Show Job Controls
Bid Cobra

BASTROP SH 304 (0573-01-039)

Items: 90

County: BASTROP
Length: N/A
Highway: SH 304
District: AUSTIN
Control Number: 0573-01-039
DBE Goal: N/A
Project: STP 2B20(067)HES
Guaranty: N/A
Time: 190 WORKING DAYS
Engineer's Estimate: $8,646,475.28
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: SAFETY IMPROVEMENT PROJECT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$8,646,475.28
$7,305,240.14
Over/Under Est: -15.51% -$1,341,235.14
Over/Under Est: -9.97% -$861,826.90
Amt Left: 6.56% $479,408.24
Over/Under Est: -9.79% -$846,289.58
Amt Left: 6.78% $494,945.56
Delta: -0.20% -$15,537.32
Over/Under Est: -0.13% -$11,645.96
Amt Left: 18.2% $1,329,589.18
Delta: -10.70% -$834,643.62
Over/Under Est: 8.9% $769,790.81
Amt Left: 28.9% $2,111,025.95
Delta: -9.05% -$781,436.77

Bid Items & Bid Tabulations

90 Total 0 of 90
BASTROP  |  SH 304  |  AUSTIN  |  0573-01-039  |  07/08/2020  |  $8,646,475.28  |  STP 2B20(067)HES  |  SAFETY IMPRV PROJECT  |  190 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
TIERRA LEASE SERVICE, LLC
JOE BLAND CONSTRUCTION, L.P.
PREPARING ROW
STA 375.000 $1,300.000 $250.000 $458.370 $600.000 $120.000 $525.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 24,235.000 $3.200 $3.000 $4.380 $4.000 $5.750 $6.250
EXCAVATION (ROADWAY)
CY 32,492.000 $8.000 $8.000 $9.990 $10.000 $10.250 $8.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 18,958.000 $12.000 $8.000 $9.990 $6.000 $7.250 $6.500
FURNISHING AND PLACING TOPSOIL (4")
SY 145,467.000 $1.000 $0.500 $1.120 $0.400 $1.500 $1.750
BROADCAST SEED (TEMP) (WARM)
SY 145,467.000 $0.100 $0.090 $0.100 $0.080 $0.100 $0.200
BROADCAST SEED (TEMP) (COOL)
SY 145,467.000 $0.100 $0.090 $0.100 $0.080 $0.100 $0.200
VEGETATIVE WATERING
MG 3,606.000 $15.000 $5.000 $18.930 $10.000 $20.000 $45.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 145,467.000 $0.900 $0.700 $0.690 $0.650 $0.750 $1.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 39,747.000 $50.000 $50.000 $48.730 $49.000 $58.000 $54.650
PRIME COAT (MULTI OPTION)
GAL 21,009.000 $3.700 $3.500 $3.680 $3.600 $3.750 $4.000
TOM (ASPHALT) PG 76-22
TON 684.000 $100.000 $90.000 $95.670 $100.000 $102.000 $120.000
TOM - C (AGGREGATE) SAC - B
TON 10,306.000 $99.000 $90.000 $95.670 $100.000 $102.000 $120.000
TACK COAT
GAL 15,393.000 $2.500 $3.000 $2.960 $2.500 $3.000 $4.100
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 9,154.000 $40.000 $35.000 $25.910 $35.000 $40.000 $40.000
CEM STABIL BKFL
CY 65.000 $100.000 $150.000 $139.000 $115.000 $185.000 $225.000
TRENCH EXCAVATION PROTECTION
LF 12.000 $4.600 $50.000 $10.000 $100.000 $60.000 $1.250
TEMPORARY SPL SHORING
SF 1,189.000 $20.000 $40.000 $20.000 $20.000 $32.000 $26.000
RIPRAP (CONC)(5 IN)
CY 38.000 $460.000 $450.000 $421.000 $430.000 $580.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 78.000 $425.000 $450.000 $420.000 $450.000 $575.000 $475.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 40.000 $265.000 $250.000 $251.510 $340.000 $255.000 $250.000
CMP (GAL STL 18 IN)
LF 14.000 $65.000 $75.000 $186.000 $145.000 $150.000 $215.000
CMP (GAL STL 36 IN)
LF 4.000 $100.000 $150.000 $374.000 $440.000 $250.000 $275.000
RC PIPE (CL III)(18 IN)
LF 812.000 $65.000 $60.000 $80.000 $60.000 $80.000 $90.000
RC PIPE (CL III)(24 IN)
LF 216.000 $80.000 $75.000 $113.000 $107.000 $84.000 $115.000
RC PIPE (CL III)(30 IN)
LF 82.000 $105.000 $100.000 $120.000 $100.000 $96.000 $125.000
RC PIPE (CL III)(42 IN)
LF 18.000 $165.000 $200.000 $500.000 $620.000 $165.000 $225.000
RC PIPE (CL III)(48 IN)
LF 22.000 $195.000 $250.000 $455.000 $350.000 $200.000 $250.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 614.000 $175.000 $130.000 $160.000 $125.000 $160.000 $160.000
HEADWALL (CH - PW - 0)(DIA=36 IN)(MOD)
EA 1.000 $18,772.000 $25,000.000 $19,990.000 $21,000.000 $26,000.000 $9,500.000
HEADWALL (CH - PW - S)(DIA= 48IN) (MOD)
EA 2.000 $18,526.000 $27,500.000 $22,490.000 $22,000.000 $28,000.000 $10,500.000
SET (TY II) (18 IN) (CMP) (3: 1) (C)
EA 1.000 $800.000 $750.000 $990.000 $1,100.000 $1,250.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 51.000 $1,050.000 $800.000 $1,090.000 $1,300.000 $1,700.000 $900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,690.000 $900.000 $1,690.000 $1,500.000 $2,000.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,715.000 $950.000 $1,990.000 $1,500.000 $2,000.000 $1,350.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,400.000 $1,000.000 $1,690.000 $1,500.000 $2,000.000 $1,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,500.000 $1,500.000 $2,990.000 $1,800.000 $2,600.000 $2,300.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 4.000 $3,600.000 $3,000.000 $4,740.000 $2,700.000 $3,000.000 $1,950.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 42.000 $2,000.000 $1,000.000 $1,990.000 $1,800.000 $2,425.000 $2,100.000
REMOV STR (SET)
EA 29.000 $580.000 $500.000 $549.000 $300.000 $500.000 $1,000.000
REMOV STR (HEADWALL)
EA 1.000 $1,700.000 $2,000.000 $3,490.000 $800.000 $1,000.000 $1,200.000
REMOV STR (DRIVEWAY CULVERT)
EA 54.000 $650.000 $350.000 $529.000 $330.000 $500.000 $600.000
MOBILIZATION
LS 1.000 $628,852.980 $525,000.000 $664,272.090 $500,000.000 $500,000.000 $930,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $2,500.000 $4,540.620 $5,000.000 $1,750.000 $13,465.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 780.000 $30.000 $25.000 $31.240 $40.000 $27.000 $33.850
ROCK FILTER DAMS (REMOVE)
LF 780.000 $10.000 $5.000 $11.810 $9.000 $10.000 $16.930
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,498.000 $2.500 $2.500 $3.200 $2.500 $2.250 $4.510
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,498.000 $0.750 $0.700 $0.770 $0.500 $0.850 $1.130
DRIVEWAYS (ACP)
SY 8,147.000 $38.000 $25.000 $31.710 $30.000 $29.500 $19.500
RUMBLE STRIPS (CENTERLINE)
LF 29,699.000 $0.150 $0.250 $0.370 $0.250 $0.170 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 1,337.500 $21.500 $25.000 $18.900 $19.000 $22.000 $21.330
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,150.000 $1,100.000 $900.000 $950.000 $1,200.000 $1,015.570
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $26.000 $20.000 $19.150 $20.000 $23.000 $21.610
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $2.000 $3.000 $2.500 $2.500 $2.200 $2.820
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $2,750.000 $2,570.000 $2,600.000 $3,240.000 $2,900.010
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $250.000 $200.000 $250.000 $250.000 $220.000 $282.100
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 42.000 $200.000 $160.000 $175.000 $180.000 $200.000 $180.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 4.000 $250.000 $200.000 $240.000 $250.000 $265.000 $210.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $425.000 $350.000 $380.000 $390.000 $420.000 $385.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $485.000 $450.000 $365.000 $370.000 $400.000 $475.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 10.000 $600.000 $600.000 $495.000 $500.000 $550.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $575.000 $525.000 $430.000 $440.000 $475.000 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $675.000 $725.000 $670.000 $680.000 $725.000 $720.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $785.000 $650.000 $620.000 $630.000 $675.000 $830.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 4.000 $850.000 $850.000 $725.000 $730.000 $800.000 $925.000
REMOVE SM RD SN SUP&AM
EA 58.000 $90.000 $75.000 $65.000 $100.000 $75.000 $90.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 39.000 $80.000 $50.000 $58.000 $59.000 $65.000 $72.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $25.000 $20.000 $27.000 $29.000 $30.000 $29.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 74,840.000 $0.200 $0.110 $0.100 $0.100 $0.120 $0.250
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 96.000 $3.500 $3.000 $3.000 $3.200 $3.250 $6.770
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,150.000 $0.200 $0.110 $0.100 $0.100 $0.120 $0.270
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 43,693.000 $0.200 $0.110 $0.100 $0.100 $0.120 $0.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 192.000 $8.500 $6.000 $6.000 $6.400 $6.500 $6.770
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 936.000 $1.000 $1.500 $1.670 $1.000 $1.000 $1.130
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 765.000 $0.800 $1.000 $0.700 $0.760 $0.750 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 177.000 $6.250 $12.000 $12.000 $13.000 $13.000 $7.900
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $150.000 $100.000 $100.000 $110.000 $110.000 $169.260
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $170.000 $110.000 $110.000 $120.000 $120.000 $169.260
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $575.000 $250.000 $250.000 $270.000 $275.000 $501.010
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 74,220.000 $0.600 $0.600 $0.600 $0.650 $0.650 $0.720
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,150.000 $0.400 $0.300 $0.300 $0.320 $0.320 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 47,139.000 $0.350 $0.300 $0.300 $0.320 $0.320 $0.370
REFL PAV MRKR TY I-C
EA 39.000 $4.000 $3.500 $3.500 $3.800 $3.850 $4.510
REFL PAV MRKR TY II-A-A
EA 1,212.000 $3.500 $3.500 $3.500 $3.800 $3.850 $3.880
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 3,021.000 $88.000 $80.000 $67.590 $84.000 $105.000 $96.760
D-GR HMA TY-D PG76-22
TON 16,670.000 $87.000 $75.000 $68.550 $84.000 $92.000 $88.790
TACK COAT
GAL 7,323.000 $2.500 $3.000 $2.960 $2.500 $3.000 $4.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $8,500.000 $8,118.750 $5,000.000 $5,000.000 $10,000.000
TMA (STATIONARY)
DAY 90.000 $220.000 $200.000 $250.060 $400.000 $250.000 $280.000
TMA (MOBILE OPERATION)
HR 80.000 $60.000 $50.000 $81.190 $35.000 $25.000 $90.000
Totals: $8,646,475.280 $7,305,240.140 $7,784,648.380 $7,800,185.700 $8,634,829.320 $9,416,266.095