Show Job Controls
Bid Cobra

AUSTIN FM 109 (0716-01-047)

Items: 124

County: AUSTIN
Length: N/A
Highway: FM 109
District: YOAKUM
Control Number: 0716-01-047
DBE Goal: N/A
Project: C 716-1-47
Guaranty: N/A
Time: 375 WORKING DAYS
Engineer's Estimate: $10,524,196.63
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: WIDEN BRIDGES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$10,524,196.63
$9,973,688.85
Over/Under Est: -5.23% -$550,507.78
Over/Under Est: -2.16% -$226,914.99
Amt Left: 3.24% $323,592.79
Over/Under Est: 5.36% $563,703.11
Amt Left: 11.17% $1,114,210.89
Delta: -7.68% -$790,618.10
$12,541,420.33
Over/Under Est: 19.17% $2,017,223.70
Amt Left: 25.75% $2,567,731.48
Delta: -13.11% -$1,453,520.59
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 69.75% $6,944,232.33
CEN TEX HYDROSEED, INC. 3.75% $373,345.82
J & M CONTRACTING, COMPANY 3.21% $319,584.03
STRIPE LINES, INC. 2.26% $225,003.08
GREGORY PILE DRIVING, INC. 1.42% $141,373.62
WILLOW CITY SIGN & RAIL, INC. 1.09% $108,519.19
EGGEMEYER LAND CLEARING, LLC 1.08% $107,523.60
D. I. J. CONSTRUCTION, INC. 0.94% $93,585.35
HIGHWAY 1 LLC 0.28% $27,876.49
H J HENKE, LLC 0.17% $16,925.01
TEXAS CUTTING & CORING GP, INC. 0.15% $14,933.83
Total: 84.10% $8,372,902.35

Bid Items & Bid Tabulations

124 Total 0 of 124
AUSTIN  |  FM 109  |  YOAKUM  |  0716-01-047  |  08/05/2020  |  $10,524,196.63  |  C 716-1-47  |  WIDEN BRIDGES  |  375 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
HUNTER INDUSTRIES, LTD.
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 29.000 $1,500.000 $500.000 $300.000 $500.000 $5,340.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 3.000 $3.000 $3,000.000 $3,000.000 $5,000.000 $5,340.000
EXCAVATION (CHANNEL)
CY 4,415.000 $10.000 $17.500 $6.300 $20.000 $31.200
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 17,999.000 $14.000 $13.500 $10.000 $20.000 $21.900
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 600.000 $50.000 $30.000 $24.000 $20.000 $39.420
BLADING
STA 540.000 $100.000 $50.000 $700.000 $250.000 $563.910
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 142,018.000 $0.300 $0.350 $0.350 $0.330 $0.360
CELL FBR MLCH SEED(TEMP)(WARM)
SY 38,684.000 $0.300 $0.330 $0.330 $0.320 $0.340
CELL FBR MLCH SEED(TEMP)(COOL)
SY 32,326.000 $0.300 $0.330 $0.330 $0.320 $0.340
VEGETATIVE WATERING
MG 1,195.040 $20.000 $15.000 $18.000 $10.000 $36.630
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 33,954.000 $65.000 $75.000 $72.000 $70.000 $87.800
FL BS (RDWY DEL) (TY E GR 1-2) (IN VEH)
CY 4,627.000 $61.000 $55.000 $52.000 $45.000 $85.910
REWORK BS MTL (TY B) (6") (ORD COMP)
STA 517.700 $500.000 $500.000 $448.000 $500.000 $1,381.950
CEMENT
TON 2,458.000 $175.000 $140.000 $140.000 $150.000 $173.250
CEMENT TREAT(EXIST MATL)(8")
SY 201,330.000 $2.000 $1.200 $0.900 $3.000 $2.850
ASPH (RC-250)
GAL 37,067.000 $4.500 $3.650 $3.700 $4.000 $5.340
AGGR(TY-E GR-5 SAC-B)
CY 1,324.000 $100.000 $140.000 $164.000 $140.000 $99.050
AGGR(TY-PE GR-3 SAC-B)
CY 2,181.000 $150.000 $110.000 $144.000 $150.000 $113.410
AGGR(TY-PE GR-4 SAC-B)
CY 1,416.000 $110.000 $112.000 $114.000 $110.000 $112.660
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 136,717.000 $3.750 $2.850 $3.050 $3.500 $4.060
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,500.000 $50.000 $36.500 $24.250 $20.000 $39.420
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 741.000 $55.000 $48.750 $31.500 $30.000 $39.420
CEM STABIL BKFL
CY 403.000 $100.000 $120.000 $113.500 $125.000 $141.330
CUT & RESTORING PAV
SY 18.000 $150.000 $225.000 $44.000 $100.000 $220.090
TRENCH EXCAVATION PROTECTION
LF 46.000 $5.000 $15.000 $16.000 $25.000 $22.010
TEMPORARY SPL SHORING
SF 198.000 $24.750 $100.000 $35.000 $100.000 $50.000
PRESTR CONC PIL (18 IN SQ)
LF 2,058.000 $160.010 $150.000 $180.000 $250.000 $125.000
CL C CONC (ABUT)(EXTEND)
CY 52.800 $1,600.000 $2,000.000 $1,200.000 $3,500.000 $1,500.000
CL C CONC (CAP)(EXTEND)
CY 48.000 $2,700.000 $2,000.000 $1,600.000 $3,500.000 $1,800.000
REINF CONC SLAB (SLAB BEAM)(EXT SLAB)
SF 7,243.000 $69.000 $35.000 $31.750 $40.000 $48.000
PRESTR CONC SLAB BEAM (4SB15)
LF 775.650 $165.000 $160.000 $156.000 $200.000 $200.000
PRESTR CONC SLAB BEAM (5SB15)
LF 775.650 $185.000 $165.000 $156.000 $200.000 $200.000
RIPRAP (CONC)(4 IN)
CY 14.000 $460.000 $650.000 $530.000 $500.000 $495.210
RIPRAP (CONC)(5 IN)
CY 20.100 $500.000 $650.000 $530.000 $500.000 $400.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 96.300 $200.000 $145.000 $129.000 $150.000 $105.010
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 513.000 $250.000 $145.000 $110.000 $150.000 $194.260
MULTI-LAYER POLYMER OVERLAY
SY 1,225.000 $60.000 $40.000 $82.500 $125.000 $145.360
RAIL (TY SSTR)
LF 872.500 $80.000 $145.000 $76.400 $150.000 $85.000
CONC BOX CULV (4 FT X 3 FT)
LF 48.000 $250.000 $275.000 $258.000 $370.000 $495.210
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 4.000 $600.000 $1,500.000 $1,000.000 $710.000 $550.230
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 4.000 $700.000 $1,550.000 $1,000.000 $850.000 $660.280
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 12.000 $725.000 $1,600.000 $1,130.000 $875.000 $715.300
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 10.000 $750.000 $1,300.000 $1,100.000 $900.000 $770.330
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 24.000 $900.000 $1,450.000 $1,150.000 $1,000.000 $825.350
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 12.000 $950.000 $1,900.000 $1,800.000 $1,200.000 $935.400
RC PIPE (CL III)(18 IN)
LF 878.000 $80.000 $60.000 $51.500 $60.000 $55.020
RC PIPE (CL III)(24 IN)
LF 508.000 $90.000 $85.000 $72.000 $73.000 $97.940
RC PIPE (CL III)(30 IN)
LF 68.000 $100.000 $115.000 $198.000 $100.000 $137.560
RC PIPE (CL III)(36 IN)
LF 4.000 $175.000 $350.000 $220.000 $250.000 $275.120
RC PIPE (CL III)(42 IN)
LF 8.000 $200.000 $375.000 $300.000 $300.000 $385.160
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,500.000 $5,000.000 $4,900.000 $5,600.000 $4,401.870
JCT BOX(COMPL)(CIP)(10FTX6FT)
EA 1.000 $15,000.000 $45,000.000 $16,800.000 $28,000.000 $30,813.120
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 1.000 $15,000.000 $9,500.000 $11,600.000 $12,300.000 $14,306.090
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 1.000 $15,000.000 $11,000.000 $11,800.000 $14,100.000 $15,406.560
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $15,000.000 $6,500.000 $14,000.000 $8,300.000 $6,052.580
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $20,000.000 $8,750.000 $17,500.000 $11,400.000 $9,353.980
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $20,000.000 $15,000.000 $14,500.000 $17,000.000 $13,755.860
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $8,500.000 $5,500.000 $7,400.000 $4,475.000 $5,502.340
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $9,000.000 $6,000.000 $7,750.000 $5,450.000 $7,153.050
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $8,500.000 $8,000.000 $8,340.000 $7,200.000 $7,153.050
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $8,000.000 $9,250.000 $10,000.000 $9,000.000 $9,353.980
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $13,000.000 $12,000.000 $11,300.000 $12,150.000 $10,454.450
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $8,000.000 $16,000.000 $12,800.000 $16,750.000 $14,306.090
SET (TY I)(S= 9 FT)(HW= 7 FT)(3:1) (C)
EA 1.000 $8,500.000 $18,500.000 $13,500.000 $20,000.000 $16,507.030
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 14.000 $1,500.000 $1,250.000 $865.000 $750.000 $935.400
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $1,200.000 $1,200.000 $923.000 $700.000 $880.370
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 55.000 $1,300.000 $1,250.000 $835.000 $850.000 $935.400
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 13.000 $1,500.000 $1,500.000 $1,100.000 $1,000.000 $990.420
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 23.000 $1,500.000 $1,750.000 $1,100.000 $1,100.000 $1,045.450
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $2,000.000 $2,500.000 $1,600.000 $1,400.000 $2,200.940
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $3,000.000 $1,750.000 $1,800.000 $1,500.000 $2,751.170
REMOV STR (SMALL)
EA 34.000 $3,000.000 $500.000 $280.000 $325.000 $935.400
MOBILIZATION
LS 1.000 $760,000.000 $900,000.000 $1,280,000.000 $1,100,000.000 $1,113,702.150
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $2,500.000 $10,000.000 $11,600.000 $5,000.000 $3,284.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 2,900.000 $35.000 $27.500 $25.400 $25.000 $34.490
ROCK FILTER DAMS (REMOVE)
LF 2,900.000 $12.000 $10.000 $9.500 $5.000 $9.530
TEMP SEDMT CONT FENCE (INSTALL)
LF 64,221.000 $3.500 $3.000 $2.650 $3.500 $2.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 64,221.000 $1.000 $1.000 $0.790 $0.500 $0.400
CONSTRUCTING DETOURS
SY 1,200.000 $83.440 $30.000 $46.000 $70.000 $39.420
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 13.000 $6,000.000 $3,750.000 $3,700.000 $7,300.000 $4,339.970
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 880.000 $40.000 $30.000 $72.000 $75.000 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $50.000 $30.000 $72.000 $75.000 $40.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 880.000 $10.000 $6.000 $13.000 $7.500 $30.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 160.000 $20.000 $6.000 $13.000 $7.500 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 880.000 $20.000 $15.000 $17.600 $15.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $25.000 $15.000 $17.600 $15.000 $15.000
INTERSECTIONS (SURF TREAT)
SY 183.000 $30.000 $35.000 $31.000 $20.000 $39.420
DRIVEWAYS (CONC)
SY 583.000 $100.000 $68.000 $66.000 $75.000 $105.010
DRIVEWAYS (ACP)
SY 148.000 $40.000 $62.000 $38.500 $50.000 $39.420
DRIVEWAYS (SURF TREAT)
SY 8,758.000 $30.000 $41.000 $23.500 $20.000 $39.420
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $21.000 $20.000 $20.900 $30.000 $20.460
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,000.000 $1,900.000 $1,833.000 $2,000.000 $1,969.000
REMOVE METAL BEAM GUARD FENCE
LF 3,981.000 $4.000 $2.000 $1.900 $3.000 $1.500
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,600.000 $2,500.000 $2,540.000 $2,800.000 $2,556.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $300.000 $200.000 $200.000 $300.000 $150.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $350.000 $170.000 $175.000 $500.000 $165.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $350.000 $260.000 $265.000 $600.000 $400.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 59.000 $150.000 $150.000 $150.000 $250.000 $145.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 9.000 $200.000 $160.000 $160.000 $300.000 $205.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $600.000 $450.000 $450.000 $500.000 $564.310
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 33.000 $600.000 $500.000 $500.000 $600.000 $626.640
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $800.000 $650.000 $660.000 $700.000 $668.950
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 70.000 $500.000 $275.000 $270.000 $300.000 $390.380
REMOVE SM RD SN SUP&AM
EA 117.000 $100.000 $50.000 $100.000 $100.000 $85.930
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 43.000 $25.000 $50.000 $31.750 $50.000 $48.440
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 75.000 $30.000 $20.000 $21.000 $30.000 $15.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 311,775.000 $0.350 $0.180 $0.160 $0.200 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 97,848.000 $0.350 $0.220 $0.160 $0.200 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 181,881.000 $0.350 $0.190 $0.160 $0.200 $0.260
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 360.000 $6.000 $4.250 $5.290 $5.000 $5.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,020.000 $0.750 $0.900 $1.060 $1.500 $1.040
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 312.000 $10.000 $8.500 $10.580 $15.000 $10.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,400.000 $0.750 $0.800 $1.060 $1.500 $1.040
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,957.000 $1.500 $1.000 $1.000 $1.000 $1.780
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 103,284.000 $0.600 $0.800 $0.690 $0.700 $0.620
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 32,616.000 $0.600 $0.800 $0.690 $0.700 $0.620
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 60,627.000 $0.600 $0.800 $0.690 $0.700 $0.620
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 122.000 $15.000 $12.500 $19.000 $20.000 $14.560
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $750.000 $550.000 $640.000 $750.000 $676.000
REFL PAV MRKR TY II-A-A
EA 1,256.000 $5.000 $3.600 $4.000 $5.000 $4.160
D-GR HMA TY-D SAC-B PG76-22
TON 146.000 $100.000 $140.000 $310.000 $250.000 $146.760
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $15,000.000 $5,000.000 $2,100.000 $7,500.000 $7,585.090
TMA (STATIONARY)
DAY 250.000 $300.000 $125.000 $340.000 $150.000 $303.400
TMA (MOBILE OPERATION)
DAY 75.000 $450.000 $125.000 $800.000 $250.000 $505.670
Totals: $10,524,196.630 $9,973,688.850 $10,297,281.640 $11,087,899.740 $12,541,420.343