS 1.000 $270,000.000 $24,424.210 $325,659.640 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $6,000.000 $5,000.000 $3,481.950 $11,750.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 61.000 $10.000 $49.000 $33.400 $25.650
ROCK FILTER DAMS (REMOVE)
LF 61.000 $40.000 $21.500 $18.000 $12.800
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 156.000 $30.000 $45.000 $33.000 $15.400
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $5.000 $10.000 $10.000 $10.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,175.000 $2.250 $3.500 $2.980 $3.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,175.000 $0.600 $0.800 $0.960 $1.050
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,560.000 $5.860 $35.000 $54.000 $73.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 2,420.000 $6.820 $4.200 $12.080 $14.650
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $9.170 $4.200 $14.280 $14.650
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,560.000 $4.970 $6.200 $4.790 $14.650
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 1,936.000 $5.970 $4.700 $9.930 $14.650
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $7.870 $8.500 $11.930 $14.650
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 484.000 $6.860 $6.100 $10.190 $14.650
CONC CURB (TY II)
LF 1,105.000 $16.650 $15.000 $23.630 $10.900
CONC MEDIAN
SY 122.000 $58.140 $66.000 $86.830 $64.300
MTL W-BEAM GD FEN (STEEL POST)
LF 850.000 $22.650 $21.000 $21.890 $27.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,666.210 $1,722.000 $1,661.000 $1,900.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,667.210 $1,000.000 $1,144.000 $970.000
REMOVE METAL BEAM GUARD FENCE
LF 225.000 $2.700 $2.100 $3.280 $5.150
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $100.000 $132.000 $189.160 $205.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,373.010 $2,520.000 $2,732.430 $2,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $216.940 $210.000 $209.760 $510.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $777.500 $370.000 $1,250.000 $1,030.000
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
EA 4.000 $16,178.000 $7,900.000 $21,000.000 $10,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $400.000 $755.000 $434.140 $840.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $3,800.000 $2,900.000 $1,610.000 $3,130.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 7.000 $2,800.000 $3,600.000 $3,700.000 $3,910.000
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
EA 1.000 $4,000.000 $4,100.000 $5,750.190 $4,460.000
CONDT (PVC) (SCH 40) (2")
LF 100.000 $9.360 $11.500 $9.850 $12.300
CONDT (PVC) (SCH 40) (3")
LF 1,988.000 $15.000 $12.500 $13.450 $13.400
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
LF 533.000 $40.000 $8.300 $12.500 $8.950
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
LF 397.000 $40.000 $9.400 $29.350 $10.050
ELEC CONDR (NO.12) BARE
LF 460.000 $1.000 $2.100 $1.000 $2.250
ELEC CONDR (NO.12) INSULATED
LF 920.000 $1.050 $3.100 $1.050 $3.350
ELEC CONDR (NO.8) BARE
LF 2,696.000 $1.310 $2.100 $1.050 $2.250
ELEC CONDR (NO.8) INSULATED
LF 5,146.000 $1.150 $2.600 $1.590 $2.800
GROUND BOX TY A (122311)
EA 1.000 $700.000 $810.000 $875.000 $890.000
GROUND BOX TY A (122311)W/APRON
EA 6.000 $900.000 $1,310.000 $955.000 $1,450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $550.000 $552.000 $524.720 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $750.000 $675.000 $641.950 $930.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,000.000 $730.000 $692.720 $850.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $650.000 $345.000 $326.540 $410.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $300.000 $2,600.000 $2,475.190 $2,430.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $250.000 $268.000 $254.540 $231.000
REMOVE SM RD SN SUP&AM
EA 6.000 $85.000 $91.000 $85.930 $154.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $300.000 $602.000 $573.020 $1,280.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 6.000 $85.000 $368.000 $242.000 $360.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 11.000 $25.000 $25.200 $18.000 $17.450
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 9.000 $20.000 $25.200 $18.250 $17.450
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 9.000 $25.000 $25.200 $18.250 $17.450
INSTL OM ASSM (OM-2X)(WC)GND
EA 2.000 $50.000 $60.000 $53.950 $50.300
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 4.000 $80.000 $105.000 $103.410 $97.400
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
EA 9.000 $35.000 $37.800 $31.950 $50.300
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 546.000 $0.300 $0.270 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,182.000 $0.200 $0.270 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 358.000 $0.670 $0.270 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,188.000 $0.300 $0.270 $0.250 $0.250
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 54.000 $7.000 $10.500 $10.000 $10.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 140.000 $1.020 $1.000 $1.000 $1.200
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 200.000 $0.750 $1.050 $1.000 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,452.000 $0.750 $0.840 $0.800 $0.800
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 357.000 $0.750 $4.200 $4.000 $4.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 170.000 $5.000 $7.350 $7.000 $7.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 599.000 $0.500 $1.050 $1.000 $1.050
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,227.000 $0.500 $0.620 $0.590 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,634.000 $0.500 $0.620 $0.590 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $200.000 $284.000 $270.000 $280.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $350.000 $389.000 $370.000 $380.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 3.000 $400.000 $389.000 $370.000 $380.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $250.000 $315.000 $300.000 $310.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $30.000 $47.500 $45.000 $46.150
REFL PAV MRKR TY II-C-R
EA 176.000 $3.250 $3.800 $3.500 $3.600
ELIM EXT PAV MRK & MRKS (4")
LF 5,274.000 $0.580 $0.800 $0.750 $0.750
ELIM EXT PAV MRK & MRKS (8")
LF 458.000 $1.000 $0.800 $0.750 $0.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $45.240 $26.500 $25.000 $25.650
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $48.230 $26.500 $25.000 $25.650
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 6,015.000 $1.970 $3.100 $2.150 $3.350
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 3,010.000 $3.470 $4.100 $4.000 $4.450
REMOVAL OF CABLES
LF 1.000 $1.040 $3.200 $1.000 $3.350
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 1.000 $994.010 $1,600.000 $1,310.000 $1,670.000
INSTALL OF CONTROL CABINET(GRND MNT)
EA 1.000 $4,234.220 $7,100.000 $3,136.600 $7,800.000
FULL - WIDTH MOWING
CYC 2.000 $1,000.000 $0.010 $250.000 $2,200.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 16.000 $3,000.000 $0.010 $3,093.440 $600.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 16.000 $3,000.000 $0.010 $3,093.440 $600.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 6.000 $3,000.000 $0.010 $3,093.440 $600.000
D-GR HMA TY-B PG64-22
TON 3,693.000 $57.120 $69.000 $65.000 $70.300
UNDERSEAL COURSE
GAL 3,541.000 $2.670 $2.550 $2.400 $12.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $80.250 $74.000 $16.070 $119.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,438.390 $0.010 $2,250.000 $8,900.000
RADAR COMMUNICATION CABLE
LF 2,805.000 $3.850 $5.100 $3.520 $5.600
TMA (STATIONARY)
DAY 240.000 $209.770 $0.010 $81.670 $290.000
TMA (MOBILE OPERATION)
HR 360.000 $47.830 $0.010 $66.010 $48.550
VIVDS CABLING
LF 85.000 $3.160 $9.500 $3.450 $10.050
Totals: $3,095,819.357 $3,098,000.000 $3,612,620.003 $3,748,941.350