AUSTIN FM 331 (0408-05-028)

Items: 75

County: AUSTIN
Length: N/A
Highway: FM 331
District: YOAKUM
Control Number: 0408-05-028
DBE Goal: N/A
Project: BR 2021(722)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $5,771,361.80
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$5,771,361.80
Over/Under Est: -33.92% -$1,957,382.76
Over/Under Est: 1.78% $103,006.23
Amt Left: 54.02% $2,060,388.99
$6,511,602.50
Over/Under Est: 12.83% $740,240.70
Amt Left: 70.73% $2,697,623.46
Delta: -10.85% -$637,234.47

Bid Items & Bid Tabulations

75 Total 0 of 75
AUSTIN  |  FM 331  |  YOAKUM  |  0408-05-028  |  07/01/2021  |  $5,771,361.80  |  BR 2021(722)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
ANGEL BROTHERS HOLDINGS CORP.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 16.200 $3,500.000 $2,250.000 $27,000.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 25.000 $15.000 $35.000 $14.500 $40.000
REMOVING CONC (DRIVEWAYS)
SY 59.000 $20.000 $25.000 $10.000 $40.000
EXCAVATION (ROADWAY)
CY 4,179.000 $15.000 $7.000 $12.000 $15.000
EXCAVATION (CHANNEL)
CY 1,957.000 $20.000 $25.000 $30.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 616.000 $30.000 $17.500 $45.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 14,274.000 $20.000 $9.750 $26.000 $20.000
BLADING
HR 40.000 $100.000 $250.000 $90.000 $80.000
FURNISHING AND PLACING TOPSOIL
CY 382.800 $15.000 $35.000 $9.000 $35.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 10,975.000 $1.000 $1.000 $0.270 $0.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 876.000 $1.000 $1.000 $0.270 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 2,964.000 $1.000 $1.000 $0.470 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 2,964.000 $1.000 $1.000 $0.470 $1.000
VEGETATIVE WATERING
MG 40.100 $40.000 $135.000 $15.000 $30.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 900.000 $1.200 $2.250 $1.720 $4.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 200.000 $3.000 $5.000 $3.040 $6.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,210.900 $80.000 $75.000 $85.000 $80.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 267.000 $100.000 $105.000 $85.000 $90.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 126.200 $225.000 $245.000 $150.000 $200.000
LIME TRT (EXST MATL)(8")
SY 7,971.000 $4.000 $5.940 $3.500 $4.000
PRIME COAT (MC-30)
GAL 1,520.000 $4.500 $6.000 $4.000 $7.000
ASPH (RC-250)
GAL 230.000 $25.000 $6.000 $18.000 $20.000
AGGR(TY-E GR-5 SAC-B)
CY 8.000 $150.000 $300.000 $850.000 $500.000
AGGR(TY-PE GR-3 SAC-B)
CY 90.200 $150.000 $80.000 $150.000 $300.000
AGGR(TY-PE GR-4 SAC-B)
CY 67.700 $150.000 $80.000 $270.000 $350.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 6,002.000 $5.000 $4.000 $4.000 $5.000
CEM STABIL BKFL
CY 437.000 $150.000 $175.000 $50.000 $125.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,000.000 $75.000 $38.000 $50.000 $15.000
PRESTR CONC PIL (18 IN SQ)
LF 1,632.000 $115.000 $185.000 $116.000 $110.000
DRILL SHAFT (18 IN)
LF 480.000 $65.000 $120.000 $80.000 $150.000
DRILL SHAFT (36 IN)
LF 1,350.000 $250.000 $240.000 $260.000 $275.000
CL C CONC (ABUT)
CY 123.200 $1,000.000 $1,100.000 $1,500.000 $1,100.000
CL C CONC (CAP)
CY 65.800 $1,100.000 $1,250.000 $1,500.000 $1,100.000
CL C CONC (COLUMN)
CY 97.400 $1,100.000 $1,250.000 $1,000.000 $1,100.000
CL C CONC (FOOTING)
CY 40.000 $1,000.000 $1,150.000 $1,600.000 $800.000
REINF CONC SLAB
SF 22,200.000 $18.000 $21.000 $20.000 $24.000
PRESTR CONC GIRDER (TX40)
LF 1,073.920 $135.000 $215.000 $178.000 $175.000
PRESTR CONC GIRDER (TX46)
LF 1,970.880 $145.000 $205.000 $178.000 $175.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 89.000 $135.000 $85.000 $140.000 $100.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,140.000 $150.000 $90.900 $140.000 $150.000
RAIL (TY T223)
LF 580.000 $120.000 $115.000 $90.000 $110.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 756.000 $75.000 $85.000 $70.000 $90.000
ARMOR JOINT (SEALED)
LF 46.000 $80.000 $80.000 $110.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 93.000 $120.000 $125.000 $140.000 $150.000
CMP AR (GAL STL DES 2)
LF 52.000 $80.000 $30.000 $90.000 $90.000
RC PIPE (CL III)(30 IN)
LF 32.000 $120.000 $155.000 $135.000 $125.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $2,250.000 $2,700.000 $3,000.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 2.000 $2,100.000 $1,250.000 $1,950.000 $500.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $70,000.000 $59,000.000 $55,000.000 $200,000.000
REMOV STR (SMALL)
EA 1.000 $1,000.000 $1,000.000 $650.000 $1,000.000
MOBILIZATION
LS 1.000 $350,000.000 $238,700.000 $440,000.000 $460,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $3,000.000 $900.000 $3,000.000 $1,200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,609.000 $3.000 $1.900 $1.940 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,609.000 $1.000 $1.500 $0.480 $2.000
DRIVEWAYS (CONC)
SY 217.000 $90.000 $85.000 $100.000 $80.000
DRIVEWAYS (SURF TREAT)
SY 163.000 $45.000 $50.000 $45.000 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $22.000 $28.000 $24.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,900.000 $2,000.000 $2,400.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,100.000 $1,500.000 $1,600.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $2.000 $7.500 $1.000 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,800.000 $3,500.000 $2,800.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $300.000 $200.000 $500.000
WIRE FENCE (TY A)
LF 325.000 $16.000 $20.000 $15.000 $10.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $225.000 $300.000 $205.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $345.000 $600.000 $405.000 $800.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 40.000 $20.000 $23.000 $6.500 $40.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $40.000 $100.000 $10.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 34.000 $24.000 $38.000 $16.250 $50.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,668.000 $1.000 $1.750 $0.570 $1.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 214.000 $1.000 $3.000 $0.570 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,814.000 $1.000 $1.750 $0.570 $1.500
REFL PAV MRKR TY II-A-A
EA 46.000 $6.000 $10.000 $7.250 $10.000
NO. OF DAYS MILESTONE 1
$/D 1,300.000 $140.000 $1.000 $140.000 $140.000
NO. OF DAYS MILESTONE 2
$/D 10,000.000 $175.000 $1.000 $115.000 $175.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,900.000 $12,500.000 $12,000.000
Totals: $5,771,361.800 $3,813,979.040 $5,874,368.030 $6,511,602.500