AUSTIN CR (0913-20-093)

Items: 37

County: AUSTIN
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-20-093
DBE Goal: N/A
Project: BR 2020(686)
Guaranty: N/A
Time: 172 WORKING DAYS
Engineer's Estimate: $1,314,061.00
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$1,314,061.00
$1,258,243.82
Over/Under Est: -4.25% -$55,817.18
Over/Under Est: 18.45% $242,402.54
Amt Left: 23.7% $298,219.72
$1,564,704.45
Over/Under Est: 19.07% $250,643.45
Amt Left: 24.36% $306,460.63
Delta: -0.53% -$8,240.91
Over/Under Est: 28.27% $371,463.80
Amt Left: 33.96% $427,280.98
Delta: -7.72% -$120,820.35
$1,966,075.50
Over/Under Est: 49.62% $652,014.50
Amt Left: 56.26% $707,831.68
Delta: -16.64% -$280,550.70
Subcontractor Percentage Amount
HEMPHILL WBE PILE DRIVING CO. 8.99% $113,116.12
TRAFFIC SIGNS & LINES, LLC 4.57% $57,501.74
CEN TEX HYDROSEED, INC. 1.82% $22,900.04
RAY"S CRANE SERVICE 0.54% $6,794.52
AREA WIDE PROTECTIVE, INC. 0.51% $6,417.04
Total: 16.43% $206,729.46

Bid Items & Bid Tabulations

37 Total 0 of 37
AUSTIN  |  CR  |  YOAKUM  |  0913-20-093  |  05/05/2022  |  $1,314,061.00  |  BR 2020(686)  |  BRIDGE REPL  |  172 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUQUA CONSTRUCTION CO., INC.
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
SB CONTRACTORS LLC
KNIFE RIVER CORPORATION - SOUTH
EARTH BUILDERS, L.P.
PREPARING ROW
STA 8.880 $3,000.000 $3,000.000 $5,907.280 $5,500.000 $15,800.000 $20,000.000
EXCAVATION (ROADWAY)
CY 222.000 $20.000 $10.000 $29.500 $46.250 $17.000 $20.000
EXCAVATION (CHANNEL)
CY 683.000 $20.000 $8.000 $25.250 $17.630 $23.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 468.000 $22.000 $15.000 $75.350 $21.940 $37.350 $40.000
BLADING
HR 48.000 $100.000 $60.000 $206.000 $80.000 $120.000 $100.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,317.000 $2.000 $3.000 $3.100 $2.770 $3.300 $3.000
BROADCAST SEED (TEMP) (WARM)
SY 581.000 $4.000 $2.000 $11.150 $10.120 $2.200 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 581.000 $4.000 $2.000 $5.000 $10.120 $2.200 $1.000
VEGETATIVE WATERING
MG 19.600 $50.000 $8.380 $92.800 $70.000 $53.000 $100.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 428.000 $120.000 $100.000 $100.000 $187.320 $115.000 $100.000
CEM STABIL BKFL
CY 110.000 $115.000 $160.000 $125.000 $168.390 $180.000 $250.000
PRESTR CONC PIL (18 IN SQ)
LF 1,136.000 $155.000 $162.160 $140.650 $145.600 $197.000 $225.000
CL C CONC (ABUT)
CY 75.300 $1,200.000 $1,050.000 $1,012.000 $1,250.690 $1,180.000 $1,500.000
REINF CONC SLAB (BOX BEAM)
SF 3,402.000 $22.000 $20.000 $36.500 $40.250 $37.650 $30.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $22.000 $20.000 $38.150 $51.810 $32.200 $25.000
SHEAR KEY
CY 17.200 $700.000 $300.000 $316.250 $728.050 $500.000 $1,500.000
PRESTR CONC BOX BEAM (4B20)
LF 516.000 $215.000 $253.550 $268.000 $276.860 $272.750 $315.000
PRESTR CONC BOX BEAM (5B20)
LF 258.000 $220.000 $253.550 $275.000 $277.090 $300.000 $315.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $230.000 $246.800 $251.000 $306.630 $301.000 $315.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 788.000 $175.000 $140.000 $137.550 $158.280 $165.000 $230.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 466.000 $185.000 $140.000 $164.000 $130.600 $162.000 $230.000
RAIL (TY T223)
LF 450.000 $120.000 $120.000 $106.000 $134.970 $131.000 $150.000
ARMOR JOINT (SEALED)
LF 132.000 $85.000 $90.000 $226.500 $232.150 $122.500 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $20,000.000 $20,000.000 $17,755.000 $17,000.000 $16,900.000 $30,000.000
MOBILIZATION
LS 1.000 $116,000.000 $144,000.000 $171,037.000 $150,000.000 $203,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,000.000 $510.900 $4,330.100 $2,500.000 $1,700.000 $4,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,276.000 $4.500 $4.500 $6.800 $6.090 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,276.000 $1.000 $1.500 $1.120 $1.100 $1.650 $1.000
DRIVEWAYS (BASE)
SY 20.000 $50.000 $23.860 $65.000 $98.160 $200.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 12.500 $22.000 $37.970 $92.800 $43.890 $45.000 $80.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $1,965.000 $3,715.000 $2,271.420 $2,160.000 $3,000.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,500.000 $1,095.000 $3,100.000 $1,265.760 $1,203.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,490.000 $3,100.000 $1,722.360 $1,650.000 $2,750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,000.000 $3,159.000 $5,567.000 $3,651.620 $3,471.000 $4,250.000
WIRE FENCE (TY A)
LF 75.000 $15.000 $14.580 $61.900 $23.120 $16.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $32.000 $25.000 $105.150 $28.900 $27.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $25.000 $35.000 $154.650 $40.460 $40.000 $50.000
Totals: $1,314,061.000 $1,258,243.833 $1,556,463.546 $1,564,704.467 $1,685,524.800 $1,966,075.500