BAYLOR US 82 (0133-04-042)

Items: 124

County: BAYLOR
Length: N/A
Highway: US 82
District: WICHITA FALLS
Control Number: 0133-04-042
DBE Goal: N/A
Project: F 2022(303)
Guaranty: N/A
Time: 377 WORKING DAYS
Engineer's Estimate: $17,221,161.63
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: UPGRADE TO SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$17,221,161.63
$15,938,381.26
Over/Under Est: -7.45% -$1,282,780.37
$17,019,309.28
Over/Under Est: -1.17% -$201,852.35
Amt Left: 6.78% $1,080,928.02
$18,781,574.04
Over/Under Est: 9.06% $1,560,412.41
Amt Left: 17.84% $2,843,192.78
Delta: -10.35% -$1,762,264.76
Over/Under Est: 20% $3,444,907.62
Amt Left: 29.66% $4,727,687.99
Delta: -10.03% -$1,884,495.21
$22,320,333.40
Over/Under Est: 29.61% $5,099,171.77
Amt Left: 40.04% $6,381,952.14
Delta: -8.00% -$1,654,264.15
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 12.27% $2,040,990.99
TRP CONSTRUCTION GROUP, LLC 1.07% $177,983.73
MARCOM'S MOWING SERVICE, LLC 0.72% $119,764.75
CONTRACTORS SERVICE, LTD. 0.54% $89,823.56
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.47% $78,179.77
DUSTIN ALLEN, INC. 0.41% $68,199.37
Total: 15.48% $2,574,942.17

Bid Items & Bid Tabulations

124 Total 0 of 124
BAYLOR  |  US 82  |  WICHITA FALLS  |  0133-04-042  |  12/01/2021  |  $17,221,161.63  |  F 2022(303)  |  UPGRADE TO SUPER 2  |  377 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ZACK BURKETT CO.
DUININCK, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
PREPARING ROW
STA 32.000 $4,000.000 $3,000.000 $1,000.000 $2,300.000 $500.000 $653.830
EXCAVATION (ROADWAY)
CY 21,015.000 $12.000 $7.750 $7.750 $13.000 $5.000 $11.640
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 49,659.000 $12.000 $12.900 $14.300 $18.000 $19.810 $21.540
FURNISHING AND PLACING TOPSOIL (4")
SY 133,289.000 $1.000 $0.500 $1.100 $2.350 $0.230 $2.240
BLOCK SODDING
SY 293.000 $6.250 $7.000 $11.700 $6.750 $11.700 $7.150
BROADCAST SEED (TEMP) (WARM)
SY 66,644.000 $0.120 $0.090 $0.120 $0.090 $0.120 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 66,644.000 $0.120 $0.100 $0.120 $0.100 $0.120 $0.110
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 133,289.000 $0.150 $0.100 $0.150 $0.090 $0.150 $0.100
VEGETATIVE WATERING
MG 1,120.000 $39.000 $12.000 $35.000 $24.500 $37.430 $62.050
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 5,668.000 $1.500 $1.250 $2.340 $1.150 $2.340 $1.210
CEMENT
TON 1,188.000 $175.000 $150.000 $276.000 $210.000 $272.690 $218.410
CEMENT TREAT (SUBGRADE) (8")
SY 109,967.000 $3.000 $1.950 $2.390 $2.700 $1.470 $3.090
PRIME COAT (MC-30)
GAL 27,492.000 $5.000 $4.200 $4.100 $4.700 $5.780 $4.870
EMULS ASPH (EROSN CONT)(MULTI)
GAL 13,329.000 $3.950 $3.700 $3.250 $3.900 $4.100 $3.730
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,000.000 $45.000 $62.000 $56.650 $75.500 $71.590 $70.560
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 8,000.000 $30.000 $31.000 $29.790 $33.000 $33.850 $30.880
PLANE ASPH CONC PAV (2")
SY 24,603.000 $4.000 $1.500 $1.510 $2.050 $1.940 $4.240
CUT & RESTORING PAV
SY 180.700 $200.000 $60.000 $58.500 $52.000 $205.120 $173.250
TEMPORARY SPL SHORING
SF 1,680.000 $30.000 $42.000 $53.000 $47.000 $52.630 $51.980
CL C CONC (CULV)(HPC)
CY 29.300 $1,025.000 $2,100.000 $2,340.000 $1,900.000 $2,339.310 $2,310.000
RETAINING WALL (SPREAD FOOTING)
SF 1,200.000 $70.000 $97.000 $240.000 $195.000 $239.780 $236.780
RIPRAP (CONC)(4 IN)
CY 6.700 $550.000 $790.000 $702.000 $625.000 $731.030 $693.000
RIPRAP (CONC)(5 IN)
CY 96.000 $500.000 $680.000 $702.000 $625.000 $701.790 $693.000
RIPRAP (MOW STRIP)(4 IN)
CY 84.700 $450.000 $680.000 $877.000 $650.000 $731.030 $721.880
RAIL (TY T631)
LF 146.300 $95.000 $90.000 $146.250 $130.000 $97.080 $91.300
RAIL (TY SSTR)
LF 300.000 $40.000 $95.000 $257.400 $230.000 $257.320 $254.100
CMP (GAL STL 18 IN)
LF 250.000 $64.000 $70.000 $93.600 $83.500 $93.570 $92.400
CMP (GAL STL 24 IN)
LF 389.000 $64.000 $90.000 $119.000 $105.000 $119.300 $117.810
CMP (GAL STL 30 IN)
LF 200.000 $95.000 $110.000 $140.000 $125.000 $140.360 $138.600
CMP (GAL STL 36 IN)
LF 78.000 $125.000 $125.000 $175.500 $155.000 $175.450 $173.250
CONC BOX CULV (3 FT X 2 FT)
LF 92.000 $265.000 $350.000 $409.500 $365.000 $409.380 $404.250
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 161.000 $550.000 $620.000 $679.000 $575.000 $678.400 $669.900
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 152.800 $575.000 $700.000 $784.000 $675.000 $783.670 $773.850
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 135.000 $600.000 $810.000 $907.000 $780.000 $900.630 $889.350
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 171.000 $650.000 $900.000 $994.500 $835.000 $994.200 $981.750
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 118.200 $700.000 $820.000 $907.000 $780.000 $906.480 $895.130
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 15.500 $750.000 $1,300.000 $1,345.500 $1,000.000 $1,345.100 $1,328.250
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 18.000 $800.000 $1,400.000 $1,404.000 $1,100.000 $1,403.580 $1,386.000
RC PIPE (CL III)(18 IN)
LF 70.000 $80.000 $75.000 $135.000 $120.000 $134.510 $132.830
RC PIPE (CL III)(30 IN)
LF 606.100 $165.000 $124.000 $222.000 $200.000 $222.230 $219.450
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 4.000 $7,500.000 $6,000.000 $9,360.000 $8,300.000 $9,357.220 $9,240.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $15,500.000 $19,000.000 $18,252.000 $16,500.000 $18,246.580 $18,018.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $17,500.000 $23,000.000 $29,389.000 $22,500.000 $25,381.470 $25,063.500
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $45,000.000 $40,000.000 $46,800.000 $41,500.000 $46,786.110 $46,200.000
WINGWALL (PW - 2) (HW=3 FT)
EA 1.000 $8,500.000 $5,700.000 $5,616.000 $5,000.000 $5,614.330 $5,544.000
WINGWALL (PW - 2) (HW=4 FT)
EA 20.000 $7,500.000 $8,000.000 $8,190.000 $7,300.000 $8,187.570 $8,085.000
WINGWALL (PW - 2) (HW=5 FT)
EA 12.000 $10,000.000 $9,200.000 $14,040.000 $12,500.000 $14,035.830 $13,860.000
WINGWALL (PW - 2) (HW=6 FT)
EA 9.000 $19,250.000 $13,000.000 $16,380.000 $14,500.000 $16,375.140 $16,170.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $32,250.000 $18,000.000 $30,420.000 $27,000.000 $30,410.970 $30,030.000
WINGWALL (SW - 0) (HW=4 FT)
EA 2.000 $11,500.000 $23,000.000 $25,389.000 $22,500.000 $25,381.470 $25,063.500
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 1.000 $8,000.000 $6,400.000 $5,265.000 $4,700.000 $5,263.440 $5,197.500
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $8,000.000 $6,400.000 $7,049.000 $6,300.000 $7,047.160 $6,958.880
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
EA 2.000 $9,000.000 $13,000.000 $9,945.000 $8,900.000 $9,942.050 $9,817.500
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $5,000.000 $13,000.000 $17,550.000 $15,500.000 $17,544.790 $17,325.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $10,750.000 $13,000.000 $6,376.000 $5,700.000 $6,374.610 $6,294.750
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $12,000.000 $13,000.000 $11,115.000 $9,900.000 $11,111.700 $10,972.500
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 10.000 $1,200.000 $950.000 $1,404.000 $1,300.000 $1,403.580 $1,386.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 16.000 $1,700.000 $1,100.000 $1,638.000 $1,500.000 $1,637.510 $1,617.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 4.000 $2,150.000 $1,600.000 $3,065.000 $2,700.000 $3,064.490 $3,026.100
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 2.000 $2,200.000 $1,700.000 $3,510.000 $3,100.000 $3,508.960 $3,465.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,950.000 $2,000.000 $3,685.500 $3,300.000 $3,684.410 $3,638.250
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $3,700.000 $3,200.000 $5,452.000 $4,900.000 $5,450.580 $5,382.300
CLEAN EXIST CULVERTS
EA 28.000 $1,900.000 $2,000.000 $4,680.000 $3,100.000 $1,285.900 $3,850.000
REMOV STR (SET)
EA 44.000 $400.000 $260.000 $409.500 $520.000 $584.830 $577.500
REMOV STR (WINGWALL)
EA 53.000 $1,500.000 $580.000 $585.000 $780.000 $1,169.650 $1,155.000
REMOV STR (HEADWALL)
EA 1.000 $1,200.000 $1,000.000 $1,170.000 $520.000 $584.830 $577.500
REMOV STR (PIPE)
LF 1,430.000 $15.000 $22.000 $11.700 $10.500 $11.700 $11.550
REMOV STR (BOX CULVERT)
LF 26.000 $145.000 $50.000 $76.000 $67.500 $76.030 $75.080
MOBILIZATION
LS 1.000 $1,596,263.000 $800,000.000 $739,850.000 $1,700,000.000 $2,259,300.370 $2,673,423.350
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $10,000.000 $10,000.000 $4,200.000 $13,500.000 $30,000.000 $10,814.200
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 780.000 $40.000 $30.000 $25.000 $30.000 $42.110 $31.900
ROCK FILTER DAMS (REMOVE)
LF 780.000 $10.250 $10.500 $5.000 $12.500 $11.700 $8.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,080.000 $3.000 $2.600 $4.000 $2.600 $4.090 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,080.000 $1.000 $1.000 $1.150 $1.050 $1.170 $1.100
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 6,278.000 $6.000 $2.500 $5.250 $2.450 $5.260 $2.590
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,278.000 $1.000 $0.800 $1.200 $0.780 $1.170 $0.830
DRIVEWAYS (ACP)
SY 3,182.000 $54.000 $33.000 $28.250 $52.500 $66.800 $40.050
TURNOUTS (ACP)
SY 350.000 $60.000 $25.000 $20.000 $51.500 $232.840 $40.310
DRIVEWAYS (BASE)
SY 12,952.000 $21.500 $20.000 $16.500 $23.500 $19.320 $34.800
RUMBLE STRIPS (SHOULDER)
LF 119,960.000 $0.150 $0.160 $0.180 $0.060 $0.070 $0.050
RUMBLE STRIPS (CENTERLINE)
LF 59,980.000 $0.200 $0.160 $0.180 $0.100 $0.070 $0.050
MTL W-BEAM GD FEN (TIM POST)
LF 937.500 $21.250 $24.000 $35.000 $32.000 $26.490 $24.920
SHORT RADIUS
LF 25.000 $72.000 $54.000 $64.000 $57.500 $59.650 $56.100
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $1,050.000 $1,100.000 $1,697.000 $1,500.000 $1,198.890 $1,127.500
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $2.800 $2.500 $4.700 $3.400 $2.340 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $280.000 $220.000 $351.000 $315.000 $233.930 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,900.000 $3,200.000 $2,954.000 $2,600.000 $3,526.500 $3,316.500
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $275.000 $220.000 $351.000 $315.000 $233.930 $220.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 33.000 $300.000 $220.000 $386.000 $315.000 $374.290 $352.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $350.000 $320.000 $386.000 $365.000 $403.530 $379.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 33.000 $673.000 $710.000 $1,053.000 $705.000 $919.350 $864.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $995.000 $750.000 $1,170.000 $745.000 $1,058.540 $995.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 34.000 $870.000 $750.000 $1,200.000 $745.000 $1,072.570 $1,008.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $793.000 $1,000.000 $1,433.000 $990.000 $1,345.100 $1,265.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $900.000 $1,000.000 $1,492.000 $990.000 $1,391.890 $1,309.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 8.000 $904.000 $1,100.000 $1,580.000 $1,000.000 $1,465.570 $1,378.300
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $930.000 $1,300.000 $1,638.000 $1,300.000 $1,534.580 $1,443.200
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 39.000 $600.000 $500.000 $848.000 $500.000 $658.510 $619.300
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 3.000 $400.000 $580.000 $965.000 $575.000 $786.010 $739.200
REMOVE SM RD SN SUP&AM
EA 116.000 $94.000 $110.000 $117.000 $105.000 $108.100 $220.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $40.000 $31.000 $176.000 $36.500 $33.920 $31.900
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 93.000 $120.000 $105.000 $176.000 $105.000 $111.120 $102.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 40,000.000 $0.250 $0.280 $0.290 $0.260 $0.290 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 32,368.000 $1.000 $0.500 $1.000 $1.050 $2.340 $1.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,474.000 $1.000 $0.500 $1.000 $1.050 $2.340 $1.350
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,113.000 $1.050 $1.300 $1.500 $1.300 $1.460 $1.100
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 373.000 $2.000 $1.650 $1.800 $1.600 $1.810 $1.380
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,719.000 $1.000 $0.850 $0.960 $0.850 $0.960 $0.950
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 161.000 $10.000 $6.000 $6.500 $5.950 $6.670 $13.200
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 36.000 $149.000 $130.000 $146.000 $130.000 $146.210 $159.500
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 6.000 $340.000 $240.000 $263.000 $235.000 $263.170 $247.500
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 22.000 $150.000 $160.000 $176.000 $155.000 $175.450 $181.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,650.000 $0.460 $0.400 $0.460 $0.410 $0.460 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 129,437.000 $0.480 $0.400 $0.460 $0.410 $0.460 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,630.000 $0.500 $0.400 $0.460 $0.410 $0.460 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 144,631.000 $0.440 $0.400 $0.460 $0.410 $0.460 $0.440
REFL PAV MRKR TY I-C
EA 817.000 $4.000 $3.700 $4.000 $3.650 $4.090 $4.240
REFL PAV MRKR TY II-A-A
EA 2,995.000 $4.100 $3.700 $4.000 $3.650 $4.090 $4.240
D-GR HMA TY-B PG64-22
TON 34,087.000 $86.000 $84.000 $85.000 $90.500 $90.000 $106.300
D-GR HMA TY-D PG70-28
TON 45,301.000 $95.000 $97.000 $101.000 $105.000 $115.000 $116.620
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 25,826.000 $100.000 $96.000 $98.500 $98.000 $110.000 $121.440
BONDING COURSE
GAL 38,096.000 $3.500 $3.000 $3.500 $3.200 $3.180 $6.410
TMA (STATIONARY)
DAY 446.000 $220.000 $240.000 $127.000 $155.000 $303.880 $413.530
TMA (MOBILE OPERATION)
DAY 21.000 $300.000 $500.000 $200.000 $885.000 $747.690 $110.490
Totals: $17,221,161.635 $15,938,381.260 $17,019,309.285 $18,781,574.040 $20,666,069.283 $22,320,333.427