Show Job Controls
Bid Cobra

BASTROP CR (0914-18-107)

Items: 52

County: BASTROP
Length: N/A
Highway: CR
District: AUSTIN
Control Number: 0914-18-107
DBE Goal: N/A
Project: BR 1802(781)
Guaranty: N/A
Time: 79 WORKING DAYS
Engineer's Estimate: $1,646,707.05
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,646,707.05
1
$1,478,746.42
Over/Under Est: -10.2% -$167,960.63
Over/Under Est: -8.35% -$137,567.31
Amt Left: 2.06% $30,393.32
Over/Under Est: -4.19% -$69,010.12
Amt Left: 6.69% $98,950.51
Delta: -4.54% -$68,557.19
Over/Under Est: 51.13% $841,964.32
Amt Left: 68.3% $1,009,924.95
Delta: -57.74% -$910,974.44
Subcontractor Percentage Amount
DIIBS SPECIALISTS, LLC 0.00% $0.00
TEXAS SHAFTS, INC. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

52 Total 0 of 52
BASTROP  |  CR  |  AUSTIN  |  0914-18-107  |  04/05/2023  |  $1,646,707.05  |  BR 1802(781)  |  BRIDGE MAINT  |  79 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
ACME BRIDGE COMPANY, INC.
CAPITAL EXCAVATION COMPANY
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 4.750 $5,000.000 $8,000.000 $9,000.000 $11,000.000 $50,000.000
EXCAVATION (ROADWAY)
CY 437.450 $20.000 $30.000 $40.000 $35.350 $35.000
EXCAVATION (CHANNEL)
CY 636.000 $30.000 $30.000 $40.000 $34.450 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 165.750 $30.000 $50.000 $30.000 $96.500 $80.000
FURNISHING AND PLACING TOPSOIL (4")
SY 668.460 $3.500 $6.000 $5.400 $9.050 $13.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 668.460 $2.000 $6.000 $1.050 $1.250 $1.500
VEGETATIVE WATERING
MG 4.000 $150.000 $100.000 $108.000 $236.000 $200.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 668.460 $2.500 $6.000 $1.050 $1.500 $2.300
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 247.000 $100.000 $85.000 $100.000 $141.000 $150.000
CEM STABIL BKFL
CY 122.000 $185.000 $150.000 $205.000 $208.000 $250.000
DRILL SHAFT (18 IN)
LF 152.000 $99.000 $185.000 $200.000 $178.000 $350.000
DRILL SHAFT (36 IN)
LF 474.000 $385.000 $275.000 $300.000 $280.000 $500.000
CL C CONC (ABUT)
CY 47.000 $1,275.000 $1,013.600 $1,100.000 $1,200.000 $2,000.000
CL C CONC (CAP)
CY 25.000 $2,000.000 $1,356.600 $1,380.000 $1,250.000 $2,000.000
CL C CONC (COLUMN)
CY 9.400 $3,000.000 $1,650.600 $1,280.000 $1,160.000 $2,000.000
REINF CONC SLAB
SF 5,250.000 $32.000 $24.000 $33.000 $26.050 $39.000
APPROACH SLAB
CY 44.900 $800.000 $765.000 $790.000 $760.000 $850.000
RETAINING WALL (MSE)
SF 1,525.000 $75.000 $85.000 $77.000 $152.000 $160.000
PRESTR CONC GIRDER (TX40)
LF 694.040 $240.000 $225.000 $300.000 $217.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 250.000 $225.000 $185.000 $166.000 $197.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.660 $600.000 $450.000 $907.000 $870.000 $850.000
RAIL (TY T223)
LF 620.000 $150.000 $85.000 $106.000 $159.000 $170.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 60.000 $250.000 $225.000 $276.000 $280.000 $240.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $45,000.000 $30,000.000 $25,900.000 $21,100.000 $20,000.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $124,304.740 $30,000.000 $18,100.000 $23,100.000 $26,000.000
MOBILIZATION
LS 1.000 $93,000.000 $115,000.000 $137,000.000 $143,000.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $7,500.000 $10,000.000 $760.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 205.000 $40.000 $50.000 $39.300 $40.350 $40.000
ROCK FILTER DAMS (REMOVE)
LF 205.000 $20.000 $20.000 $10.600 $7.050 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 767.000 $5.000 $4.000 $4.250 $3.800 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 767.000 $1.000 $3.000 $1.050 $0.550 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 114.800 $4.990 $20.000 $5.300 $9.100 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 114.800 $1.550 $5.000 $1.050 $1.100 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $35.000 $27.500 $26.100 $27.600 $27.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,500.000 $2,420.000 $1,100.000 $1,120.000 $1,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,650.000 $3,245.000 $3,680.000 $3,750.000 $3,600.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $36,500.000 $10,600.000 $10,800.000 $11,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,000.000 $715.000 $825.000 $920.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $800.000 $106.000 $107.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $22.000 $45.700 $14.800 $75.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $95.000 $192.500 $170.000 $55.700 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $40.000 $24.200 $81.800 $46.150 $100.000
REFL PAV MRKR TY II-A-A
EA 12.000 $20.000 $33.000 $26.600 $27.050 $43.000
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 205.000 $300.000 $165.000 $145.000 $260.000 $260.000
RELOCATE EXISTING TRUSS BRIDGE
LS 1.000 $100,000.000 $100,000.000 $46,600.000 $75,000.000 $300,000.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 420.000 $4.490 $25.000 $12.000 $4.050 $6.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 420.000 $0.820 $15.000 $2.000 $0.550 $0.500
INSTALL FTB
LF 80.000 $33.000 $100.000 $68.500 $84.300 $70.000
REMOVE FTB
LF 80.000 $5.500 $50.000 $20.800 $26.350 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,088.270 $10,000.000 $11,500.000 $6,600.000 $20,000.000
TMA (STATIONARY)
DAY 20.000 $150.000 $300.000 $124.000 $171.000 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $300.000 $560.000 $218.000 $250.000
Totals: $1,646,707.052 $1,478,746.420 $1,509,139.750 $1,577,696.950 $2,488,671.378