PREPARING ROW
|
STA
|
54.000
|
$1,200.000
|
$600.000
|
$2,650.000
|
$5,500.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
226.000
|
$12.000
|
$22.530
|
$7.000
|
$11.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,077.000
|
$5.000
|
$2.830
|
$5.000
|
$7.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
84.000
|
$15.000
|
$48.920
|
$40.000
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (21")
|
SY
|
7,982.000
|
$5.150
|
$9.000
|
$11.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,957.000
|
$5.000
|
$6.500
|
$8.000
|
$7.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,406.000
|
$15.000
|
$9.000
|
$5.000
|
$5.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
540.000
|
$9.000
|
$15.000
|
$18.000
|
$12.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,811.000
|
$5.000
|
$27.000
|
$35.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
1,133.000
|
$12.000
|
$4.000
|
$2.600
|
$10.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C1)(AS)
|
CY
|
2,164.000
|
$41.500
|
$27.000
|
$35.000
|
$50.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
6,843.000
|
$0.300
|
$1.500
|
$2.750
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
6,843.000
|
$3.500
|
$3.260
|
$4.110
|
$4.200
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
8,996.000
|
$0.100
|
$0.320
|
$0.160
|
$0.170
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
12,053.000
|
$0.080
|
$0.220
|
$0.100
|
$0.100
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
12,053.000
|
$0.080
|
$0.220
|
$0.100
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
324.000
|
$7.400
|
$15.000
|
$21.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,275.000
|
$1.050
|
$1.430
|
$1.500
|
$3.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
3,157.000
|
$34.100
|
$39.000
|
$42.000
|
$39.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
2,273.000
|
$3.060
|
$3.500
|
$3.420
|
$3.850
|
|
|
ASPH (CRS-2)
|
GAL
|
5,033.000
|
$2.000
|
$3.100
|
$2.990
|
$3.300
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
90.000
|
$74.000
|
$155.000
|
$149.410
|
$145.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,460.000
|
$55.000
|
$72.000
|
$68.300
|
$80.000
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
1,530.000
|
$60.000
|
$74.000
|
$70.440
|
$82.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
32.000
|
$90.000
|
$120.000
|
$114.190
|
$110.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
457.000
|
$90.000
|
$120.000
|
$114.190
|
$110.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
33.000
|
$85.000
|
$120.000
|
$116.330
|
$112.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
447.000
|
$85.000
|
$120.000
|
$116.330
|
$112.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
6,731.000
|
$1.000
|
$2.000
|
$1.190
|
$1.350
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,348.000
|
$1.500
|
$2.250
|
$1.390
|
$1.450
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
605.000
|
$3.000
|
$3.500
|
$2.700
|
$3.000
|
|
|
CEM STABIL BKFL
|
CY
|
181.000
|
$155.000
|
$130.000
|
$150.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,776.200
|
$15.000
|
$10.000
|
$6.000
|
$0.010
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
675.000
|
$150.000
|
$130.000
|
$140.000
|
$200.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
22.000
|
$139.500
|
$163.640
|
$162.000
|
$165.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
25.000
|
$400.600
|
$414.140
|
$410.000
|
$412.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
36.000
|
$509.450
|
$674.750
|
$668.000
|
$670.000
|
|
|
CL C CONC (ABUT)
|
CY
|
60.300
|
$850.000
|
$680.000
|
$750.000
|
$1,180.000
|
|
|
CL C CONC (CAP)
|
CY
|
12.000
|
$875.000
|
$800.000
|
$1,500.000
|
$1,580.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
14.100
|
$875.000
|
$810.000
|
$1,000.000
|
$1,250.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
96.000
|
$500.000
|
$415.000
|
$500.000
|
$420.000
|
|
|
REINF CONC SLAB
|
SF
|
9,212.000
|
$15.000
|
$14.000
|
$15.000
|
$23.000
|
|
|
APPROACH SLAB
|
CY
|
83.700
|
$390.000
|
$435.000
|
$460.000
|
$450.000
|
|
|
RETAINING WALL (MSE) (ASHLAR STONE FIN)
|
SF
|
33,613.600
|
$39.000
|
$45.000
|
$40.000
|
$32.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
418.000
|
$125.000
|
$130.000
|
$145.000
|
$155.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
892.080
|
$136.000
|
$133.000
|
$145.000
|
$155.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
244.000
|
$358.000
|
$340.000
|
$375.000
|
$450.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
349.310
|
$412.000
|
$340.000
|
$380.000
|
$460.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
419.000
|
$450.000
|
$340.000
|
$360.000
|
$460.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
89.000
|
$120.000
|
$192.510
|
$130.000
|
$250.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
15.270
|
$410.000
|
$747.300
|
$850.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
6.000
|
$350.000
|
$488.590
|
$600.000
|
$600.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,839.000
|
$40.000
|
$48.000
|
$55.100
|
$55.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
108.000
|
$95.000
|
$81.840
|
$80.000
|
$112.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
53.000
|
$50.500
|
$67.470
|
$55.000
|
$128.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,034.000
|
$66.000
|
$74.000
|
$65.000
|
$137.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
9.000
|
$3,900.000
|
$2,800.000
|
$2,400.000
|
$3,400.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$3,533.000
|
$3,000.000
|
$2,300.000
|
$3,300.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$3,900.000
|
$3,100.000
|
$2,700.000
|
$4,400.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$4,390.000
|
$3,500.000
|
$3,100.000
|
$6,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$4,475.000
|
$3,600.000
|
$3,300.000
|
$4,700.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$5,525.000
|
$4,500.000
|
$3,600.000
|
$5,700.000
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
6.000
|
$4,790.000
|
$4,000.000
|
$5,700.000
|
$11,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,146.350
|
$1,708.250
|
$1,200.000
|
$1,600.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$850.000
|
$969.170
|
$250.000
|
$500.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$463.000
|
$233.560
|
$350.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
908.000
|
$17.700
|
$8.450
|
$4.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$210,000.000
|
$203,000.000
|
$500,000.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,000.000
|
$2,000.000
|
$16,000.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
113.000
|
$48.000
|
$38.220
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
113.000
|
$8.500
|
$8.000
|
$8.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
581.000
|
$3.200
|
$3.000
|
$3.500
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
581.000
|
$0.600
|
$0.500
|
$0.500
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
8,127.000
|
$6.000
|
$7.000
|
$6.300
|
$10.500
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
8,127.000
|
$5.500
|
$7.000
|
$5.600
|
$10.500
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
84.000
|
$120.000
|
$84.000
|
$280.000
|
$180.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
676.000
|
$21.500
|
$20.770
|
$23.000
|
$30.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
3,018.000
|
$0.150
|
$1.640
|
$2.310
|
$1.350
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
167.000
|
$22.550
|
$24.450
|
$24.450
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,685.000
|
$1,345.000
|
$1,795.000
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$990.000
|
$1,098.000
|
$898.000
|
$1,210.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
115.000
|
$2.450
|
$5.000
|
$10.000
|
$5.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,330.000
|
$2,550.000
|
$2,475.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$240.000
|
$200.000
|
$250.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
7.000
|
$12,000.000
|
$2,250.000
|
$2,750.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$1,000.000
|
$2,250.000
|
$1,500.000
|
$440.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
|
EA
|
3.000
|
$14,500.000
|
$2,250.000
|
$2,750.000
|
$750.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
20.000
|
$11.000
|
$93.940
|
$93.000
|
$150.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
25.000
|
$1.100
|
$6.310
|
$6.250
|
$10.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
50.000
|
$1.380
|
$6.570
|
$6.500
|
$10.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,350.000
|
$1,616.160
|
$1,600.000
|
$1,650.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
157.500
|
$23.160
|
$22.220
|
$22.000
|
$22.500
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
513.750
|
$20.000
|
$24.600
|
$24.350
|
$26.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$456.000
|
$630.890
|
$630.890
|
$635.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$420.000
|
$627.560
|
$627.560
|
$630.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$656.000
|
$646.550
|
$646.550
|
$650.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,630.000
|
$2,949.490
|
$1,866.990
|
$1,520.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$2,095.000
|
$2,949.490
|
$1,896.990
|
$1,520.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$90.000
|
$75.000
|
$75.000
|
$76.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
686.800
|
$4.950
|
$4.700
|
$4.650
|
$4.700
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$22,142.000
|
$21,772.730
|
$21,555.000
|
$22,000.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
40.000
|
$0.600
|
$1.000
|
$1.080
|
$1.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$50.000
|
$150.000
|
$162.420
|
$188.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$65.000
|
$150.000
|
$162.420
|
$188.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
|
LF
|
1,025.000
|
$1.000
|
$2.000
|
$2.170
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BKN W/MRKR)
|
LF
|
511.000
|
$0.600
|
$3.000
|
$3.250
|
$3.750
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
48.000
|
$0.840
|
$1.000
|
$1.080
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
38.000
|
$1.000
|
$2.000
|
$2.170
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,329.000
|
$0.700
|
$0.670
|
$0.730
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
617.000
|
$1.990
|
$3.000
|
$3.250
|
$4.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
900.000
|
$2.630
|
$3.000
|
$3.250
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
64.000
|
$5.850
|
$6.000
|
$6.500
|
$8.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,651.000
|
$0.500
|
$0.100
|
$0.110
|
$0.110
|
|
|
PAVEMENT SEALER 6"
|
LF
|
81.000
|
$0.150
|
$0.500
|
$0.540
|
$0.520
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,707.000
|
$0.350
|
$0.400
|
$0.430
|
$0.410
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,517.000
|
$0.900
|
$1.120
|
$1.210
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
748.000
|
$0.300
|
$0.500
|
$0.540
|
$0.510
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,951.000
|
$0.250
|
$0.380
|
$0.410
|
$0.390
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,721.000
|
$0.260
|
$0.380
|
$0.410
|
$0.390
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
3,205.000
|
$0.450
|
$2.440
|
$2.640
|
$2.450
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
81.000
|
$6.550
|
$33.000
|
$35.730
|
$34.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$195.000
|
$210.000
|
$227.380
|
$212.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$255.000
|
$210.000
|
$227.380
|
$213.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
245.000
|
$3.150
|
$4.000
|
$4.330
|
$4.100
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,498.000
|
$0.550
|
$0.670
|
$0.730
|
$0.680
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
36.000
|
$2.000
|
$1.400
|
$1.520
|
$1.450
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$47.000
|
$63.000
|
$68.220
|
$64.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
33,613.600
|
$1.000
|
$0.770
|
$1.770
|
$0.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$97.000
|
$303.210
|
$115.000
|
$315.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$9,350.000
|
$1,123.010
|
$4,330.000
|
$15,000.000
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
1.000
|
$27,684.000
|
$25,404.040
|
$25,150.000
|
$25,500.000
|
|
|
RELOCATE HIGH MAST LIGHTING (150 FT)
|
EA
|
1.000
|
$10,750.000
|
$15,353.540
|
$15,200.000
|
$15,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
4.000
|
$150.000
|
$380.000
|
$330.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$60.000
|
$20.000
|
$60.000
|
$250.000
|
|
Totals: |
$4,323,326.230
|
$4,549,397.663
|
$5,172,420.824
|
$5,454,565.822
|