Show Job Controls
Bid Cobra

BELL US 190 (0231-03-146)

Items: 134

County: BELL
Length: N/A
Highway: US 190
District: WACO
Control Number: 0231-03-146
DBE Goal: N/A
Project: NH 1802(211)
Guaranty: N/A
Time: 255 WORKING DAYS
Engineer's Estimate: $4,323,326.23
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: RDWY RECONFIG
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,323,326.23
$4,549,397.66
Over/Under Est: 5.23% $226,071.43
Over/Under Est: 19.64% $849,094.59
Amt Left: 13.69% $623,023.16
$5,454,565.82
Over/Under Est: 26.17% $1,131,239.59
Amt Left: 19.9% $905,168.16
Delta: -5.45% -$282,145.00

Bid Items & Bid Tabulations

134 Total 0 of 134
BELL  |  US 190  |  WACO  |  0231-03-146  |  06/05/2018  |  $4,323,326.23  |  NH 1802(211)  |  RDWY RECONFIG  |  255 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CAPITAL EXCAVATION COMPANY
JAMES CONSTRUCTION GROUP, L.L.C.
J.D. ABRAMS, L.P.
PREPARING ROW
STA 54.000 $1,200.000 $600.000 $2,650.000 $5,500.000
REMOVING CONC (MEDIANS)
SY 226.000 $12.000 $22.530 $7.000 $11.000
REMOVING CONC (CURB)
LF 1,077.000 $5.000 $2.830 $5.000 $7.000
REMOVE CONC (RAIL)
LF 84.000 $15.000 $48.920 $40.000 $50.000
REMOVING STAB BASE AND ASPH PAV (21")
SY 7,982.000 $5.150 $9.000 $11.000 $15.000
EXCAVATION (ROADWAY)
CY 9,957.000 $5.000 $6.500 $8.000 $7.000
EXCAVATION (CHANNEL)
CY 2,406.000 $15.000 $9.000 $5.000 $5.000
EXCAVATION (SPECIAL)
CY 540.000 $9.000 $15.000 $18.000 $12.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,811.000 $5.000 $27.000 $35.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 1,133.000 $12.000 $4.000 $2.600 $10.000
EMBANKMENT (FINAL)(ORD COMP)(TY C1)(AS)
CY 2,164.000 $41.500 $27.000 $35.000 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,843.000 $0.300 $1.500 $2.750 $2.000
BLOCK SODDING
SY 6,843.000 $3.500 $3.260 $4.110 $4.200
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 8,996.000 $0.100 $0.320 $0.160 $0.170
DRILL SEEDING (TEMP) (WARM)
SY 12,053.000 $0.080 $0.220 $0.100 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 12,053.000 $0.080 $0.220 $0.100 $0.100
VEGETATIVE WATERING
MG 324.000 $7.400 $15.000 $21.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,275.000 $1.050 $1.430 $1.500 $3.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 3,157.000 $34.100 $39.000 $42.000 $39.000
PRIME COAT(MC-30 OR AE-P)
GAL 2,273.000 $3.060 $3.500 $3.420 $3.850
ASPH (CRS-2)
GAL 5,033.000 $2.000 $3.100 $2.990 $3.300
AGGR(TY-D GR-4 OR TY-L GR-4)
CY 90.000 $74.000 $155.000 $149.410 $145.000
D-GR HMA TY-B PG64-22
TON 2,460.000 $55.000 $72.000 $68.300 $80.000
D-GR HMA TY-C PG64-22
TON 1,530.000 $60.000 $74.000 $70.440 $82.000
PFC (ASPHALT) PG76-22
TON 32.000 $90.000 $120.000 $114.190 $110.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 457.000 $90.000 $120.000 $114.190 $110.000
TOM (ASPHALT) PG 76-22
TON 33.000 $85.000 $120.000 $116.330 $112.000
TOM-C (AGGREGATE) SAC-A
TON 447.000 $85.000 $120.000 $116.330 $112.000
PLANE ASPH CONC PAV(0" TO 1")
SY 6,731.000 $1.000 $2.000 $1.190 $1.350
PLANE ASPH CONC PAV(0" TO 2")
SY 4,348.000 $1.500 $2.250 $1.390 $1.450
PLANE ASPH CONC PAV(0" TO 3")
SY 605.000 $3.000 $3.500 $2.700 $3.000
CEM STABIL BKFL
CY 181.000 $155.000 $130.000 $150.000 $20.000
TEMPORARY SPL SHORING
SF 1,776.200 $15.000 $10.000 $6.000 $0.010
DRILL SHAFT (36 IN)
LF 675.000 $150.000 $130.000 $140.000 $200.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 22.000 $139.500 $163.640 $162.000 $165.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 25.000 $400.600 $414.140 $410.000 $412.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 36.000 $509.450 $674.750 $668.000 $670.000
CL C CONC (ABUT)
CY 60.300 $850.000 $680.000 $750.000 $1,180.000
CL C CONC (CAP)
CY 12.000 $875.000 $800.000 $1,500.000 $1,580.000
CL C CONC (COLUMN)
CY 14.100 $875.000 $810.000 $1,000.000 $1,250.000
CL C CONC (RAIL FOUNDATION)
CY 96.000 $500.000 $415.000 $500.000 $420.000
REINF CONC SLAB
SF 9,212.000 $15.000 $14.000 $15.000 $23.000
APPROACH SLAB
CY 83.700 $390.000 $435.000 $460.000 $450.000
RETAINING WALL (MSE) (ASHLAR STONE FIN)
SF 33,613.600 $39.000 $45.000 $40.000 $32.000
PRESTR CONC GIRDER (TX46)
LF 418.000 $125.000 $130.000 $145.000 $155.000
PRESTR CONC GIRDER (TX54)
LF 892.080 $136.000 $133.000 $145.000 $155.000
RIPRAP (CONC)(4 IN)
CY 244.000 $358.000 $340.000 $375.000 $450.000
RIPRAP (CONC)(5 IN)
CY 349.310 $412.000 $340.000 $380.000 $460.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 419.000 $450.000 $340.000 $360.000 $460.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 89.000 $120.000 $192.510 $130.000 $250.000
RIPRAP (CONC)(FLUME)
CY 15.270 $410.000 $747.300 $850.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 6.000 $350.000 $488.590 $600.000 $600.000
RAIL (TY SSTR)
LF 2,839.000 $40.000 $48.000 $55.100 $55.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 108.000 $95.000 $81.840 $80.000 $112.000
RC PIPE (CL III)(18 IN)
LF 53.000 $50.500 $67.470 $55.000 $128.000
RC PIPE (CL III)(24 IN)
LF 1,034.000 $66.000 $74.000 $65.000 $137.000
MANH (COMPL)(PRM)(48IN)
EA 9.000 $3,900.000 $2,800.000 $2,400.000 $3,400.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $3,533.000 $3,000.000 $2,300.000 $3,300.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $3,900.000 $3,100.000 $2,700.000 $4,400.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $4,390.000 $3,500.000 $3,100.000 $6,000.000
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 1.000 $4,475.000 $3,600.000 $3,300.000 $4,700.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $5,525.000 $4,500.000 $3,600.000 $5,700.000
INLET (COMPL)(RWI)(TY II)
EA 6.000 $4,790.000 $4,000.000 $5,700.000 $11,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,146.350 $1,708.250 $1,200.000 $1,600.000
REMOV STR (INLET)
EA 10.000 $850.000 $969.170 $250.000 $500.000
REMOV STR (SET)
EA 2.000 $463.000 $233.560 $350.000 $500.000
REMOV STR (PIPE)
LF 908.000 $17.700 $8.450 $4.000 $12.000
MOBILIZATION
LS 1.000 $210,000.000 $203,000.000 $500,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $2,000.000 $16,000.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 113.000 $48.000 $38.220 $40.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 113.000 $8.500 $8.000 $8.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 581.000 $3.200 $3.000 $3.500 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 581.000 $0.600 $0.500 $0.500 $1.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 8,127.000 $6.000 $7.000 $6.300 $10.500
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 8,127.000 $5.500 $7.000 $5.600 $10.500
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 84.000 $120.000 $84.000 $280.000 $180.000
CONC CURB & GUTTER (TY I)
LF 676.000 $21.500 $20.770 $23.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 3,018.000 $0.150 $1.640 $2.310 $1.350
MTL W-BEAM GD FEN (STEEL POST)
LF 167.000 $22.550 $24.450 $24.450 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,685.000 $1,345.000 $1,795.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $990.000 $1,098.000 $898.000 $1,210.000
REMOVE METAL BEAM GUARD FENCE
LF 115.000 $2.450 $5.000 $10.000 $5.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,330.000 $2,550.000 $2,475.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $240.000 $200.000 $250.000 $220.000
CRASH CUSH ATTEN (INSTL)
EA 7.000 $12,000.000 $2,250.000 $2,750.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $1,000.000 $2,250.000 $1,500.000 $440.000
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
EA 3.000 $14,500.000 $2,250.000 $2,750.000 $750.000
CONDT (PVC) (SCH 40) (2")
LF 20.000 $11.000 $93.940 $93.000 $150.000
ELEC CONDR (NO.8) BARE
LF 25.000 $1.100 $6.310 $6.250 $10.000
ELEC CONDR (NO.8) INSULATED
LF 50.000 $1.380 $6.570 $6.500 $10.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,350.000 $1,616.160 $1,600.000 $1,650.000
ALUMINUM SIGNS (TY G)
SF 157.500 $23.160 $22.220 $22.000 $22.500
ALUMINUM SIGNS (TY O)
SF 513.750 $20.000 $24.600 $24.350 $26.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $456.000 $630.890 $630.890 $635.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $420.000 $627.560 $627.560 $630.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $656.000 $646.550 $646.550 $650.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,630.000 $2,949.490 $1,866.990 $1,520.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $2,095.000 $2,949.490 $1,896.990 $1,520.000
REMOVE SM RD SN SUP&AM
EA 9.000 $90.000 $75.000 $75.000 $76.000
INSTALL LRSS (STRUCT STEEL)
LB 686.800 $4.950 $4.700 $4.650 $4.700
INS OH SN SUP(40 FT CANT)
EA 1.000 $22,142.000 $21,772.730 $21,555.000 $22,000.000
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 40.000 $0.600 $1.000 $1.080 $1.250
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 4.000 $50.000 $150.000 $162.420 $188.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 4.000 $65.000 $150.000 $162.420 $188.000
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
LF 1,025.000 $1.000 $2.000 $2.170 $2.500
WK ZN PAV MRK REMOV (Y)4"(BKN W/MRKR)
LF 511.000 $0.600 $3.000 $3.250 $3.750
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 48.000 $0.840 $1.000 $1.080 $2.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 38.000 $1.000 $2.000 $2.170 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,329.000 $0.700 $0.670 $0.730 $2.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 617.000 $1.990 $3.000 $3.250 $4.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 900.000 $2.630 $3.000 $3.250 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 64.000 $5.850 $6.000 $6.500 $8.000
PAVEMENT SEALER 4"
LF 7,651.000 $0.500 $0.100 $0.110 $0.110
PAVEMENT SEALER 6"
LF 81.000 $0.150 $0.500 $0.540 $0.520
PAVEMENT SEALER 8"
LF 1,707.000 $0.350 $0.400 $0.430 $0.410
PAVEMENT SEALER 12"
LF 1,517.000 $0.900 $1.120 $1.210 $1.150
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 748.000 $0.300 $0.500 $0.540 $0.510
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,951.000 $0.250 $0.380 $0.410 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,721.000 $0.260 $0.380 $0.410 $0.390
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 3,205.000 $0.450 $2.440 $2.640 $2.450
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 81.000 $6.550 $33.000 $35.730 $34.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $195.000 $210.000 $227.380 $212.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $255.000 $210.000 $227.380 $213.000
REFL PAV MRKR TY II-C-R
EA 245.000 $3.150 $4.000 $4.330 $4.100
ELIM EXT PAV MRK & MRKS (4")
LF 1,498.000 $0.550 $0.670 $0.730 $0.680
ELIM EXT PAV MRK & MRKS (8")
LF 36.000 $2.000 $1.400 $1.520 $1.450
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $47.000 $63.000 $68.220 $64.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 33,613.600 $1.000 $0.770 $1.770 $0.800
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $97.000 $303.210 $115.000 $315.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $9,350.000 $1,123.010 $4,330.000 $15,000.000
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 1.000 $27,684.000 $25,404.040 $25,150.000 $25,500.000
RELOCATE HIGH MAST LIGHTING (150 FT)
EA 1.000 $10,750.000 $15,353.540 $15,200.000 $15,500.000
TMA (STATIONARY)
DAY 4.000 $150.000 $380.000 $330.000 $1,000.000
TMA (MOBILE OPERATION)
HR 24.000 $60.000 $20.000 $60.000 $250.000
Totals: $4,323,326.230 $4,549,397.663 $5,172,420.824 $5,454,565.822