BANDERA FM 1283 (1730-01-043)

Items: 98

County: BANDERA
Length: N/A
Highway: FM 1283
District: SAN ANTONIO
Control Number: 1730-01-043
DBE Goal: N/A
Project: STP 2021(677)HES
Guaranty: N/A
Time: 174 WORKING DAYS
Engineer's Estimate: $3,129,991.00
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$3,129,991.00
$2,946,881.40
Over/Under Est: -5.85% -$183,109.60
$3,039,951.10
Over/Under Est: -2.88% -$90,039.90
Amt Left: 3.16% $93,069.70
Over/Under Est: -1.11% -$34,865.03
Amt Left: 5.03% $148,244.57
Delta: -1.81% -$55,174.87
Over/Under Est: 3.06% $95,921.62
Amt Left: 9.47% $279,031.22
Delta: -4.23% -$130,786.65
Over/Under Est: 10.3% $322,279.27
Amt Left: 17.15% $505,388.87
Delta: -7.02% -$226,357.65

Bid Items & Bid Tabulations

98 Total 0 of 98
BANDERA  |  FM 1283  |  SAN ANTONIO  |  1730-01-043  |  07/01/2021  |  $3,129,991.00  |  STP 2021(677)HES  |  HAZARD ELIM & SAFETY  |  174 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
FARIS INDUSTRIES, INC.
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 147.000 $2,000.000 $520.000 $643.420 $493.006 $2,322.780 $1,640.000
REMOVING CONC (RIPRAP)
SY 97.000 $15.000 $43.000 $10.000 $15.120 $16.650 $10.700
REMOVING CONC (DRIVEWAYS)
SY 141.000 $15.000 $31.950 $11.000 $15.120 $16.650 $11.800
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 3,573.000 $4.000 $4.900 $6.510 $7.105 $5.610 $8.600
EXCAVATION (ROADWAY)
CY 3,857.000 $9.000 $20.300 $30.380 $14.612 $21.210 $31.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 3,711.000 $20.000 $17.200 $18.930 $12.042 $21.210 $11.400
COMPOST MANUF TOPSOIL (4")
SY 22,935.000 $3.000 $4.000 $4.240 $3.090 $0.890 $2.800
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 22,935.000 $1.000 $0.450 $0.420 $0.155 $0.460 $0.160
DRILL SEED (TEMP)(WARM OR COOL)
SY 22,935.000 $1.000 $0.450 $0.420 $0.082 $0.460 $0.090
VEGETATIVE WATERING
MG 357.800 $25.000 $15.000 $8.450 $22.626 $16.650 $45.500
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 11,003.000 $1.000 $1.000 $0.930 $0.783 $1.030 $0.810
AGGR(TY-PB GR-4 SAC-B)
CY 304.000 $200.000 $128.000 $92.060 $164.333 $89.100 $134.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 10,985.000 $4.000 $3.500 $4.300 $3.629 $4.060 $5.400
PLANE ASPH CONC PAV(0" TO 2")
SY 232.000 $2.000 $9.500 $26.040 $23.236 $12.230 $26.800
CEM STABIL BKFL
CY 4.000 $87.000 $178.500 $160.000 $257.500 $176.410 $171.000
TRENCH EXCAVATION PROTECTION
LF 24.000 $3.000 $55.000 $25.000 $15.450 $27.560 $26.800
TEMPORARY SPL SHORING
SF 154.000 $15.000 $11.000 $75.000 $103.000 $82.690 $80.300
RIPRAP (CONC)(4 IN)
CY 22.000 $400.000 $640.000 $475.000 $592.250 $523.710 $509.000
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $482.000 $560.000 $655.000 $669.500 $722.170 $702.000
CMP (GAL STL 30 IN)
LF 27.000 $90.000 $170.000 $105.000 $139.050 $115.770 $112.000
CMP (GAL STL 36 IN)
LF 4.000 $110.000 $430.000 $116.000 $216.300 $127.900 $124.000
CMP AR (GAL STL DES 4)
LF 20.000 $160.000 $260.000 $85.000 $190.550 $93.720 $91.100
CMP AR (GAL STL DES 5)
LF 46.000 $170.000 $139.000 $183.000 $257.500 $201.770 $196.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 12.000 $800.000 $2,000.000 $750.000 $1,030.000 $826.910 $803.000
HEADWALL (CH - FW - 0) (DIA= 42 IN)
EA 1.000 $6,000.000 $7,300.000 $5,250.000 $9,785.000 $5,788.400 $5,620.000
HEADWALL (CH - FW - 45) (DIA= 36 IN)
EA 1.000 $8,000.000 $6,800.000 $5,500.000 $10,815.000 $6,064.040 $5,890.000
HEADWALL (CH - PW - A - 0) (DES= 4)
EA 3.000 $7,000.000 $6,100.000 $2,500.000 $9,785.000 $2,756.380 $2,680.000
HEADWALL (CH - PW - A - 0) (DES= 5)
EA 2.000 $9,000.000 $9,000.000 $3,000.000 $11,845.000 $3,307.660 $3,210.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $15,000.000 $19,000.000 $19,500.000 $24,720.000 $21,499.770 $20,900.000
SET (REPLACE PIPE RUNNER)
EA 1.000 $800.000 $1,800.000 $3,250.000 $2,060.000 $3,583.290 $3,480.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 1.000 $2,800.000 $3,000.000 $1,825.000 $2,575.000 $2,012.160 $1,950.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 2.000 $890.000 $1,600.000 $1,400.000 $1,030.000 $1,543.570 $1,500.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 1.000 $2,500.000 $1,665.000 $1,600.000 $1,596.500 $1,764.080 $1,710.000
SET (TY II) (DES 4) (CMP) (3: 1) (C)
EA 6.000 $2,900.000 $2,100.000 $1,900.000 $3,090.000 $2,094.850 $2,040.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 4.000 $2,400.000 $2,260.000 $2,050.000 $3,347.500 $2,260.230 $2,200.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 2.000 $4,200.000 $2,670.000 $3,100.000 $4,120.000 $3,417.910 $3,320.000
SET (TY II) (DES 5) (CMP) (3: 1) (C)
EA 4.000 $3,900.000 $2,385.000 $2,350.000 $4,635.000 $2,591.000 $2,520.000
CLEAN EXIST CULVERTS
EA 30.000 $1,980.000 $2,000.000 $4,000.000 $1,545.000 $4,410.210 $1,500.000
REMOV STR (SET)
EA 19.000 $860.000 $435.000 $150.000 $618.000 $165.380 $161.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $1,480.000 $500.000 $2,060.000 $551.280 $536.000
REMOV STR (HEADWALL)
EA 3.000 $1,900.000 $1,340.000 $750.000 $1,545.000 $826.910 $803.000
MOBILIZATION
LS 1.000 $285,000.000 $232,000.000 $334,394.620 $283,835.141 $256,194.750 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $12,000.000 $5,000.000 $1,146.470 $3,581.180 $3,671.650 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 465.000 $25.000 $28.900 $26.350 $56.650 $29.080 $24.600
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 265.000 $43.000 $27.400 $25.010 $29.870 $27.600 $31.100
ROCK FILTER DAMS (REMOVE)
LF 730.000 $8.000 $10.800 $9.890 $8.240 $10.910 $8.600
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $15.000 $28.700 $26.210 $13.390 $28.930 $13.900
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $5.000 $15.300 $14.000 $2.060 $15.450 $2.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,125.000 $2.000 $3.200 $2.900 $2.369 $3.200 $2.450
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,125.000 $1.000 $0.650 $0.580 $0.721 $0.640 $0.750
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,440.000 $120.000 $100.000 $32.550 $145.541 $114.000 $337.000
DRIVEWAYS (CONC)
SY 69.000 $70.000 $130.000 $96.510 $128.750 $99.230 $96.400
DRIVEWAYS (ACP)
SY 2,428.000 $53.000 $35.000 $60.550 $35.446 $39.420 $46.300
MTL W-BEAM GD FEN (TIM POST)
LF 575.000 $21.000 $27.500 $25.950 $30.900 $25.200 $27.000
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,270.000 $1,390.000 $1,165.000 $1,180.380 $1,271.000 $1,360.000
MTL BEAM GD FEN TRANS (T6)
EA 4.000 $730.000 $610.000 $747.400 $769.410 $557.400 $597.000
REMOVE METAL BEAM GUARD FENCE
LF 2,125.000 $2.000 $2.200 $1.500 $2.060 $2.000 $3.850
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $200.000 $235.000 $189.120 $25.750 $215.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,670.000 $2,850.000 $3,134.810 $309.000 $2,595.000 $2,780.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 13.000 $300.000 $270.000 $217.740 $255.440 $217.740 $233.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $525.000 $590.000 $570.320 $553.110 $570.320 $611.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $600.000 $670.000 $845.450 $627.270 $845.450 $906.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $730.000 $870.000 $803.870 $817.820 $803.870 $861.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $950.000 $1,050.000 $1,038.900 $993.950 $1,038.900 $1,110.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $340.000 $535.000 $544.080 $501.610 $544.080 $583.000
REMOVE SM RD SN SUP&AM
EA 31.000 $90.000 $125.000 $85.930 $118.450 $85.930 $92.100
INSTL OM ASSM (OM-2Y)(WC)GND
EA 28.000 $64.000 $86.500 $62.650 $81.370 $62.650 $67.100
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $29.000 $24.000 $23.350 $22.660 $23.350 $25.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 52.000 $70.000 $73.500 $53.440 $69.010 $53.440 $57.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 60.000 $1.000 $0.550 $1.150 $1.998 $1.410 $3.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,480.000 $1.000 $0.550 $1.150 $1.404 $1.410 $3.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,049.000 $1.000 $1.100 $0.700 $0.721 $1.000 $0.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 160.000 $6.000 $6.550 $6.000 $6.180 $10.000 $6.400
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $150.000 $192.000 $150.000 $154.500 $175.000 $161.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 2.000 $225.000 $275.000 $250.000 $257.500 $250.000 $268.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $155.000 $220.000 $150.000 $154.500 $200.000 $161.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $250.000 $550.000 $344.000 $354.320 $500.000 $369.000
PAVEMENT SEALER 4"
LF 25,530.000 $1.000 $0.150 $0.110 $0.113 $0.150 $0.120
PAVEMENT SEALER 6"
LF 28,896.000 $1.000 $0.150 $0.180 $0.185 $0.150 $0.190
PAVEMENT SEALER 8"
LF 1,049.000 $1.000 $0.350 $0.400 $0.412 $0.300 $0.430
PAVEMENT SEALER 24"
LF 160.000 $2.000 $2.200 $3.000 $3.090 $2.000 $3.200
PAVEMENT SEALER (ARROW)
EA 5.000 $50.000 $27.500 $63.000 $64.890 $25.000 $67.500
PAVEMENT SEALER (WORD)
EA 13.000 $45.000 $73.000 $67.000 $69.010 $25.000 $71.800
PAVEMENT SEALER (MED NOSE)
EA 2.000 $130.000 $110.000 $188.000 $193.640 $100.000 $201.000
PAVEMENT SEALER (NUMBER)
EA 2.000 $126.000 $27.500 $188.000 $193.640 $25.000 $201.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 28,896.000 $1.000 $0.800 $0.870 $0.896 $0.750 $0.930
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 1,590.000 $1.000 $0.800 $0.700 $0.721 $0.750 $0.750
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 23,940.000 $1.000 $0.700 $0.580 $0.597 $0.650 $0.620
REFL PAV MRKR TY I-C
EA 52.000 $4.000 $4.400 $4.000 $4.120 $4.000 $4.300
REFL PAV MRKR TY II-A-A
EA 595.000 $4.000 $4.400 $4.000 $4.120 $4.000 $4.300
HIGH FRICTION SURFACE COURSE
SY 27,943.000 $17.000 $23.150 $21.960 $24.244 $21.000 $24.600
D-GR HMA TY-B PG64-22
TON 6,937.000 $64.000 $76.150 $82.550 $78.175 $78.270 $67.000
D-GR HMA TY-C PG70-22
TON 2,291.000 $81.000 $78.850 $88.550 $79.474 $85.620 $75.000
TACK COAT
GAL 4,452.000 $4.000 $3.650 $2.610 $3.596 $3.380 $3.200
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $19,435.930 $8,100.000 $7,986.300 $13,600.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $4.000 $10.400 $14.000 $14.420 $9.500 $15.000
TMA (STATIONARY)
DAY 312.000 $175.000 $150.000 $40.000 $237.600 $266.210 $113.000
TMA (MOBILE OPERATION)
DAY 32.000 $220.000 $150.000 $40.000 $469.800 $319.450 $167.000
Totals: $3,129,991.000 $2,946,881.400 $3,039,951.100 $3,095,126.064 $3,225,912.620 $3,452,270.270