PREPARING ROW
|
STA
|
16.200
|
$3,500.000
|
$2,250.000
|
$27,000.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
25.000
|
$15.000
|
$35.000
|
$14.500
|
$40.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
59.000
|
$20.000
|
$25.000
|
$10.000
|
$40.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,179.000
|
$15.000
|
$7.000
|
$12.000
|
$15.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,957.000
|
$20.000
|
$25.000
|
$30.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
616.000
|
$30.000
|
$17.500
|
$45.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,274.000
|
$20.000
|
$9.750
|
$26.000
|
$20.000
|
|
|
BLADING
|
HR
|
40.000
|
$100.000
|
$250.000
|
$90.000
|
$80.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
382.800
|
$15.000
|
$35.000
|
$9.000
|
$35.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
10,975.000
|
$1.000
|
$1.000
|
$0.270
|
$0.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
876.000
|
$1.000
|
$1.000
|
$0.270
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,964.000
|
$1.000
|
$1.000
|
$0.470
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,964.000
|
$1.000
|
$1.000
|
$0.470
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
40.100
|
$40.000
|
$135.000
|
$15.000
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
900.000
|
$1.200
|
$2.250
|
$1.720
|
$4.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
200.000
|
$3.000
|
$5.000
|
$3.040
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,210.900
|
$80.000
|
$75.000
|
$85.000
|
$80.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
267.000
|
$100.000
|
$105.000
|
$85.000
|
$90.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
126.200
|
$225.000
|
$245.000
|
$150.000
|
$200.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
7,971.000
|
$4.000
|
$5.940
|
$3.500
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,520.000
|
$4.500
|
$6.000
|
$4.000
|
$7.000
|
|
|
ASPH (RC-250)
|
GAL
|
230.000
|
$25.000
|
$6.000
|
$18.000
|
$20.000
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
8.000
|
$150.000
|
$300.000
|
$850.000
|
$500.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
90.200
|
$150.000
|
$80.000
|
$150.000
|
$300.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
67.700
|
$150.000
|
$80.000
|
$270.000
|
$350.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
6,002.000
|
$5.000
|
$4.000
|
$4.000
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
437.000
|
$150.000
|
$175.000
|
$50.000
|
$125.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
1,000.000
|
$75.000
|
$38.000
|
$50.000
|
$15.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,632.000
|
$115.000
|
$185.000
|
$116.000
|
$110.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
480.000
|
$65.000
|
$120.000
|
$80.000
|
$150.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,350.000
|
$250.000
|
$240.000
|
$260.000
|
$275.000
|
|
|
CL C CONC (ABUT)
|
CY
|
123.200
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
65.800
|
$1,100.000
|
$1,250.000
|
$1,500.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
97.400
|
$1,100.000
|
$1,250.000
|
$1,000.000
|
$1,100.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
40.000
|
$1,000.000
|
$1,150.000
|
$1,600.000
|
$800.000
|
|
|
REINF CONC SLAB
|
SF
|
22,200.000
|
$18.000
|
$21.000
|
$20.000
|
$24.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,073.920
|
$135.000
|
$215.000
|
$178.000
|
$175.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,970.880
|
$145.000
|
$205.000
|
$178.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
89.000
|
$135.000
|
$85.000
|
$140.000
|
$100.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,140.000
|
$150.000
|
$90.900
|
$140.000
|
$150.000
|
|
|
RAIL (TY T223)
|
LF
|
580.000
|
$120.000
|
$115.000
|
$90.000
|
$110.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
756.000
|
$75.000
|
$85.000
|
$70.000
|
$90.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
46.000
|
$80.000
|
$80.000
|
$110.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
93.000
|
$120.000
|
$125.000
|
$140.000
|
$150.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
52.000
|
$80.000
|
$30.000
|
$90.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
32.000
|
$120.000
|
$155.000
|
$135.000
|
$125.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$2,250.000
|
$2,700.000
|
$3,000.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,100.000
|
$1,250.000
|
$1,950.000
|
$500.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$70,000.000
|
$59,000.000
|
$55,000.000
|
$200,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$650.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$238,700.000
|
$440,000.000
|
$460,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,000.000
|
$900.000
|
$3,000.000
|
$1,200.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,609.000
|
$3.000
|
$1.900
|
$1.940
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,609.000
|
$1.000
|
$1.500
|
$0.480
|
$2.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
217.000
|
$90.000
|
$85.000
|
$100.000
|
$80.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
163.000
|
$45.000
|
$50.000
|
$45.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$22.000
|
$28.000
|
$24.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,900.000
|
$2,000.000
|
$2,400.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,100.000
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
325.000
|
$2.000
|
$7.500
|
$1.000
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,800.000
|
$3,500.000
|
$2,800.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$500.000
|
$300.000
|
$200.000
|
$500.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
325.000
|
$16.000
|
$20.000
|
$15.000
|
$10.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
2.000
|
$225.000
|
$300.000
|
$205.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$345.000
|
$600.000
|
$405.000
|
$800.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
40.000
|
$20.000
|
$23.000
|
$6.500
|
$40.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$40.000
|
$100.000
|
$10.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
34.000
|
$24.000
|
$38.000
|
$16.250
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,668.000
|
$1.000
|
$1.750
|
$0.570
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
214.000
|
$1.000
|
$3.000
|
$0.570
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,814.000
|
$1.000
|
$1.750
|
$0.570
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
46.000
|
$6.000
|
$10.000
|
$7.250
|
$10.000
|
|
|
NO. OF DAYS MILESTONE 1
|
$/D
|
1,300.000
|
$140.000
|
$1.000
|
$140.000
|
$140.000
|
|
|
NO. OF DAYS MILESTONE 2
|
$/D
|
10,000.000
|
$175.000
|
$1.000
|
$115.000
|
$175.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,900.000
|
$12,500.000
|
$12,000.000
|
|
Totals: |
$5,771,361.800
|
$3,813,979.040
|
$5,874,368.030
|
$6,511,602.500
|