Job Info for 1186-02-025

County: BASTROP Highway: FM 969 Date: 08/04/2022 (2 years ago) Engineer's Estimate: $2,292,119 Control Number: 1186-02-025
Project: STP 2022(818)HES District: AUSTIN Time: 111 WORKING DAYS Type: WIDEN ROAD - ADD SHOULDERS
HCS
Pay Estimate
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,292,119.06
DAN WILLIAMS COMPANY   $2,496,797.28 1
8.93% | $204,678.22
JOE BLAND CONSTRUCTION, L.P.   $2,622,043.98 2
14.39% | $329,924.92
5.02% | $125,246.70
AARON CONCRETE CONTRACTORS, L.P.   $2,881,673.90 3
25.72% | $589,554.84
15.41% | $384,876.62
9.90% | $259,629.92
ACME BRIDGE COMPANY, INC.   $2,963,512.80 4
29.29% | $671,393.74
18.69% | $466,715.52
2.84% | $81,838.90
CAPITAL EXCAVATION COMPANY   $3,074,140.59 5
34.12% | $782,021.53
23.12% | $577,343.31
3.73% | $110,627.79

Bid Items

Items: 78, 0 filtered
BASTROP FM 969  |  AUSTIN  |  1186-02-025  |  08/04/2022  |  $2,292,119  |  STP 2022(818)HES  |  WIDEN ROAD - ADD SHOULDERS  |  111 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DAN WILLIAMS COMPANY JOE BLAND CONSTRUCTION, L.P. AARON CONCRETE CONTRACTORS, L.P. ACME BRIDGE COMPANY, INC. CAPITAL EXCAVATION COMPANY
100 6002 PREPARING ROW STA 53.100 $1,500.000 $1,400.000 $685.000 $500.000 $2,500.000 $1,100.000
104 6009 REMOVING CONC (RIPRAP) SY 233.000 $16.000 $12.000 $22.500 $29.000 $18.600 $15.300
104 6017 REMOVING CONC (DRIVEWAYS) SY 180.000 $22.000 $13.000 $30.000 $29.000 $21.800 $34.500
110 6001 EXCAVATION (ROADWAY) CY 4,339.000 $15.000 $14.000 $12.000 $20.000 $25.000 $18.250
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 3,197.000 $20.000 $15.000 $6.750 $20.000 $20.000 $33.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 18,687.000 $2.000 $1.000 $1.750 $1.900 $2.800 $3.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 18,687.000 $0.500 $0.270 $0.310 $0.300 $0.290 $0.300
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 18,687.000 $0.200 $0.270 $0.310 $0.300 $0.290 $0.300
168 6001 VEGETATIVE WATERING MG 31.600 $25.000 $10.000 $95.000 $35.000 $77.400 $42.150
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 18,687.000 $1.500 $1.100 $1.240 $1.200 $1.150 $1.150
247 6392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 2,495.000 $50.000 $40.000 $75.500 $92.000 $100.000 $111.000
260 6043 LIME (HYD, COM OR QK)(SLURRY) TON 231.000 $178.000 $225.000 $300.000 $240.000 $250.000 $290.000
260 6073 LIME TRT (SUBGRADE)(8") SY 12,736.000 $6.000 $2.500 $8.750 $5.000 $3.000 $14.000
310 6001 PRIME COAT (MULTI OPTION) GAL 2,159.000 $4.850 $5.000 $5.980 $5.400 $5.700 $5.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 2,380.000 $50.000 $61.000 $73.000 $73.000 $70.800 $65.000
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 2,400.000 $28.000 $31.000 $35.900 $42.000 $35.400 $34.000
354 6064 PLANE ASPH CONC PAV (2 1/2") SY 809.000 $3.500 $15.000 $16.750 $7.000 $16.000 $14.000
400 6005 CEM STABIL BKFL CY 30.500 $150.000 $250.000 $425.000 $230.000 $251.000 $380.000
420 6071 CL C CONC (COLLAR) EA 2.000 $1,500.000 $1,000.000 $1,630.000 $750.000 $1,760.000 $1,840.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 16.400 $565.000 $550.000 $582.000 $550.000 $835.000 $1,150.000
464 6005 RC PIPE (CL III)(24 IN) LF 11.000 $145.000 $215.000 $231.000 $125.000 $269.000 $250.000
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 1.000 $6,500.000 $11,500.000 $17,063.000 $16,000.000 $10,300.000 $5,200.000
467 6351 SET (TY II) (18 IN) (HDPE) (6: 1) (P) EA 34.000 $1,400.000 $1,750.000 $1,374.000 $1,800.000 $1,300.000 $2,100.000
467 6384 SET (TY II) (24 IN) (HDPE) (6: 1) (P) EA 10.000 $1,700.000 $2,100.000 $1,676.000 $2,100.000 $1,750.000 $2,960.000
496 6004 REMOV STR (SET) EA 1.000 $600.000 $1,200.000 $712.000 $500.000 $1,190.000 $2,050.000
496 6005 REMOV STR (WINGWALL) EA 2.000 $2,000.000 $1,200.000 $1,948.000 $1,300.000 $1,260.000 $3,080.000
496 6006 REMOV STR (HEADWALL) EA 3.000 $2,000.000 $1,200.000 $1,950.000 $1,300.000 $888.000 $3,790.000
496 6007 REMOV STR (PIPE) LF 883.000 $22.000 $12.000 $29.500 $18.000 $13.700 $13.650
500 6001 MOBILIZATION LS 1.000 $185,000.000 $245,000.000 $110,164.000 $200,000.000 $240,000.000 $250,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $7,000.000 $18,500.000 $10,531.000 $800.000 $10,000.000 $3,050.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 90.000 $35.000 $25.000 $28.270 $28.000 $26.400 $25.650
506 6004 ROCK FILTER DAMS (INSTALL) (TY 4) LF 796.000 $50.000 $32.000 $36.190 $36.000 $33.800 $32.800
506 6011 ROCK FILTER DAMS (REMOVE) LF 886.000 $13.500 $20.000 $22.620 $23.000 $21.200 $20.500
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,565.000 $3.500 $0.400 $4.520 $4.500 $4.250 $4.100
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,565.000 $1.000 $1.000 $1.130 $1.100 $1.050 $1.050
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 100.000 $8.000 $4.000 $4.520 $4.500 $4.250 $4.100
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 100.000 $2.000 $1.000 $1.130 $1.100 $1.050 $1.050
506 6053 ROCK FILTER DAMS (INSTALL) (TY 2) (6:1) LF 36.000 $85.000 $35.000 $39.580 $40.000 $37.000 $35.900
530 6002 INTERSECTIONS (ACP) SY 506.000 $60.000 $70.000 $55.050 $84.000 $125.000 $47.000
530 6004 DRIVEWAYS (CONC) SY 184.000 $100.000 $100.000 $118.000 $120.000 $100.000 $188.000
530 6005 DRIVEWAYS (ACP) SY 1,495.000 $55.000 $85.000 $71.800 $110.000 $125.000 $115.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 300.000 $30.000 $28.000 $29.950 $31.000 $28.000 $27.150
540 6039 MTL BM GD FEN TRANS (31"-28")(25') EA 4.000 $1,200.000 $1,000.000 $802.340 $1,100.000 $750.000 $730.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 350.000 $2.500 $3.000 $2.050 $3.400 $1.900 $1.850
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,500.000 $4,500.000 $3,700.120 $3,800.000 $3,460.000 $3,360.000
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 2.000 $1,200.000 $1,400.000 $383.130 $1,600.000 $358.000 $350.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $300.000 $250.000 $306.510 $28.000 $287.000 $280.000
560 6011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 8.000 $260.000 $330.000 $320.070 $318.000 $299.000 $280.000
560 6012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 3.000 $280.000 $360.000 $347.210 $344.000 $325.000 $310.000
560 6013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 4.000 $730.000 $1,000.000 $966.990 $1,000.000 $904.000 $860.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 32.000 $625.000 $710.000 $692.160 $690.000 $647.000 $310.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $775.000 $900.000 $876.510 $870.000 $819.000 $780.000
644 6076 REMOVE SM RD SN SUP&AM EA 26.000 $100.000 $150.000 $133.460 $133.000 $125.000 $118.000
658 6046 INSTL OM ASSM (OM-2X)(WC)GND EA 6.000 $60.000 $55.000 $62.200 $62.000 $89.900 $85.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 19.000 $35.000 $29.000 $32.740 $33.000 $31.700 $30.000
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 22,060.000 $1.200 $0.550 $0.620 $0.700 $0.580 $0.750
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 44.000 $15.000 $15.000 $16.960 $18.000 $15.900 $15.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 22,060.000 $1.200 $0.550 $0.620 $1.400 $0.580 $0.750
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 100.000 $2.000 $2.000 $1.130 $2.200 $2.050 $6.100
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 280.000 $3.480 $9.000 $10.180 $11.000 $9.500 $4.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 26.000 $8.560 $12.000 $13.570 $14.000 $12.700 $10.000
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 12,564.000 $0.700 $0.900 $1.020 $1.100 $0.950 $1.000
666 6344 REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF 630.000 $1.000 $0.900 $1.020 $1.100 $0.950 $5.000
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 9,551.000 $0.750 $0.900 $1.020 $1.100 $0.950 $1.000
672 6009 REFL PAV MRKR TY II-A-A EA 153.000 $5.000 $8.000 $9.050 $10.000 $8.500 $5.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 2,000.000 $0.600 $2.600 $2.940 $6.100 $2.750 $1.000
685 6005 RELOCT RDSD FLSH BCN AM (SOLAR PWRD) EA 2.000 $5,500.000 $10,000.000 $7,828.660 $7,800.000 $6,770.000 $6,600.000
3076 6003 D-GR HMA TY-B PG64-22 (EXEMPT) TON 1,781.000 $115.000 $115.000 $131.630 $125.000 $125.000 $116.000
3076 6072 D-GR HMA TY-D PG 76-22 (EXEMPT) TON 2,305.000 $120.000 $145.000 $168.730 $180.000 $161.000 $150.000
3081 6008 TOM-C PG76-22 SAC-B TON 1,347.000 $150.000 $179.000 $201.040 $205.000 $192.000 $180.000
3084 6001 BONDING COURSE GAL 4,657.000 $3.500 $4.300 $5.150 $5.700 $4.900 $5.050
4122 6010 THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III) LF 230.000 $65.000 $75.000 $89.750 $138.000 $70.800 $91.100
4122 6014 THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III) LF 1,000.000 $40.000 $65.000 $48.000 $106.000 $70.800 $78.600
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $7,000.000 $12,000.000 $3,918.000 $5,100.000 $17,500.000 $16,600.000
6185 6002 TMA (STATIONARY) DAY 180.000 $200.000 $150.000 $150.000 $170.000 $116.000 $480.000
6185 6003 TMA (MOBILE OPERATION) HR 160.000 $80.000 $55.000 $115.000 $95.000 $94.500 $52.600
7251 6001 SUBSURFACE UTIL LOCATE (OUTSIDE RDBED) EA 10.000 $2,200.000 $350.000 $1,232.000 $1,300.000 $793.000 $2,990.000
7251 6002 SUBSURFACE UTIL LOCATE (WITHIN RDBED) EA 5.000 $3,200.000 $700.000 $6,156.000 $4,500.000 $1,770.000 $2,990.000
Totals: $2,292,119.06 $2,496,797.28 $2,622,043.98 $2,881,673.90 $2,963,512.80 $3,074,140.59