Show Job Controls
Bid Cobra

BASTROP SH 304 (0573-01-041)

Items: 73

County: BASTROP
Length: N/A
Highway: SH 304
District: AUSTIN
Control Number: 0573-01-041
DBE Goal: N/A
Project: C 573-1-41
Guaranty: N/A
Time: 61 WORKING DAYS
Engineer's Estimate: $2,836,279.99
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,836,279.99
$2,515,580.84
Over/Under Est: -11.31% -$320,699.15
Over/Under Est: -0.21% -$6,067.70
Amt Left: 12.51% $314,631.45
Over/Under Est: 8.12% $230,214.73
Amt Left: 21.9% $550,913.88
Delta: -8.35% -$236,282.43
Over/Under Est: 15.31% $434,158.30
Amt Left: 30.01% $754,857.45
Delta: -6.65% -$203,943.57

Bid Items & Bid Tabulations

73 Total 0 of 73
BASTROP  |  SH 304  |  AUSTIN  |  0573-01-041  |  02/02/2023  |  $2,836,279.99  |  C 573-1-41  |  WIDEN ROAD - ADD SHOULDERS  |  61 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
LONE STAR SITEWORK, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 81.000 $1,200.000 $691.740 $400.000 $376.640 $1,510.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 4,704.000 $7.000 $6.840 $8.400 $12.660 $7.900
EXCAVATION (ROADWAY)
CY 6,679.000 $14.000 $18.360 $9.850 $15.380 $17.200
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,040.000 $20.000 $18.360 $22.400 $15.650 $13.300
FURNISHING AND PLACING TOPSOIL (4")
SY 32,676.000 $1.750 $1.130 $2.000 $1.650 $3.200
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 32,676.000 $0.180 $0.180 $0.220 $0.230 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 32,676.000 $0.180 $0.160 $0.190 $0.180 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 32,676.000 $0.180 $0.160 $0.190 $0.180 $0.130
VEGETATIVE WATERING
MG 810.000 $20.000 $20.520 $50.000 $42.760 $42.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 32,676.000 $1.500 $1.500 $1.800 $1.680 $1.450
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 5,415.000 $45.000 $69.270 $96.000 $80.420 $113.000
PRIME COAT (MULTI OPTION)
GAL 4,070.000 $4.500 $5.260 $4.600 $5.220 $4.450
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,974.000 $55.000 $49.240 $57.750 $67.970 $56.400
CEM STABIL BKFL
CY 27.000 $175.000 $210.000 $725.000 $186.090 $212.000
TEMPORARY SPL SHORING
SF 240.000 $35.000 $105.000 $60.000 $18.020 $106.000
RIPRAP (CONC)(4 IN)
CY 2.000 $600.000 $735.000 $1,025.000 $633.830 $742.000
RIPRAP (MOW STRIP)(4 IN)
CY 17.000 $600.000 $788.000 $785.000 $612.110 $795.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 26.000 $275.000 $237.000 $330.000 $502.350 $280.000
RC PIPE (CL III)(18 IN)
LF 68.000 $100.000 $69.000 $151.000 $91.780 $68.900
RC PIPE (CL III)(24 IN)
LF 24.000 $130.000 $142.000 $163.000 $117.960 $143.000
RC PIPE (CL III)(48 IN)
LF 18.000 $300.000 $315.000 $309.000 $337.860 $318.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 302.000 $170.000 $158.000 $274.000 $235.490 $159.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,300.000 $1,050.000 $2,875.000 $1,774.120 $1,060.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,800.000 $1,575.000 $3,290.000 $2,187.250 $1,590.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 1.000 $5,750.000 $4,725.000 $6,760.000 $7,666.020 $4,770.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $6,000.000 $5,250.000 $7,580.000 $9,273.450 $5,300.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 18.000 $2,500.000 $1,575.000 $3,040.000 $2,341.200 $1,590.000
REMOV STR (SET)
EA 9.000 $450.000 $788.000 $850.000 $1,086.790 $795.000
REMOV STR (DRIVEWAY CULVERT)
EA 9.000 $500.000 $1,313.000 $675.000 $777.960 $1,320.000
MOBILIZATION
LS 1.000 $235,500.000 $235,403.290 $75,617.000 $208,101.140 $294,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $2,870.240 $2,005.000 $2,941.250 $32,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 120.000 $55.000 $48.000 $58.000 $54.530 $47.700
ROCK FILTER DAMS (REMOVE)
LF 120.000 $20.000 $25.000 $30.000 $36.150 $10.600
TEMP SEDMT CONT FENCE (INSTALL)
LF 270.000 $3.750 $4.000 $4.800 $4.780 $6.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 270.000 $1.000 $1.750 $2.100 $2.310 $1.050
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 995.000 $6.000 $3.500 $4.200 $3.950 $7.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 995.000 $1.000 $1.750 $2.100 $2.970 $0.530
DRIVEWAYS (ACP)
SY 2,035.000 $60.000 $36.000 $60.000 $51.200 $62.500
RUMBLE STRIPS (CENTERLINE)
LF 8,077.000 $0.300 $0.250 $1.870 $0.400 $0.530
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $30.000 $23.050 $33.000 $30.570 $24.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,330.390 $2,010.000 $1,946.110 $1,410.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $3.000 $0.890 $2.400 $2.500 $0.940
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,575.000 $3,224.870 $3,900.000 $3,678.830 $3,420.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $265.190 $270.000 $299.510 $281.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 6.000 $275.000 $367.850 $441.000 $415.020 $323.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $290.000 $585.870 $703.000 $654.840 $371.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $700.000 $810.760 $973.000 $902.220 $688.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $700.000 $1,015.830 $1,219.000 $1,127.800 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $800.000 $957.810 $1,150.000 $1,063.970 $787.000
REMOVE SM RD SN SUP&AM
EA 10.000 $150.000 $173.140 $208.000 $200.840 $84.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $35.000 $83.760 $100.000 $102.520 $29.700
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 1.000 $100.000 $75.000 $90.000 $164.650 $222.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000 $6.000 $17.760 $6.850 $10.610 $5.300
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $15.000 $25.000 $14.800 $15.740 $5.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,154.000 $1.200 $0.770 $1.100 $1.000 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 202.000 $2.000 $1.600 $2.000 $2.710 $1.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 24.000 $10.000 $7.770 $9.700 $13.240 $9.500
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 8,077.000 $1.000 $1.670 $1.500 $1.410 $0.950
REFL PAV MRK TY II (W) 6" (SLD)
LF 15,999.000 $0.250 $0.340 $0.750 $1.730 $0.530
REFL PAV MRK TY II (W) 24" (SLD)
LF 24.000 $10.000 $7.000 $5.300 $48.150 $4.250
REFL PAV MRK TY II (Y) 6" (BRK)
LF 4,040.000 $0.350 $0.340 $0.750 $0.860 $0.640
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 15,999.000 $0.700 $1.060 $1.900 $1.730 $0.950
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,040.000 $0.700 $0.770 $0.900 $0.860 $0.950
REFL PAV MRKR TY II-A-A
EA 202.000 $5.000 $7.770 $6.800 $6.730 $6.400
D-GR HMA TY-C PG64-22
TON 2,239.000 $170.000 $96.210 $110.000 $145.820 $113.000
D-GR HMA TY-D PG76-22
TON 3,494.000 $135.000 $104.850 $123.000 $141.980 $127.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 652.000 $140.000 $110.700 $122.000 $142.660 $129.000
TOM-C PG76-22 SAC-B
TON 2,262.000 $160.000 $134.460 $140.000 $164.920 $145.000
BONDING COURSE
GAL 7,215.000 $4.500 $4.010 $4.300 $6.940 $4.200
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $10,969.940 $12,960.000 $9,202.980 $11,800.000
TMA (STATIONARY)
DAY 18.000 $300.000 $270.620 $540.000 $568.790 $201.000
TMA (MOBILE OPERATION)
HR 16.000 $100.000 $108.250 $300.000 $284.400 $156.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 2.000 $1,500.000 $1,450.240 $1,750.000 $1,461.200 $3,180.000
Totals: $2,836,279.990 $2,515,580.840 $2,830,212.290 $3,066,494.720 $3,270,438.290