Job Info for 0914-18-111

County: BASTROP Highway: CR Date: 06/01/2022 (2 years ago) Engineer's Estimate: $713,796 Control Number: 0914-18-111
Project: BR 2B20(289) District: AUSTIN Time: 93 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimate
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $713,795.74
ENCINO LANDSCAPE, INC.   $964,123.30 1
35.07% | $250,327.56
FUQUA CONSTRUCTION CO., INC.   $975,094.87 2
36.61% | $261,299.13
1.14% | $10,971.57
SB CONTRACTORS LLC   $1,032,028.65 3
44.58% | $318,232.91
7.04% | $67,905.35
5.84% | $56,933.78
CHASCO CONSTRUCTORS   $1,078,882.20 4
51.15% | $365,086.46
11.9% | $114,758.90
4.54% | $46,853.55
HILL COUNTRY BRIDGE, INC.   $1,099,077.10 5
53.98% | $385,281.36
14% | $134,953.80
1.87% | $20,194.90
ACME BRIDGE COMPANY, INC.   $1,222,820.50 6
71.31% | $509,024.76
26.83% | $258,697.20
11.26% | $123,743.40
RELMCO, INC.   $1,742,939.90 7
144.18% | $1,029,144.16
80.78% | $778,816.60
42.53% | $520,119.40

Bid Items

Items: 39, 0 filtered
BASTROP CR  |  AUSTIN  |  0914-18-111  |  06/01/2022  |  $713,796  |  BR 2B20(289)  |  BRIDGE REPL  |  93 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. FUQUA CONSTRUCTION CO., INC. SB CONTRACTORS LLC CHASCO CONSTRUCTORS HILL COUNTRY BRIDGE, INC. ACME BRIDGE COMPANY, INC. RELMCO, INC.
100 6002 PREPARING ROW STA 6.640 $4,000.000 $5,000.000 $7,004.400 $3,500.000 $6,000.000 $4,420.000 $7,060.000 $15,000.000
110 6001 EXCAVATION (ROADWAY) CY 216.000 $10.000 $20.000 $9.636 $46.940 $50.000 $20.400 $40.800 $50.000
110 6002 EXCAVATION (CHANNEL) CY 547.000 $15.000 $30.000 $9.708 $17.850 $50.000 $20.400 $34.000 $50.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 262.000 $15.000 $30.000 $10.548 $27.310 $25.000 $15.850 $47.000 $50.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 3,404.000 $0.990 $2.000 $1.212 $10.310 $2.000 $1.150 $4.050 $5.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 778.000 $0.570 $0.050 $0.132 $2.530 $2.500 $1.400 $2.350 $5.000
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 1,556.000 $0.320 $0.400 $0.468 $1.960 $2.000 $1.350 $1.800 $4.000
168 6001 VEGETATIVE WATERING MG 40.000 $26.500 $8.000 $10.056 $69.000 $35.000 $205.000 $115.000 $60.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 1,556.000 $1.000 $5.000 $1.608 $1.960 $2.000 $1.700 $1.800 $5.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 329.000 $50.000 $80.000 $57.048 $133.010 $100.000 $139.400 $155.000 $200.000
275 6001 CEMENT TON 16.000 $159.000 $220.000 $214.428 $276.340 $150.000 $283.250 $426.000 $500.000
275 6003 CEMENT TREAT (NEW BASE) (6") SY 624.000 $4.330 $2.000 $1.716 $24.590 $10.000 $9.050 $14.600 $35.000
400 6005 CEM STABIL BKFL CY 106.000 $140.000 $160.000 $84.456 $140.100 $180.000 $206.750 $258.000 $200.000
409 6002 PRESTR CONC PIL (18 IN SQ) LF 520.000 $100.000 $120.000 $66.468 $0.010 $0.010 $0.010 $0.010 $550.000
416 6002 DRILL SHAFT (24 IN) LF 456.000 $140.000 $200.000 $192.972 $217.230 $300.000 $240.500 $273.000 $325.000
420 6013 CL C CONC (ABUT) CY 37.200 $800.000 $1,200.000 $1,260.768 $1,281.580 $2,000.000 $1,515.000 $1,770.000 $2,500.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,600.000 $13.500 $20.000 $20.892 $38.020 $40.000 $33.750 $30.200 $35.000
422 6015 APPROACH SLAB CY 77.200 $450.000 $800.000 $535.980 $613.410 $800.000 $945.000 $941.000 $1,500.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 495.000 $185.000 $220.000 $221.628 $302.200 $300.000 $278.500 $382.000 $300.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 308.000 $120.000 $160.000 $168.612 $161.280 $240.000 $226.150 $230.000 $205.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 52.000 $500.000 $600.000 $569.172 $527.490 $600.000 $920.000 $1,020.000 $550.000
450 6018 RAIL (TY T631) LF 348.000 $88.000 $200.000 $107.304 $63.550 $40.000 $85.000 $90.500 $93.500
454 6004 ARMOR JOINT (SEALED) LF 88.000 $150.000 $140.000 $131.712 $233.340 $120.000 $100.000 $154.000 $185.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 2.000 $25,000.000 $19,999.000 $30,235.392 $9,408.740 $7,500.000 $24,650.000 $16,000.000 $35,000.000
500 6001 MOBILIZATION LS 1.000 $58,562.000 $70,000.000 $127,185.000 $100,000.000 $90,000.000 $109,750.000 $98,800.000 $150,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,700.000 $5,000.000 $9,223.536 $3,000.000 $1,500.000 $4,440.000 $4,340.000 $6,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 84.000 $35.000 $40.000 $35.772 $40.300 $40.000 $56.650 $37.300 $40.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 84.000 $9.500 $10.000 $10.992 $34.550 $35.000 $28.300 $31.900 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,153.000 $2.440 $5.000 $3.012 $4.600 $6.000 $4.000 $4.250 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,153.000 $0.720 $1.000 $0.720 $1.150 $2.000 $1.100 $1.050 $4.000
508 6001 CONSTRUCTING DETOURS SY 200.000 $50.000 $80.000 $70.944 $176.380 $60.000 $126.900 $250.000 $200.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 790.000 $21.500 $30.000 $30.612 $27.510 $22.000 $27.750 $26.100 $26.950
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 8.000 $1,300.000 $1,400.000 $1,659.348 $1,438.160 $500.000 $950.000 $1,010.000 $1,045.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $2,700.000 $3,600.000 $3,491.352 $3,716.870 $3,600.000 $3,455.000 $3,250.000 $3,355.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 6.000 $470.000 $600.000 $709.008 $802.560 $800.000 $793.000 $745.000 $770.000
644 6076 REMOVE SM RD SN SUP&AM EA 3.000 $90.000 $200.000 $109.272 $115.140 $200.000 $170.000 $21.300 $22.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 12.000 $25.000 $30.000 $27.876 $28.780 $28.000 $22.000 $20.200 $20.900
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 24.000 $45.000 $35.000 $36.120 $34.550 $35.000 $27.000 $25.600 $26.400
3076 6072 D-GR HMA TY-D PG 76-22 (EXEMPT) TON 128.000 $110.000 $150.000 $284.640 $318.950 $500.000 $361.000 $295.000 $300.000
Totals: $713,795.74 $964,123.30 $975,095.04 $1,032,028.66 $1,078,882.20 $1,099,077.10 $1,222,820.50 $1,742,939.90